HomeMy WebLinkAbout7510RESOLUTION NO. 7510
A RESOLUTION APPROVING AMENDMENT NO. FOUR TO CONTRACT DATED
FEBRUARY 24, 1992, BETWEEN THE CITY OF PUEBLO, A MUNICIPAL
CORPORATION, AND ISBILL ASSOCIATES, INC., RELATING TO FEDERAL
GRANT AIP PROJECT NO. 3 08 0046 13 FOR PHASE I OF ADA
MODIFICATIONS AT THE PUEBLO MEMORIAL AIRPORT, AND AUTHORIZING
THE PRESIDENT OF THE CITY COUNCIL TO EXECUTE SAME
WHEREAS, the City of Pueblo, A Municipal Corporation, and Isbill Associates, Inc.
entered into a Contract on February 24, 1992, and
WHEREAS, both parties wish to amend the Contract to include fees for design and
engineering services relating to improvements at the Pueblo Memorial Airport,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, COLORADO THAT:
SECTION 1
A certain Amendment No. Four to the Contract, a copy of which is attached hereto and made
part thereof by reference, after having been approved as to form by the City Attorney, by and
between the City of Pueblo, a Municipal Corporation, and Isbill Associates, Inc., relating to the
inclusion of fees for design and engineering services for Federal Grant AIP Project No. 3 08
0046 13 for Phase I of ADA Modifications at the Pueblo Memorial Airport, is hereby approved,
subject to the conditions as set forth in said contract.
SECTION 2
Funds for said design and engineering services for this project shall be paid from the 36 fund
contingent upon the approval of the grant and the availability of matching funds.
SECTION 3
The President of the City Council is hereby authorized to execute said Amendment No. Four
to the Contract on behalf of Pueblo, A Municipal Corporation, and the City Clerk shall affix the
Seal of the City thereto and attest the same.
INTRODUCED November 28, 1994
BY FAY KASTELIC
Councilperson
ATTEST:
City Clerk
APPROVED:
President of City Council
r
r
t
IAI No. PUB 1732
AIP PROJECT NO. 3 -08- 0046 -13
AMENDMENT NO. FOUR TO CONTRACT
DATED FEBRUARY 24, 1992
BETWEEN
ISBILL ASSOCIATES, INC.
AND
CITY OF PUEBLO, COLORADO
The Sponsor and the Engineer agree to amend their contract for improvements to Pueblo
Memorial Airport, Pueblo, Colorado to include fees for engineering services. The improvement
Item No. Ten (10) is added to the Scope of Work of the original contract. The item covered by
this amendment is described as follows:
10. Modify Terminal Building to Comply with ADA Requirements (Phase I)
The Sponsor agrees to pay the Engineer for the services listed under Article II of the original
contract in the following manner:
PART A - BASIC SERVICES
A lump sum for Item No. 10 ......... ............................... $18,400.00
BIDDING AND CONSTRUCTION ADMINISTRATION
A lump sum for Item No. 10 .......... ............................... $6,500.00
Method of payment shall be as follows:
Interim payments up to 90 percent based on work performed by the Engineer and
detailed in a report submitted to the Sponsor with the request for payment. The
remaining ten percent to be paid upon Notice to Proceed for construction.
PART B - SPECIAL SERVICES (SOILS AND PAVEMENT INVESTIGATIONS/
TOPOGRAPHIC SURVEYS)
The maximum estimated SPECIAL SERVICES engineering is as follows:
SOILS AND PAVEMENT INVESTIGATIONS (FOR DESIGN)
ItemNo. 10 ............................ ............................... N/A
TOPOGRAPHIC SURVEYS (FOR DESIGN)
ItemNo. 10 ............................ ............................... N/A
Page 1 of 2
If work is abandoned or terminated after obtaining approval by the Sponsor and the
FAA of the final construction plans and specifications, the Sponsor shall reimburse up
to 100 percent of the total lump sum as listed under PART A and 100 percent of the
invoiced costs for soils and pavement investigations and topographic surveys listed
under PART B.
FIELD ENGINEERING
The estimated maximum for FIELD ENGINEERING is:
For Item No. 10 ................... ............................... N/A
All other terms and conditions of the original contract shall remain in effect.
IN WITNESS WHEREOF, the parties hereto have affixed t eir signatures this
��T� day o f`aF� zf� R 19 .
SPONSOR:
CITY OF PUEBLO
PUEBLO, COLORADO
By
, �A reWdent, City Council
Attest
C ty Clerk
ENGINEER:
ISBILL ASSOCIATES, INC.
By
President
Page 2 of 2