HomeMy WebLinkAbout16420Docusign Envelope ID: A0A73D4D-B899-8CCF-8170-B9E7C6014B5F RESOLUTION NO. 16420 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $43,569.00 TO INDUSTRIAL CONSTRUCTORS/MANAGERS, INC. (ICM) IN THE AMOUNT OF $43,569.00 FOR PROJECT NO. 26-005 (WWAN04) FY2026 PRIMARY SCUM FLUSHING LOOP AT THE JAMES R. DIIORIO WATER RECLAMATION FACILITY, SETTING FORTH $4,356.90 FOR CONTINGENCIES AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, competitive bids for Project No. 26-005 (WWAN04) FY2026 Primary Scum Flushing Loop at the James R. Dilorio Water Reclamation Facility (WRF) have been received and examined; and WHEREAS, the proposal of Industrial Constructors/Managers, Inc. (ICM). was the lowest of those bids determined to be responsive; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that SECTION 1. The City Council authorizes Project No. 26-005 (WWAN04) FY2026 Primary Scum Flushing Loop at the James R. Dilorio Water Reclamation Facility (WRF) to be performed, and the contract for said project is hereby awarded to Industrial Constructors/Managers, INC. (ICM), in the amount of $43,569.00. SECTION 2. Funds for Project 26-005 (WWAN04) WRF Facility Rehab shall be from the Sewer User Funds. SECTION 3. The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, A Colorado Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 4. In addition to the amount of the bid set forth, as aforementioned, an additional amount as stipulated in this section is hereby established for contingencies and additional work. Contingencies and Additional Work......... $4,356.90. Docusign Envelope ID: A0A73D4D-B899-8CCF-8170-B9E7C6014B5F SECTION 5. The officers and staff of the City are directed and authorized to perform any and all acts consistent with the intent of this Resolution and the contract to implement the transactions described therein. SECTION 6. This Resolution shall become effective immediately upon passage and approval. INTRODUCED: September 14, 2026 Docusigned by: ATTESTED BY: CITY BY: Selena Ruiz -Gomez MEMBERI v OF u Qj4NCIL APPROVED: U(i(( PRESIDENT OF CITY COUNCIL Docusign Envelope ID: A0A73D4D-B899-8CCF-8170-B9E7C6014B5F City Clerk's Office Item # M2 Ciify of PUEBLO m;µ ...w Background Paper for Proposed Resolution COUNCIL MEETING DATE: September 14, 2026 TO: President Mark Aliff and Members of City Council CC: Mayor Heather Graham VIA: Clyde Bishop, City Clerk FROM: Andra Ahrens, Director Wastewater SUBJECT: A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $43,569.00 TO INDUSTRIAL CONSTRUCTORS/MANAGERS, INC. (ICM) IN THE AMOUNT OF $43,569.00 FOR PROJECT NO. 26-005 (WWAN04) FY2026 PRIMARY SCUM FLUSHING LOOP AT THE JAMES R. DIIORIO WATER RECLAMATION FACILITY, SETTING FORTH $4,356.90 FOR CONTINGENCIES AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME SIIMMORY. This Resolution awards a construction contract to Industrial Constructors/Managers, Inc. (ICM) for Project No. 26-005 (WWAN04), FY2026 Primary Scum Flushing Loop at the James R. Dilorio Water Reclamation Facility (WRF). The project will add necessary valves and pipe work to flush scum pumps. PREVIOUS COUNCIL ACTION: None. BACKGROUND: The primary scum pumps are used in wastewater treatment plants to remove and transfer floating waste —such as grease oil, fat, hair, and light debris — from the surface of the primary clarifier to the solids processing. Due to the thickness of these solid materials, the pumps often overload and shut down and the pipes become clogged. Employees will manually back wash the pumps and the piping system. Doing the cleaning this way causes the pumps to spin backwards; this cleaning is a daily chore and does not always clear the clog. If that happens, employees will be called in to manually open the pumps and piping to get the system back online. This project is to install new piping and valves to ensure the new flushing process will allow the pumps to be cleaned without spinning backwards and causing damage. This project also prevents clogs in the piping. Docusign Envelope ID: A0A73D4D-B899-8CCF-8170-B9E7C6014B5F FINANCIAL IMPLICATIONS: The cost of the construction project was bid at $43,569.00 with contingencies of $4,356.90 Funds are available from the Sewer User Funds and have been budgeted and appropriated to Project No. 26-005 (WWAN04) WRF Facility Rehab. BOARD/COMMISSION RECOMMENDATION: Not applicable STAKEHOLDER PROCESS: None. ALTERNATIVES: If not passed, the Scum Pump Piping will continue to overload pump motors and destroy pump impellers, shortening the life of the new pumps and motors. It will leave the WRF with increased costs for continuing operations and maintenance and disrupt plant processes. RECOMMENDATION: Approval of the Resolution. ATTACHMENTS: 1. 09-14-26 Bid Summary for Scum Flush Loop 2. 09-14-26 site map