HomeMy WebLinkAbout7703RESOLUTION NO. 77o3
A RESOLUTION APPROVING AN AGREEMENT BETWEEN
THE CITY OF PUEBLO, A MUNICIPAL CORPORATION,
AND THE STATE DEPARTMENT OF TRANSPORTATION,
STATE OF COLORADO, FOR FABRICATION AND
INSTALLATION WORK TO PROVIDE HIGH VISIBILITY
REGULATORY SIGNS, METRO STREET SIGNS, AND
THERMOPLASTIC TRAFFIC MARKINGS ON VARIOUS
CORRIDORS WITHIN THE PUEBLO URBAN AREA AND
CONSTRUCTION WORK TO IMPROVE THE SHARPE
CURVE IN THE 1000 -1700 BLOCK OF EAST
NORTHERN AVENUE (PROJECT SHO M086 -015)
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, COLORADO, that
SECTION 1.
The Agreement between the City of Pueblo, a Municipal Corporation, and the
Colorado Transportation Department concerning fabrication and installation work to
provide high visibility regulatory signs, metro street signs and thermoplastic
traffic markings on various corridors within the Pueblo Urban Area and construction
work to improve the sharp curve in the 1000 -1700 block of East Northern Avenue
(Project SHO M086 -015) is hereby approved.
SECTION 2.
The President of the City Council is hereby authorized to execute this
Agreement for and on behalf of the City and the City Clerk is authorized and
directed to attest same and affix the Seal of the City thereto.
Introduced September 11, 1995
By ,john Califano
Councilperson
APP VED. V
ATTEST: President of the City Council
City Cl
Ll e0�,_� /
SHO M086 -015 % _ 2s
PUEBLO CORRIDOR
Region 2 /TDR
CONTRACT
THIS CONTRACT, made this 1 h-th day of _KoVernbe 1995, by and between
the State of Colorado for the use and benefit of THE DEPARTMENT OF TRANSPORTA-
TION, hereinafter referred to as the State, and the CITY OF PUEBLO, P.O. Box 1427,
Pueblo, CO 81002, hereinafter referred to as the Local Agency or as the Contractor,
WHEREAS, authority exists in the law and funds have been budgeted, appropri-
ated and otherwise made available and a sufficient unencumbered balance thereof
remains available for payment of project and Local Agency costs in Fund Number 400,
ORGANIZATION NUMBER 9991, APPROPRIATION CODE 010, PROGRAM 2000, FUNCTION 3301
OBJECT 2311 1 P, REPORTING CATEGORY 2040, ENCUMBRANCE NUMBER 10690 [00] C
ENCUMBRANCE AMOUNT $954,424 AND FUND NUMBER 400, ORGANIZATION NUMBER 9991
APPROPRIATION CODE 010, PROGRAM 2000, FUNCTION 3200, OBJECT 2312 1 P,
REPORTING CATEGORY 2040, ENCUMBRANCE NUMBER 10690 [00] C, ENCUMBRANCE AMOUNT
$122,876.00. (TOTAL CONTRACT ENCUMBRANCE AMOUNT IS $1,077,300.00).
WHEREAS, required approval, clearance and coordination has been accomplished
from and with appropriate agencies; and
WHEREAS, pursuant to Title I, Part A, Section 1007 of the Intermodal Surface
Transportation Efficiency Act of 1991, certain Federal funds have been and will in the
future be, allocated for projects eligible under the Surface Transportation Program,
hereinafter referred to as the program; and
WHEREAS, pursuant to the program, federal -aid funds have been made available
for a project, identified as SHO M086 -015 for fabrication and installation work to provide
high visibility regulatory signs, metro street signs, and thermoplastic traffic markings on
various corridors within the Pueblo urban area and construction work to improve the
sharp curve in the 1000 -1700 block of East Northern Avenue within the City, these
activities hereinafter collectively referred to as "the work" or the "project "; and
WHEREAS, the matching ratio for this federal -aid project is 90% federal -aid funds
to 10% Local Agency funds, it being understood that such ratio applies only to such
-1-
costs as are eligible for federal participation, it being further understood that all
non - participating costs are borne by the Local Agency at 100 %; and
WHEREAS, the Local Agency has submitted initial design data to the State
(D.O.H. Form 463), dated May 22, 1995, setting forth therein preliminary details,
information and estimates of cost of this work, which data has been approved'by the
State, and
WHEREAS, the Local Agency has estimated the total cost of the work and is
prepared to provide its share of the cost as evidenced by an appropriate ordinance or
resolution duly passed and adopted by the authorized representatives of the Local
Agency, a copy of which is attached hereto and made a part hereof; and
WHEREAS, said ordinance or resolution also establishes the authority under
which the Local Agency enters into this contract; and
WHEREAS, this contract is executed by the State under authority of Sections
24 -92 -101, et seq., 29 -1 -203, 43 -1 -110, 43 -1 -116, 43- 2- 101(4)(c) and 43 -2 -144, C.R.S., as
amended; and
WHEREAS, the parties hereto desire to agree upon the division of responsibilities
with regard to this project; and
WHEREAS, the Local Agency is prepared to pay all indirect costs and provide its
share of direct costs in the form of "in kind" labor in fabricating and installing the signs,
the fabrication and installation of which are part of the work; and
WHEREAS, the Local Agency estimates that the value of its labor contribution to
be $106,920.00 which exceeds the amount of $105,000.00 that is estimated to be its share
of direct project costs; and
WHEREAS, the Local Agency's proposal to provide "in kind" force labor to cover
its share of direct costs is acceptable to the State and the F.H.W.A.; and
WHEREAS, the Local Agency is adequately staffed and suitably equipped to
undertake and satisfactorily complete portions of the work; and
WHEREAS, the State certifies that such work can be more advantageously
performed by the Local Agency.
NOW, THEREFORE, it is hereby agreed that:
-2-
I. STATE COMMITMENTS
A. The State will provide liaison with the Local Agency through the State's
Region Transportation Director, Region 2, located at 905 Erie Avenue, P.O.
Box 536, Pueblo, Colorado 81002,719-546-5400. Said Region Transportation
Director will also be responsible for issuing the "Notice to Proceed" to the
Local Agency for commencement of the work and for coordinating the
State's activities under this contract.
B. The State will administer Local Agency and federal -aid funds for this
project in accordance with the following provisions. All funds expended
by the State for the performance of any work under this contract or relative
to the administration of this contract shall be charged to this project.
1. Costs incurred by the Local Agency
The State will reimburse the Local Agency for the federal -aide
share of the project charges following the State's review and
approval of such charges. Charges incurred by the Local Agency
prior to the date the Controller approves this project or prior to
Federal Highway Administration (FHWA) authorization for each
phase of this project, will not be charged to the project.
2. Costs incurred by the State
The State will prepare monthly estimates of incurred costs relative
to the project. The State's monthly billings for the Local Agency
share will be based on actual costs. As funds are expended during
the course of the work, the State will bill the Local Agency monthly
for the Local Agency share of such expenditures. Upon completion
of the work to be performed under this contract and acceptance
thereof by the State, FHWA and the Local Agency, the State will
submit a final recapitulation of the project costs to the Local Agency
and a final billing for the balance due of its share of participating
costs plus all non - participating costs. The State will make a good
faith effort to submit the final recapitulation to the Local Agency
-3-
within three months after the project is completed, provided that the
FHWA and the Local Agency furnish written acceptance in a timely
manner.
C. The State will review construction plans, special provisions and estimates
and make those changes necessary to assure compliance with State and
FHWA requirements. The State will afford the Local Agency ample
opportunity to review the construction plans, special provisions and
estimates, as changed and said plans shall be considered final when
approved and accepted by the parties hereto. The final plans are incorpo-
rated herein by this reference.
D. In the event all or part of the construction work is to be contracted, the
State will establish appropriate Disadvantaged Business Enterprise (DBE)
goals for the construction contract(s) and complete CDOT form 719 (DBE
Participation Summary) before the contract is awarded.
E. The State be responsible for independent assurance testing and will
conduct random project quality assurance reviews. The project also will
be subject to periodic inspection by the FHWA.
F. The State will perform a final project inspection prior to project acceptance
as a quality control activity. When all project work has been satisfactorily
completed, the State will sign the FHWA form 1446C and CDOT form 950.
II. LOCAL AGENCY COMMITMENTS
A. The Local Agency will provide:
1. Preliminary engineering that it undertakes (at no cost to the project),
design services, preparation of construction plans, specifications for
roadway work and the purchase of materials, special provisions and
estimates The Local Agency's plans, standards and specifications
shall be in accordance with the applicable published standards of
the American Association of State Highway and Transportation Offi-
cials (AASHTO) as published in A Policy on Geometric Design of
-4-
Highways and Streets, amended to the date of this contract. Said
plans shall include details of any required detours to prevent any
interference of the construction work and to protect the traveling
public and shall conform with current State safety criteria, and shall
be in compliance with all applicable State and federal safety
requirements. All plans produced shall be stamped by a Colorado
registered professional engineer, unless they were prepared by an
employee of the Local Agency who is exempted by Section 12-22 -
103(1)(g) C.R.S., as amended.
2. Design work sheets used in designing the project.
B. The Local Agency will comply with the following:
1. The Local Agency will prepare construction plans in accordance
with the requirements of Engineering Services Section 107, Prepara-
tion of Corlstruction Plans by Local Agency, attached hereto and
made a part hereof.
2. The Local Agency will be responsible for the plans being accurate
and complete and for reproduction of all needed copies of the plans.
C. The Local Agency will comply with the applicable provisions of the State's
approved Action Plan, including all federal directives contained therein by
reference, which may be obtained from CDOT's Department of Environ-
mental Services, 4201 E Arkansas Ave., Denver, CO 80222
D. The Local Agency will be responsible for bidding the construction contract
and may enter into a contract with (a) consultant(s) to do all or any portion
of the proposed preliminary engineering and preparation of construction
plans. In the event that federal -aid funds provided herein are to partici-
pate in the cost of work to be done by (a) consultant(s), the contract(s)
shall comply with the requirements of 23 C.F.R. 172. The contract(s) with
the consultant(s) shall be preceded by an acceptable proposal and may not
be executed or awarded until the selection of the consultant and terms of
the contract shall have been approved by the State and the Federal
-5-
Highway Administration (FHWA). All changes in the contract shall be by
written supplemental agreement and must have prior approval of the State
and FHWA. As soon as the contract with the consultant has been
awarded, one copy of the executed contract shall be submitted to the State.
Any supplemental agreements shall be similarly submitted. The Local
Agency shall ensure that any consultant billings shall comply with the
State's standardized consultant billing format. Examples of the billing
formats for the various methods of contract payment are attached hereto
and made a part hereof.
E. The Local Agency shall be responsible for the right of way plans and
acquisition necessary for the project. Final right of way plans shall be
sealed by a Colorado licensed professional land surveyor and shall be
submitted to the State pursuant to 23 C.F.R. 712.204. Right of way costs
shall be billed separately and shall include a tabulation of all right of way
acquisition and relocation costs by individual ownership as outlined in 23
C.F.R. 710 -305
F. The Local Agency shall perform its project right of way responsibilities in
accordance with the CDOT Right of Way Manual and in compliance with
the requirements of 23 C.F.R. 712. If right of way acquisition and relocation
is required, the Local Agency shall be responsible to perform acquisition
and relocation assistance for the project in compliance with Section
24 -56 -101, et seq., C.R.S. However, if the State determines that such
performance by the Local Agency will jeopardize or is jeopardizing
distribution of federal assistance funds, or that action by the State is
necessary to comply with federal policy or procedures, .then the State, in
its discretion, may perform the acquisition and relocation assistance itself
or may supervise and direct the Local Agency in the performance of such
acquisition and assistance. Prior to taking such action, the State will
provide written notice to the Local Agency of the basis of such determina-
tion or action and will meet with the Local Agency to discuss possible
ff0-
i � a
remedial measures. Prior to this project being advertised for bids, the
Local Agency will certify in writing to the State that all right of way has
been acquired in accordance with the applicable State and Federal
regulations, or that no additional right of way is required.
G. The Local Agency will be responsible for obtaining the proper clearance or
approval from any utility company which may become involved in this
project, by separate agreement between the Local Agency and the utility,
if necessary. Prior to this project being advertised for bids, the Local
Agency will certify in writing to the State that all such clearances have
been obtained.
H. In the event the project involves modification of a railroad company's
facilities at a railroad grade crossing whereby the work is to be accom-
plished by railroad company forces, the Local Agency shall make
application to the Public Utilities Commission requesting its order
providing for the installation of the proposed improvements. Pursuant to
23 C.F.R. the Local Agency shall also establish contact with the railroad
company involved for the purpose of:
1. Executing an agreement setting out what work is to be accom-
plished and the location(s) thereof, and that the costs of the
improvement shall be eligible for Federal participation.
2. Obtaining the railroad's detailed estimate of the cost of the work.
3. Establishing future maintenance responsibilities for the proposed
installation.
4. Prescribing future use or dispositions of the proposed improvements
in the event of abandonment or elimination of the grade crossing.
5. Establishing future repair and /or replacement responsibilities in the
event of accidental destruction or damage to the installation.
I. In the event the Local Agency has engaged a consultant for the design of
a major structure, the Local Agency /consultant contract shall contain the
following:
-7-
t •
1. Upon advertisement for the project for construction, the consultant-
shall make available services as requested by the State to assist the
State in the evaluation of construction and the resolution of
construction problems that may arise during the construction of the
project.
2. The consultant shall review the construction contractor's shop
drawings for this project for conformance with the contract
documents and compliance with the applicable AASHTO stan-
dards.
J. The Local Agency has the option to accept or reject the proposal of the low
bidder for work on which competitive bids have been received. The Local
Agency must declare the acceptance or rejection at the award conference
or within 3 working days after said bids are publicly opened, whichever
occurs later. If the bid is rejected, costs incurred by the State in project
development will not be eligible for participation by the FHWA and must
be reimbursed to the State by the Local Agency. Following award of the
construction contract(s), no further revisions in design data or cost estimate
shall be made except by agreement in writing between the parties. By
indicating its concurrence in such award at the award conference, the Local
Agency acting by or through its duly authorized representatives, agrees to
provide additional funds if required to complete the work under this
project if no additional federal -aid funds will be made available for the
project. The total amount of such additional required funds will be
determined at the time of final billing.
K. The Pre - construction and the Construction Administration Checklists, as
amended, define responsibilities of the parties hereto with respect to the
administration of these aspects of the project. The checklists are attached
hereto and made a part of this contract by this reference.
L. If the Local Agency requests, and the State agrees, that the Local Agency
assume responsibility for administration of the construction of the project,
me
1 f
the Local Agency shall appoint a qualified professional engineer, licensed
in the State of Colorado, as the Local Agency Project Engineer (LAPE).
Such administration shall consist of project inspection and testing;
approving sources of materials; performing required plant and shop
inspections; documentation of contract payments, testing, and inspection
activities; preparing and approving pay estimates; preparing, approving,
and securing the funding for contract modification orders (CMOs) and
minor contract revisions (MCRs); processing contractor claims; and,
meeting the Quality Control (QC) requirements of the FHWA /State
stewardship program.
M. The LAPE shall administer the project in accordance with this agreement,
the requirements of the construction contract, and State procedures. The
LAPE may be an employee of the Local Agency or a consultant. In such
event, notwithstanding Section 12 -25 -103, C.R.S., as amended, the LAPE
shall be in responsible charge of the construction of the project as provided
in Section 12 -25 -102 C.R.S. as amended.
O. The Local Agency will prepare and submit to the State monthly charges for
costs incurred relative to the project. The Local Agency will prepare
project charges in accordance with the State's standard policies, proce-
dures, and standardized billing format attached hereto and made a part
hereof. Charges incurred by the Local Agency prior to the date of Federal
Highway Administration (FHWA) authorization for the project will not be
charged to the project. The Local Agency will advise the CDOT Audit
Division upon completion of their matching requirement.
P. The Local Agency shall maintain all books, documents, papers, accounting
records and other evidence pertaining to costs incurred and to make such
materials available for inspection at all reasonable times during the contract
period and for 3 years from the date of final payment to the Local Agency.
Copies of such records shall be furnished by the Local Agency if requested.
0
Q. During the time that this contract is in force, the City of Pueblo shall
provide CDOT Audit Division copies of their audited financial statements.
If the City of Pueblo does not have audited financial statements, arrange-
ments should be made with the CDOT Audit Division, External Audit
Branch to determine appropriate compensating audit activity. If the City
of Pueblo has multiple contracts with CDOT, the submission of one
audited financial statement to the CDOT Audit Division will suffice for all
contracts in force during the audit period.
R. The Local Agency will maintain and operate the improvements constructed
under this contract, at its own cost and expense during their useful life, in
a manner satisfactory to the State and FHWA, and will make ample
provision for such maintenance each year. Such maintenance and
operations shall be in accordance with all applicable statutes and ordinanc-
es, and regulations promulgated thereunder, which define the Local
Agency's obligation to maintain such improvements. The State and FHWA
will make periodic inspections of the project to verify that such improve-
ments are being adequately maintained.
III. GENERAL PROVISIONS
A. The Local Agency has estimated the total cost of "the work" to be
$1,077,300.00 which is to be funded as follows:
a. Federal participating funds
(90% of $1,050,000.00) $945,000.00
b. Local Agency share:
(1) Local Agency parti-
cipating funds
(10% of $1,050,000.00) $105,000.00
-10-
1
(2) The Local Agency non-
participating funds for
indirect costs incurred
by the Local Agency and /or
the State (2.6% rate) $27,300.00
Subtotal (Local Agency share) $132,300.00
Total Funds
$1,077,300.00
B. The matching ratio for this federal -aid urban system project is 90% federal -aid
funds to 10% Local Agency funds, it being understood that such ratio applies only
to such costs as are eligible for federal participation, it being further understood
that all non - participating costs are borne by the Local Agency at 100 %. The
performance of the work shall be at no cost to the State. If the total actual cost
of performance of the work exceeds $1,050,000.00, and additional federal funds
are made available for the project, the Local Agency shall pay 10% of all such
costs eligible for federal participation and 100% of all non - participating costs. If
the total actual cost of performance of the work is less than $1,077,300.00, then the
amounts of Local Agency and federal -aid funds will be decreased in accordance
with the funding ratio described herein.
C. The maximum amount payable to the Local Agency under this contract shall be
$945,000.00 (100% of the federal funds) less federal funds withheld for State
charges, unless such amount is increased by a written supplemental contract.
Credit for the Local Agency matching funds is limited to not more than 10% of
the total reimbursable costs incurred by the Local Agency.
D. The Local Agency's 10% contribution of $105,000.00 to project costs will be
provided in the form of labor, specifically the City of Pueblo will use its own
labor force to fabricate and install the signage. The Local Agency estimates that
the value of its labor contribution to be $106,920.00 which exceeds the amount of
$105,000.00 that is estimated to be its 10% share of direct project costs. Each bill
from the Local Agency will reflect the total cost incurred by the Local Agency, the
Local Agency's force account (in kind) labor costs to be applied toward the Local
-11-
I 1
I
Agency matching contribution, and the. net federal share being billed. The Local
Agency will make available to the State adequate documentation of its labor
contribution to the project upon request by the State. Should the Local Agency
fail to adequately document its contribution to costs to the State within 30 days
of demand or within such other period as may be agreed between the parties
hereto, the Local Agency agrees that at the request of the State, the State
Treasurer may withhold an equal amount from future apportionments due the
Local Agency from the Highway Users Tax Fund and to pay such funds directly
to the State. Interim funds, until the State is reimbursed, shall be payable from
State Highway Supplementary Fund (400). Local Agency costs provided as their
match will be verified by CDOT audit. The CDOT audit staff will contact the
City of Pueblo to establish the basis for verification of the labor costs to include:
the details of the anticipated cost of the labor of $106,920.00 (match being
$105,000.00) and the accounting process in place to collect the labor costs.
E. Upon execution of this contract the State is authorized, in its discretion, to
perform any necessary administrative support services pursuant to this contract.
These services may be performed prior to and in preparation for any conditions
or requirements of this contract, including prior FHWA approval of project work.
The Local Agency understands and agrees that the State may perform such
services, and that payment for such services shall be at no cost to the State but
shall be as provided herein. At the request of the Local Agency, the State shall
also provide other assistance pursuant to this contract as may be agreed in
writing. In the event that federal -aid project funds remain available for payment,
the Local Agency understands and agrees the costs of any such services and
assistance shall be paid to the State from project funds at the applicable rate.
However, in the event that such funding is not made available or is withdrawn
for this contract, or if the Local Agency terminates this contract prior to project
approval or completion for any reason, then all actual incurred costs of such
services and assistance provided by the State shall be the sole expense of the
-12-
Local. Agency. The Local Agency shall pay. the State for all such. costs within 30
days of receipt of written notice from the State requesting same.
F. It is understood and agreed by the parties hereto that the total cost of the work
stated hereinbefore is the best estimate available based on the design data as
approved at the time of execution of this contract, and that such cost is subject to
revisions agreeable to the parties prior to bid and award.
G. The parties hereto agree that this contract is contingent upon all funds designated
for the project herein being made available from federal and Local Agency
sources. Should these sources, either federal or Local Agency, fail to provide
necessary funds as agreed upon herein, the contract may be terminated by either
party. Any party terminating its interest and obligations herein shall not be
relieved of any financial obligations which existed prior to the effective date of
such termination or which may occur as a result of such termination.
H. Notwithstanding any consents or approvals given by the State for said plans, the
State will not be liable or responsible in any manner for the structural design,
details or construction of any major structures that are designed within the work
of this contract.
I. Because the Local Agency will use force account labor to cover its share of
participating costs as hereinabove specified., the Local Agency will ensure that all
work is accomplished in accordance with the pertinent State specifications as well
as FAPG, Title 23, Chapter I, Sub - chapter B, Part 635, Sub -part B, Force Account
Construction. Work will normally be based upon estimated quantities and firm
unit prices agreed to between the Local Agency, the State and the F.H.W.A. in
advance of the work, as provided for in FAPG, Title 23, Chapter I, Sub - chapter
B, Part 635, Sub -part B, Section 635.204(c). Such agreed unit prices shall constitute
a commitment as to the value of the work to be performed. It may be agreed to
participate in the work based on actual costs of labor, equipment rental, materials
supplies and supervision necessary to complete the work. Where actual costs are
used, eligibility of cost items shall be evaluated for compliance with Federal
Procurement Regulations Part 1 -15. Rental rates for publicly owned equipment
-13-
i I
will be determined in accordance with Section 109.04 of the State's "Standard
Specifications for Road and Bridge Construction ". All force account work shall
have prior approval of the FHWA and shall not be initiated until the State has
issued a written notice to proceed. The Local Agency shall, during all phases of
the work, permit duly authorized agents and employees of the State and the
FHWA to inspect the project and to inspect, review and audit the project records.
J. The term of this contract, except for the provisions regarding maintenance, shall
continue through the completion and final acceptance of this project by the State,
FHWA and Local Agency. The covenants with regard to maintenance of the
improvements constructed under this contract shall remain in effect in perpetuity
or until such time as the Local Agency is, by law or otherwise, relieved of such
responsibility.
K. During the performance of all work under this contract, the parties hereto agree
to comply with Title VI, of the Civil Rights Act of 1964, the salient points of
which are shown in the Non - Discrimination Provisions attached hereto and made
a part hereof.
L. The Special Provisions, Appendix B, Attachment LO and Engineering Services
Section 107 requirements form are attached hereto are hereby made a part of this
contract.
M. The Local Agency shall comply with applicable federal requirements in its
performance of the work and /or to any procurement of the work, under this
federally funded contract. Such requirements include Title 49, Code of Federal
Regulations, Part 18 ( "The Common Rule "), specifically 49 C.F.R. 18.36 regarding
procurement and 49 C.F.R. 18.36(1) regarding required contract provisions. The
specific provisions in 49 C.F.R. 18.36(i) containing federal statutory and regulatory
citations are incorporated herein by this reference as provisions of this contract
as though fully set forth. Further, the Local Agency shall include the language
of this paragraph verbatim in any subcontract(s) for the work, in order to comply
with 18.36(i) and to ensure subcontractor compliance with applicable federal
-14-
requirements. In the event of a conflict between 49 C.F.R. 18 and the provisions
of this contract, the provisions of 49 C.F.R. 18 shall control.
N. The Local Agency shall comply with the applicable requirements of attached
FWHA Form -1273 and shall ensure that any contracted or subcontracted portions
of the construction work include by attachment FHWA Form -1273 as terms and
conditions of the contract(s).
O. This Contract may be terminated as follows:
(1) Termination for Cause If, through any cause, the Local Agency
fails to fulfill in a timely and proper manner all obligations under
this contract, or if the Local Agency violates any of the covenants,
agreements, or stipulations under this contract, the State shall
thereupon have the right to terminate this contract for cause by
giving written notice to the Local Agency of such termination and
specifying the effective date thereof, at least five (5) days before the
effective date of such termination. In that event, all finished and
unfinished documents, data, studies, surveys, drawings, maps,
models, photographs, and reports or other material prepared by the
Local Agency under this contract shall, at the option of the State,
become its property, and the Local Agency shall be entitled to
receive just and equitable compensation for any satisfactory services
completed on such documents and other materials. Notwithstand-
ing the above, the Local Agency shall not be relieved of liability to
the State for any damages sustained by the State by virtue of any
breach of the contract by the Local Agency, and the State may
withhold any payments to the Local Agency for the purpose of
setoff until such time as the exact amount of damages due the State
from the Local Agency is determined.
(2) Termination for Convenience State may cancel upon thirty (30)
day written notice to the Local Agency. The State shall effect such
termination by giving written notice of the termination to the Local
-15-
Agency and_specifying the effective date thereof, at least thirty (30)
days before the effective date of such termination. In that event, all
finished or unfinished documents and other materials as described
in the previous paragraph shall, at the option of the State, become
its property. If the contract is terminated by the State as provided
herein, the Local Agency will be paid an amount which bears the
same ratio to the total compensation as the services actually
performed bear to the total services of the Local Agency covered by
this contract, less payments of compensation previously made;
provided, however, that is less than sixty percent (60 %) of the
services covered by this contract have been performed upon the
effective date of such termination, the Local Agency shall be reim-
bursed (in addition to the above payment) for that portion of the
actual out -of- pocket expenses (not otherwise reimbursed under this
contract) incurred by the Local Agency during the contract period
which are directly attributable to the incomplete portion of the
services covered by this contract. If this contract is terminated due
to the fault of the Local Agency the previous paragraph shall apply.
(3) Termination Due to Loss of Funding (Federal Funds)
The parties hereto expressly recognize that the Local Agency is to
be paid, reimbursed, or otherwise compensated with federal funds
provided to the State for the purpose of contracting for the services
provided for herein, and therefore, the Local Agency expressly
understands and agrees that all its rights, demands, and claims to
compensation arising under this contract are contingent upon
receipt of such funds by the State. In the event that such funds or
any part thereof are not received by the State, or are withdrawn
before completion of the work, the State may immediately terminate
or amend this contract.
-16
P. To the extent that this contract may be executed and performance of the
obligations of the parties may be accomplished within the intent of the
contract, the terms of this contract are severable, and should any term or
provision hereof be declared invalid or become inoperative for any reason,
such invalidity or failure shall not affect the validity of any other term or
provision hereof. The waiver of any breach of a term hereof shall not be
construed as a waiver of any other term, or the same term upon subse-
quent breach.
Q. This contract is intended as the complete integration of all understandings
between the parties. No prior or contemporaneous addition deletion, or
other amendment hereto shall have any force or effect whatsoever, unless
embodied herein by writing. No subsequent novation, renewal, addition,
deletion or other amendment hereto shall have any force or effect unless
embodied in a written contract executed and approved pursuant to the
State Fiscal Rules.
R. This contract shall inure to the benefit of and be binding upon the parties,
their successors, and assigns.
S. The Local Agency represents and warrants that it has taken all actions that
are necessary or required by internal procedures and bylaws, and
applicable law, to properly authorize the undersigned signatory for the
Local Agency to lawfully execute this contract on behalf of the Local
Agency and to bind the Local Agency to its terms.
-17-
IN WITNESS WHEREOF, the parties hereto have executed this contract the day
and year first above written.
ATTEST:
STATE OF COLORADO
ROY ROMER, GOVERNOR
By (AJ
Chief Clerk cutive 15irector
DEPARTMENT OF TRANSPORTATION
CLIFFORD W. HALL
State Controller
A'.
B
Title City Clerk
APPROVED:
GALE A. NORTON
Attorney General
By
BARRY B. RY N
Assistant Attorney General
Natural Resources Section
CITY OF PUEBLO
COLORADO
B
Title President of theCoun
FFI AI 44 $'16 000 6 «
so
-U D E O
D
City of Pueblo
I, Gina Dutcher, City Clerk of the City of Pueblo, Colorado, do hereby certify that
the attached is a true and correct copy of Resolution No. 7703, adopted by the City
Council of Pueblo on September 11, 1995, and that I am entrusted with the safekeeping of
the original.
IN WITNESS WHEREOF, I have hereunto set my hand and affixed the Seal of the City of
Pueblo, Colorado, this 19th day of September, 1995.
City ACIierki ..........................................
(S E A Q
OFFICE OF CITY CLERK
P.O. Box 1427 Pueblo, Colorado 81002 (719) 584.0840
I 7
APRIL 1980
Nondiscrimination Provisions:
In compliance with Title VI of the Civil Rights Act of 1964 and with Section 162(a) of the
Federal Aid Highway Act of 1973, the Contractor, for itself, its assignees and successors
in interest, agree as follows:
A. Comuliance with Regulations. The Contractor will comply with the Regulations
of the Department of Transportation relative to nondiscrimination in Federally
assisted programs of the Department of Transportation (Title 49, Code of Federal
Regulations, Part 21, hereinafter referred to as the "Regulations "), which are herein
incorporated by reference and made a part of this contract.
B. Nondiscrimination. The Contractor, with regard to the work performed by it after
award and prior to completion of the contract work, will not discriminate on the
ground of race, color, sex, mental or physical handicap or national origin in the
selection and retention of Subcontractors, including procurement of materials and
leases of equipment. The Contractor will not participate either directly or
indirectly in the discrimination prohibited by Section 21.5 of the Regulations,
including employment practices when the contract covers a program set forth in
Appendix C of the Regulations.
C. Solicitations for Subcontracts, Including Procurement of Materials and Equipment.
In all solicitations either by competitive bidding or negotiation made by the
Contractor for work to be performed under a subcontract, including procurement
of materials or equipment, each potential Subcontractor or supplier shall be
notified by the Contractor of the Contractor's obligations under this contract and
the Regulations relative to nondiscrimination on the ground of race, color, sex,
metal or physical handicap or national origin.
D. Information and Reports. The Contractor will provide all information and reports
required by the Regulations, or orders and instructions issued pursuant thereto
and will permit access to its books, records, accounts, other sources of information
and its facilities as may be determined by the State or the FHWA to be pertinent
to ascertain compliance with such Regulations, orders and instructions. Where
any information required of the Contractor is in the exclusive possession of
another who fails or refuses to furnish this information, the Contractor shall so
certify to the State, or the FHWA as appropriate and shall set forth what efforts
have been made to obtain the information.
page 1 of 2 pages
E. Sanctions for Noncompliance. In the event of the Contractor's noncompliance
with the nondiscrimination provisions of this contract, the State shall impose such
contract sanctions as it or the FHWA may determine to be appropriate, including,
but not limited to:
(1) Withholding of payments to the Contractor under the contract until the
Contractor complies, and /or;
(2) Cancellation, termination or suspension of the contract, in whole or in part.
F. Incorporation of Provisions. The Contractor will include the provisions of
paragraphs A through F in every subcontract, including procurement of materials
and leases of equipment, unless exempt by the Regulations, orders, or instructions
issued pursuant thereto. The Contractor will take such action with respect to any
subcontract or procurement as the State or the FHWA may direct as a means of
enforcing such provisions including sanctions for noncompliance; provided,
however, that, in the event the Contractor becomes involved in, or is threatened
with, litigation with a Subcontractor or supplier as a result of such direction, the
Contractor may request the State to enter into such litigation to protect the
interest of the State and in addition, the Contractor may request the FHWA to
enter into such litigation to protect the interests of the United States.
page 2 of 2 pages
t �
SPECIAL PROVISIONS
CONTROLLER'S APPROVAL
1. This contract shall not he deemed valid until it shall have been approved by the Controller of the State of Colorado or such assistant as he may designate. This
provision is applicable to any contract involving the payment of money by the State.
FUND AVAILABILITY
2. Financial obligations of the State of Colorado payable after the current fiscal year are contingent upon funds for that purpose being appropriated, budgeted
and otherwise made available.
BOND REQUIREMENT
3. If this contract involves the payment of more than fifty thousand dollars for the construction, erection, repair, maintenance, or improvement of any building,
road, bridge, viaduct, tunnel, excavation or other public work for this State, the contractor shall, before entering upon the performance of any such work included
in this contract, duly execute and deliver to the State official who will sign the contract, a good and sufficient bond or other acceptable surety to be approved by
said official in a penal sum not less than one -half of the total amount payable by the terms of this contract. Such bond shall be duly executed by a qualified corporate
surety conditioned upon the faithful performance of the contract and in addition, shall provide that if the contractor or his subcontractors fail to duly pay for any
labor, materials, team hire, sustenance, provisions, provendor or other supplies used or consumed by such contractor or his subcontractor in performance of the work
contracted to be done or fails to pay any person who supplies rental machinery, tools, or equipment in the prosecution of the work the surety will pay the same in
an amount not exceeding the sum specified in the bond, together with interest at the rate of eight per cent per annum. Unless such bond is executed, delivered and
filed, no claim in favor of the contractor arising under such contract shall be audited, allowed or paid. A certified or cashier's check or a bank money order payable
to the Treasurer of the State of Colorado may be accepted in lieu of a bond. This provision is in compliance with CRS 38 -26 -106.
INDEMNIFICATION
4. To the extent authorized by law, the contractor shall indemnify, save, and hold harmless the State, its employees and agents, against any and all claims,
damages, liability and court awards including costs, expenses, and attorney fees incurred as a result of any act or omission by the contractor, or its employees,
agents, subcontractors, or assignees pursuant to the terms of this contract.
DISCRIMINATION AND AFFIRMATIVE ACTION
5. The contractor agrees to comply with the letter and spirit of the Colorado Antidiscrimination Act of 1957, as amended, and other applicable law respecting
discrimination and unfair employment practices (CRS 24- 34-402). and as requited by Executive Order, Equal Opportunity and Affirmative Action, dated April 16,
1975. Pursuant thereto, the following provisions shall be contained in all State contracts or sub- contracts.
During the performance of this contract, the contractor agrees as follows:
(a) The contractor will not discriminate against any employee or applicant for employment because of race, creed, color, national origin, sex,
marital status, religion, ancestry, mental or physical handicap, or age. The contractor will take affirmative action to insure that applicants are employed, and that
employees are treated during employment, without regard to the above mentioned characteristics. Stich action shall include, but not be limited to the following:
employment upgrading, demotion, or transfer, recruitment or recruitment advertisings; lay -offs or terminations; rates of pay or other forms of compensation; and
selection for training, including apprenticeship. The contractor agrees to post in conspicuous places, available to employees and applicants for employment,
notices to be provided by the contracting officer setting forth provisions of this non - discrimination clause.
(b) The contractor will, in all solicitations or advertisements for employees placed by or on behalf of the contractor, state that all qualified applicants will
receive consideration for employment without regard to race, creed, color, national origin, sex, marital status, religion, ancestry, mental or physical handicap,
or age.
(c) The contractor will send to each labor union or representative of workers with which he has a collective bargaining agreement or other contract or
understanding, notice to be provided by the contracting officer, advising the labor union or workers' representative of the contractor's commitment under the
Executive Order, Equal Opportunity and Affirmative Action, dated April 16. 1975, and of the rules, regulations, and relevant Orders of the Governor.
(d) The contractor and labor unions will furnish all information and reports required by Executive Order, Equal Opportunity and Affirmative Action of April
16, 1975, and by the rules, regulations and Orders of the Governor_ or pursuant thereto, and will permit access to his books, records, and accounts by the
contracting agency and the office of the Governor or his designee for purposes of investigation to ascertain compliance with such rules, regulations and orders.
(e) A labor organization will not exclude any individual otherwise qualified from full membership rights in such labor organization, or expel any such individual
from membership in such labor organization or discriminate against any of its members in the full enjoyment of work opportunity because of race, creed, color,
sex, national origin, or ancestry.
(f) A labor organization. or the employees or members thereof will not aid, abet, incite, compel or coerce the doing of any act defined in this contract to be
discriminatory or obstruct or prevent any person from complying with the provisions of this contract or any order issued thereunder: or attempt, either directly
or indirectly, to commit any act defined in this contract to be discriminatory.
Form 6- AC -02B
Revised 1/93
395 -53 -01 -1022
P , ige 1 of 2 Page,
APPENDIX B
DISADVANTAGED BUSINESS ENTERPRISE (DBE)
SECTION 1. Policy.
It is the policy of the Colorado Department of Transportation that
disadvantaged business enterprises as defined in 49 CFR Part 23
shall have the maximum opportunity to participate in the
performance of contracts financed in whole or in part with Federal
funds under this agreement. Consequently, the DBE requirements of
49 CFR Part 23 apply to this agreement.
SECTION 2. DBE Obligation.
The recipient or its contractor agrees to ensure that disadvantaged
business enterprises as defined in 49 CFR Part 23 have the maximum
opportunity to participate in the performance of contracts and
subcontracts financed in whole or in part with Federal funds
provided under this agreement. In this regard all recipients or
contractors shall take all necessary and reasonable steps in
accordance with 49 CFR Part 23 to ensure that disadvantaged
business enterprises have the maximum opportunity to compete for
and perform contracts. Recipients and their contractors shall not
discriminate on the basis of race, color, national origin, or sex
in the award and performance of CDOT assisted contracts.
SECTION 3. DBE Program.
The contractor (subrecipient) shall be responsible for obtaining
the Disadvantaged Business Enterprise Program of the Colorado
Department of Transportation, 1988, as amended, and shall comply
with the applicable provisions of the program.
A copy of the DBE Program is available from:
Staff Construction Engineer
Colorado Department of Transportation
4201 East Arkansas Avenue, Room 287
Denver CO 80222 -3400
Phone: (303)757 -9231
and will be mailed to the contractor upon request.
Rev. 5/86
DEPARTMENT OF HIGHWAYS
DIVISION OF HIGHWAYS
STATE OF COLORADO
ENGINEERING SERVICES
SECTION 107
PREPARATION OF CONSTRUCTION PLANS BY LOCAL AGENCY
107.1 All plans shall be in accordance with the Department of
Highways Drafting Manual. (Copies available through
Department of Highways, Staff Design Branch or Bid Plans,
Room 117).
107.2 The State will prepare permanent type polyester reproductions
of original drawings at a nominal charge when requested by
the Local Agency.
107.3 The Local Agency may, at its option, purchase approved
standard size sheets from the State. The purchase price of
such materials shall be the actual cost as incurred by the
State.
The following approved standard size sheets measuring 22
inches by 34 inches with rectangular border of 20 inches by
31 -1/2 inches for the working drawing's, are normally
available from current State inventories.
DOH
FORM
NO. TITLE COMPOSITION
113 Summary of Approximate Quantities * Mylar
125 Structure Quantities Mylar
126 Blanket Sheet Mylar
134 Plan and Profile Mylar
146 Cross Section Vellum
* Accepted trade name for polyester film
107.4 The State will prepare the title sheet for the final
construction plans. The title sheet will be made available
for Local Agency use upon request of the Local Agency. The
cost incurred by the State for preparation of the title sheet
will be charged to the project.
PRE - CONSTRUCTION ADMINISTRATION CHECKLIST
Region: 2 SubAccount #: to ( o
Local Agency: T'Je b1, Project #: S u v m vie d i
Design Project Manager: 701 1Ier Location: PJ ebi o Cgrr �,I o�
Resident Engineer vN rO Description:
The following checklist shall be utilized to establish. the PRE -
CONSTRUCTION ADMINISTRATION CHECKLIST responsibilities of the
individual parties to this agreement.
RESPONSIBLE PARTY
8. Environmental Processes . . . . . . . . .
9. Design Approval . . . . . . . . . . . . .
10.. Force Account Justification . . . . . . .
11. Proprietary Item Justification . . . . . .
12. Davis -Bacon Wage Rates . . . . _ . . . . _
13. Design Exceptions . . . . . . . . . . . .
14. Rights -of -Way . . . . . . . . . . . . . .
15. Plans, Specifications, and Construction
Cost Estimates . . . . . . . . . . . . . .
16. EEO /DBE Requirements . . . . . . . . . . _
U
X
X
CDOT
N_
X*
a
X— _ I Ad/
4k —
X*
LOCAL
NO.
DESCRIPTION OF TASK
AGENCY
1.
Transportation Improvement Program
(T.I.P.) X
2.
Design Data (CDOT 463) . . . . . .
. . . . X
3.
Funding Authorization . . . . . . .
. . .
4.
LPA /CDOT Project Agreement
X
5.
Utility, Railroad, and Consultant
Agreements . . . . . . . . . . . .
. . . .
6.
Consultant Selection . . . . . . .
. .
7.
Public Hearings . . . . . . . . .
. . . . .
8. Environmental Processes . . . . . . . . .
9. Design Approval . . . . . . . . . . . . .
10.. Force Account Justification . . . . . . .
11. Proprietary Item Justification . . . . . .
12. Davis -Bacon Wage Rates . . . . _ . . . . _
13. Design Exceptions . . . . . . . . . . . .
14. Rights -of -Way . . . . . . . . . . . . . .
15. Plans, Specifications, and Construction
Cost Estimates . . . . . . . . . . . . . .
16. EEO /DBE Requirements . . . . . . . . . . _
U
X
X
CDOT
N_
X*
a
X— _ I Ad/
4k —
X*
PRE - CONSTRUCTION ADMINISTRATION CHECKLIST
Page 2
RESPONSIBLE PARTY
LOCAL CDOT
AGENCY
17. Advertising Less Than Three Weeks
18. LPA Ad and Award . . . . . . . . . . . . . X Alp)
19. Construction Administration . . . . . . . . 1 /1_
Preliminary Checklist
Revised Checklist
Final Checklist
Date •
Date:
Date
* Requires FHWA concurrence/ involvement _
03/08/95
CONSTRUCTION CONTRACT ADMINISTRATION CHECK LIST
Region:
Local Agency:
Design Project Manager:
Resident Engineer:
Project Code (SA #) : /Okjo
Project No.:
Location:
Description:
The following check list shall be utilized to establish the CONSTRUCTION
CONTRACT ADMINISTRATION responsibilities of the individual parties to this
agreement.
THE CHECK LIST MAY BE INCORPORATED INTO THE ENTITY AGREEMENT AT PROJECT
INCEPTION.
THE CHECK LIST SHALL BE PREPARED BY PLACING A X UNDER THE RESPONSIBLE
AGENCY, OPPOSITE EACH OF THE TASKS LISTED BELOW.
WHEN NEITHER CDOT OR THE LOCAL AGENCY WILL BE RESPONSIBLE FOR A PARTICULAR
TASK, NON- APPLICABLE (NA) SHALL BE PLACED UNDER BOTH AGENCIES AND AN
EXPLANATION OF WHY NEITHER AGENCY IS RESPONSIBLE SHALL BE INCLUDED.
TASKS THAT WILL BE PERFORMED BYHHEADQUARTERS STAFF WILL SO INDICATE.
THE REGIONS, IN ACCORDANCE WITH ESTABLISHED POLICIES AND PROCEDURES WHEN
APPLICABLE, SHALL DETERMINE WHO SHALL PERFORM ALL OTHER TASKS THAT ARE THE
RESPONSIBILITY OF CDOT.
THE PROJECT MANAGER SHALL NOTIFY THE APPROPRIATE RESIDENT OF FINAL
INSPECTION REVIEWS (F.I.R.) AND FINAL OFFICE REVIEWS (F.O.R.) FOR ALL LOCAL
AGENCY PROJECTS.
IF A CHECK LIST WAS NOT INCORPORATED INTO THE ORIGINAL PROJECT AGREEMENT OR
THE CONSTRUCTION CONTRACT ADMINISTRATION RESPONSIBILITIES HAVE CHANGED THE
FOLLOWING PROCEDURES SHALL BE USED.
A preliminary check list shall be prepared, by the Project Manager, prior
to the F.I.R. and submitted to the Region Construction Engineer (RCE) with
the F.I.R notice. If Contract Administration responsibilities are changed
after the F.I.R., the Project Manager, shall prepare a revised check list
and submit a copy to the RCE. The Project Manager shall prepare the FINAL
check list prior to the F.O.R. and submit copies to all persons receiving
the F.O.R. notice.
v PRELIMINARY CHECK LIST - DATE
REVISED CHECK LIST - DATE
FINAL CHECK LIST - DATE
10/12/94
CONTRACT ADMINISTRATION CHECK LIST
PAGE 2
NO, DESCRIPTION OF TASK
1. Set Disadvantaged Business Enterprise . . . . . . .
(DBE) goals for the project. (CDOT Region EEO
Representative.)
2. Set On Job Training (OJT) goals for the . . . . . .
project. (CDOT Region EEO Representative)
3. Assure that the correct Federal Wage Decisions, . .
all required DBE /OJT Special Provisions and the FHWA
Form 1273 are include in the Contract documents.
(CDOT Region Design Project Manager.)
4. Advertise for bids /open bids. . . . . . . . . . . . _1,
(CDOT Agreements and Consultant Management Office,
Division of Human Resources and Administration,
when CDOT is responsible)
5. Distribute "bid set" of plans and specifications. 1 �4_
to the person responsible for showing the project.
(CDOT Printing and Visual Communications Center,
Division of Human Resources and Administration
when CDOT is responsible)
6. Review work site and.plan details with prospective
bidders while project is under advertisement.
X
X
7. Determine compliance with DBE requirements
before the Contract is awarded:
Nl
a. Check CDOT Form 715s (Certification of. �
Proposed DBE Participation) -when the low
bidder meets DBE goals. (CDOT Business
Development Office, 755 -9234, Room #287,
Division of Human Resources and Administration)
RESPONSIBLE PARTY
LOCAL
AGENCY D T
� A
10/12/94
c i ,
CONTRACT ADMINISTRATION CHECK LIST
PAGE 3
RESPONSIBLE PARTY
LOCAL
NO. DESCRIPTION OF TASK AGENCY, D T
b. Evaluate CDOT Form 718 (DBE Good. . . . . . . X
Faith Effort Documentation) and determine
if the Contractor has made a good faith
effort when the low bidder does not meet
DBE goals. (CDOT Business Development Office,
757 -9234, Room #287, Division of Human
Resources and Administration)
C. Approve /disapprove award of Contract by. . . . X- X
completing CDOT Form 719 (DBE Participation
Summary). THIS FORM MUST BE COMPLETED BEFORE
THE CONTRACT IS AWARDED, (CDOT Business
Development Office, 757 -9234, Room #287,
Division of Human Resources and Administration)
8. Approve rejection of low bidder . . . . . . . .
9. Award Contract . . .
(CDOT Agreements and Consultant Management Office,
Division of Human Resources and Administration when
CDOT is responsible)
10. Distribute "award set" of plans and specifications. X
to CDOT Region Construction Engineer, CDOT Staff
Construction, CDOT Staff Materials and the CDOT
Region Materials Engineer. (CDOT Printing and
Visual Communications Center, Division of Human
Resources and Administration when CDOT is
responsible)
11. Issue notice to proceed to the Contractor . . . . .
(CDOT Agreements and Consultant Management Office,
Division of Human Resources and Administration when
CDOT is responsible)
10/12/94
CONTRACT ADMINISTRATION CHECK LIST
PAGE 4
NO.
12.
DESCRIPTION OF TASK
Conferences:
RESPONSIBLE PARTY
LOCAL
AGENCY • D T
13.
a. Preconstruction . . . . . . . . . . . . . . . .
b. HBP prepaving . . . . . . . . . . . . . . . .
C. Structural concrete prepour. . . . . . . . . .
d. Concrete pavement prepaving. . . . . . . . . . x
e. Presurvey:
(1) Construction staking. . . . . . . . . . . �(
(2) Monumentation . . . . . . . . . . . . . . X
Supervision of construction:
a. Professional Engineer (PE) who will be "in X
responsible charge of construction supervision ".
Loca�Agency or CDOT PE Phone number
b. Develop and distribute public notice of. . . . X
planned construction to the media and
local residents.
C. Competent, experienced, staff that will
complete the following tasks and ensure that
the Contract work is constructed in accordance
with appropriate Federal Highway Administration
(FHWA) and CDOT policies and procedures:
(Refer to the CDOT Procedural Directives and
the following CDOT Operating Manuals for
guidance and assistance - CDOT Construction
Manual, CDOT Field Materials Manual, CDOT
Survey Manual, CDOT Davis Bacon Manual.)
10/12/94
CONTRACT ADMINISTRATION CHECK LIST
PAGE 5
NO. DESCRIPTION OF TASK
( 1) CDOT Form 205 (Sublet Permit
Application):
(a) Check CDOT Form 713 (Contractor .
DBE Subcontractor, Supply and
Service Contract Statement). Sign
Form 205 if Form 713 is complete.
(CDOT Region EEO Representative)
(b) Check, sign and approve Form 205 .
after Form 713 has been approved
by the Region EEO Representative.
RESPONSIBLE PARTY
LOCAL
AGENCY D T
. DC
( Construction inspection including
calculations, measurements, and
documentation of interim and final pay
quantities.
( 3) Conduct Contractor /Subcontractors. . . . X
reviews to ensure conformance with the
Equal Employment Opportunity (EEO) /Affirmative
Action (AA) /DBE /OJT requirements contained in the
Contract. (Standard Special Provisions,
Project Special Provisions and
FHWA Form 1273.)
( 4) Notify CDOT Region EEO Representative
and request assistance for all DBE /OJT
questions or concerns.
( 5) Complete and submit to the CDOT Region.
EEO Representative, CDOT Form 280 (Equal
Employment Opportunity and Labor
Compliance Verification).
( 6) Monitor DBE participation to ensure . . X
compliance with the "Commercially Useful
Function" requirements.
10/12/94
CONTRACT ADMINISTRATION CHECK LIST
PAGE 6
RESPONSIBLE PARTY
LOCAL
NO._ DESCRIPTION OF TASK AGENCY CDOT
( 7) Complete and submit to the CDOT Region.
EEO Representative, CDOT Form 200 (OJT
Training Questionnaire), when project
contains OJTs.
( 8) Check certified payrolls to verify. . . . x
that Contractor /subcontractors are
in compliance with Contract
requirements.
( 9) Coordinate submittals by Contractor . . . x
and all subcontractors of FHWA
Form 1391 (Highway Construction
Contractor's Annual EEO Report) to
the CDOT Region EEO Representative.
The Report is due.in Staff Construction
on August 20 for all active construction
projects.
(10) Materials:
(a) CDOT Form 250 (Materials
Documentation Record):
i) Fill out and distribute. . . .
CDOT Form 250 before the
Contractor commences work.
(CDOT Staff Materials
Branch when CDOT is
responsible)
ii) Complete Form 250 after work. x
is completed distribute
per instructions in CDOT
Materials Manual.
10/12/94
CONTRACT ADMINISTRATION CHECK LIST
PAGE 7
RESPONSIBLE PARTY
DESCRIPTION
OF TASK
A EN Y, DOT
(b) Approve changes to typical section
�(
(c) Design mix approvals:
1) Concrete . . . . . . . . . . . ._
2) Hot Bituminous Pavement (HBP)
X
(d) Acceptance of manufactured products.
X
(e) Inspecting fabrication of. . . . . .
structural steel.
NlA
(f) Inspecting fabrication of. . . . . .
bearing devices.
(g) Process control testing. . . . . . .
X
(h) Acceptance testing . . . . . . . . .
X
(i) Independent assurance testing...
X.
(Region Materials Laboratory)
(11)
Approving sources of materials. . . . . .
A—
(12)
Approve shop drawings . . . . . . . . . .
(13)
Approve traffic signal equipment. . . . .
(14)
Construction surveying. . . . . . . . . .
(15)
R.O.W. monumentation.
.
(16)
Prepare, approve and sign . . . . . . . .
_ZC
vouchers for interim and final
Contractor pay estimates.
(17)
Prepare, approve and sign . . . . . . . .
vouchers for interim and final
Utility Company billings for utility
relocation work.
10/12/94
CONTRACT ADMINISTRATION CHECK LIST
PAGE 8
RESPONSIBLE PARTY
Nom. DESCRIPTION OF TASK AGENCY D T
(18) Prepare and authorize CDOT Form . . . . .
94 (Minor Contract Revisions) (MCRs)
and CDOT Form 90 (Contrast Modification
Orders) (CMOs)
(19) Approve MCRs and CMOs . . . . . . . . . .
(20) Approve Federal -aid funding for . . . . .
MCRs /CMOs.
(21) Monitor project financial status by
preparing CDOT Form 65 (Project Financial
Status Report).
(22) Prepare and submit monthly. . . . . . . .
progress reports to the Region
Construction Engineer. CDOT Form 110
(Status of Active Construction Projects),
and CDOT Form 517 (Status of
Construction Project Finals)
(23) Contractor claims /dispute resolution. . .
Local Agency must follow CDOT procedures
unless Section 105.17 of the Standard
Specifications is modified by a Project
Special Provision.
14. Make monthly progress and final payments. . . . . .
to the Contractor for completed work. (CDOT.
Center for Accounting, Division of Human Resources
and Administration when CDOT is responsible)
15. Make monthly progress and final payments to x
Utility Companies for completed utility
relocation work. (CDOT Center for Accounting,
Division of Human Resources and Administration
when CDOT is responsible)
10/12/94
CONTRACT ADMINISTRATION CHECK LIST
PAGE 9
RESPONSIBLE PARTY
LOCAL
NO. DESCRIPTION OF TASK AGENCY, D T
16. Accomplish Certification Acceptance (CA) . . . . . . x
requirements by conducting routine, random,
project reviews to ensure that the project
is being administered in accordance with
the terms of the construction Contract and
the approved project specific agreement
between CDOT and the local agency.
Provide the name and phone number of the person
responsible for this task.
Name of LA or CDOT person Phone Number'
17. Joint FHWA /CDOT Quality Assurance (QA) Review . . .
Teams will conduct random project reviews in
accordance with CDOT's Stewardship Program.
(Staff Construction Branch)
18. Final project acceptance, write final project . . . _
acceptance letter and distribute per procedures
in the Construction Manual.
19. Conduct final project inspection, complete and X
submit FHWA Form 1446C (Final Acceptance Report).
20. Advertise for final settlement. (CDOT Staff. . . .
Construction when CDOT is responsible)
21. Prepare and distribute
final "as constructed" plans.
22. Check final quantities, final plans and . . . . . .
the final estimate.
23. Sign final estimate sheets and . . . . x
24. Check material certifications . . . . . . . . . . .
10/12/94
7
CONTRACT ADMINISTRATION CHECK LIST
PAGE 10
RESPONSIBLE PARTY
LOCA
NO. DESCRIPTION OF TASK AGENCY D T
25. Sign final materials certification . . . . . . . .
26. Obtain CDOT Form 17s - Contractor DBE Payment . . .
Certification from the Contractor and submit
to Staff Construction.
27. Obtain FHWA Form PR 47 from the Contractor, check
and then.submit to-Staff Construction. (REQUIRED
ONLY ON NHS PROJECTS EXCEEDING $1,000,000.)
28. Complete and submit CDOT Form 9_�_(Project Closure).
29. Retain project records. . . . . . . . . . . .
10/12/94
EXAMPLE A (Lump Sum Contracts)
Company Name:
Project No.
Address:
Project Location
Employer (FEIN) ID Number:
Subaccount No.
Invoice Number and Date:
Progress Report Dated:
% Completed: (1)
Current Billing Period: From: To:
BASIC AND / OR SUPPLEMENTAL CONTRACT TOTAL: (
$
Total Billed to Date:
$
Less: Retainage (10% of billing not to exceed 5% of contract)
$
Less: Prior Payments:
$
Prior Billing : $ Less Retainage:
$
TOTAL CURRENT PAYMENT REQUEST: *
$
(% To Date of DBE Work: )
I certify that the billed amounts are in agreement with the contract terms:
Signature - - Title
% Completed x Contract Total = Total Curent Payment Request
(1) X (2)
Date
EXAMPLE B (Cost Plus Fixed Fee Contracts)
Company Name:
Project No.
Address:
Employer (FEIN) ID Number:
Project Location
Invoice Number and Date:
Progress Report Dated:
Subaccount No.
% Completed:
BASIC AND/ OR SUPPLEMENTAL CONTRACT TOTAL $
Prior Period Billing Amount: $
Current Billing Period: From: To:
DIRECT LABOR: (List individually)
EmDlo ee Name
Classification
Regular
Hours
Direct Hourly
Rate $
Overtime
Hours
Cost
$
Current
This Period
Total Amount to
Date (Optional
SUBTOTAL - DIRECT LABOR
$
$
INDIRECT ( %) (As specified in contract)
$
$
OTHER DIRECT COSTS (In - House)
List individually - at actual cost as in final cost proposal; mileage (miles x $),
CADD (hrs. x $), equip. rental (hrs. x $), etc.
$
$
SUBTOTAL (DIRECT LABOR, INDIRECT & OTHER DIRECT COSTS)
$
$
FEE ( %) (As specified in the contract)
$
$
OUTSIDE SERVICES (Subconsultants & Vendors) (List individually)
(To be in this same format - attach copies)
$
$
% To Date on DBE Work
$
$
Outside Services Management Expense (when applicable)
$
$
TOTAL CURRENT PERIOD:
$
$
TOTAL TO DATE:
$
$
LESS: Retaina a 10% of billing not to exceed 5 % of contract
$
$
LESS: Prior Payments
$
$
Prior Billing Less Retaina e
$
$
TOTAL CURRENT PAYMENT REQUEST
$
$
I certify that the billed amounts are actual and in agreement with the contract terms:
Signature Title Date
* Eligible classifications only; in accordance with contract
EXAMPLE C (Specific Rates Of Pay Contracts)
Company Name:
Project No.
Address:
Em to er FEIN ID Number:
Project Location
Invoice Number and Date
Progress Report Dated:
Subaccount No.
% Completed:
BASIC AND/ OR SUPPLEMENTAL CONTRACT TOTAL $
Prior Period Billing Amount: $
Current Billing Period: From: To:
PAY RATES: (List individually)
Employee Name
Classification
Regular
Hours
Overtime
Hours
Rate of Pay
$ / Hours **
Cost
$
SUBTOTAL - PAY RATES:
$
OTHER DIRECT COSTS In - House
List individually - at actual rates as in final cost proposal; mileage (miles x $),
CADD hrs. x $), equip. rental hrs. x $), etc.
$
SUBTOTAL (Pay Rates and Other Direct Rates
$
OUTSIDE SERVICES (Subconsultants &Vendors) (List individually)
o be in this same format - attach copies
$
% To Date on DBE Work. ---
Outside Services Management Expense when applicable)
$
TOTAL CURRENT PERIOD:
$
TOTAL TO DATE:
$
LESS: Retaina a 10% of billing not to exceed 5 % of contract
$
LESS: Prior Payments
$
Prior Billing Less Retaina e $
TOTAL CURRENT PAYMENT REQUEST:
$
1 certify that the billed amounts are actual and in agreement with the contract terms:
Signature Title
* Eligible classifications only; in accordance with contract
** In accordance with contract
Date