Loading...
HomeMy WebLinkAbout16192RESOLUTION NO.16192 A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $191,903.17 WITH PARKER EXCAVATING, INC., FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 101 W RIVERWALK, PROJECT NO. 24-033 EXECUTION OF THE SAME. WHEREAS, an emergency sanitary sewer repair was authorized by the Mayor in accordance with Section 1-10-5 of the Pueblo Municipal Code; and WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under the 2024-2026 multi-year point repair contract; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that SECTION 1. City Council ratifies and approves the contract for repair of the sanitary sewers at 101 W. Riverwalk with Parker Excavating, Inc., Project No. 24-033 (WWAN03) Emergency Point Repair awarded to said bidder in the amount of $191,903.17. SECTION 2. Funds for Project 24-033 (WWAN03) Emergency Point Repair shall be from the Sewer User Fund. SECTION 3. The Purchasing Agent was authorized to execute said contract on behalf of Pueblo, a Colorado Municipal Corporation, and the City Clerk properly affixed the seal of the City thereto and attested the same. SECTION 4. The officers and staff of the City are authorized to perform any and all acts consistent with the intent of this Resolution and the contract to implement the transactions described therein. Furthermore, all actions previously taken by officers and staff of the City consistent with the contract, including contract change order in the amount of $112,165.17 and any other payment authorized under the contract are hereby ratified. SECTION 5. This Resolution shall become effective immediately upon passage and approval. INTRODUCED: December 8, 2025 BY: Brett Boston MEMBER OF CITY COUNCIL APPROVED: __________________________ PRESIDENT OF CITY COUNCIL ATTESTED BY: ________________________ CITY CLERK City Clerk's Office Item # M1 Background Paper for Proposed Resolution COUNCIL MEETING DATE: December 8, 2025 TO: President Mark Aliff and Members of City Council CC: Mayor Heather Graham VIA: Marisa Stoller, City Clerk FROM: Andra Ahrens, Director Wastewater SUBJECT: A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $191,903.17 WITH PARKER EXCAVATING, INC., FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 101 W RIVERWALK, PROJECT NO. 24-033 (WWAN03) AND THE SAME. SUMMARY: This Resolution ratifies and approves award of a construction contract to Parker Excavating, Inc., for emergency sanitary sewer point repairs at 101 W. Riverwalk. PREVIOUS COUNCIL ACTION: None BACKGROUND: The Wastewater Department collection crew televised the sewer main next to 101 W Riverwalk to determine the current conditions of the sewer main before the City of Pueblo starts to occupy the building. They discovered multiple sags ranging from 25% to 90% in the main, with the most severe at the services. These defects will further deteriorate, increase the chance of collapse and block the flow from the building services. An emergency repair was performed to remove and replace the defective pipe, install a new manhole at the upstream end of the main and putting back existing surface improvements. Additionally, the existing manhole at the downstream end of the main was rehabilitated with calcium aluminate patching and epoxy coating, and the trough and bench were rebuilt with fast-setting cementitious material. Due to the utilities in the repair location, relocating the sewer main was not possible and removing and replacing the defective pipe segment of the existing line together with the need to improve the slope of the sewer main required extensive surface improvements, labor, time and material costs as summarized in the change order. The repair work was performed under the Sanitary Sewer Point Repair multi-year contract under which two contractors were qualified via competitive bid. An estimate was prepared, and Parker Excavating was the lowest bidder and accepted the work. The cost breakdown for the project is as follows: Sanitary Sewer Replacement-related Total: $ 134,816.05 70% Surface Improvement Related Total: $ 57,087.12 30% Grand Total: $ 191,903.17 100% FINANCIAL IMPLICATIONS: Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer User Fund. Funding was available and had been budgeted, appropriated, and allocated to Project No. 24-033 (WWAN03) Emergency Point Repair. BOARD/COMMISSION RECOMMENDATION: Not applicable STAKEHOLDER PROCESS: None ALTERNATIVES: Not approve the Resolution would require a finding that there was not an emergency condition. RECOMMENDATION: Approval of the Resolution. ATTACHMENTS: 1. 12-08-25 101 W Riverwalk Emergency Point Repair Attachment