Loading...
HomeMy WebLinkAbout6758RESOLUTION NO. , 6758 A RESOLUTION APPROVING A CONTRACT BETWEEN ISBILL ASSOCIATES, INC. AND THE CITY OF PUEBLO, A MUNICIPAL CORPORATION, FOR ENGINEERING SERVICES AT PUEBLO MEMORIAL AIRPORT UNDER AIRPORT IMPROVEMENT PROJECT NO. 3- 08- 0046 -11 AND AUTHORIZING THE PRESIDENT OF THE COUNCIL TO EXECUTE SAME BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PUEBLO, COLORADO, THAT: SECTION 1: AMENDMENT NO. NINE DATED JUNE 10 1991 TO A CONTRACT DATED AUGUST 12, 1985 BETWEEN ISBILL ASSOCIATES, INC. AND THE CITY OF PUEBLO, A MUNICIPAL CORPORATION, TO PROVIDE ENGINEERING SERVICES FOR THE IMPROVEMENTS TO PUEBLO MEMORIAL AIRPORT, A COPY OF WHICH IS ATTACHED HERETO AND INCORPORATED HEREIN, HAVING BEEN APPROVED AS TO FORM BY THE CITY ATTORNEY, IS HEREBY APPROVED. SECTION 2: CITY FUNDS IN THE AMOUNT OF $12 ARE AVAILABLE IN ACCOUNT NUMBER 36-1991-796-0-40-3550 . SECTION 3: THE PRESIDENT OF THE CITY COUNCIL IS HEREBY AUTHORIZED TO EXECUTE SAID CONTRACT ON BEHALF OF PUEBLO, A MUNICIPAL CORPORATION, AND THE CITY CLERK SHALL AFFIX THE SEAL OF THE CITY THERETO AND ATTEST THE SAME. ATTEST: CIT CL RI INTRODUCED JUNE BY JOHN CALIFANO COUNCILPERSON APPRO D: PRESTaNT OF THE CITY COUNCIL e � IAI No. PUB -1433 & 1493 AIP No. 3 -08- 0046 -11 City Project No. 91 -042 AMENDMENT NO. NINE TO CONTRACT DATED AUGUST 12, 1985, BETWEEN ISBILL ASSOCIATES, INC. AND THE CITY OF PUEBLO, COLORADO The Sponsor and the Engineer agree to amend their contract dated August 12, 1985, for improvements to The Pueblo Memorial Airport, Pueblo, Colorado to include fees for engineering services associated with AIP Project No. 3- 08- 0046 -11. Improvement Item Nos. 1 and 2 are added to the scope of work of the original contract by this Amendment and are described as follows: 1. Apply Bituminous Porous Friction Course on Runway 17/35 (PUB- 1493). 2. Install Runway Intersection Signs, Install Airfield Lighting Control System, Modify Lighting Equipment Vault and Replace Electric Operated Gate (PUB - 1433). The Sponsor agrees to pay the Engineer for the services listed under Article II of the original contract in the following manner: PART A - BASIC SERVICES • lump sum for Item No. 1 $21,580.00 • lump sum for Item No. 2 55,000.00 BIDDING AND CONSTRUCTION ADMINISTRATION • lump sum for Item No. 1 4,125.00 • lump sum for Item No. 2 10,560.00 Method of Payment shall be as follows: Interim payments up to 90 percent based on work performed by the Engineer and detailed in a report submitted to the Sponsor with the request of payment. The remaining ten percent to be paid upon Notice to Proceed for construction. Page 1 of 3 PART B - SPECIAL SERVICES /FIELD ENGINEERING FIELD ENGINEERING The Engineer shall be reimbursed on a Cost Plus Fixed Fee Basis. The Engineer's costs shall be determined on the basis of time (i.e., the number of hours worked), multiplied by the Engineer's standard hourly rates for each applicable employee classification, plus direct non - hourly expenses including labor, overhead, and general administrative costs. Overhead costs are based on the most recent audit on the Engineer's records. See attached page for hourly rates and billing procedure. The estimated maximum for FIELD ENGINEERING is: Item No. 1 $11,941.00 Item No. 2 18,890.00 For Item No. 1 of this Amendment, the Sponsor shall pay the Engineer's costs to a maximum of $10,783.00 plus a fixed fee of $1,158.00 For Item No. 2 of this Amendment, the Sponsor shall pay the Engineer's costs to a maximum of $16,915.00 plus a fixed fee of $1,975.00. The Engineer's costs, exclusive of the fixed fee, shall not be exceeded without the Sponsor's written prior approval. The above estimated maximums are based on a construction project taking 12 working days for Item No. 1 and an additional 25 working days for Item No. 2. Method of payment shall be as follows: For services rendered under PART B - SPECIAL SERVICES, the Sponsor agrees to make monthly payments based upon the work performed by the Engineer less 10 percent. The final 10 percent of the fee shall be due and payable when the project final inspection and the construction report have been completed, and when reproducible "Record Drawings" have been submitted to the Sponsor and when the revised Airport Layout Plan has been approved by the FAA. The "Record Drawings" and Construction Report shall be submitted within a period of 90 days from end of construction period. This Amendment shall be considered concurrent with completion of audit. Page 2 of 3 t All other tern 'and conditions of the original contract shall remain in effect. IN WITNESS WHEREOF, the parties hereto have affixed their signatures this 10th day of ,line 19 91 SPONSOR: THE CITY OF PUEBLO PUEBLO, COLORADO By resident - City Council Attest ity Clerk APPROVED AS TO FORM By City tt rney ENGINEER: ISBILL ASSOCIAT , IN By President Page 3 of 3