Loading...
HomeMy WebLinkAbout7722RESOLUTION NO. 7722 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT FOR 1995 BIKE TRAIL RECONSTRUCTION, AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, proposals for 1995 BIKE TRAIL RECONSTRUCTION have been received and examined; and WHEREAS, the proposal of Royal T Construction, of Pueblo, Colorado, was the lowest of those bids determined to be responsible; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, COLORADO, that: SECTION 1 A contract for 1995 BIKE TRAIL RECONSTRUCTION be, and the same is hereby awarded to said bidder in the amount of $36,687.13. SECTION 2 The Purchasing Agent be, and he is hereby authorized to execute said contract on behalf of Pueblo, a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. 1 SECTION 3 In addition to the amount of the bid set forth, as aforementioned, an additional amount as stipulated in this section is hereby established for contingencies and additional work. Contingencies and Additional Work --- $3,313.00 SECTION 4. Funds for said project shall be from Account Number 144 - 1995- 40 -0 -40 -1028. INTRODUCED October 10 M John Califano ,1995 Councilperson APPROVEI� President of City Council ATTEST: 1 ity Clerk 2 END PHASE 1 PHASE 1 PHASE 11 45.4 L.F. 8 CQV�" C, O -8, BIKE TRAIL LENGTH = 2,090± L.F. BIKE TRAIL LENGTH = 2,375± L.F. swm - i tI Y — - NoniN �- PUE LO MALL BLVD f REM, k REPL. CONC SUB I T REM. k REPL. CONC SLAB L N .J REM. 2,090.0 LIN.FT. ASPHALT PLAN REM. 196.0 SOFT CONC. N CONST 16,080.0 SOFT 4 ., CONC. N0 `�•" CONST 6370 SO.FT. 8'; THK. CONC. �— CONST 525.0 SO. YD. 4 THK. BASE COURSE SCALE; 1" = 400' RIVER SIDE v a X- SECTION DETAIL NO SCALE HART RD - -_ soun� aa3x _'d'= a� Nanny X SECTION \ No scuE \\ DILLON DR FOUNTAIN RIVER PHASE 11 PHASE 1 �(FU TURE) eKE nrNE END PHASE 1 SEE ABOVE HEREON SAN. SEW. PIPE CRp59NG — — — PIP= CRaSSIiG REM. OUTER _CONC_ SLABS _-�A -- HAFF SCHOOL AO p YAKIMA LN 0 JERRY MURPHY RD BIKE —IL FOU 7,4 /N UN BEG. 3' WOE BASE COURSE BEG. PHASE 1 PIPE m.G .G