HomeMy WebLinkAbout16444Docusign Envelope ID: D3CE058A-0BFB-8804-8037-E2CC77B6B14C
City Clerk's Office Item # M2
Ciify of
PUEBLO
m;µ
...w
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: October 13, 2026
TO: President Mark Aliff and Members of City Council
CC: Mayor Heather Graham
VIA: Clyde Bishop, City Clerk
FROM: Andra Ahrens, Director Wastewater
SUBJECT: A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION
CONTRACT IN THE AMOUNT OF $38,810.36 WITH PARKER
EXCAVATING, INC. FOR EMERGENCY SANITARY SEWER POINT
REPAIR AT 132 MARIAN DR, PROJECT NO. 24-033 (WWAN03) AND
APPROVING THE PURCHASING AGENTS EXECUTION OF THE
SAME
SIIMMORY.
This Resolution ratifies and approves award of a construction contract to Parker
Excavating, Inc., for emergency sanitary sewer point repairs at 132 Marian Dr.
PREVIOUS COUNCIL ACTION:
Resolution 15534, dated March 11, 2024, established an approved list of contractors to
perform emergency sanitary sewer point repairs during calendar years 2024, 2025, and
2026.
BACKGROUND:
During routine manhole inspections, the Wastewater Department collection crew
discovered a main serving Marian Dr. had severe defects, a large hole, a break, and a
substantial sag. These defects significantly impact the service of the neighborhood and
necessitate emergency repair.
The repair work was performed under the Sanitary Sewer Point Repair multi -year
contract under which two contractors were qualified via competitive bid. An estimate
was prepared, and Parker Excavating accepted the work.
The cost breakdown for the project is as follows:
Docusign Envelope ID: D3CE058A-0BFB-8804-8037-E2CC77B6B14C
Sanitary Sewer Replacement -related
Total: $ 25,460.36 65.60%
Surface Improvement Related
Total: $ 13,350.00 34.40%
Grand Total: $ 38,810.36 100%
FINANCIAL IMPLICATIONS:
Funding for this project came from the sanitary sewer rehabilitation budget funded by
the Sewer User Fund. Funding was available and had been budgeted, appropriated,
and allocated to Project No. 24-033 (VVVVAN03) — Emergency Point Repair.
BOARD/COMMISSION RECOMMENDATION:
Not applicable.
STAKEHOLDER PROCESS:
None.
ALTERNATIVES:
Not approve the Resolution would require a finding that there was not an emergency
condition.
RECOMMENDATION:
Approval of the Resolution.
ATTACHMENTS:
1. 10-13-26 132 Marian Dr Emergency Point Repair Attachment
Docusign Envelope ID: D3CE058A-0BFB-8804-8037-E2CC77B6B14C
RESOLUTION NO. 16444
A RESOLUTION RATIFYING AN EMERGENCY
CONSTRUCTION CONTRACT IN THE AMOUNT OF $38,810.36
WITH PARKER EXCAVATING, INC. FOR EMERGENCY
SANITARY SEWER POINT REPAIR AT 132 MARIAN DR,
PROJECT NO. 24-033 (WWAN03) AND APPROVING THE
PURCHASING AGENTS EXECUTION OF THE SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Mayor in
accordance with Section 1-10-5 of the Pueblo Municipal Code; and
WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under the
2024-2026 multi -year point repair contract; NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that
SECTION 1 _
City Council ratifies and approves the contract for repair of the sanitary sewers at 132
Marian Dr. with Parker Excavating, Inc., Project No. 24-033 (WWAN03) - Emergency Point
Repair awarded to said bidder in the total amount of $38,810.36 including all contract change
orders.
SECTION 2.
Funds for Project 24-033 (WWAN03) - Emergency Point Repair shall be from the Sewer
User Fund.
SECTION 3.
The Purchasing Agent was authorized to execute said contract on behalf of Pueblo, a
Colorado Municipal Corporation, and the City Clerk properly affixed the seal of the City thereto
and attested the same.
SECTION 4
The officers and staff of the City are authorized to perform any and all acts consistent
with the intent of this Resolution and the contract to implement the transactions described
therein. Furthermore, all actions previously taken by officers and staff of the City consistent with
the contract, including contract change order in the amount of $6,487.36 and any other payment
authorized under the contract are hereby ratified
Docusign Envelope ID: D3CE058A-0BFB-8804-8037-E2CC77B6B14C
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED: October 13, 2026
Docusigned by:
I 'i"
ATTESTED BY:
CITY CLERK
BY: Selena Ruiz -Gomez
MEMBER OF T'uQ,Qdl yNCIL
APPROVED: ��((
PRESIDENT OF CITY COUNCIL
2024-2026 Emergency Sanitary Sewer Point Repair
132 Marian
Date 8/3/26
Parker Excavating, Inc.
Project Number: 24-033 (WWAN03)
Item
Description
Estimated
Unit Price
1-20
LF
150.00
$ -
1
Remove and Replace 8" PVC
Less than 10' Deep
21-100
LF
70
138.00
$ 9,660.00
>100
LF
113.00
$ -
1-20
LF
158.00
$ -
2
Remove and Replace 8" PVC
More than 10' Deep
21-100
LF
146.00
$ -
>100
LF
121.00
$ -
1-20
LF
170.00
$ -
3
Remove and Replace 10" PVC
Less than 10' Deep
21-100
LF
142.00
$ -
>100
LF
138.00
$ -
1-20
LF
183.00
$ -
4
Remove and Replace 10" PVC
More than 10' Deep
21-100
LF
153.00
$ -
>100
LF
149.00
$ -
1-20
LF
189.00
$ -
5
Remove and Replace 12" PVC
Less than 10' Deep
21-100
LF
155.00
$ -
>100
LF
153.00
$ -
1-20
LF
204.00
$ -
6
Remove and Replace 12" PVC
More than 10' Deep
21-100
LF
167.00
$ -
>100
LF
165.00
$ -
1-20
LF
167.00
$ -
7
Remove and Replace 15" PVC
Less than 10' Deep
21-100
LF
153.00
$ -
>100
LF
151.00
$ -
1-20
LF
182.00
$ -
8
Remove and Replace 15" PVC
More than 10' Deep
21-100
LF
171.00
$ -
>100
LF
167.00
$ -
1-20
LF
129.00
$ -
9
Remove and Replace 4" Service
Tap Less than 10' Deep
21-100
LF
107.00
$ -
>100
LF
102.00
$ -
1-20
LF
143.00
$ -
10
Remove and Replace 4" Service
Tap More than 10' Deep
21-100
LF
114.00
$ -
>100
LF
108.00
$ -
1-20
LF
154.00
$ -
11
Remove and Replace 6" Service
Tap Less than 10' Deep
21-100
LF
128.00
$ -
>100
LF
122.00
$ -
1-20
LF
166.00
$ -
12
Remove and Replace 6" Service
Tap More than 10' Deep
21-100
LF
138.00
$ -
>100
LF
132.00
$ -
1-20
LF
102.00
$ -
13
Asphalt Patch — 4" HMA on 4"
Class 6 ABC For 8" and 10" Pipe
21-100
LF
75
78.00
$ 5,850.00
>100
LF
75.00
$ -
1-20
LF
104.00
$ -
14
Asphalt Patch —S' HMA on 6"
Class 6 ABC For 8" and 10" Pipe
21-100
LF
79.00
$ -
>100
LF
77.00
$ -
1-20
LF
105.00
$ -
15
Asphalt Patch — 4" HMA on 4"
Class 6 ABC For 12" and 15" Pipe
21-100
LF
81.00
$ -
>100
LF
79.00
$ -
1-20
LF
112.00
$ -
16
Asphalt Patch —S' HMA on 6"
Class 6 ABC For 12" and 15" Pipe
21-100
>100
LF
LF
86.00
85.00
$ -
$ -
17
Remove and Replace 7"
Reinforced Concrete
1-20
SF
24.50
$ -
21-100
SF
19.50
$ -
>100
SF
18.50
$ -
18
Remove and Replace 6"
Reinforced Concrete
1-20
SF
24.00
$ -
21-100
SF
19.00
$ -
>100
SF
18.00
$ -
19
Remove and Replace 4" Concrete
1-20
SF
19.00
$ -
21-100
SF
16.50
$ -
>100
SF
16.00
$ -
20
Remove and Replace Standard
Curb and Gutter
1-20
LF
51.00
$ -
21-100
LF
49.50
$ -
>100
LF
48.00
$ -
21
Install or Remove and Replace 6"
Curb Head
1-20
LF
31.00
$ -
21-100
LF
29.00
$ -
>100
LF
28.00
$ -
22
Install Extra Lean Concrete
(FlowFill)
1-20
CY
164.00
$ -
21-100
CY
25
164.00
$ 4,100.00
>100
CY
164.00
$ -
23
Class 6 Base Course for Gravel
Surfaced Alleys
TN
33.00
$ -
24
Remove Camera/Cleaning
Head/Tap Cutter
HR
400.00
$ -
25
Remove and Replace 48"
Diameter Manhole
with 1
EA
4280.00
$ -
with 2
EA
2
5300.00
$ 10,600.00
with 3
EA
6340.00
$ -
with 4
EA
7380.00
$ -
26
Remove and Replace 60"
Diameter Manhole
with 1
EA
5130.00
$ -
with 2
EA
6170.00
$ -
with 3
EA
7210.00
$ -
with 4
EA
8250.00
$ -
27
Calcium Aluminate Coat 48 -inch
Manhole
1-10
VF
375.00
$ -
11-15
VF
350.00
$ -
>15
VF
325.00
$ -
28
Calcium Aluminate Coat 60 -inch
Manhole
1-10
VF
468.75
$ -
11-15
VF
437.50
$ -
>15
VF
406.25
$ -
29
Rebuild Manhole Bench and
Trough 48 -inch Manhole
LS
2000.00
$ -
30
Rebuild Manhole Bench and
Trough 60 -inch Manhole
LS
2500.00
$ -
31
Reinstate Services - 4"
EA
1
388.00
$ 388.00
32
Reinstate Services - 6"
EA
427.00
$ -
33
Mobilization
LS
1
1725.00
$ 1,725.00
Total $ 32,323.00
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number: 24-033 (WWAN03) Change Order No. : ONE 9/16/2026
Project Name : 2024, 2025 and 2026 Sanitary Sewer Point Repair
132 Marian Dr.
Contractor: PARKER EXCAVATING INC
1428 STOCKYARD RD, PUEBLO, CO 81001
You are hereby requested to comply with the following changes from the plans & specifications:
Bid Item
Description of Changes
Decrease
Increase
No.
Contract By
Contract By
1
REMOVE AND REPLACE 8" PVC LESS THAN 10' DEEP (21-100 LF)
($1,380.00)
ASPHALT PATCH - 4" HMA ON 4" CLASS 6 ABC FOR 8" AND 10"
2
PIPE (21-100 LF)
$7,500.00
3
INSTALL EXTRA LEAN CONCRETE (FLOWFILL) (21-100)
$820.00
4
REMOVE AND REPLACE 48" DIAMETER MANHOLE (WITH 2 INVERTS)
($10,600.00)
7
REMOVE AND REPLACE 48" DIAMETER MANHOLE (WITH 1 INVERT)
$8,560.00
8
TRAFFIC CONTROL
$11,980.00
$1 ,587.36
$18,467.36
TOTAL (Decrease) / Increase
Net Adjustment This Change Order $
6,487.36
Amount of Previous Change Order(s) $
0.00
Original Contract Amount $
32,323.00
Total Adjusted Contract Amount To Date $
38,810.36
Reason For Change: Actual Field Quantities.
The time provided for completion of the contract is changed by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto.
Prepared by: Date:
Wastewater Civil Engineer
Reviewed by: Date:
Wastewater Engineering Manager
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Director of Wastewater
FORM CO100.1299
Page 1 of 1
24-033 (WWAN03)
2024 -2026 Emergency Sanitary Point Repair
132 Marian Drive