Loading...
HomeMy WebLinkAbout16271Docusign Envelope ID: 108AE49D-CFA2-4D4A-A28D-F7AA1930D42F City Clerk's Office Item # M1 COUNCIL MEETING DATE: March 9, 2026 TO: President Mark Aliff and Members of City Council CC: Mayor Heather Graham VIA: Vince Petkosek, Deputy City Clerk FROM: Andra Ahrens, Director Wastewater SUBJECT: A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $450,000 TO COLORADO FRONT RANGE ROOFING AND SETTING FORTH $45,000 FOR CONTINGENCIES FOR PROJECT NO. 25-112 (WWAN04) FY2026 REPLACEMENT OF VARIOUS ROOFS AT THE JAMES R. DIIORIO WATER RECLAMATION FACILITY AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME. SUMMARY: This Resolution awards a construction contract to Colorado Front Range Roofing for Project No. 25-112 (WWAN04), FY2026 Replacement of Various Roofs at the James R. Dilorio Water Reclamation Facility (WRF). The project will replace the damaged roofs at five buildings around the plant. PREVIOUS COUNCIL ACTION: None BACKGROUND: The WRF has five buildings, which are the Administration, Shop, Secondary Clarifier, Non -Potable Water, and the Dissolved Air Filtration Building that need to have their roofs replaced. In this project, the contractor will pull and replace all layers of roofing and bring the roof insulation up to code. The contractor will have to remove all air conditioner units and build up the curbs to allow for the proper spacing from the roof to the unit. The contractor will have to remove and replace all the skylights that are damaged and raise them up to accommodate the new roof. FINANCIAL IMPLICATIONS: The cost of the construction project was bid at $450,000 with contingencies of $45,000. Funds are available from the Sewer User Funds and appropriated to Project No. 25-112 (WWAN04 - Water Reclamation Facility Rehabilitation). Docusign Envelope ID: 108AE49D-CFA2-4D4A-A28D-F7AA1930D42F BOARD/COMMISSION RECOMMENDATION: Not applicable STAKEHOLDER PROCESS: None ALTERNATIVES: If no rehabilitation is performed on the roof, the building will continue to leak and cause damage inside the building. In some of the buildings, the leaks are over electrical equipment and could cause a power outage to the plant and could cause major issues. RECOMMENDATION: Approval of the Resolution. ATTACHMENTS: 1. 03-09-26 Roofing Bid Document 25-112 Bid Summary 2. 03-09-26 Location Map of Roofs Docusign Envelope ID: 108AE49D-CFA2-4D4A-A28D-F7AA1930D42F RESOLUTION NO. 16271 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $450,000 TO COLORADO FRONT RANGE ROOFING AND SETTING FORTH $45,000 FOR CONTINGENCIES FOR PROJECT NO. 25-112 (WWAN04) FY2026 REPLACEMENT OF VARIOUS ROOFS AT THE JAMES R. DIIORIO WATER RECLAMATION FACILITY AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME. WHEREAS, competitive bids for Project No. 25-112 (WWAN04-Water Reclamation Facility Rehabilitation) FY2026 Replacement of Various Roofs at the James R. Dilorio Water Reclamation Facility have been received and examined; an WHEREAS, the proposal of Colorado Front Range Roofing of Pueblo, Colorado was the lowest of those bids determined to be responsive, and the Committee of Awards, by majority vote, recommends to the City Council that it authorize Project No. 25-112 (WWAN04) FY2026 Replacement of Various Roofs at the James R. Dilorio Water Reclamation Facility to be performed; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that SECTION 1 The City Council authorizes Project No. 25-112 (WWAN04) FY2026 Replacement of Various Roofs at the James R. Dilorio Water Reclamation Facility to be performed, and the contract for said project is hereby awarded to Colorado Front Range Roofing, in the amount of $450,000. SECTION 2. Funds for Project 25-112 (WWAN04-Water Reclamation Facility Rehabilitation) shall be from the Sewer User Funds. SECTION 3. The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, A Colorado Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 4. In addition to the amount of the bid set forth, as aforementioned, an additional amount as stipulated in this section is hereby established for contingencies and additional work. Contingencies and Additional Work......... $45,000. Docusign Envelope ID: 108AE49D-CFA2-4D4A-A28D-F7AA1930D42F SECTION 5. The officers and staff of the City are directed and authorized to perform any and all acts consistent with the intent of this Resolution and the contract to implement the transactions described therein. SECTION 6. This Resolution shall become effective immediately upon passage and approval. INTRODUCED: March 9, 2026 BY: Ted Hernandez S�ned by: ATTESTED BY: FZ �tDSt DEPOT R� K MEMBER OF CITY COUNCIL DocuSigned by: APPROVED: PRESIDEN CO N IU C L