Loading...
HomeMy WebLinkAbout7510RESOLUTION NO. 7510 A RESOLUTION APPROVING AMENDMENT NO. FOUR TO CONTRACT DATED FEBRUARY 24, 1992, BETWEEN THE CITY OF PUEBLO, A MUNICIPAL CORPORATION, AND ISBILL ASSOCIATES, INC., RELATING TO FEDERAL GRANT AIP PROJECT NO. 3 08 0046 13 FOR PHASE I OF ADA MODIFICATIONS AT THE PUEBLO MEMORIAL AIRPORT, AND AUTHORIZING THE PRESIDENT OF THE CITY COUNCIL TO EXECUTE SAME WHEREAS, the City of Pueblo, A Municipal Corporation, and Isbill Associates, Inc. entered into a Contract on February 24, 1992, and WHEREAS, both parties wish to amend the Contract to include fees for design and engineering services relating to improvements at the Pueblo Memorial Airport, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, COLORADO THAT: SECTION 1 A certain Amendment No. Four to the Contract, a copy of which is attached hereto and made part thereof by reference, after having been approved as to form by the City Attorney, by and between the City of Pueblo, a Municipal Corporation, and Isbill Associates, Inc., relating to the inclusion of fees for design and engineering services for Federal Grant AIP Project No. 3 08 0046 13 for Phase I of ADA Modifications at the Pueblo Memorial Airport, is hereby approved, subject to the conditions as set forth in said contract. SECTION 2 Funds for said design and engineering services for this project shall be paid from the 36 fund contingent upon the approval of the grant and the availability of matching funds. SECTION 3 The President of the City Council is hereby authorized to execute said Amendment No. Four to the Contract on behalf of Pueblo, A Municipal Corporation, and the City Clerk shall affix the Seal of the City thereto and attest the same. INTRODUCED November 28, 1994 BY FAY KASTELIC Councilperson ATTEST: City Clerk APPROVED: President of City Council r r t IAI No. PUB 1732 AIP PROJECT NO. 3 -08- 0046 -13 AMENDMENT NO. FOUR TO CONTRACT DATED FEBRUARY 24, 1992 BETWEEN ISBILL ASSOCIATES, INC. AND CITY OF PUEBLO, COLORADO The Sponsor and the Engineer agree to amend their contract for improvements to Pueblo Memorial Airport, Pueblo, Colorado to include fees for engineering services. The improvement Item No. Ten (10) is added to the Scope of Work of the original contract. The item covered by this amendment is described as follows: 10. Modify Terminal Building to Comply with ADA Requirements (Phase I) The Sponsor agrees to pay the Engineer for the services listed under Article II of the original contract in the following manner: PART A - BASIC SERVICES A lump sum for Item No. 10 ......... ............................... $18,400.00 BIDDING AND CONSTRUCTION ADMINISTRATION A lump sum for Item No. 10 .......... ............................... $6,500.00 Method of payment shall be as follows: Interim payments up to 90 percent based on work performed by the Engineer and detailed in a report submitted to the Sponsor with the request for payment. The remaining ten percent to be paid upon Notice to Proceed for construction. PART B - SPECIAL SERVICES (SOILS AND PAVEMENT INVESTIGATIONS/ TOPOGRAPHIC SURVEYS) The maximum estimated SPECIAL SERVICES engineering is as follows: SOILS AND PAVEMENT INVESTIGATIONS (FOR DESIGN) ItemNo. 10 ............................ ............................... N/A TOPOGRAPHIC SURVEYS (FOR DESIGN) ItemNo. 10 ............................ ............................... N/A Page 1 of 2 If work is abandoned or terminated after obtaining approval by the Sponsor and the FAA of the final construction plans and specifications, the Sponsor shall reimburse up to 100 percent of the total lump sum as listed under PART A and 100 percent of the invoiced costs for soils and pavement investigations and topographic surveys listed under PART B. FIELD ENGINEERING The estimated maximum for FIELD ENGINEERING is: For Item No. 10 ................... ............................... N/A All other terms and conditions of the original contract shall remain in effect. IN WITNESS WHEREOF, the parties hereto have affixed t eir signatures this ��T� day o f`aF� zf� R 19 . SPONSOR: CITY OF PUEBLO PUEBLO, COLORADO By , �A reWdent, City Council Attest C ty Clerk ENGINEER: ISBILL ASSOCIATES, INC. By President Page 2 of 2