Loading...
HomeMy WebLinkAbout16433Docusign Envelope ID: A0A73D4D-B899-8CCF-8170-B9E7C6014B5F RESOLUTION NO. 16433 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $928,420.00 TO N LINE ELECTRIC FOR PROJECT NO. 26-043 (WW1203) FY2026 SWITCHGEAR REPLACEMENT AT THE JAMES R. DIIORIO WATER RECLAMATION FACILITY, SETTING FORTH $92,842.00 FOR CONTINGENCIES AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, competitive bids for Project No. 26-043 (WW1203) FY2026 Switchgear Replacement at the James R. Dilorio Water Reclamation Facility have been received and examined; and WHEREAS, the proposal of N Line Electric. was the lowest of those bids determined to be responsive; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that SECTION 1 The City Council authorizes Project No. 26-043 (WW1203) FY2026 Switchgear Replacement at the James R. Dilorio Water Reclamation Facility to be performed, and the contract for said project is hereby awarded to N Line Electric, in the amount of $928,420.00. SECTION 2. Funds for Project 26-043 (WW1203) WRF Electrical Upgrade shall be from the Sewer User Funds. SECTION 3. The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, A Colorado Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 4. In addition to the amount of the bid set forth, as aforementioned, an additional amount as stipulated in this section is hereby established for contingencies and additional work. Contingencies and Additional Work......... $92,842.00. SECTION 5. The officers and staff of the City are directed and authorized to perform any and all acts consistent with the intent of this Resolution and the contract to implement the transactions described therein. Docusign Envelope ID: A0A73D4D-B899-8CCF-8170-B9E7C6014B5F SECTION 6. This Resolution shall become effective immediately upon passage and approval. INTRODUCED: September 14, 2026 Docusigned by: I 'i" ATTESTED BY: CITY CLERK BY: Roger Gomez MEMBER OF UQQj CIL APPROVED: PRESIDENT OF CITY COUNCIL Docusign Envelope ID: A0A73D4D-B899-8CCF-8170-B9E7C6014B5F City Clerk's Office Item # O10 Ciify of PUEBLO m;µ ...w Background Paper for Proposed Resolution COUNCIL MEETING DATE: September 14, 2026 TO: President Mark Aliff and Members of City Council CC: Mayor Heather Graham VIA: Clyde Bishop, City Clerk FROM: Andra Ahrens, Director Wastewater SUBJECT: A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $928,420.00 TO N LINE ELECTRIC FOR PROJECT NO. 26-043 (WW1203) FY2026 SWITCHGEAR REPLACEMENT AT THE JAMES R. DIIORIO WATER RECLAMATION FACILITY, SETTING FORTH $92,842.00 FOR CONTINGENCIES AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME SUMMARY: This Resolution awards a construction contract to N Line Electric for Project No. 26-043 (WW1203), FY2026 Switchgear Replacement at the James R. Dilorio Water Reclamation Facility (WRF). The project will replace the incoming switchgear. PREVIOUS COUNCIL ACTION: None. BACKGROUND: The WRF treats all the wastewater for the City of Pueblo. The incoming switchgear controls all the power that is supplied to the WRF. The current switchgear does not trip like a breaker, with a power outage or lighting strike. This is how the switchgear should protect the WRF and keep all components safe and protected. The new switchgear will protect all the phases of incoming power to the WRF electrical components. Without the new switchgear, the WRF is in danger of lightning strikes or power surges that will cause damage to pumps, motors, and other switchgear throughout the WRF, which would incur a great cost to replace all the damaged items. Docusign Envelope ID: A0A73D4D-B899-8CCF-8170-B9E7C6014B5F FINANCIAL IMPLICATIONS: The cost of the construction project was bid at $928,420.00 with contingencies of $92,842.00. Funds are available from the Sewer User Funds and appropriated to Project No. 26-043 (WVV1203) WRF Electrical Upgrade. BOARD/COMMISSION RECOMMENDATION: Not applicable. STAKEHOLDER PROCESS: None. ALTERNATIVES: If nothing is done with the switchgear it will leave the WRF in a compromised state. RECOMMENDATION: Approval of the Resolution. ATTACHMENTS: 1. 09-14-26 site map switchgear 2. 09-14-26 26-043 Bid Summary for Switchgear