Loading...
HomeMy WebLinkAbout16235 City Clerk's Office Item # M4 Background Paper for Proposed Resolution COUNCIL MEETING DATE: January 26, 2026 TO: President Mark Aliff and Members of City Council CC: Mayor Heather Graham VIA: Marisa Stoller, City Clerk FROM: Andra Ahrens, Director Wastewater SUBJECT: A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $6,987.42 WITH MILLER PIPELINE, INC., FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 1951 LAKE AVE., PROJECT NO. 24-033 (WWAN03) AND APPROVING THE SAME. SUMMARY: This Resolution ratifies and approves award of a construction contract to Miller Pipeline, Inc., for emergency sanitary sewer point repairs at 1951 Lake Ave. PREVIOUS COUNCIL ACTION: None BACKGROUND: On November 24, 2025, the City of Pueblo Police Department reported that complaints were received regarding a deteriorated manhole. The manhole wall, bench, ring, and lid of the manhole were heavily corroded and were causing a safety hazard for the traveling public. An emergency repair was performed to repair the deteriorated manhole wall, bench, ring and lid. The repair work was performed under the Sanitary Sewer Point Repair multi-year contract under which two contractors were qualified via competitive bid. An estimate was prepared, and Miller Pipeline, Inc. was the lowest bidder and accepted the work. The cost breakdown for the project is as follows: Sanitary Sewer Replacement-related Total: $ 6,689.14 96% Surface Improvement Related Total: $ 298.28 4% Grand Total: $ 6,987.42 100% FINANCIAL IMPLICATIONS: Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer User Fund. Funding was available and had been budgeted, appropriated, and allocated to Project No. 24-033 (WWAN03) Emergency Point Repair. BOARD/COMMISSION RECOMMENDATION: Not applicable STAKEHOLDER PROCESS: None ALTERNATIVES: Not approving the Resolution would require a finding that there was not an emergency. RECOMMENDATION: Approval of the Resolution ATTACHMENTS: 1. 1-26-26 1951 Lake Ave Emergency Point Repair Attachment.docx RESOLUTION NO. 16235 A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $6,987.42 WITH MILLER PIPELINE, INC., FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 1951 LAKE AVE., PROJECT NO. 24-033 (WWAN03) OF THE SAME. WHEREAS, an emergency sanitary sewer repair was authorized by the Mayor in accordance with Section 1-10-5 of the Pueblo Municipal Code; and WHEREAS, the point repair work was awarded to Miller Pipeline, Inc., under the 2024- 2026 multi-year point repair contract; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that SECTION 1. City Council ratifies and approves the contract for repair of the sanitary sewers at 1951 Lake Ave. with Miller Pipeline, Inc., Project No. 24-033 (WWAN03) Emergency Point Repair awarded to said bidder in the amount of $6,987.42. SECTION 2. Funds for Project 24-033 (WWAN03) Emergency Point Repair shall be from the Sewer User Fund. SECTION 3. The Purchasing Agent was authorized to execute said contract on behalf of Pueblo, a Colorado Municipal Corporation, and the City Clerk properly affixed the seal of the City thereto and attested the same. SECTION 4. The officers and staff of the City are authorized to perform any and all acts consistent with the intent of this Resolution and the contract to implement the transactions described therein. Furthermore, all actions previously taken by officers and staff of the City consistent with the contract, including any payments authorized under the contract. SECTION 5. This Resolution shall become effective immediately upon passage and approval. INTRODUCED: January 26, 2026 BY: Brett Boston MEMBER OF CITY COUNCIL APPROVED: __________________________ PRESIDENT OF CITY COUNCIL ATTESTED BY: ________________________ CITY CLERK 1951 Lake 2024-2026 Emergency Sanitary Sewer Point Repair Date 07/29/2025 Miller Pipeline, LLCParker Excavating, Inc. Project Number: 24-033 (WWAN03) DescriptionEstimated Item 1-20LF-$ -$ 21-100LF-$ -$ 1Remove and Replace 8Ñ PVC Less than 10Ó Deep >100LF-$ -$ 1-20LF-$ -$ 21-100LF-$ -$ 2Remove and Replace 8Ñ PVC More than 10Ó Deep >100LF-$ -$ 1-20LF-$ -$ 21-100LF-$ -$ 3Remove and Replace 10Ñ PVC Less than 10Ó Deep >100LF-$ -$ 1-20LF-$ -$ 21-100LF-$ -$ 4Remove and Replace 10Ñ PVC More than 10Ó Deep >100LF-$ -$ 1-20LF-$ -$ 21-100LF-$ -$ 5Remove and Replace 12Ñ PVC Less than 10Ó Deep >100LF-$ -$ 1-20LF-$ -$ 21-100LF-$ -$ 6Remove and Replace 12Ñ PVC More than 10Ó Deep >100LF-$ -$ 1-20LF-$ -$ 21-100LF-$ -$ 7Remove and Replace 15Ñ PVC Less than 10Ó Deep >100LF-$ -$ 1-20LF-$ -$ 21-100LF-$ -$ 8Remove and Replace 15Ñ PVC More than 10Ó Deep >100LF-$ -$ 1-20LF-$ -$ 21-100LF-$ -$ 9Remove and Replace 4Ñ Service Tap Less than 10Ó Deep >100LF-$ -$ 1-20LF-$ -$ 1021-100LF-$ -$ Remove and Replace 4Ñ Service Tap More than 10Ó Deep >100LF-$ -$ 1-20LF-$ -$ 21-100LF-$ -$ 11Remove and Replace 6Ñ Service Tap Less than 10Ó Deep >100LF-$ -$ 1-20LF-$ -$ 1221-100LF-$ -$ Remove and Replace 6Ñ Service Tap More than 10Ó Deep >100LF-$ -$ 1-20LF-$ -$ Asphalt Patch Î 4Ñ HMA on 4Ñ Class 6 ABC For 8" and 10" 21-100LF252,250.00$ 1,950.00$ 13 Pipe >100LF-$ -$ 1-20LF-$ -$ Asphalt Patch Î 5Ñ HMA on 6Ñ Class 6 ABC For 8Ñ and 10Ñ 1421-100LF-$ -$ Pipe >100LF-$ -$ 1-20LF-$ -$ Asphalt Patch Î 4Ñ HMA on 4Ñ Class 6 ABC For 12" and 15" 21-100LF-$ -$ 15 Pipe >100LF-$ -$ 1-20LF-$ -$ Asphalt Patch Î 5Ñ HMA on 6Ñ Class 6 ABC For 12" and 15" 1621-100LF-$ -$ Pipe >100LF-$ -$ 1-20SF-$ -$ 21-100SF-$ -$ 17Remove and Replace 7Ñ Reinforced Concrete >100SF-$ -$ 1-20SF-$ -$ 21-100SF-$ -$ 18Remove and Replace 6Ñ Reinforced Concrete >100SF-$ -$ 1-20SF-$ -$ 21-100SF-$ -$ 19Remove and Replace 4Ñ Concrete >100SF-$ -$ 1-20LF-$ -$ 20Remove and Replace Standard Curb and Gutter21-100LF-$ -$ >100LF-$ -$ 1-20LF-$ -$ 21-100LF-$ -$ 21Install or Remove and Replace 6'' Curb Head >100LF-$ -$ 1-20CY-$ -$ 21-100CY-$ -$ 22Install Extra Lean Concrete (FlowFill) >100CY-$ -$ TN$ --$ Class 6 Base Course for Gravel Surfaced Alleys 23 HR$ --$ Remove Camera/Cleaning Head/Tap Cutter 24 with 1 InvertEA-$ -$ with 2 InvertsEA-$ -$ Remove and Replace 48Ñ Diameter Manhole 25 with 3 InvertsEA-$ -$ with 4 InvertsEA-$ -$ with 1 InvertEA-$ -$ with 2 InvertsEA-$ -$ Remove and Replace 60Ñ Diameter Manhole 26 with 3 InvertsEA-$ -$ with 4 InvertsEA-$ -$ 1-10VF103,000.00$ 3,750.00$ 27Calcium Aluminate Coat 48-inch Manhole11-15VF-$ -$ >15VF-$ -$ 1-10VF-$ -$ 11-15VF-$ -$ 28Calcium Aluminate Coat 60-inch Manhole >15VF-$ -$ LS11,600.00$ 2,000.00$ Rebuild Manhole Bench and Trough 48-inch Manhole 29 LS $ --$ Rebuild Manhole Bench and Trough 60-inch Manhole 30 EA$ --$ Reinstate Services - 4'' 31 EA Reinstate Services - 6''$ --$ 32 LS11,750.00$ 1,725.00$ Mobilization 33 Total8,600.00$ 9,425.00$ With Contingency10,320.00$ 11,310.00$ CONTRACT CHANGE ORDER City of Pueblo Department of Public Works Project Number :Change Order No. :24-033 (WWAN03)ONE1/6/2026 Project Name : 2024, 2025 and 2026 Sanitary Sewer Point Repair 1951 Lake Ave Contractor : MILLER PIPELINE 421 E. Industrial Blvd., Pueblo West, CO81007 You are hereby requested to comply with the following changes from the plans & specifications: Bid Item Description of ChangesDecreaseIncrease No.Contract ByContract By 1 ASPHALT PATCH - 4" HMA on 4" CLASS 6 ABC FOR 8" AND 10" PIPE($2,250.00) 2 CALCIUM ALUMINATE COAT 8-INCH MANHOLE($1,050.00) 5 TRAFFIC CONTROL$690.00 6 PARTS$997.42 TOTAL (Decrease) / Increase ($3,300.00)$1,687.42 Net Adjustment This Change Order $(1,612.58) Amount of Previous Change Order(s) $0.00 Original Contract Amount $8,600.00 Total Adjusted Contract Amount To Date $6,987.42 Reason For Change:Actual Field Quantities. The time provided for completion of the contract is changed by 0 calendar days. This document shall become an amendment to the contract and all provisions of the contract apply hereto. Prepared by: ___________________________________________ Date:____________ Wastewater Civil Engineer Reviewed by: ___________________________________________ Date:____________ Wastewater Engineering Manager Accepted by: ___________________________________________ Date:____________ Contractor's Representative If this Change Order causes an increase from the original contract price, signed approval by the Director constitutes representation that lawful appropriations are sufficient to cover such increase. Approved by: ___________________________________________ Date:____________ Director of Wastewater FORM CO100.1299 Page 1 of 1