HomeMy WebLinkAbout6334RESOLUTION NO. 6334 A RESOLUTION ADOPTING THE NORTHEAST QUADRANT ANNEXATION MASTER PLAN AS THE THREE -MILE AREA PLAN FOR THE NORTHEAST QUADRANT OF THE CITY OF PUEBLO PURSUANT TO THE MUNICIPAL ANNEXATION ACT OF 1965 WHEREAS, the City Planning and Zoning Commission is authorized to prepare and submit to the City Council for its approval a master plan for the physical development of the City pursuant to Section 12 -5 of the Charter of Pueblo; and WHEREAS, the City Planning and Zoning Commission has, in compliance with the Municipal Annexation Act of 1965 (Section 31- 12- 105[1][e], CRS [1988 Cum. Supp.]), approved a three -mile area plan for the Northeast Quadrant of the City (the "Northeast Quadrant Master Annexation Plan "); BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO that: gRCTTnN 1_ The Northeast Quadrant Master Annexation Plan heretofore approved by the City Planning and Zoning Commission and submitted to the City Council, the original of which is on file in the office of the City Clerk, is hereby approved. gFCTTnN 9_ The Northeast Quadrant Annexation Master Plan shall function and hereby is adopted as the City of Pueblo's official three -mile area plan," as required by Section 31- 12- 105[1][e], CRS [1988 Cum. Supp.]) for the Northeast Quadrant of the City and shall be updated at least annually. SECTION 3. All three -mile area plans and all parts thereof heretofore adopted by the City Council for the Northeast Quadrant of the City are hereby repealed and rescinded, except insofar as any physical development has been approved pursuant thereto by the City or any of its agencies, commissions, or boards. gRrTTnN A _ This Resolution shall become effective upon final passage. INTRODUCED February 27 , 1989 By MIKE SALAR Councilman APPROVED: ATTEST: City Clerk President of the Council (SEAL) NORTHEAST QUADRANT ANNEXATION MASTER PLAN �o 0 0 0 - City of Pueblo Department of Planning and Development February 1989 NORTHEAST QUADRANT ANNEXATION MASTER PLAN Pueblo City Manager Lewis A. Quigley City of Pueblo, Department of Planning and Development James F. Munch, Director Betty J. Gonzales Donald R. Vest Vern P. Martinez Sharon K. Weldon Karin A. Sable William J. Zwick Richard G. Schaffer Principal Authors Karin A. Sable Richard G. Schaffer Pueblo City Council Kenneth F. Hunter, President ------------ - ----- -District 2 Michael Salardino, Vice President ---------- - - - -At -Large John Califano -------------- -- ------------ - - - - -- District 4 Samuel Corsentino --------------- --------- - - - - -- District 3 Gilbert Garbiso ------------- -- -- -------- - - - - At - Large Michael Occhiato ---------------- ------ - ---- - - - - At - Large Douglas Ring --------------- ------ -------- - - - - -- District 1 Pueblo City Manager Lewis A. Quigley City of Pueblo, Department of Planning and Development James F. Munch, Director Betty J. Gonzales Donald R. Vest Vern P. Martinez Sharon K. Weldon Karin A. Sable William J. Zwick Richard G. Schaffer Principal Authors Karin A. Sable Richard G. Schaffer NORTHEAST QUADRANT ANNEXATION MASTER PLAN TABLE OF CONTENTS SECTION TITLE PAGE I. INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . . . . 1 A. PURPOSE . . . . . . . . . . . . . . . . . . . . . . . . . 1 B. OBJECTIVE . . . . . . . . . . . . . . . . . . . . . . . . 1 — C. ASSUMPTIONS . . . . . . . . . . . . . . . . . . . . . . . . 2 D. LOCATION . . . . . . . . . . . . . . . . . . . . . . . . . . 2 — II. ANNEXATION REQUIREMENTS . . . . . . . . . . . . . . . . . . . . 4 PREFACE . . . . . . . . . . . . . . 4 A. COLORADO ANNEXATION REQUIREMENTS. . . . . . . . . . 4 _ 1. Development Eligibility (CRS Title 31 -12 -104 . . . . . . 4 2. Annexation Master Plan (CRS Title 31- 12- 1054[e) . . . . . . 4 3. Annexation Impact Report (CRS Title 31 -12 -108.5 . . . . . . 5 B. CITY OF PUEBLO ANNEXATION REQUIREMENTS. . . . . . . . . . . 5 1 . Development Plan . . . . . . . . . . . . . . . . . . . . . . 6 _ 2. Drainage Plan . . . . . . . . . . . . . . . . . . . . . 6 3. Sanitary Sewer Plan . . . 6 4. Transportation Plan . . . 8 5. Zoning and Subdivision . . . . . . . . . . . . . . . . . . . 10 — 6. Public Facilities . . . . . . . . . . . . . . ... . . . . 11 7 . Utilities . . . . . . . . . . . . . . . . . . . . . . . . . 11 — III. REFERENCE PLANS . . . . . . . . . . . . . . . . . . . . . . . . 12 PREFACE . . . . . . . . . . . . . . . . . . . . . . . . . 12 _ A. LAND USEPLANS. . . . . 12 1. Pueblo Regional Comprehensive Development Plan. 12 2. Airport Subdivision Sketch Plan . . . . . . . . . . . . . . 12 3 . Air Facilities Plan . . . . . . . . . . . . . . . . 12 — 4. City of Pueblo Urban Parks and Recreation Recovery Action Program and Plan . . . . . . . . . . . . . . . . . 12 5. Pueblo Memorial Airport Master Plan . . . . . . . . . . . . 19 — 6. Airport Noise Compatibility Program . . . . . . . . . . . . 20 B. INFRASTRUCTURE PLANS . . . . . . 15 1. Report On Water Distribution System for PuebloBoard _ of Water Works. . . . . . . . . . . . • . . . . . . 15 2. Sanitary Sewerage and Wastewater Treatment Facilities for the City of Pueblo. . . . . . . . . . . . . . . . 15 — 3. Pueblo Airport Industrial Park Wastewater Treatment Plant Preliminary Engineering Study . . . . . . . . . . . 15 _ C. TRANSPORTATION PLANS . . . . . . . . . . . . . . . . . . . . 16 1. Year 2000 and 2010 Transportation Plans . . . . . . . . . . 16 2. Pueblo Airpark Access Alternatives Study. . . . . . . . . . 16 - i - TABLE OF CONTENTS (CONT'D) SECTION TITLE PAGE IV. PUEBLO'S THREE -MILE ANNEXATION PLAN . . . . . . . . . . . . . . 19 1. Major Transportation Corridors . . . . . . . . . . . . . . . 19 2. Residential Land Use . . . . . . . . . . . . . . . . . . . . 23 3. Commercial Land Use . . . . . . . . . . . . . . . . . . . . 24 4. Industrial Land Use . . . . . . . . . . . . . . . . . . . . 25 5. Public Facilities . . . . . . . . . . . . . . . . . . . . . 26 6. Parks, Open Space, and Trails . . . . . . . . . . . . . . . 26 V. ENVIRONMENTAL ANALYSIS . . . . . . . . . . . . . . . . . . . . . 28 A. ENVIRONMENTAL INVENTORY . . . . . . . . . . . . . . . . . . 28 1. Geology and Soils . . . . . . . . . . . . . . . . . . . . . 28 2. Drainage /Topography . . . . . . . . . . . . . . . . . . . . 28 3. Floodplains . . . . . . . . . . . . . . . . . . . . . . . . 34 4. Wetlands. . . . . . . . . . . . . . . . . . . . . . . . . 34 5. Flora and Fauna . . . . . . . . . . . . . . . . . . . . . . 34 6 . Climate . . . . . . . . . . . . . . . . . . . . . . . . 34 7 . Water Quality . . . . . . . . . . . . . . . . . . . . . . . 34 8. Air Quality . . . . . . . . . . . . . . . . . . . . . . . . 35 B. ENVIRONMENTAL CONSTRAINTS . . . . . . . . . . . . . . . . . 36 1. Floodplain Hazards . . . . . . . . . . . . . . . . . . . . 36 2. Wildfire Hazards . . . . . . . . . . . . . . . . . . . . 37 3. Geologic Hazards . . . . . . . . . . . . . . . . . . . . . . 37 4 . Mineral Resource Areas . . . . . . . . . . . . . . . . . . . 39 5. Landfill. . . . 39 6. Environmental Hazards Composite . . . 41 VI. INFRASTRUCTURE -- EXISTING AND PROPOSED ROADWAY AND UTILITY SYSTEM- -PLANS . . . . . . . . . . . . . . . . . . . . . . . . 43 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . 43 A. TRANSPORTATION NETWORK . . . . . . . . . . . . . . . . . . 43 B. WATER SERVICE . . . . . . . . . . . . . . . . . . . . . . . 44 C. WASTEWATER . . . . . . . . . . . . . . . . . . . . . . . . 48 D. ELECTRIC POWER . . . . . . . . . . . . . . . . . . . . . . 49 E. GAS . . . . . . . . . . . . . . . . . . . . . . . . . 50 F. TELEPHONE . . . . . . . . . . . . . . . . . . . . . . . 52 G. CABLE TELEVISION . . . . . . . . . . . . . . . . . . . . . 53 -ii - TABLE OF CONTENTS (CONY D) SECTION TITLE PAGE VII. PUBLIC FACILITIES -- EXISTING AND PROPOSED PLANS. . . . . . . . . 54 A. SCHOOLS . . 54 1. School District No. 60. 81 — 2. School District No. 70. 56 3. Detachment and Annexation of School Districts 57 — B. PARKS . . . . . . . . . . . . . . . . . . . . . . . . . . 57 C. POLICE . . . . . . . . . . . . . . . . . . . . . . . . 60 1. City Police Department . . . . . . . . . . . . . . . . . . . 60 _ 2. County Sheriff Department . . . . . . . . . . . . . . . . . 61 D. FIRE . . . . . . . . . . . . . . . . . . . . . . . . . . . 61 VIII. ZONING AND LAND USE . . . . . . . . . . . . . . . . . . . . . . 64 INTRODUCTION . . . . . . . . . . . . . . . . . . . . . . . 64 A. CITY OF PUEBLO . . . . . . . . . . . . . . . . . . . . . . 64 B. LAND USE . . . . . . . . . . . . . . . . . . . . . . . . . 64 — C. PUEBLO COUNTY . . . . . . . . . . . . . . . . . . . . . . . 64 D. COUNTY LAND USE . . . . . . . . . . . . . . . . . . . . . . 67 E. LAND OWNERSHIP . . . . . . . . . . . . . . . . . . . . . . 67 _ F. BELLE PLAIN . . . * * i * i ' * * * * . . . . . . . . . . 67 G. PUEBLO MEMORIAL AIROT & IDSRAPARK . . . ... . . . . 72 1 . Airport . . . . . . . . . . . . . . . . . . . . . . . 72 2. The Airport Industrial Park . . . . . . . . . . . . . . 73 — 3. Fire Protection -- Airport & AIP . . . . . . . . . . . . . . . 73 4 . Emergency Services . . . . . . . . . . . . . . . . . . . . . 74 5. Airport Police Protection . . . . . . . . . . . . . . . 74 — 6. Pueblo Memorial Airport Noise Zones . . . . . . . . . . . . 75 APPENDIX 1: STANDARD AVIGATION EASEMENT. . . . . . . . . . . . - iii - LISTING OF MAPS MAP NO. MAP TITLE PAGE I. PLANNING AREA. . . . . 3 II. PUEBLO AIRPARK SUBDIVISION SKETCH PLAN * MAP. 13 III. CL FI MAJOR TRANSPORTATION ROUTES FUNCTIONAL ASSICATION 17 IV. AIRPARK ACCESS ALTERNATIVES . . . . . . . . . . . . . . . . . . 18 V. PROPOSED URBAN -RURAL DEMARCATION . . . . . . . . . . . . . . . 20 VI. PROPOSED LAND USES . . . . . . . 21 VII. POTENTIAL PRINCIPAL ARTERIALS AND TRAIL EXTENSIONS . . . . . . 22 VIII. BEDROCK GEOLOGY. . . . . . . . . . . . . . . . . . . . . . . 29 IX. SURFICIAL GEOLOGY . . . . . . . . . . . . . . . . . . . . . . . 30 X. SOIL ASSOCIATIONS . . . . . . . . . . . . . . . . . . . . . . . 31 XI. LANDFORMS. . . . . . . . . 32 XII. DRAINAGE BASINS AND 100 -YEAR FLOODPLAIN. 33 XIII. MINERAL RESOURCE AREAS . . . . . . . . . . . . . . . . . 40 XIV. ENVIRONMENTALLY SENSITIVE AREAS . . . . . . . . . . . . . . . . 42 XV. SERVICE AREA BOUNDARIES . . . . . . . . . . . . . . . . . . 45 XVI. CITY WATER PRESSURE ZONES . . . . . . . . . . . . . . . . . 46 XVII. GAS AND POWER LINES . . . . . . . . . . . . . . . . . . . . . . 51 XVIII. SCHOOL SITES & DISTRICT BOUNDARIES . . . . . . . . . . . . . . 55 XIX. CITY PARK FACILITIES . . . . . . . . . . . . . . . . . . . . . 59 XX. CITY AND COUNTY FIRE SERVICE AREAS . . . . . . . . . . . . . . 62 XXI. CITY ZONING . . . . . . . . . . . . . . . . . . . . . . . . . . 65 XXII. COUNTY ZONING. . . . . . . . . . . . . . . . 66 XXIII. EXISTING COUNTY SUBDIVISIONS . . . . . . . . . . . ., . . 68 XXIV. FARMLANDS . . . . . . . . . . . . . . . . . . . . . . . . 69 XXV. LAND OWNERSHIP GREATER THAN 20 ACRES . . . . . . . . . . . . . 70 XXVI. BELLE PLAIN INDUSTRIAL AREA . . 71 XXVII. 1977 PUEBLO MEMORIAL AIRPORT CNR NOISE CORRIDOR 76 XXVIII. PUEBLO MEMORIAL AIRPORT LDN NOISE CONTOURS . . . . . . . . . . 77 TABLE NO. TITLE PAGE I. GEOLOGIC PROPERTIES . . . . . . . . . . . . . . . . 29 -A II. BOARD OF WATER WORKS PLANT WATER INVESTMENT FEES . . . . . 47 III. BOARD OF WATER WORKS WATER MAIN EXTENSIONS - -UNIT COST. . . . . 47 IV. SCHOOL DISTRICT 60 ENROLLMENT -- MAXIMUM OPTIMAL CAPACITIES. . . 54 V. SCHOOL DISTRICT 70 ENROLLMENT. . . . . . . . . . . . . . . 56 VI. PARKS AND RECREATIONAL FACILITIES. . . . . . . . . . . . . 58 VII. COMPARISON OF CNR /LDN NOISE LEVELS RELATING TO LAND USE IMPACT. . . * i * * . . . . . . . . . 78 VIIII. LAND USES NORMALLY COMAIL WITH VARIOUS NOISE LEVELS. . . . 79 - iv - CITY OF PUEBLO NORTHEAST QUADRANT ANNEXATION MASTER PLAN I. INTRODUCTION A. PURPOSE The Department of Planning and Development for the City of Pueblo is charged with _ the responsibility of conducting land use planning activities. The Northeast Quadrant Master Plan is being prepared in response to Senate Bill 45, to recent developments at the Pueblo Memorial Airport Industrial Park (AIP), and to proposed development adjacent to the University of Southern Colorado. The AIP, owned by but not located within the Corporate limits of the City of Pueblo, is rapidly developing as the largest industrial park in Southern Colorado. Intensive building at the AIP began in 1984 when Unisys constructed a new plant. It has since grown with the construction of new facilities by Target (Dayton Hudson Corporation), Pryor - Giggy, Atlas Pacific, Kurt Manufacturing, Trane Corporation, B. F. Goodrich Company, PCL Corporation, McDonnell Douglas Corporation, and Kaiser _ Corporation. The employment generated by these industries has fueled interest in residential development within the Northeast Quadrant. The City and the University of Southern Colorado have recently entered into an agreement to develop a new municipal golf course within the quadrant. The purpose of this plan is to provide policies to insure that new development does not adversely impact the Pueblo Memorial Airport operation. This Plan shall be consistent with the City's land use and transportation policies and State annexation statutes. B. OBJECTIVE This annexation master plan will serve as an addendum to the 1980 Pueblo Regional Comprehensive Development Plan It is designed to be a framework for development, with sufficient flexibility to be changed as conditions warrant. The goals of this plan are: (1) Establish land use and annexation policies which will guide the physical development within the Northeast Quadrant. These policies will provide a standard for future annexations and will supplement City zoning and subdivision regulations. (2) Comply with State annexation laws, Pueblo Board of Water Works policies, and U. S. Government Federal Aviation Administration (FAA) airport regulations and aircraft noise recommendations. (3) Lay out a framework for development including roadway and utility infra- structure requirements and environmental and man -made constraints and opportunities to development. - 1 - C. ASSUMPTIONS For the purpose of this master plan, the following assumptions are made: (1) Development at the AIP will continue at its existing rate. (2) There will be continued pressure to develop the land adjoining the University of Southern Colorado. (3) There will be a need for additional roadway access to the Airport and AIP. (4) There will be a need to protect the Airport from incompatible development. D. LOCATION The Northeast Quadrant Annexation Master Plan area contains approximately 50 square miles within the Northeast Quadrant of Pueblo, Colorado (See Map I). The study area is bounded on the south by Highway 50 -C (State Highway 96); on the east by State Highway 231 (36th Lane extended north); on the north by the KCSJ Radio Tower on Baculite Mesa; and on the west by Interstate 25. The planning area encompasses property that is located within three miles of the current eastern and northern City boundaries. - 2 - II. ANNEXATION REQUIREMENTS PREFACE This plan is designed to conform with the Municipal Annexation Act of 1965 (Part I of Article 12 of Title 31, CRS) amended by Senate Bill 45 passed in 1987. This act requires a municipality to develop an annexation master plan describing proposed public facilities, utilities, and land uses within a three -mile limit from current City boundaries. A. COLORADO ANNEXATION REQUIREMENTS Senate Bill 45 was passed in the 1987 Session of the Colorado General Assembly. It applies to all municipal annexations requested after May 28, 1987. 1. Development Eligibility (CRS Title 31 -12 -104 The perimeter of the area proposed for annexation must have no less than one sixth contiguity with the annexing municipality. Contiguity may be established by the annexation of one or more parcels in a series, completed simultaneously, and considered together for the purposes of public hearing requirements. Contiguity is not affected by the existence of a platted street or alley, a public or private _ right -of -way, a public or private transportation right -of -way, and public lands whether owned by the State, the United States, or an agency thereof. Contiguity is affected by County -owned open space, or a lake, reservoir, stream, or other natural or artificial waterway between the annexing municipality and the land proposed to be annexed. Municipality boundaries shall not be extended more than three miles in any direction from any point of such municipal boundary in any one year. Such three mile limit may be exceeded if such limit would have the effect of dividing a parcel of Property held in identical ownership provided that at least 50 percent _ of the Property is within the three -mile limit. Such three -mile limit may also be exceeded for the annexation of an enterprise zone. 2. Annexation Master Plan (CRS Title 31 -12- 1054 -[e Prior to completion of any annexation within the three -mile area, the municipality shall have in place a plan for that area which describes the proposed location, character, and extent of streets, subways, bridges, waterways, waterfronts, parkways, playgrounds, squares, parks, aviation fields, other public ways, _ grounds, open spaces, public utilities, and terminals for water, light, and sanitation, and transportation. Power to be provided by the municipality and the proposed land uses for the area shall be addressed. Such plan shall be updated at least once annually. - 4 - 3. Annexation Impact Report (CRS Title 31 -12- 108.5). The municipality shall not be required to furnish an Annexation Impact Report for annexations of ten acres or fewer in total area. The municipality and the Board of County Commissioners governing the area proposed to be annexed may agree that the report be waived. The Annexation Impact Report shall include as a minimum a map or maps of the municipality and adjacent territory to show the following information: (a) the present and proposed boundaries of the municipality in the vicinity of the proposed annexation; (b) the present streets, major trunk water mains, sewer interceptors and outfalls, other utility lines and ditches, and the proposed extension of such streets and utility lines in the vicinity of the proposed annexation; (c) the existing and proposed land use pattern in the areas to be annexed; (d) a copy of any draft or final pre- annexation agreement, if available; (e) a statement setting forth the plans of the municipality for extending to or otherwise providing for, within the area to be annexed, municipal services performed by or on behalf of the municipality at the time of annexation; (f) a statement setting forth the method under which the municipality plans to finance the extension of the municipal services into the area to be annexed; (g) a statement identifying existing districts within the area to be annexed; and (h) A statement on the effect of annexation upon local public school district systems including the estimated number of students generated and the capital construction required to educate such students. B. CITY OF PUEBLO ANNEXATION REQUIREMENTS Petitioners for annexations must meet as a minimum the following conditions: (1) The area to be annexed is a logical extension of the City's boundary. (2) The Petitioner agrees to prepare and submit to the Planning and Zoning Commission for adoption a master plan for all the Property. The Master Plan will comply with the policies of the Pueblo Regional Comprehensive Development Plan and the Northeast Quadrant Annexation Master Plan presently existing (and as same hereafter may be amended). It shall be designed to address a wide range of planning and development issues involved in the proposed annexation. The Master Plan shall consist of (1) Development Plan; (2) Drainage Plan; (3) Sanitary Sewer Report; and (4) Transportation Plan. - 5 - 1. Development Plan. The Development Plan shall be prepared by the Petitioner in consultation with the City's Subdivision Review Committee and Department of Planning and Development in accordance with the requirements of Section 12- 4 -6(A) of the 1971 Code of Ordinances of the City of Pueblo and as same may be subsequently amended. A development phasing plan which will establish the anticipated phasing of the development of the Property shall also accompany the Development Plan. 2. Drainage Plan. The Drainage Plan shall be prepared by the Petitioner in accordance with the Pueblo Storm Drainage Criteria (MANUAL) (then in effect or as same hereafter may be amended). It shall be certified by a Professional Engineer competent in the field of surface water drainage engineering and registered in the State of Colorado. The Drainage Plan shall address surface water drainage within the Property and onto the Property from other areas, as well as the effects of the development of the Property upon downstream properties and drainage facilities. Associated impacts identified in the Drainage Plan will be mitigated through surface water drainage improvements financed by the Petitioner. The Drainage Plan shall include a phasing plan for such improvements. Storm water detention facilities, designed and constructed in accordance with the MANUAL, may be used to mitigate the increased runoff due to development. 3. Sanitary Sewer Report. A Sanitary Sewer Report shall be submitted by the Petitioner in accordance with criteria specified by the City Engineer. This Report shall be supported by studies and reports prepared by a licensed Professional Engineer competent in the field of sanitary sewer engineering and registered in the State of Colorado. The Sanitary Sewer Report shall address the needs of the entire gravity -fed basin (sewer drainage basin), so designated by the Director of Public Works. Associated impacts identified in the Sanitary Sewer Report will be mitigated through sanitary sewer improvements financed by the Petitioner. The Sanitary Sewer Report shall provide a phasing plan for such improvements. If the Petitioner installs sanitary sewers which are oversized in the Master Plan area to serve future development outside the Master Plan area but within the sewer drainage basin, a Sewer Participation Cost Recovery Agreement may be entered into _ between the Petitioner and the City. The Petitioner may then be reimbursed for the oversize cost plus interest by a newly benefitted Property owner when any part of the benefitted Property within an approved subdivision is connected, directly or indirectly, to such oversized sewers located within the Master Plan area. If the Petitioner constructs sewers downstream from the Master Plan area which will serve future development outside the Master Plan area but within the sewer drainage basin, the Sewer Participation Cost Recovery Agreement shall include provisions so that the Petitioner may be reimbursed for a pro -rata share of the costs of construction of such downstream sewers, as the Director of Public Works shall determine to be just and equitable, by the benefitted Property is connected, directly or indirectly, to such sewers. The Sewer Participation Cost Recovery Agreement shall be in conformity with the City's then existing ordinances and shall be approved by City Council. a. Sanitary Sewer Report Criteria The following criteria provides guidelines for the Planning and Design of sanitary sewers. These guidelines shall include planning criteria, minimum or maximum controls of sewer design, and construction. However, in unusual circumstances or where special conditions dictate, certain deviations from the standard criteria may be directed or approved by the Director of Public Works. All improvements to the sanitary sewer system shall be planned and designed to provide adequate service as specified by the following planning criteria for sanitary sewers: (1) Acreages for separate land uses (i.e., as single - family, multifamily, commercial, and industrial) shall be established based upon the Development Plan. (2) Sanitary sewer impact shall be computed for the entire sewer drainage basin including the proposed development or annexation. Mains shall be designed to accommodate the area as per criteria contained herein. (3) If any flow from the development is accepted into the existing sanitary sewerage system, an analysis of the existing sanitary sewerage system shall be prepared addressing the impact of the additional flows, including but not limited to: (a) locations of all points on the City's existing sewer system where the new system will connect; (b) identification of hydraulic deficiencies in the system created by the development, as determined by the City; (c) a discusion of any pumping stations, forced mains, packaged treatment plans, etc., needed to service the area; (d) proposed corrections, improvements, or upgrading to relieve existing impacted system; and (e) financing and scheduling of corrections, improvements, or upgrading to relieve existing system, including any proposed private sewer agreements. (4) The Report shall discuss and analyze areas upstream of the annexation site, within the gravity drainage basin, that would impact a trunk line through the site. - 7 - (5) The Report shall identify the proposed site on a United States Geological Survey (USGS) Map, the gravity drainage basin or basins that it lies within, and the service boundary limits for the City's Wastewater Treatment Plant. b. Design Criteria for Sanitary Sewers (1) Design shall be in accordance with the minimum design standards and specifications for subdivisions of the City of Pueblo, Colorado. (2) Sewer lines shall be designed to flow at less than capacity. Lines 15 inches and less shall have a design capacity of 50 percent of the pipe depth. Lines 18 inches and larger shall have a design capacity of 75 percent of the pipe depth. (3) Flow Factors- -Pe Single- Family Residential -- 0.0042 cfs per acre Multiple - Family Residential -- 0.0009 cfs per unit Commercial -- 0.0040 cfs per acre Industrial -- 0.0051 cfs per acre High Water Consuming Industries -- Special Study Required Institutional Use -- Special Study Required Areas Outside the Development Plan -- 0.0044 cfs per acre Average Infiltration /Inflow -- 0.0003 cfs per acre (4) Areas with a high potential for groundwater infiltration shall be identified. Maximum allowable infiltration /inflow (I /I) shall be in accordance with Article 13, "Specifications for Sanitary Sewers." Information provided by the Sanitary Sewer Report pertains only to that time when it is submitted. Conditions may change by the time an area is subdivided. The Public Works Department shall not be committed to the reported sewer capacities until the property has been legally subdivided. 4. Transportation Plan. A Transportation Plan shall be prepared by the Petitioner in accordance with the following criteria and outline specified by the City Traffic Engineer. The Plan shall be supported by studies and reports prepared by Professional Engineers competent in the field of transportation and registered in the State of Colorado. The Plan shall be in conformance at a minimum with the goals and classifications of the Year 2000 Plan as presently exists and as same may hereafter be amended and these transportation plan requirements. Development impacts to the existing and proposed roadway system identified in this study will be mitigated through traffic improvements financed by the Petitioner (such as but not limited to additional roadway corridors, traffic signals, signal interconnect conduit and wire, deceleration /acceleration lanes, and median islands). The Transportation Plan shall provide a schedule of such improvements. The Transportation Plan shall comply with existing and proposed roadways in adjacent subdivisions. a. Transportation Plan Requirements The following criteria set forth the general outline for the Transportation Plan. (1) Study Area Boundaries (a) Description of Study Area Boundaries The study area boundaries shall include the area and intersections identified by the City Traffic Engineer, including but not limited to the development Plan area of the proposed subdivision. (b) Existing and Proposed Land Uses. Proposed land uses shall be based upon the Development Plan. (c) Existing and Proposed Study Boundary Area Uses. Proposed uses for land areas which are outside the Development Plan, but within the study area boundaries, shall be based upon existing zoning. (d) Existing and Proposed Roadways and Intersections. (2) Study Area Trip Generation (3) Study Area Trip Distribution (4) Study Area Trip Assignment (5) Study Area Existing Condition and Proposed Traffic Volumes (a) A study of morning and evening peak -hour site traffic, including turning movements and site traffic, plus through traffic, including turning movements for current conditions and 20 -year projections or at buildout, must be conducted. (6) Critical Movement Analysis (a) Conduct Volume /Capacity and Level of Service Analysis at Critical Intersections for peak hours for existing conditions and at build out. (7) Traffic Signal Progression (a) Determine traffic signal locations (using criteria from the Manual on Uniform Traffic Control Devices and corresponding two -way traffic signal progression pattern. Traffic progression is of paramount importance; generally a spacing of one -half mile for all intersections should be maintained. To ensure optimum two -way signal progression, an approved traffic engineering analysis will be made to properly locate all intersections and connecting access approaches that may require signalization. (8) T raffic Accidents (a) The traffic consultant will review the number and type of accidents occurring at study area intersections. This information will be available from the Pueblo Police Department. Estimates of increased or decreased accident potential shall be evaluated. The consultant will recommend roadway improvements based on accepted safe design practices. The developer shall only be responsible for additional impact upon existing off -site roadways and intersections. (9) Recommendations (a) Proposed Recommended Improvements. The Transportation Plan shall identify the project construction phases at which time specific street improvements and traffic controls shall be required. (b) Major arterial streets - -Troy Avenue, Eagleridge (47th Street), Baculite Mesa, Pueblo Boulevard and others as may be identified - -shall be constructed to principal arterial standards (5 lanes with median). Construction may be phased at the discretion of the City. Alamosa Road, 27th Lane, 36th Lane, Constitution Road, William White Boulevard, and others as may be identified shall be constructed to minor arterial standards (4 lanes with two -way left turn lanes). (10) Revised Critical Lane Capacity Analysis (a) Recommended improvement plan revised Volume /Capacity Analysis at Critical Intersections for peak hours for study area at build -out. (11) Study Criteria (a) Trip generation is to be from Institute of Transportation Engineers Trip Generation Guide (latest edition). (b) Critical Lane Capacity Analysis to be determined using the 1985 Highway Capacity Manual (Special Report 209), as amended. (c) Level of Service of "C" as defined in the Highway Capacity Manual shall be the goal for street design. However, it is recognized that Level of Service "D ", for some traffic movements, is acceptable for short periods during the peak traffic hours. 5. Zoning and Subdivision. The Property shall be zoned and subdivided in conformity with the approved Master Plan pursuant to the requirements of Titles 12 and 17 of the 1971 Code of Ordinances of the City of Pueblo, and as same may be subsequently amended and the land use policies of the Northeast Quadrant Annexation Master Plan and as same may be subsequently amended. - 10 - 6. Public Facilities. The Petitioner shall dedicate land and right -of -way for public uses and facilities required by the City including, but not limited to, sanitary and storm sewers, utilities, drainage ways, roadways, trail systems, and parks. The Petitioner at his expense shall construct and install all on -site and off -site improvements required by the City including, but not limited to, streets, curbs and gutters, sidewalks, trail systems, bridges, traffic control devices, sanitary sewers, storm sewers, drainage channel improvements and facilities, but excluding public buildings such as fire stations. 7. Utilities. The Petitioner shall comply with all applicable City of Pueblo (sanitary and storm sewers), Public Service Company (gas), Centel Company (electric), Pueblo TV and Power (cablevision), and Pueblo Board of Water Works (water) requirements for the installation of mains, lines, stations, and any other relevant utility facilities. - 11 - III. REFERENCE PLANS PREFACE The following Land Use, Infrastructure, and Transportation Plans have been prepared to guide development within the Northeast Quadrant: A. LAND USE PLANS 1. Pueblo Regional Comprehensive Development Plan. The Pueblo Regional Comprehensive Development Plan was prepared by the Pueblo Regional Planning Commission (PRPC) and adopted by the City of Pueblo and Pueblo County in 1980. The purpose of this document is to prepare for necessary and — desirable growth through the development of a master plan for physical development. The plan includes eight major parts, or elements, which address concerns associated with physical development in the region. The eight elements are Land Use, Housing, Public Facilities, Environmental Quality, Land Conservation, Parks and Recreation, Transportation, and Downtown Pueblo. The Plan contains goals and recommendations for each Element. 2. Airport Subdivision Sketch Plan. The City of Pueblo in 1986 prepared a sketch plan for the subdivision of the Airport property. The purpose was to enhance development'opportunities at the Airport and AIP. The sketch plan (See Map II) is part of the process required by — the Pueblo County's subdivision process. It identifies roadway and utility corridors and the general arrangement of the lots. 3. Air Facilities Plan. The Air Facilities Plan was prepared in October, 1986, by the City of Pueblo — Department of Planning and Development. The plan's goal is to maximize the amount of land available for industrial development while insuring that sufficient land is reserved for continued development of the Airport. The Air Facilities Plan addressess land availability, ground access, air -side access, and utility availability. 4. City of Pueblo Urban Parks and Recreation Recovery Action Program and Plan UPARR . The UPARR, which was prepared by the Pueblo Regional Planning Commission in 1981, assessed the physical rehabilitation service and management concerns of the City of Pueblo Parks and Recreation Department. This federally funded program was designed to help physically and economically distressed urban areas improve - 12 - w i- i i N J U H U Y001VW9* AVMOVOV .L. V 4� O C City of Pueblo Department of Planning & Development NORTHEAST QUADRANT ANNEXATION MASTER PLAN z a a x U Ey W x z 0 a x x a a a 0 a QI MAP: II - 13 - recreational opportunities. The conclusion of this plan states that Pueblo's physical parks system is evidence of a firm foundation for providing the open spaces and services needed and requested by its population. Recent emphasis on providing parks at the neighborhood level has had positive results. The plan recomends that quality be emphasized in design construction, rehabilitation, renovation, operations, maintenance, and in the need for the development of additional City -wide facilities. 5. Pueblo Memorial Airport Master Plan. This Airport Master Plan was prepared to provide an objective analysis of the 1975 facilities and capabilities of Pueblo Memorial Airport. It presents a detailed, yet flexible, plan for the future needs of the Airport. Based upon the available data, this plan was designed to furnish reasonable recommendations for the aviation needs of 1975 and thereafter for the Pueblo area. Recommendations and alternatives for meeting aviation demands were presented. These provided for short -range (5- year), intermediate range (10- year), and long range (20 -year) development. It should be understood that this document, although detailed, is for use as a general guideline for the continued development of the Pueblo Memorial Airport and AIP areas. The development recommendations set forth in this analysis will _ provide the guidance for long -range airport needs of the Pueblo area. The Airport Master Plan is being updated. 6. Airport Noise Compatibility Program. Federal Aviation Regulation (FAR) Part 150 implements portions of Title I of the Aviation Safety and Noise Abatement Act of 1979. It establishes a single system for the measurement of airport (and background) noise, a single system for determining the exposure of individuals to airport noise, and a standardized airport noise compatibility planning program. The planning program includes: (1) a provision for the development and submission to the FAA of Noise Exposure Maps and Noise Compatibility Programs by Airport operations; (2) standard noise units, methods, and analytical techniques for use in airport noise assessments; (3) identification of land uses which are normally considered compatible (or non - compatible) with various levels of noise around airports; and (4) procedures and criteria for FAA approval or disapproval of noise compatibility programs by the administrator. The program includes consideration of alternative noise control that might be employed as well as appropriate land use planning strategies. The goal of the overall program is for the airport proprietor, in consultation with State /local planners, local aviation groups, and interested citizens, to develop a balance and cost - effective program to minimize and /or mitigate the airport's noise impact on local communities. This study is currently being prepared. - 14 - B. INFRASTRUCTURE PLANS 1. Report on Water Distribution System for Pueblo Board of Water Works. In 1979, Black and Veach consulting engineers prepared a Water Distribution System Study for the Board of Water Works. The report provides a master plan for guidance of the Water Board in its continuing program of major water distribution system improvements construction. The purpose was to determine the adequacy of the Pueblo water distribution system in satisfying the present and future water requirements through the Year 1985. The report provides guidance thereafter for projections made through the Year 2000. The report contains area development studies to determine the present and probable future distribution of population within the service area, along with estimates of water demands and predicted distribution of demands on the system. 2. Sanitary Sewerage and Wastewater Treatment Facilities for the City of Pueblo, Colorado. This report, prepared by Sellards and Grigg, Inc., consulting engineers in 1971, presents a study of the City's sanitary sewerage and wastewater treatment facilities. The report proposes additions and corrections which will add to or improve the facilities so that they will provide for the present and future needs of the City. The scope of the work within this report includes the following: (a) development of a long -range master plan for the sewerage and establishment of a service area boundary; and (b) analyzing of the existing wastewater treatment plant and recommending improve- ments to correct present deficiencies and to provide capacity for future needs. Please see the City Department of Public Works for updated information on the City sewer service. 3. Pueblo Airport Industrial Park Wastewater Treatment Plant Preliminary Engineering Study. The Pueblo Airport Industrial Park Wastewater Treatment Plant Preliminary Engineering Study was prepared by CH2M Hill consultants in March, 1988. The study stated that the existing airport wastewater treatment facility would not be capable of handling wastewater flow and loading in the event of significant industrial growth within the Airport Industrial Park. Several industrial development scenarios were used to calculate five flow and loading projections. The analysis then examined five wastewater management alternatives in respect to the flow and loading projections, cost effectiveness, and other non - monetary criteria. - 15 - CH2M Hill recommended the first alternative, that of pumping to the City's main — plant, as being the best suited alternative to the goals of the City. This engineering study concludes that it is "essential for the City of Pueblo to select and begin implementing a wastewater management system that can effectively respond to the development plans of the Airport Industrial Park." C. TRANSPORTATION PLANS 1. Year 2000 and 2010 Transportation Plans. The Year 2000 Transportation Plan, adopted in 1981, is a guide for transportation systems development. It was developed as a cooperative venture by PACOG, Urban Transportation Planning Division, and the State Highways Department, with technical support from the Pueblo Regional Planning Commission, City of Pueblo Transportation Department, and the U. S. Federal Highway Administration. Within the Northeast Quadrant, the Year 2000 Plan identifies the extension of Constitution Road to Colorado Highway 47, the extension of 47th Street across the — Fountain Creek to University Park, and the construction of a new roadway from Jerry Murphy Road to USC (See Map III). This plan and the Year 2010 Plan which is being prepared are statements of present policy toward future needs. The Year 2010 Plan will reflect new development trends, changes in travel behavior, and new technologies. Employment, population, and dwelling units will be projected for 139 traffic zones and seven special generators. Trips will be generated based on projected dwelling units and employment and are loaded onto collectors, minor arterials, principal arterials, expressways, and freeways. The system will then be analyzed for system — deficiencies. 2. Pueblo Airvark Access Alternatives Stud Recent developments at the Pueblo Airport and AIP have resulted in traffic congestion and delays within the AIP internal traffic system, especially during — the peak hours. In response to the development and activity at the AIP, the FY 1987 Unified Planning Work Program listed Task C. 6. an "Airport Corridor Study." The Urban Transportation Planning Division contracted with the City of Pueblo's Department of Planning and Development to complete this study. The objective of this study is to identify and assess the environmental, economic, social, and traffic impacts of the alternative corridors. The six alternative _ corridors studied are identified on Map IV. This study concluded that no single alternative completely addressed the Airport Industrial Park's transportation needs at "build- out." Combinations of these alternatives can provide a solution. There are many possible combinations of alternatives that together can form a course of action. The best course of action appears to be the construction of improvements to the Paul Harvey interchange followed by the community concentrating its entire effort toward the extension of William White Boulevard. If at the time when a second access is needed and the right -of -way or funding for the William White extension is not available, the 36th Lane Alternative can _ address a short -term need. The course ultimately chosen will be determined by the availability of funds, timing, and need. - 16 - t 4 1 Ir I 1 I— \1 I LL— i I r - - - -I / i I / I / I / KEY: 11!2�1 North FAE=WAY EXPRESSWAY PRINCIPAL ARTERIAL °- MINOR ARTERIAL COLLECTOR - - -- CITY _IMITS SCIUNDARY City of Pueblo Department of Planning & Developme NORTHEAST QUADRANT ANNEXATION MASTER PLAN z O Ey d U W a U MAP: III - 17 - ra d zz o E a' zo wH c� a E» �o Z Z ff E- go a cq �a z� � x w ?' Ey O MAP: III - 17 - ���BBB�BBB JlTN LANE N / r r V O C BAXTER RD. I a 0 ° > J m W � = W F'- J q ; ° I > ca co W a e = = :? = 3 ° OWE. 0 � ♦ • ♦ - - QaJ�G 3 �_3a0 BACULITE ME ''^^ - ..�. O p65 ca +-OW t ul LJ W �- 1 0ZZ =Mw ° 1 1 —SSSy 3 ' TROY a l,,. F. �, Z V r Z Hmtir'OQ 4 • p W (.1 co N C— .) M BO F F Y rN t'74 6G TE 2 O NOnwOOD V HUDSON JERRY MURPHY INTERSTATE 2S City of Pueblo Department of Planning & Development NORTHEAST QUADRANT ANNEXATION MASTER PLAN w ►-1 z w F a C!1 w U x x a tx MAP: IV - is - IV. PUEBLO'S THREE -MILE ANNEXATION PLAN The population of the City of Pueblo is estimated to reach 110,000 persons by the Year 2000. It is anticipated that this growth will be largely fueled by increased employment at the Pueblo Airport Industrial Park. Recent trends indicate that a substantial portion of the accompanying residential growth will occur within the Northeast Quadrant. The goal of the Northeast Quadrant three -mile annexation plan is to facilitate development by establishing an efficient land use pattern which is consistent with the adopted standards and policies of the City of Pueblo. This plan is designed to meet the requirements of Senate Bill 45 which requires that the plan describe the proposed location, character, and extent of streets, subways, bridges, waterways, waterfronts, parkways, playgrounds, squares, parks, aviation fields, other public ways, grounds, open spaces, public utilities, and terminals for water, light, sanitation, and transportation; power is to be provided by the municipality and the proposed land uses for the area (CRS Title 31 -12- 1054 -[e]). The City's three -mile annexation plan is a compendium of all those plans referenced previously in this document and is a companion document to the Pueblo Regional Comprehensive Development Plan and the City's Code of Ordinances. It will provide guidance in the negotiation of annexation agreements. The boundaries of the study area for this plan extend three miles north of the existing City limit line and eastwardly to a line just east of the Pueblo Memorial Airport. The easterly study limit extends further than the three -mile limit. _ This was done to include the City -owned Airport facility and Industrial Park. The western study boundary is I -25 and the southern boundary is U. S. Highway 50. The study area has been divided into an Urban and Rural category. The Urban /Rural Demarcation line identifies the boundary beyond which the City does not anticipate urbanization to occur within the 12 -month period following the adoption of this plan (See Map V). The Urban portion represents the area within which municipal services could be logically extended. The primary features of this plan (See Map VI) include the identification of the major transportation corridors and anticipated land use concentrations around those corridors within the urbanized area. The plan also identifies the anticipated location of major public facilities and district and regional parks. The following plan will not depict any urban land use beyond the Urban Rural Demarcation Line. 1. Maior Transportation Corridors. The major east /west transportation corridors (See Map VII) from north to south include Pueblo Boulevard, 47th Street, and William White Boulevard. The east - wardly extension of Pueblo Boulevard and 47th Street will require the construction of a bridge over the Fountain Creek. William White Boulevard will be extended - 19 - LAW/ - - Z.r _ ') 7 _ from the AIP westwardly to its point of intersecting with Constitution Road extended and Colorado Highway 47. A major grade separated intersection will be required at this point of intersection. The major north /south transportation corridors from west to east include Jerry Murphy Road, Troy Avenue, Baculite Mesa Road, 27th Lane, and 36th Lane. Both Jerry Murphy Road (Overton Road) and Baculite Mesa Road currently exist. An exact alignment for the extension of Troy Avenue, 27th Lane, and 36th Lane has not yet been determined. Both 27th and _ 36th Lane extensions will require a major grade separated interchange at their point of intersection with U. S. Highway 50. The depicted alignment of these corridors is based upon the rationale that there should be a minimum one -mile separation between major transportation corridors. The only exception to this scenario is the approximate two -mile separation between the Jerry Murphy Road and Troy Avenue corridors. The City anticipates the construction of a "right in /right out" interchange with State Highway 47 approxi- mately half way between these two corridors. This interchange should provide access to University Park and the University of Southern Colorado. The transporta- tion corridors depicted on this Plan are identified within the forthcoming 2010 Plan, Northeast Quadrant Transportation Corridor Study, and within the Pueblo Memorial Airport Alternatives Access Study. All roadways within the Quadrant shall be constructed to the City standards then in effect. The goal for street design for the City of Pueblo shall be Level of Service "C" as defined in the Highway Capacity Manual. It is however envisioned that a new standard should be developed for these planned transportation corridors. The optimum standard right -of -way (ROW) for these corridors should be 150 feet; this would include a 125 -foot roadway ROW and a 25 -foot trail ROW. The roadway would be a minimum of four lanes with five to six lanes being required at the intersection of major transportation corridors, depending upon projected traffic volume. Private access onto these roadways would be prohibited with public access being permitted per the Colorado Highway Access Code. The two opposing lanes of traffic would be separated by a median with a minimum width of 20 feet. These medians should be designed and landscaped to the City's standard to minimize maintenance costs. These roadways should be constructed to include a pedestrian sidewalk on one side and a trail within the 25 foot trail ROW on the other. All trail ROW dedication should be credited to the parkland dedication where appropriate. The trails shall be constructed of concrete with a minimum width of six feet for pedestrians and eight feet for bicycles. The City currently requires developers to pay the entire cost of roadway and sidewalk construction. Due to the fact that the envisioned standard for these corridors exceeds the City's current standard, the City may choose to study the adoption of an impact fee or alternate system to help fund the construction of these corridors. 2. Residential Land Use. All residential development within the Northeast Quadrant must conform to the City's Code of Ordinances then in effect and the policies of the Pueblo Regional Comprehensive Development Plan. This quadrant contains both the Airport Indus- -23- trial Park and the City's planned new golf course. It is expected that this quadrant will experience, as a result of these factors, a majority of the residential growth anticipated within the community. (1) Rural residential development (A -3, A -4) shall be permitted in areas previously zoned A -4 by Pueblo County. (2) Single - family residential units adjacent to principal arterials and expressways shall be required to provide properly engineered noise buffers between the residence and the roadway. The buffers must meet a design standard to be established by the City of Pueblo. (3) Every attempt should be made to have transitional high- density residential (R -4, R -5, R -6) or office (0 -1) uses located between commercial (B -1, B -2, or B -3) and low- density, single - family residential (R -1, R -2) areas. (4) Every attempt should be made to pursue compatible zoning and land use policies in those areas impacted by Airport operations. It is highly recommended that until the FAA Part 150 Study is completed, residential development within Airport Noise Zones 1, 2, and 3 be in accord with the standards found in Table VIII, page 79. (5) Petitioners for annexations within Noise Zones 1, 2, and 3 will be required to grant to the City the Standard Avigation Easement, attached as Appendix 1. (6) Every effort should be made to link residential development with the City's Master Trails System. (7) Residential development on slopes of 20 percent or greater is permitted in the A -4 Zone, rural residential, only and with the requirement that soils and geology tests be prepared showing on -site or off -site hazards due to this development. (8) No single - family residential units (R -1, R -2, R -3, R -4) shall have private access onto major roadways. (9) Multiple residential units (R -5, R -6) shall be permitted a common access onto major roadways per the Colorado Highway Access Code. 3. Commercial Land Use. All commercial development within the Northeast Quadrant will be undertaken in accordance with the then existing City Code of Ordinances and should comply with the Policies of the Pueblo Regional Comprehensive Development Plan. It is anticipated that the market will dictate concentrations of commercial land uses at the intersections of the major transportation corridors. The City's goal should be to promote clustering around these intersections, thus discouraging strip commercial developments. Highway business (B -3 zones) should be encouraged to cluster at the intersections along the I -25 and State Highway 47 corridors. - 24 - Subregional and neighborhood commercial uses (B-2, B -2) should be permitted at the intersections of major roadways. In those cases where intersections exceed one -mile spacings, commercial nodes shall be permitted at other intersections along major roadways. A commercial node has been proposed at the intersection of State Highway 47 and William White Boulevard extended. This commercial area lies within the landing pattern of the Pueblo Memorial Airport. The recently commenced Pueblo Memorial Airport Plan Update will address this and other land use issues _ for properties near and adjoining the Airport. Private and public access onto major transportation routes will be strictly controlled as per the Colorado State Highway Access Code. Office (0 -1) and high density residential uses (R -3 through R -5) are encouraged to be used as buffers between low- density residential (R -1 and R -2) and regional (B -2 and B -3) commercial uses. Prior to the completion of the FAA Part 150 Airport Noise Study, commercial development within Airport Noise Zones 1, 2, and 3 should be in accord with the standards found in Table VIII, page 79. Petitioners within all noise zones within the Northeast Quadrant will be required to grant to the City the Standard Avigation Easement, attached as Appendix 1. 4. Industrial Land Use. All industrial development within the Northeast Quadrant will be undertaken in accordance with the then existing City Code of Ordinances and should comply with the Policies of the Pueblo Regional Comprehensive Development Plan. Industrial development will continue at the Airport Industrial Park and between I -25 and the Fountain Creek in the northern portion of the study area. The area north of U. S. Highway 50 between the Belle Plain Industrial'Park and the Airport Industrial Park, portions of which are presently zoned Industrial, I -3, is also anticipated to develop as industrial. Recent land use decisions by the Pueblo County Planning Commission have not granted any expansions of the I -3 zone adjoining the Belle Plain Industrial Park. It is therefore anticipated that if the land between the AIP and Belle Plain is to develop industrially and is not currently zoned I -3, it will be developed as I -2. It is not planned that any of the existing or proposed industrial development adjoin a residential area; but if such an industrial area develops, it must be contingent upon the development of an adequate buffer between these two uses. Prior to the completion of the FAA Part 150 Airport Noise Study, all industrial development within Airport Noise Zones 1, 2, and 3 should be in accord with the standards found in Table VIII, page 79. Petitioners within all noise zones within the Northeast Quadrant will be required to grant to the City the Standard Avigation Easement, attached as Appendix 1. - 25 - 5. Public Facilities. a. Police There are currently no plans to locate a police substation within the area covered by the three -mile annexation plan. b. Fire Fire Department standards require that new fire stations be central to their service area with no point further than one and one -half miles away. Additional fire stations will be required within the study area. The exact locations of these fire stations have not been identified. These locations will be dependent upon where development takes place, new road construction, number and density of new buildings, and other factors which may affect response time. 6. Parks, Open Space, and Trails. a. Parks Parks shall be dedicated as per the City Subdivision Ordinance, Section 12- 4 -7(e) (or as may be subsequently amended) by the developer of residential areas. (1) Neighborhood Park -- Neighborhood parks shall be developed on a minimum of five acres of land accessible to all subdivision residents. These parks shall have sufficient areas for recreational activities including but not limited to playgrounds, multipurpose courts, and open and shaded grassed areas. Dedicated parkland shall be located, when possible, adjacent to school district facilities to share use. Dedication for drainage ways, steep slopes, or other "nondevelopable land" for use as a park is not permitted. The City may accept drainage ways as a part of the master trails system if they are identified on the master trails map and are improved in accordance with the Storm Drainage Criteria Manual. The City will not accept dedication of a park site unless it meets Board of Water Works criteria for the provision of free irrigation water (Board of Water Works Rules and Regulations, October 18, 1983). (2) District Park - -A District Park should be developed in this Northeast area and contain facilities and programming for all ages. This park should be a minimum of 25 acres. It should provide specialized facilities such as a swimming pool, court sports, a recreation center, and regulation -size playing fields. Large grass and tree areas and specially landscaped open areas should be provided. Land currently owned by the City between the Fountain Creek and University Park Subdivision has been identified as a possible district park site. - 26 - (3) Regional Park -Every attempt should be made to acquire over 200 acres for a regional "urban park" on the west side of Baculite Mesa Road. This site shall be open for multiple recreational uses including but not limited to ball fields, tennis courts, a swimming pool, soccer fields, picnic areas, and playgrounds (See Map VI, page 21). The area contains three sand and gravel pits which, once renovated, would serve as a natural scenic area. There is also a spring, Nussbaum Spring. b. Open Space The southern tip of Baculite Mesa should be acquired, as indicated on the proposed land use map (Map VI) and maintained in its natural state. Open spaces shall remain in their natural state only to be traversed by developed bicycle and pedestrian trails and scenic, historic, or archeological viewing areas. One Hundred Year floodplains shall remain undeveloped, in their natural state, unless a technical evaluation demonstrates that encroachments shall not result in any increase in flood levels during the occurrence of the base flood discharge. It is recommended that a portion of Section 21, east of Baculite Mesa Road, remain as open space /agricultural, pending the completion of the Part 150 Airport Noise Study and the Pueblo Memorial Airport Master Plan Update. According to 1987 LDN Noise Contours, this land is located within Noise Zone Two. c. Trails To ensure continuity of the trail system, all developers should be responsible for the dedication of ROW and the extension of those trail corridors through their development, or alternately be required to share in the tost of construction. These trails shall be identified by the City of Pueblo Master Trails Plan then in effect. These trails may be located along major roadways, natural scenic areas, arroyos, at park and school locations, at the Pueblo Memorial Airport, and central commercial centers. Trail standards and recommended trail location shall be determined by the Pueblo Master Trails Plan. This plan, due to be released in 1989 or early 1990, will address trail construction standards, landscape design, maintenance requirements, and traffic control. The City should consider establishing an impact fee system to assist in the funding of new trail facilities. - 27 - V. ENVIRONMENTAL ANALYSIS INTRODUCTION The purpose of this review is to inventory environmental conditions and identify potential hazardous areas and mineral resource extraction areas. This inventory will be used as a planning tool to assure that environmental constraints are mitigated prior to development and that sensitive lands are conserved. The first part of this section will identify geological, topographical, and biological characteristics of the area. Climate, water quality, and air quality will also be discussed. The second part of the environmental analysis will identify hazardous areas and mineral resource reserves. A. ENVIRONMENTAL INVENTORY 1. GeoloQv and Soils. Soils within the study area consist primarily of surficial clays and shales from the Niobrara formations and alluvial deposits from creeks, gullies, and rivers. Silt, clay, and sand particles are located along the area's arroyos. These deposits have been made in many areas over Pierre Shale and Niobrara Shale geologic formations. The mesas consist of well sorted pebble gravel, and the floodplains consist of poorly sorted cobbles, pebbles, sand, and silt deposits. Bedrock geologic formations are identified on Map VIII, surficial geology on Map IX, and soil associations on Map X. Geologic properties are listed in Table I and landforms in this area are identified on Map XI. Characteristics of these geologic formations and soils are described in Environmental Constraints Section B of this analysis. 2. Drainage /T000graph The area slopes from Baculite Mesa and adjoining mesas southward to the Arkansas River and southwest to the Fountain Creek. Slopes on the mesas range from seven to twenty -five percent and from three to seven percent over the lowland prairie. Much of the Pueblo Memorial Airport and Pueblo Airport Industrial Park have been graded to slopes of less than three percent. There are eight sub - drainage basins which flow into the Fountain Creek and Arkansas River; they are the East Dry Creek and seven unnamed basins (See Map XII). These arroyos, or intermittent stream courses, have been created in highly erosive silt and clay alluviums. Stream flows are created primarily during thunderstorms in which rapid runoffs flow into the arroyos. The environmental constraints of these arroyos are described in Section B. lil,'Ir VG I�Ill� ; fill' l i I I•. 1. 'llj ' !!L'illl I';illl'illl,�lllllll' lllllllb' I:, : „ : .I i1 111111 111111 �� 111111 ' I '11111 III,. _ ii !IU' Irl'''IIIIl1�. III .II llii; �IllMii I llilll'llll lull north '''1111 '� I ��u1h� '!111111111.1111� 1 �11' I ,(i II. , nl�, II "gII11un1 ' 4, I ,. I "' III IIII• �III11.111 '1, — 'Illllll ' x11111: l llllllll 'III I IIIIIIIu' luulllll llllll' ' II IIL Ill; III III I '''ll it III 1' l i�ur 11j11 Igllll'Illlll Il llip� il �g l lllll� 1 1111 111 IIII 1 IIII I IIII'' 1 , 1111111111 IIII'll Ill) � — 'lllljll 1i 'IIII :I � 11 1111' ' 11111 1ij11 1 � IIII MAP KEY Kpm, Pierre Shale Kpl, Pierre Shale, Organic Rich III ' & Bentonite ® Kpu, Sedimentary Rock of Upper Cretaceous Age, Pierre Shale W M I, II '"'' 11 1 1 111 n1 1 ' ljjll. v/ IIIIIIII' I uIInI' 1 'lllllp' III I III�� 'll'I,,'ll' I1 ' II II 11, Il I1111,�llllill I'lil , "'1114;;;1 'IIIIII ,IL' - - III 111111: 'Ii1• II I: IdIIh1• II I' 1.. 'I� j lil II 1111111 I' IIII.;Iiff' II(U' Illlllnfn IIII IIIII Il� 11�1111lj1 � IIIII! I 1111111 1111 i .1! l 11'; p II I; IIII I hl I I I II Vj 1 111 1 , 1 I. ufill,,l ,IIII I Ilp IIIIII I III IIII Illli x'14' 11 ��� �1111111 Ill .III 1111' ".I IIIII) IIII IIIIII pu' 1 4P' I illu''IIL 1 111 II I IIII 1 ' 1 .II' IIIIII ,III "I, IIII .IIIIIIII'I ,I I' l'• II IIIII �' ;'llll� III III 1111111 IIIII �nlll' 'lll'llllll 1 I 'I " 1 I• I I IIII 11 I ' 11111111 ' 1 Ilp ''III. I '.IIIII' 1.1 lIlID � I , ,,Idlll IIII — 'III' �Ilju; III '111 II 1 'l 11'IIIIIII I � IP'' 1 IIIII 'IIIII I IIIIIIII IIIII IIIIII 11 I I II 11111.11 I�' I '�I I I IIl1l.1 "' II IIII I! , � IIIIIIn ��' 111 11111 III I ' IIIIIIII 111' IIII III Il . llllllllll ' i III,1 I IIII III � 111 ' �Id I' IIII 1'. ��IllUl Id11 IP' IIII' Ill .IIIIILIIIIIIi II IIIII IIII !' IIIIIII1�J1111 111111'111111,' 'IIII '1111 ' Illllll I ' u• � i IIIII' 111 III — 1 '�IIII:'llll IIII':IIIIII 1 X1 '' ulllpl��l�l' 1111'''lllllll II ''Illllll ,Il►UI Ipl11l.IId1 II k '� I�'41 ; I ' ''�' — 1 ; �IIII 'Illlh 1 I 1 1 ;' 11 ' IIII' II •,' alllll'f�Il1l i "��II' Ip, Illllll) IIII •�� I I X111 1 1111 II IIII „1111111111111 II '11111;ii11'� IIII ' I lll lll I I 1 III ! ulll' I IIII�Iallllll 11 _ °I�i�llllllll , ;'II'�111 111'IIIIIIIIIIIIi11111 'Itl' II I I II i�' Illllll J Illllllilll. 1: I ', ;,11 I I I �I ,.III 1 ,�1 a IIIIII'' '1111 — � 1.':' � U',l 11 I Il I !, ,•llllll II IIIIpI 'll 11p� IIII , ulllllllll �Iii ��; II ' ylU '1IIIIr all). ', I , `� 'I'�I 1 I "'� •;;III �' I III ' 1'111111' �glill'I�IIIII!Ill I I , I , , ���� I II '.I. II �'ilI .IIII I IIII• ; I� "`�� .IIII I;'lllq� Ii �ll� r I t till N IIII I) I II'. 1 i . i1'I I' 1:11 1' llllll- ,I III II. �I u. �I l III I I, 11 ! Ill)• 1. dIIlu1':IIIIIIIII'.lullll 11111 In�1 ;1111 1i h, IIII ".11.111111 p'IIIIIII1� IIIII Illi i I I:Ill � II' I II I III , I ! l ' IIIII X 111111 III , 1 :I h ,� I 4� �1 'IIII I '1i1j Illllll II �'lllil� � i, ' 111 ' •dl 111 I ' ll '•111111111' II I' �', 'II11• IIIIIg1i''41111111111� 11111 'Ill' p �,.�„ '1111111 ! 1 111 1 11111 1 1 dU ���� 'nnll�j ' IIIII IIIIII ll tilllllll 1111I11�11 tlll11 1 111iI IIII 1111 Ih — 111, II ", I llll K I Illy • � ' IIIIII :I, 1i� II11 I , ;IIIIIIII ,� - ;i„�� ^� � � `(/ >> '11,11 '111 , �Ildl 111 d1j1 111 i' l�llll�llll 111'1111 1 111111 11 X11 11111 I IIl .111 111! II l -,t,� ' ,j� 'Il ,1111 lllllil I I Ill) 11 11 .111!6 � I. II ' •� I :I I' I III II I -- w �;r I � I - ql jll 1 "_ ,Ili Illllll I , ,: ulllll III 'IIIII'': Il II III 1 ���� � " I� � I 'IIIII III '111 it p. 11' ,lu ll'IIII I' 11, ! 1 I - w, -x ��'N ��- � �� 2 I 1 111 Iq'IIIIII'llll!1111iiIII,II' : 1 �lll: �U �r: ��II i�!I II I hill, h 11 II 1 IIIII 'Ihl I I p ,I'll '1111, 2 City of Pueblo Department of Planning & Develop 0 W W U li7 Gq NORTHEAST QUADRANT ANNEXATION MASTER PLAN VIII - 29 - s - 30 - 39 rA k.- :Y 4 � 7 3 t north e 47 ii Q II � I( ? 11 MAP KEY 47 Gaynor, Samsil, Limon Association 39 Cascajo, Samsil Association 10 Stoneham, Vona, Harvey Association 0 Las Association 0 Valent Association 21 Vona, Olney, Dwyer Association 39 7 10 it 10 it �� uu nniue IN I InuuI IInIn IIIII 0 39 E0 5 -� PUEBLO i CI LIMIT 10 KLO 47 j MORIAI„ 10 R PORT' 5 1 _ 4 21 4 ' 7 S.F. 8 AX 7 39 7 -4 City of Pueblo Department of Planning & Development NORTHEAST QUADRANT ANNEXATION MASTER PLAN 31 - 47 rn z 0 E- C U a MAP: X - 3I - TABLE I. 3. Floodplains. Five watercourses, two rivers, and three arroyos are classified as 100 -year floodplains in this study. A 100 -year floodplain is considered an area with a one percent chance of flooding in any single year, or once every 100 years. The Fountain Creek, Arkansas River, and three arroyos, including the East Dry Creek, have significant drainage basins and are classified as Zone A, 100 -year floodplain (See Map XII). Environmental constraints that result from these floodplain hazards are described in the accompanying Section B. 4. Wetlands. Wetlands refers to those areas that are inundated by surface or groundwater with a frequency sufficient to support a prevalence of vegetative or aquatic life. Wetlands generally include swamps, marshes, bogs, and similar areas such as sloughs, potholes, wet meadows, sewer overflows, mud flats, and natural ponds. There are no wetlands within the study area. 5. Flora and Fauna. The wildlife habitat within the study area is grassland prairie. No critical wildlife habitat is present within the study area. Critical habitat is that which offers a rare or limited animal environment, or that which supports a rare and endangered species. Most of the area consists of short grass prairie land with little or no shrub or tree cover. Limited cover is available along creek beds and man -made lakes. Inhabitants of the area include coyotes, antelope, and many types of small animals, as well as many small birds including quail, larger hawks, crows, owls, and vultures. Migratory waterfowl are very limited due to the relative lack of lakes and ponds. According to the Colorado Division of Wildlife, there are no known threatened and endangered plants or animals within the study area. 6. Climate. The Pueblo region is located in the transition zone between the temperate and hot, arid climatic regions. The climate is characterized by abundant sunshine, low relative humidity, light to moderate winds, large daily temperature variations, and light precipitation. Average annual precipitation is approximately 11.6 inches. Temperatures in the summer reach 90 degrees, or more, approximately one out of every two days. Afternoon thunderstorms account for much of the summer precipita- tion, and the probability of measurable precipitation is one day out of four. 7. Water Quality. Water quality standards and classifications have been adopted for the waters of the State, including the Arkansas River. These ensure the suitability of Colorado's waters for beneficial uses. - 34 - The Arkansas River segment that may be impacted by activities within this area is the Lower Arkansas River, Segment 1, which is classified as Class 2 Recreation, Warm Water Aquatic Life - -Class 2, Domestic and Agricultural Water. This segment of the river from the confluence with the Fountain Creek to the Kansas border is impaired. The 208 Water Quality Program identified fecal coliform and metals as the impaired parameters. Fountain Creek, as a tributary to the Arkansas River, is classified as Class 2 Recreation, Agriculture, and Domestic Water Supply. In 1984 the Fountain Creek was classified as an impaired stream by the State Water Quality Control Commission. High un- ionized ammonia levels and the absence of aquatic life were listed as impaired parameters. The depth to groundwater is greater than six feet in all parts of the study area. According to the Soil Conservation Service, little or no groundwater recharge occurs in the study area. 8. Air Quality. Air quality in the Northeast Quadrant poses no problem to human health and welfare. The entire Pueblo region complies with all National Ambient Air Quality Standards pursuant to the Clean Air Act, 1971, as amended. Air quality is determined by measuring specific particles suspended in the atmosphere. Beginning in 1985, the Pueblo City- County Health Department has been monitoring Total Suspended Particulates (TSPs). The results over time have indicated a steady increase in air quality. As of October, 1987, a new system -- Particulate Matter 10 Microns or less, PM -10, has been installed. Eventually, all monitoring will be done by PM -10 as this system allows for a more detailed analysis. The Pueblo region PM -10 results have a 14 percent chance of noncompliance with Ambient Air Quality Standards. This is considered a low priority of concern and only requires that the region continue to monitor air quality on a regular basis. Those areas with a 20 percent chance, or greater, of noncompliance must have a State Implementation Plan in place. The Plan outlines procedures directed at decreasing the chance of noncompliance. There is a monitoring station located at the Pueblo Memorial Airport and Airport Industrial Park and one atop the City- County Health Department Office in downtown Pueblo. It should be noted that new development will cause a short -term increase in suspended particulates as a result of cut and fill, grading, and other construction activities. New or proposed stationary sources of air pollutants, such as a manufacturing firm, must first apply to the State for an emissions level permit. The Pueblo City- County Health Department will strictly enforce these permit levels. - 35 - B. ENVIRONMENTAL CONSTRAINTS Land use development, from an environmental perspective, is optimal where few, if any, environmental hazards exist. Those areas where steep slopes, floodplains, large arroyos, and potential rock slides exist can place severe hazards upon physical development and human safety. However, areas where shrink /swell clay soils exist can support local development practically and safely through sound engineering practices. Colorado House Bill 1041, passed in 1974, is a land use regulating bill which specifies that four Areas and nine Activities of State Interest must be considered during the local land use decision - making process. Natural Hazardous Areas, including geologic hazardous areas and mineral resource areas, have been designated as Matters of State and Local Interest and identified in Pueblo County. The location and severity of the following environmental hazards has been computer mapped through the use of the IMGRID (Improved Grid) System developed at the Department of Architecture, Harvard University School of Design. The hazards analyzed and mapped include: (1) Floodplain Hazards; (2) Wildfire Hazards; (3) Geologic Hazards (Unstable Slopes, Landslides, Mudflows /Debris Fans, Expansive Soils and Rocks, Ground Subsidence, Seismic Effects); Rockfalls (no hazards in this area), Radioactivity (no hazards in this area), Avalanches (no hazards in this area); (4) Mineral Resource Areas; and (5) Environmental Hazards Composite. 1. Floodplain Hazards. Floodplain areas are a constraint to development when the land is so adverse to - past, current, or foreseeable flooding of land so as to constitute a significant hazard to public health and safety and to property. The 100 -year floodplains in this study area include the Fountain Creek, the Arkansas River, and three arroyos- -the East Dry Creek and two unidentified drainages located within the Airport boundaries (See Map XII). _ Fine silt, mud, and sand are laid down on the floodplain when the volume of the stream is high. During each high water stage, these deposits (called alluvium beds) become thicker and the width of the floodplain is increased. At the same time, the deepening of the main channel by erosion makes the height of the flood- - plain above the normal stream so great that the floodplain is no longer completely covered by the river, except in times of very high floods. The channels are then bordered on the sides by steep slopes. Natural changes in these drainages, including the Arkansas River and the Fountain Creek, can be predicted relatively well. Changes made by man, including roads, bridges, and any other land use development, should be carefully controlled so as not to increase flood hazards. The Federal Insurance Administration has delineated both areas of special flood hazards and the risk premium zones applicable to Pueblo County. According to Federal law, the floodway, or channel of a river, must be reserved in order to discharge the base flood without cumulatively increasing the water surface eleva- tion more than one foot. Development in floodways is thereby restricted by the r - 36 - City of Pueblo unless a technical evaluation demonstrates that encroachments shall not result in any increase in flood levels during the occurrence of a flood. Construction on fringe areas (those areas in the floodplain) requires adequate space, floodproofing measures (such as anchoring, over the top ties on mobile homes, frame ties and use of materials resistant to flood damage), and other specific standards found in Title XVII -- Zoning Ordinances for the City of Pueblo. The courses of drainage channels change over the years due to high peak flows which erode the channel and side banks. In order to determine the current flow and channel within a drainage basin, a master drainage plan must be prepared. Drainage improvements will then be engineered according to the natural flow and additional hydrologic flow generated by the development. The only constraint to these improvements is cost and land, depending upon the needs of the development. Holding ponds and the natural channels take up valuable land while drainage pipes, gutters, and channel boxes are expensive drainage improvements. Hydrologically, the results are similar yet with different fiscal impacts. 2. Wildfire Hazards. Wildfire simply means any fire that is burning out of control. A number of elements must be present in order to create a wildfire hazardous area. The amount and kinds of fuels, the lay of the land, and climate especially in regard to the amount of moisture and the wind patterns all affect the potential and level of severity of wildfire. High wildfire hazardous areas have been identified by IMGRID on the west side of Baculite Mesa (See Map XIV, page 42). 3. Geologic Hazards. Geologic hazards are a geologic phenomenon which are so adverse to past, current, or foreseeable construction or land use as to constitute a significant hazard to public health and safety or to property. The term includes, but is not limited to: Unstable Slopes; Landslides; Mudflows /Debris Fans; Expansive Soils and Rocks; Ground Subsidence; and Seismic Effects); Rockfalls (not identified in study area) Avalanches (not identified n study area); and Radioactivity (not identified in study area). a. Unstable Slopes An unstable slope is an area where gravity alone can cause loose surface materials to move downhill. Wherever the surface of the earth slopes, rock fragments, soil, artificial or man -made fills, or any combination of such materials, may fall, slide, or "creep" at slow speeds to lower levels. The natural conditions that can cause unstable slopes include weathering, erosion, changes in surface, and groundwater flows and earthquakes. Potentially unstable slopes have been identified on Baculite Mesa (See Map XIV, page 42). These slopes can be very dangerous as they are in a state of balance - -it's not moving but it would take very little to get started. Land use development in these areas should be carefully controlled as man's activities can turn even a slow, gentle "creep" into a major landslide. Park or open space uses would be preferable in these areas. - 37 - b. Landslides Where large masses of earth and rock slide bodily down steep slopes, the movement is called a landslide. The rate of movement ranges form very slow to very rapid. — The amount of material in the slide can vary from a few cubic yards to millions of cubic yards. Landslides are caused by a change in an unstable slope. Changes can occur naturally through watering and earthquakes or man -made through changing drainage patterns, creating ponds, and reservoirs. The only potential landslide hazards in the study area are on the southern tip of Baculite Mesa (See Map XIV, page 42). c. Mudflows /Debris Fans A mudflow (also called earth flows or debris fans) is a rapid movement of a large mass of "mud" formed from loose earth and water. Mudflows occur chiefly in the normally dry canyons (arroyos) of semiarid regions and result from cloudbursts or rapid snowmelt. A debris fan is a deposit of mud, silt, gravel, small rocks, and other flood deposited debris shaped like a triangle and formed where a small stream enters a larger valley. A debris fan is related to a mudflow and is sometimes associated with each other. Building, or the placement of, a structure of any kind in the path of a mudflow or on a debris fan is extremely hazardous. The "IMGRID Debris Flow, Mudflow, and Debris Fan Hazards Map" was generated by the compilation of soil, geology, intermittent stream, and alluvium data bank components. Areas of concern are indicated on Map XIV, page 42. d. Expansive Soils and Rocks Expansive soils and rocks contain clay which expands to a significant degree upon wetting and shrinks upon drying. The swelling of the clay minerals is caused by their chemical attraction of water. Clay is composed of flat, microscopic plates. Layers of water molecules form between these plates. As more water is added, the water molecules push the clay plates further and further apart. This occurs throughout the clay deposit and causes an increase in the volume which in turn creates very high swelling pressures. When the clay deposits dry out the reverse is true, and the deposits will shrink in size. Building can take place in areas containing swelling clay deposits. It does mean that professional soil engineers and engineering geologists should become involved before the design of a structure is completed. Swelling clays are so common in the study area that it is difficult to avoid them. The U. S. Soil Conservation Service has rated soils from low to very high in their potential to shrink /swell. The area between the City and the Airport is characterized by high to very high shrink -swell potential (See Map XIV, page 42). Foundation design, water drainage, landscaping, and interior finishes are the design considerations that must be engineered for every building, bridge, or structure. - 38 - e. Ground Subsidence Ground subsidence is a process characterized by the downward displacement of surface material. Displacement is caused by natural phenomena such as removal of underground fluids, natural consolidation, dissolution of underground materials, or by man -made phenomena such as underground mining. Much of the study area, due to clay and alluvium soils and alluvium geologic formations, has a potential subsidence hazard (See Map XIV, page 42). f. Seismic Effects Seismic effects are the direct and indirect effects caused by an earthquake or by an underground nuclear detonation. For the purpose of mapping, seismic effects were defined as "the effects a seismic event has on the geologic environment by increasing the probability of geologic hazard occurrence, landslide hazards, potentially unstable slopes, rockfall hazards, subsidence hazards, and flood potential." Data was compiled into the number of potential seismic hazards present per cell; a maximum of three hazards were found per cell. Due to potentially unstable slopes, rockfall hazards, and landslide hazards, the southern tip of Baculite Mesa has the most number of potential seismic hazards present in the study area. 4. Mineral Resource Areas. The only existing extractive mineral resource in the study area is alluvium sand and gravel. The State Highway Department operates two sand and gravel pits on the southern tip of Baculite Mesa (Sec. 3, T20S R64W, Sec. 4, T20S R64W) (See Map XIV). A total of five pits are found in the study area. Special use permits (SUP) for active excavation are issued by the County. Upon the completion of excavation, the Mined Land Reclamation Board (MLRB) reclaims the areas. The status of the five sand and gravel pits are: 1) SUP 322: Approved 1/24/78; is Partially Reclaimed. 2) SUP 323: Approved 1/24/78; Reclaimed /Released by MLRB. 3) SUP 324: Approved 1/24/78; Reclaimed /Not Released by MLRB. 4) SUP 341: Approved 7/23/85; Active. 5) SUP 643: Approved 10/27/87; Active (See Map XIII). 5. Landfill. A landfill and dead animal dumping area is located southeast of the east -west runway at the Pueblo Memorial Airport. This area is on City property and contained within Noise Zone 3. Development within this noise zone is considered "noncompatible" by FAA Standards. Aluminum draws are the only substance in the landfill. These draws are from one of the manufacturing firms of the Airport Industrial Park. This area will remain open indefinitely. It is operated by Airport personnel and monitored by the City- County Health Department. - 39 - 6. Environmental Hazards Composite. A composite of environmental impacts is graphically depicted in those areas determined to be "environmentally sensitive" (See Map XIV). The major environmental constraints in this area are floodplains, landslides, wildfire dangers, mudflows, debris fans, steep slopes, ground subsidence, and expansive soils. Individually, certain constraints such as expansive soils and steep slopes can be mitigated through sound engineering practices. Landslides, ground subsidence, and mudflows however are difficult to control and place a severe constraint upon development. The areas indicated on the map contain various environmental conditions which could dictate the design and method of development. The degree of sensitivity in these areas is difficult to quantify without more indepth study. Decisions to develop these areas should be preceded by an environmental assessment. - 41 - VI. INFRASTRUCTURE -- EXISTING AND PROPOSED ROADWAY AND UTILITY SYSTEM- -PLANS INTRODUCTION The existing infrastructure of an area and its ability to expand is a key to attracting and supporting new growth. Annexation and the subsequent development — of new areas, whether residential, commercial or industrial, will impact the existing infrastructure and will likewise result in the extension of services to the new area. This section will describe the existing transportation routes, water and waste- water systems, electric and gas services, and telephone and cable television _ systems. The established policies and the ability of the service to be extended to the new areas will also be discussed. A. TRANSPORTATION NETWORK The major transportation routes (with functional classifications) serving the Northeast area of the City and the eastern, urbanized portion of Pueblo County are: Interstate 25, a "freeway," the primary north /south roadway in Pueblo along the Front Range; U. S. Highway 50, an "expressway," the primary east /west roadway serving Pueblo and the State; and State Highway 47, an "expressway," the primary east /west roadway to the University of Southern Colorado (USC) and serving as major access routes from I -25 to U. S. Highway 50 and the Pueblo Memorial Airport Industrial Park. Jerry Murphy Road, a "minor arterial," serves the western Belmont area and the University Park Subdivision. It ties in with Overton Road which serves rural residential and agricultural areas north along Fountain Creek. U. S. Highway 50 -B is of particular importance since it not only parallels the Airport's southern boundary, but also is the primary western entrance into Pueblo intersecting I -25 on the City's "North Side." It feeds into State Highway 47, the primary western entrance to USC and the Airport. Bonforte Boulevard, a "minor arterial," provides the major north /south access to USC through the Belmont Subdivision. Troy Avenue, a "minor arterial," serves the eastern area of Belmont and is the main eastern access to USC. Constitution Road, a "minor arterial," serves southern Belmont and is proposed as an alternative western access to the AIP. The access alternatives to the AIP identified in the Pueblo Airpark Access Alternatives Study are shown on Map IV (page 18). - 43 - B. WATER SERVICE Water service within the study area is limited to the Pueblo Board of Water Works and individual wells. The Pueblo Board of Water Works, the water purveyor for the City, also provides extraterritorial water service to an area adjacent to the City (Area A) and areas outside the Pueblo Urban Area (Area B) (City of Pueblo, Code of Ordinances 3207, 1971, as amended) (Map XV). Conditions for this extraterritorial water service include the agreement to annex to the City when legally eligible and to pay the associated fees for water line placement. The Board serves the Pueblo Memorial Airport Industrial Park with two water lines, a 20 -inch line located north of U. S. Highway 50 and serving the Central and West areas, and a 16 -inch line located south of U. S. Highway 50 which serves the Eastern area. These lines are crosstied for reliability. The Board of Water Works has enough water in water rights and storage capacity to support a population of 350,000. This includes the City and surrounding environs. The study area incorporates four Board of Water Works pressure zones - -the 3000 Zone, 7000 Zone, 1000 Zone, and 500 Zone. The 500 Zone serves the Airport (See Map XVI). Expansion of these pressure zones would be necessary to serve Baculite Mesa and the area to the north and west of the Airport. Additional water tanks, pump stations, and changes in the transmission mains would be necessary in this area to provide ample water pressure for household use and fire protection. The plant water investment fee is charged to customers seeking service through new, additional, or increased size of meter, or number of units, effective January 1, 1989, as shown on the following Table II. The unit cost structure program allows all water applicants, including contractors and developers, to install water mains at equitable costs under Board engineering and inspection. The methodology for the calculation of the unit cost program was developed in 1978, and the procedure is studied annually for the orderly calculation of the prices outlined. If an applicant requests the Board to install a main extension inside the City limits, the Board might (time permitting) install the mains and charge the applicant the unit cost per foot of main, regardless of size, with the cost of any asphalt pavement or concrete replacement being an additional charge. However, it should be noted that the work load of the Board does not allow for any early scheduling of water main installation requested under this portion of the program. The costs for main extensions under the debit /credit system are shown on Table III. Upon application, under the unit /cost system, there is a one -year completion deadline, and no extensions of time will be granted. Furthermore, the established costs per linear foot may not refer to the applicant's actual cost to install the water main. In certain cases such actual cost may exceed the costs outlined. Any such additional costs are the responsibility of the applicant. - 44 - 1 I 5000 ZONE t Northeast Quadrant ` = � 7000 I north =, _`3000 , ZONE IONE I �I 1000 rY ' ZONE iI� i.; - — " a�ssdaE —zauE- $e�+ert4K ' 1 r 1 2000 'Ij � ZONE ,,:,`,,. 4000 ZONE 6000 W W 1 W A4 W U City of Pueblo Department of Planning & Deve MAP: NORTHEAST QUADRANT ANNEXATION MASTER PLAN XVI - 46 - TABLE II BOARD OF WATER WORKS OF PUEBLO, COLORADO PLANT WATER INVESTMENT FEE -- EFFECTIVE JANUARY 1, 1989 I. Amount of Fee: The plant water investment fee for customers seeking service through new, additional, or increased size of meter, or number of units will be as follows: Single Family Residential 3/4" or 1" meter Multi - Family Residential Per Unit Commercial 3/4" meter (up to 20 gpm) 1" meter (up to 40 gpm) 1 1/2" meter (up to 80 gpm) 2" meter (up to 120 gpm) 2" turbine meter (up to 160 gpm) 3" meter (up to 320 gpm) 3" turbine meter (up to 350 gpm) 4" meter (up to 500 gpm) 4" turbine meter (up to 630 gpm) 6" meter (up to 1000 gpm) 6" turbine meter (up to 1400 gpm) 8" turbine meter (up to 2400 gpm) TABLE III $ 1,345.00 $ 800.00 $ 775.00 1,310.00 $ 5,994.00 $ 8,086.00 $ 10,176.00 $ 16,346.00 $ 17,561.00 $ 48,839.00 $ 58,757.00 $123,644.00 $161,838.00 $363,919.00 BOARD OF WATER WORKS OF PUEBLO, COLORADO WATER MAIN EXTENSIONS - -UNIT COST -- EFFECTIVE MAY 1, 1988 I. Effective May 1, 1987, the Board will apply the following costs for appropriate water main extensions under the debit /credit system: Agreement signed before May 1, 1987. Construction completed within one year of agreement signed. Main Size Cost Per Lineal foot 6" $11.11 8 13.90 12" 21.95 16" 33.14 Unit Cost $19.28 II. The actual cost of asphalt pavement or concrete replacement shall be paid by the developer /customer. - 47 - C. WASTEWATER The City of Pueblo has completed plans and specifications for construction of a new 19 million gallon per day (MGD) High -Rate Trickling Filter /Activated Sludge Wastewater Treatment Plant. Physical construction commenced in 1984 with completion and full operation anticipated during 1989. This new plant will service the needs of the community up to a population of 147,900. The wastewater service area for the City and the Airport are shown on Map XV. The Airport Wastewater Treatment Facility was constructed in 1942 by the U. S. Army Corps of Engineers, and a trickling filter was added in 1943. Prior to 1977, the performance of the trickling filter did not consistently meet NPDES permit requirements. In 1977, the City of Pueblo upgraded the Airport facility by replacing the trickling filter with a rotating biological disc and by installing chlorination basin baffles. The plant was expanded in late 1986 to a new hydraulic flow of 300,000 gpd (average flow) 640,000 gpd peak flow. The expansion included the installation of a second Rotating Biological Contactor (RBC) (100,000 sq. ft.) and the conversion of an unused intermediate clarifier into a chlorine contact chamber. Since the 1986 update, three (3) sewage lift stations were installed in the Airport Service Area. The first lift station, named Sperry, is located near the entrance of the AIP and south of Unysis. It is a duplex system with each pump rated at 800 gpm and serves the western portion of the AIP. The second lift station, named Target, currently serves the Target Distribution Center. In the future, this lift station will serve the area to the northeast of Target. The Target lift station has a duplex system with each pump rated at 251 gpm. A third lift station is located between the County Shops area and the AIP wastewater treatment facility. It was constructed to accommodate a portion of the central area of the AIP that otherwise would not be served by a gravity sewer. It has a duplex system with each pump rated at 302 gpm. It will handle the remaining capacity of the existing treatment facility. In 1987, Pueblo City Council authorized an engineering study of the Airport's wastewater treatment needs. In March of 1988, CH2M Hill consultants released the Pueblo Airport Industrial Park Wastewater Treatment Plant Preliminary Engineering Study. _ This report addressed the fact that if the remaining 500 acres of available industrial land at the Industrial Park is developed, existing wastewater facilities would be unable to process the resulting flow and loading. The engineers began their study by establishing five "flow and loading" projections based on various development scenarios. This approach was necessary since current zoning regulations in the study area allow for several types of industry, each with differing flows and high strength wastes. In cooperation with City representatives, five management alternatives to the capacity problem were - developed. All of these alternatives involved the abandonment of the existing airport treatment facility. The CH2M Hill Engineering Study, based on selection criteria, nonmonetary issues and costs, recommended pumping all wastewater back to the City plant. CH2M Hill is conducting a continuing study and considering another alternative. This new alternative would utilize the existing AIP wastewater treatment plant for the flows currently directed to the plant and pumping a portion of the AIP back to the City plant. Two areas in this study area are not serviced by a wastewater treatment facility - -the area north of the existing service areas including the southern tip of Baculite Mesa and an area between the AIP and the east boundary of the City. Wastewater service to these areas may be costly. At this time, the Engineering Staff of the City's Public Works Department has not yet determined the construction needs of the areas in question. A Sanitary Sewer Report will be required for all annexations. For details of this report, please refer to Section II, Part B, of this report. In March, 1988, City Council adopted Ordinance No. 5464. This amendment to Section 2 of Chapter 4, Title XVI of the 1971 Code of Ordinances relating to Extraterritorial Sewer Services reads: "Notwithstanding any other provision of this Chapter to the contrary, no land located outside the City of Pueblo or outside the Pueblo Memorial _ Airport is eligible to receive extraterritorial sewer service, and no application for such service may be filed with or accepted by the City. This Subsection (d) is repealed, effective July 1, 1989. Prior to said repeal, the City Council shall review this Chapter." If on July 1, 1989 the new treatment plant is in full operation, it is likely that this amendment will be repealed. D. ELECTRIC POWER Centel Corporation (Centel Electric -- Colorado) is the electric power company which serves the study area. The company has a franchise agreement with the City of Pueblo to be the sole provider of electricity within municipal boundaries. Centel operates an electric -power generating station at 105 S. Victoria Avenue. Initially, the plant burned coal to generate electric power. The plant currently burns natural gas as its primary fuel and utilizes oil for peaking generation and as a backup in the event of natural gas curtailments. The plant complies with all Environmental Protection Agency (EPA) requirements. Generation facilities at the plant consist of two units with a capacity of 8,000 kilowatts each; one unit with 19,000 kilowatt capacity; and five diesel generators, each with a capacity of 2,000 kilowatts. Centel has two power plants outside the City of Pueblo, one at Canon City and another at Rocky Ford. Together, the three power plants have a total capacity of 106,000 kilowatts. Centel purchases approximately 65 percent of its power requirements from Public Service Company of Colorado under a renewable twenty -year contract. - 49 - Centel is a member of the Colorado Power Pool which includes Public Service Company, the City of Colorado Springs, and the City of Lamar. The power pool provides backup power in the event Centel experiences a temporary shutdown of any of its generating units. Most power outages are due to extreme weather conditions and rarely affect the entire City at one time. Centel distributes electric energy throughout the City of Pueblo through its transmission and distribution network. The Northeast Quadrant of the City is served by three distribution substations -- Eastwood on E. 16th Street; Airport Industrial Park at the west edge of the Airport; and Pueblo Memorial Airport on United Avenue in the center of the Airport. These substations are served by 69,000 and 115,000 volt electric transmission lines (See Map XVII). The transmission lines are located on utility easements of 120' for parallel lines and 100' for single lines. Centel states that it can provide reliable service to both present and future customers at the Airport. Centel officials state that all requests for electric service in the study area can be fulfilled with reasonable promptness. Centel's service policy is found in Section 18 of its rules and regulations manual. The policy states that an applicant's electric requirements (either an individual or a developer) are designated by the company to be permanent, indeterminate, or temporary. Distribution system extension costs are estimated on the basis of the anticipated construction and installation costs, including material, labor, rights -of -way, trenching, backfill, tree trimming, and any incidental and overhead expenses. An applicant for permanent service is required to pay all distribution extension costs in excess of a construction allowance determined by Centel. The construction allowance is determined by the type of service and the customer's estimated electric power demand. The customer's payment may be partially or totally refunded during a five -year period, after which no refunds will be made. Indeterminate and temporary customers are required to pay all distribution extension costs and do not receive refunds unless reclassified as permanent by Centel. E. GAS The Public Service Company of Colorado provides gas service to Pueblo and the surrounding area including the Northeast Quadrant. The Company has a franchise agreement with the City to be the sole provider of gas within municipality boundaries. Gas is supplied to the Public Service Company by Colorado Interstate Gas Company (CIG). East Pueblo, including Belmont, is served through two eight -inch, 300 pound per square -inch (psi) lines. The two lines share a 75 -foot easement from the Airport boundary to a substation located between Troy Avenue and Colorado Highway 47. A twenty -inch line traveling in a north /south direction is located east of the Airport (See Map XVII). Easement for this line is 100 feet. The Public Service Company, in its Manual of Rules and Regulations -- Extension Policy, claims it does not operate nor maintain CIG lines and is, therefore, not responsible for a continuous flow. The Public Service Company taps into the CIG main pipelines and distributes gas to its service area. - 50 - Extension of distribution lines for new service is by application. The Company will desi an applicant's service needs as either permanent, indeterminate, or temporary. The proposed service installation is analyzed in order to estimate costs of labor, materials, and rights -of -way and any incidental and overhead expenses. This estimate is the construction payment. Distribution lines are paid for by the applicant (less the construction allowance). Construction payments are refundable in part or in their entirety within a five -year period, commencing with the extension completion date. When a new customer is added to the line, his or her share of the construction payment is refunded to those who initially paid for the installation of the distribution line. These refunds are paid on a yearly basis. No refunds are given to temporary or indeterminate customers unless the new applicant is designated for permanent service. If an area develops beyond the capacity of the distribution line, reinforcements to increase capacity of the line are paid for by the Company. The Airport is served by a tap and a sub - regulator located at the AIP and fed by a CIG pipeline. The Public Service Company sees no problems in continuing service to this growing area, regardless of annexation. Long -term planning for service extension is dependent upon development and where it takes place. If Company analysts see the potential for growth in an area, they will lay larger pipelines than are needed to serve present applicant(s). The initial applicant is not charged the additional cost of the larger lines. The Public Service Company is regulated by the Public Utilities Commission. Policies are subject to periodic change. F. TELEPHONE The U. S. West Communications provides local telephone service to the City of Pueblo and to the Northeast Quadrant. The service area is divided by 27th Lane, with everything to the west being served by U. S. West's technical offices in Downtown Pueblo and everything to the east served by U. S. West's Vineland technical center. The Airport and Industrial Park are served from Vineland offices. This division of service is not fixed and can fluctuate so as to accommodate impacts of new development. U. S. West will provide prompt service to all requests in its service area. For most installations, the entire cost is paid for by the developer. Upon the completion of installation, and for five years thereafter, the developer will be entitled to refunds of part or the entirety of the installation foot payments. This occurs when new customers make use of the new distribution lines and when initial construction payments are recalculated to include the new customer. U. S. West prefers to work closely with the developer so as to efficiently serve new customers. Such cooperation facilitates the acquisition of 20 -foot easements for the cables and poles; it also insures the use of the most appropriate communication system. Currently, there are very few distribution lines in the study area. In most cases, new installations would be required. - 52 - G. CABLE TELEVISION The Northeast Quadrant is in the service area of Telecommunications (TCI), Inc., Cablevision of Colorado. TCI Cablevision offers cable television hookup and an array of programming packages. TCI Cablevision services most of Pueblo and is currently installing cables in the St. Charles Mesa area to 30th Lane and north to include Baxter. There are no future plans to service the study area for there is little residential development in the area. The Company requires that there be 28 to 35 residences per square mile prior to considering the extension of services. If service is to be offered, company technicians estimate the total cost of materials, labor, and installation methods needed to extend service. An application is then submitted to the Company's budget committee for approval. The application and installation process takes approximately one year. TCI Cablevision has a contract to use U. S. West telephone poles by application. They are not opposed to installing cable underground and will work with the developer or follow the ordinances of the community in order to install cable in the least obtrusive manner. Costs of installing cable are approximately $5,000 for an aerial mile and $10,000 for a subsurface mile. All construction and installation costs of distribution cables are paid for by the Company. Residents who desire the cable services pay for the initial hookup and then pay a monthly service charge. - 53 - VII. PUBLIC FACILITIES -- EXISTING AND PROPOSED PLANS A. SCHOOLS Two school districts serve Pueblo County. District 60 is made up of the City of Pueblo and some land outside the City's boundary. School District 70 serves the _ remaining areas of Pueblo County (See Attached Map XVIII). The Northeast Quadrant Study area is divided between the two districts. 1. School District No. 60. The Northeast portion of the City contains four elementary schools, one middle school, and one high school (See Map XVIII). Table IV shows current enrollment, projected enrollment for 1988/89 school year, maximum capacity, and optimal capacity for each of the schools. According to these figures, Franklin Elementary and Heaton Middle Schools are approaching optimal capacity. Haaff Elementary has surpassed optimal capacity and is less than 20 students from the actual school capacity. All other schools in the area can accommodate increased enrollment growth. Service areas for each school in District 60 are adjustable so as to accommodate growth trends. For high schools and middle schools, which make greater use of busing, these flexible boundaries allow the District to regulate the impact of residential growth on the City's school system. School officials, however, prefer a "neighborhood" atmosphere for elementary schools, keeping the facility central to and within walking distance from the population it serves. Therefore, it would be preferable to build a new elementary school in a growing residential area, rather than bus young students to other existing schools. TABLE IV: SCHOOL DISTRICT 60 ENROLLMENT -- MAXIMUM OPTIMAL CAPACITIES 9/25/87 PROJECTION MAXIMUM OPTIMAL SCHOOL MEMBERSHIP 1988 -1989 CAPACITY 90% CAPACITY ELEMENTARY Belmont 373 373 510 459 Eastwood 125 124 230 207 _ Franklin 444 440 500 450 Haaff 339 368 385 347 MIDDLE SCHOOL Heaton 688 664 775 698 HIGH SCHOOL East Hi 1,379 1,335 1,943 1,749 SOURCE: School District No. 60, Office of Pupil Personnel. - 54 - School District 60 works closely with the developer of new subdivisions in order to purchase quality land for a school site. This method is preferable to the land dedication process which often does not take land quality into consideration. Prior to any new construction decision, the District in cooperation with a citizens' committee will analyze demographic trends, community needs, and an alternative to new school construction, such as existing facility expansion or busing. Once a decision is made, funding must be provided for through a bond issue and a local election. Assuming a positive vote, the entire process would take at least two years before a new school was put into operation. In October of 1988, a local bond issue, intended for new school construction and repair, was defeated by voters. School District officials will now conduct a public survey focused at revealing public attitudes and perceived needs. This, coupled with other research, will direct the District's future expansion plans. 2. School District No. 70. District 70 has four elementary schools -- Baxter, North Mesa, South Mesa, and Vineland - -whose service areas incorporate the Northeast Quadrant. Baxter Elementary, which is presently closed, would be reopened if residential growth warranted such action. Two middle schools and one high school service the area. All of these schools are below their maximum capacity (See Map XVIII & Table V). TABLE V SCHOOL DISTRICT 70 ENROLLMENT NO. OF STUDENTS SCHOOL 1987 -1988 CAPACITY ELEMENTARY Baxter - -- 250 North Mesa 317 408 South Mesa 439 528 Vineland 297 408 MIDDLE SCHOOL Pleasantview Vineland 346 624 300 384 uTru Rrunni. Pueblo County High 1,147 1,560 SOURCE: School District No. 70, Administrative Services Center. - 56 - The schools in District No. 70 are considered suburban schools by the Colorado Department of Education. Approximately 94 percent of the students are bussed to schools. The distict identifies philosophically with neighborhood schools and would construct additional facilities in an area to meet the demands of growth and development. District 70 through an agreement with Pueblo County requires that eight to ten percent of net land in residential development be dedicated for schools or that fees be paid to the district in lieu of land dedication. Officials estimate that 10 to 15 acres are needed for an elementary school, 20 to 25 for a middle school, and 35 to 40 for a high school. 3. Detachment and Annexation of School Districts. Detachment and annexation of territory from one district to another is a complex process. The School District Organization Act of 1965, Section 22 -30 -138, states that if detachment and annexation is deemed to be worthwhile, then both boards of education must adopt a resolution to change the boundaries of their respective districts. This resolution then goes to a joint committee or to the County school superintendent for approval. Once this is done, a special election is held in the territory proposed to be detached. If five or fewer registered voters reside within the territory proposed to be detached and annexed, a notarized statement of consent of all voters within the territory shall make it unnecessary to hold an election. In the absence of said statements, an election must be held. If there are no registered voters within the territory, no election is to be held; and the joint committee or County superintendent shall approve the proposed detachment and annexation of the territory. Such detachment and annexation of territory brings to issue not only student welfare but district assets, liabilities, revenues, and influence. It should not be assumed that Districts 60 and 70 would change their boundaries when land is annexed to the City. B. PARKS The City of Pueblo ha floodplain within its percent of total City Park- -which serves the serving populations of populations. s 948.28 acres of parkland boundaries. Together, land. These facilities entire Pueblo community; 20,000 to 25,000; and si and 1,706.80 acres of open space these constitute more than ten include a large urban park - -City a district park, Mineral Palace, naller parks serving neighborhood The Parks and Recreation Department is responsible for the development, operation, and maintenance of park facilities with the exception of buildings which are maintained by the Public Works Department. The Parks and Recreation Department's $2.5 million annual budget is supplemented with State and Federal funds. The staff consists of 45 full -time positions and seasonal employment numbering in the hundreds. Chapter 4, Title XII, Section 7(e) of the City Code of Ordinances states that eight percent of land subdivided for residential purposes is to be dedicated as parkland. This land can be several small parks or one large park depending on the - 57 - needs of the community. appropriate for parkland lieu of land dedication land in such subdivisions. future recreational needs in If the City Council determines that the land is not dedication, the Council shall require a cash payment in equal to eight percent of the fair market value of the This payment is deposited into a special fund to meet the area. Presently, the Northeast Quadrant has 100.34 acres of recreational land (See Map XIX). These are primarily small neighborhood parks and school - parks. TABLE VI PARKS AND RECREATIONAL FACILITIES Northeast Facilies Acres "University Park" Park 10.70 Neighborhood Park — Belmont 35th Filing Site 1.56 Neighborhood Park McNeil Road School -Site 6.23 School - Playground Belmont Park 18.96 Neighborhood Park _ Belmont- School Playground 6.63 School - Playground Drew Dix Park 8.60 Neighborhood Park East High School -Park 20.10 School -Park Eastwood Park 6.15 Neighborhood Park — Eastwood School -Park 2.25 School -Park Haaff School - Playground 5.84 School - Playground Franklin School - Playground 2.83 School - Playground — Heaton School -Park 10.49 School -Park TOTAL 100.34 SOURCE: Urban Park and Recreation Recovery Action Program, 1980. The Northeast Quadrant study area has an estimated population of 14,965 with approximately 14,552 within City limits (City Information Department estimates for 1985 from 1980 Census Tracts). Currently, this population is not in need of a district park by the quantitative standards; however, build -out of several proposed residential areas will create a demand for such a park. Parks and Recreation officials however have been researching potential future locations for a larger park. Approximately 80 acres in the floodplain at the Fountain Creek, between the Creek and the University Park Subdivision, is the most obvious choice for a district park. The land is currently owned by the City and offers room for playing fields, courts, parking, and picnicking. This proposed park (indicated on Map XIX) would be an ideal northern access point to the Pueblo Trails System. The Parks and Recreation Department recommends the development of a regional park in the Northeast Quadrant. This park would be a minimum of 200 acres and would serve the entire Pueblo Community. It could include lighted fields and courts, a concessions area, rest rooms, ample parking, and a large recreation complex. M"Um T•, _ -- -- -- --- „,,,,,,,,,,,,,,,,,,,,,,,,, MAP KEY �,,,,N,,,,,,,,,,,,,,,,,,, BJ Proposed Park f Neighborhood Park School Park M1 f School Playground P U E 8 l 0 n or t h —kill o4 > > 5 • Jr S � • fONNTNC • .r �,,' \ ���^ _ _ _ -� JC• ~ ( ♦ NNa \ • + j �C J 01 , n NW Y i � >• i ] � f "ff • , M. 10” V� fw 0.3 ♦ � j I� I I ,A ► 0 I uDM 0 : 'I: "._:. ♦gyp lIN v O� w ,,�'lN0 l•DOw6.T[ 0 • 'Jl,o on I 5:.5t� S.In •Nwow i 4 A N N Ic NI z , v r Nlfc • w : ••• �, - r I � \�ll 3 N 3N0[ � N y • r i •NSON - l ` I J •j.j'ONS'A" J a ION A T 1 w0 • CN� w � •, N W. t• tY ANI T• z - + WA A r NC Y 1 T 1• i• � y t r IS t.• cv� w ' T Hi q i o 11 L I f� 3 I 1 !T f ° • » , I s b -- ST WINNOW City of Pueblo � 1� '�, tom!■ �/ Department .. NORTHEAST QUADRANT ANNEXATION MASTER PLAN 1 .r1 W H r U 1�1 a E U I m . . - 59 - League sports and evening activities could be concentrated here, away from the City residential areas. It is envisioned that this park be developed adjacent to the environmentally sensitive lands of Baculite Mesa and nearby creeks and arroyos. The City, utilizing reclaimed sand and gravel pits, could then offer sports areas and areas with varied terrain. The multi -use trail should extend to this park, wind through natural areas, and explore scenic vistas. It is unlikely that such a large area would be donated to the City in full. The land would, most probably, have to be purchased. The concept of a major river park trails system in the floodplains of the Fountain Creek and Arkansas River and extending to other City and County recreational areas has been an integral part of the Pueblo Regional Comprehensive Development Plan since 1960. It is the goal to utilize the drainage patterns and the transportation networks to connect trails throughout the City and act as a link of major recreational facilities. Ideally, trail heads and access points will be strategically established so as to promote a variety of trail opportunities for all non - motorized vehicles and recreational activities. The Parks and Recreation Department considers as top priority the multi -use trailway. Providing a link between this system and major arterials, arroyos, Baculite Mesa, and Pueblo Memorial Airport within this study area is a goal of this Annexation Master Plan. Reference to trails within this plan can be found in the Three -Mile Annexation Plan (Section IV). It is necessary that the City_develop a master trails plan. In order to create an orderly cohesive trails system, master trails should be planned for in advance of new development. Proposals for land dedication policies by residential, commercial, and industrial developments and impact fee programs for financing these trails should be addressed in the Master Trails Plan. C. POLICE 1. City Police Department. The Pueblo City Police Department is located at 130 Central Main Street. All operations are headquartered from this location. There are no substations. The Department employs 171 authorized sworn officers and has an array of patrol and policing vehicles. The City is divided into ten beats, or patrol routes. These routes are patrolled 24 hours a day in three shifts. The annual cost for one _ beat is approximately $200,000, including three one - person shifts of officers backup personnel, automobile expenses, and upkeep expenditures. When land is annexed to the City, the Police take over protection of that land from the County Sheriff. This land does not become a regularly patrolled area until it is developed. Currently, officials see no problem extending the northeast beat, consisting of Belmont and University Park, to include City annexations and new subdivisions. The southeast beat, located south of U. S. 50 Bypass, is one of the busiest in the City and cannot adequately handle expansion. •1 The City Police Department is presently responsible for protection of the Airport and AIP. A uniformed police officer must be present for all departing flights. These duties are provided for by a Special Operations Section. Airport and AIP protection is detailed in the Airport Section. Long -term plans of the Department are dependent upon growth and development- - where it takes place and what economic, social, and political changes occur. Officials envision an expansion of the northeast beat, a separate beat to include the Airport and surrounding development, and a permanent position to perform Airport duties. 2. County Sheriff. The County Sheriff deputies patrol all areas outside the City with the exception of the Airport and AIP. They frequently patrol the Belle Plain area, the Transportation Test Center east of the Airport, and Baxter to the south. The County Sheriff Deputies do not regularly patrol the open rangeland. D. FIRE The City of Pueblo is divided into eight fire protection areas (See Map XX). Station 8 serves the Northeast portion of the City. Located at 1515 Bonforte Boulevard, this station is operated by three, three - person shifts and equipped with a three -way pumper truck. Station 6 at 1335 E. Fourth Street is equipped with the same type truck and shifts. By Fire Department standards, a station should be central "to its service area with no point further than one and one -half miles away. It is ideal to have a maximum response time of four and one -half to five minutes to any point in the service area. Roadways, accessibility, and the number and density of houses are all factors contributing to new fire station locations. University Park is a newly developing area of the City, which is not within one and one -half miles from any City fire station. Station 8 is presently serving the area. Land in University Park has been deeded to the City Fire Department; however, funds are not available for new construction. The Fire Department is budgeted by the City. Special requests must be made for additional funding for new construction. A new fire station, utilities, a new pumper truck, equipment, and firefighter salaries (3 shifts and backup) would initially cost $861,000. Annual operation costs would be approximately $400,000 (figures are shown in 1988 dollars). There is a City Fire Station at the Pueblo Memorial Airport which is staffed 24 hours a day by two people and equipped with a three -way pumper truck and two crash trucks complete with foam and powder fire retardants to control fuel fires. The responsibility of the station is to provide protection to the terminal facility, to air -side (landing zones, taxiways, ramps, hangars, etc.) emergencies, and also to the AIP. Fire protection at the AIP is explained in detail in the Airport Section. - 61 - The City Fire Department has a hazardous materials response team ( "Haz -Mat Team ") located at Station 4 at 1201 E. Evans Avenue. This crew is specially trained and equipped to contain hazardous material (chemicals, radioactive material, and some waste products) accidents. They will respond to accidents outside the City limits. Long -range plans for Pueblo City Fire Department are dependent upon where development takes place, new road construction, number of new buildings, density of buildings, and other factors which may affect response time. Slow City growth has been an asset to the Department, enabling precise planning decisions to be made. Additional funding for renovation, expansion, and new construction has however been scarce. Priority for the Fire Department is the construction of a new station in University Park. The Department of Civil Defense is located at the Airport. In the case of any peace time -- natural or man - made -- accident, including nuclear accidents, the staff of four and a trained volunteer response team of 20 to 30 persons will assist in the planning, mitigation, preparation, and exercising of disaster plans. They respond County -wide and have vehicles, medical supplies, tools, and other emergency equipment. - 63 - VIII. ZONING AND LAND USE INTRODUCTION Current land uses within this study area reflect zoning patterns that are based on historic trends. The predominately single - family housing areas of Belmont and University Park within City boundaries reflect residential and commercial trends. The Belle Plain and AIP areas reflect City and County economic developments of a different scope. Potential land uses are proposed in the Section IV, the Three -Mile Annexation Plan. A. CITY OF PUEBLO Two large single- family residential subdivisions and the University of Southern Colorado have been established within the City boundaries. The Belmont Subdivision is primarily residential with commercial zoning located at the intersection of Bonforte Boulevard and U. S. Highway 50. University Park Subdivision is residentially zoned with commercial uses bordering Colorado Highway 47. Agricultural and open space, light industrial, and pockets of commercial zoning lie to the north along the I -25 Corridor (See Map XXI). The University of Southern Colorado is zoned for public use, yet bordered by adjacent and developed commercial, single - family, and multifamily residential properties. B. LAND USE A mobile home park, a church, and mixed - commercial and residential uses are found along Troy Avenue. The University of Southern Colorado (USC) lies north of the Belmont Subdivision. A proposed golf course and residential development on 300 acres north of USC is being considered for annexation. Other undeveloped areas of residential, commercial, and industrial zoning lie between Fountain Creek and I -25, at the intersection of Colorado Highway 47 and Troy Avenue, and south of Colorado Highway 47. C. PUEBLO COUNTY The majority of County land in the study area is zoned A -1, indicating a range type agricultural use. Rural residential and a small pocket of industrially zoned land is located in the northwestern corner of the study area. Heavy industrial zoning follows the U. S. Highway 50 Corridor. The Pueblo Memorial Airport, owned by the City of Pueblo, is zoned as public land. The AIP is zoned for light industrial uses, with pockets of public land dedicated for drainage purposes (See Map XXII). - 64 - A-1 I { -3 S -1 o-1 \ R-4 \ 2 ' I; n1 '1 1 -2 111 R -2 R 2� �l 4. R-I S -3 JrV ! 0-1 B -3 R-5 ,. B -3 z -5 (' R -1 R -5 I R -4 „Rr4 1 B - 4 S R - 4 ` R -3 Jill 'III• 1�` R 2 _ �� - � 1 � ✓�F a R -2 -- - e -d t - 1 north �- -T I ccw :rY 1 UNrJER OF � -_ _ I Q _� J R -2 SDir,H COLORP�� J r— J i R 2 GpFy I R -2 Q. 9 R-4 R -7 B -3 E '�� R-6 'RqJ, 8- , R -2 - T� {- 11 R-4 ��z R2�` I 1 2 r� I S-1 it till ¢ a�Fx���7 S >3 -t f r ii ii r - iZ411 _ ■� -- - -- a " R - 0 z N E-+ U 4 City of Pueblo Department of Planning & Development MAP: NORTHEAST QUADRANT ANNEXATION MASTER PLAN XXI - 65 - D. COUNTY LAND USE Existing County subdivisions, both developed and undeveloped, are illustrated on Map XXIII and listed below. Any proposed developments adjacent to these subdivi- sions will be required to align roadways and rights -of -way in a logical manner. 1) Baculite Mesa Estates 8) Scott's Haven 2) Stewarts 9) Clearview 3) Vitallo 10) Oil Acres — 4) Overton Estates 11) City View 5) North College Acres 12) Fearnowville 6) Trani Estates 13) McLaughlin _ 7) Fountain Lake 14) Belle Plain The three intensively developed areas are the Airport, the AIP, and the Belle Plain Industrial Park. Five approved sand and gravel extraction pits are located in the study area. The only irrigated and prime irrigated farmland within the study area is located along Fountain Creek and the Arkansas River. These areas are presently in use as farmland. Rangeland located north and east of Pueblo Memorial Airport could become prime land if irrigated. These farmlands are identified on Map XXIV. E. LAND OWNERSHIP Most of the land in the study area is divided into 20 acre parcels or larger. One land owner possesses thousands of acres to the north and east of the Airport. Smaller parcels and subdivisions are found along the City boundary. Parcel sizes will be analyzed in the event of an annexation because they impact road and utility line extension decisions (See Map XXV). F. BELLE PLAIN Belle Plain is located to the immediate north of U. S. Highway 50 and to the east of Colorado Highway 47 (See Map XXVI). Several large auto salvage operations and some residential development are found here on land that is zoned Industrial Category 3. The I -3 zoning allows, as a use -by- right, all heavy industrial uses except hazardous waste facilities. Residential uses here include housing for _ caretakers and security, some nonconforming residences (those not allowed by zoning ordinances, but having been established before such zones were designated in 1963), and vacant older homes. Water and sewer is provided by private cisterns and septic tanks. County zoning I -3 has no requirements for the landscaping or screening of industrial grounds. The City, however, requires that salvage yards be completely enclosed by a seven foot fence of masonry, wood, or ornamental hedge. No stacked vehicles may be visible above the screen, and the operation shall not encroach upon or utilize any area outside the salvage yards (Title 9, Chapter 7). - 67 - • T W GOC AQGE H - iJ O L >, .. E I d F1 , t ii i i s 1 I r L t 3 MAP KEY: ti Auto Salvage or Storage (I -3 Zoned) Q I I ' = FIQ Ica north 1 -- City of Pueblo Department o Pl & De NORTHEAST QUADRANT ANNEXATION MASTER PLAN W a E-4 z a a w a a PEI MAP: X:iVI - 71 - The auto salvage yards are visible form U. S. Highway 50 and Colorado Highway 47. Screening and landscaping can be utilized along highways to visually block the salvage yards. However, State highway safety regulations make it impossible for 34 percent of State Highway 47 to be adequately screened due to the need for 30 feet of vehicle recovery zones on each side of the road. The Pueblo Regional Comprehensive Development Plan, 1980, recommends that the Belle Plain area be zoned for "light industry," and that the lands to the north remain "open lands." Policy B3 -1(4) of the Plan reads: "Promote the aesthetic improvement and positive visual image of industrial uses, and regulate through developmental controls the need to physically and visually buffer new and existing heavy industries." The Morgan Report, issued by Morgan Associates in 1979, states that the area instills a "negative image of Pueblo to visitors." Recently, some salvage operations have requested rezoning of adjacent parcels in order to expand operations. No new rezoning has occurred in the area since the _ 1986 Pueblo Regional Comprehensive Development Plan was approved, aside from one map amendment which was applied for prior to the Plan's adoption. G. PUEBLO MEMORIAL AIRPORT AND INDUSTRIAL PARR 1. Airport. The Pueblo Memorial Airport and adjacent Industrial Park is located six miles east of Downtown Pueblo and occupies 3,800 acres of land. The Airport was established in 1943 as an Army Air Corps Base. In 1953, the facility was transferred to the City for use as a municipal Airport. Occupying 2,900 acres with three runways, terminal and complete air -side facilities, the Airport serves as a major air facility to Southern Colorado. The Master Plan for Pueblo Memorial Airport by Isbill Associates, Inc., refers to _ the "primary trade area" as the "geographic area from where the greatest majority of airline passengers are normally generated." The "primary trade area" for Pueblo Memorial Airport includes Pueblo, Colorado City, and Pueblo West. "Secondary trade areas" extend to La Junta, Rocky Ford, Walsenburg, and small mountain resorts. The volume and type of air traffic (passenger or cargo) is related to the population, seasonal employment, and economic climate of these trade areas. Based on increasing population, rising employment opportunities, and increasing business and industry in the Pueblo area, an increasing demand for all Airport services is probable. Pueblo's Aviation Director states that capacity at the Airport is four commercial airlines. Beyond four, the terminal building and other facilities would be in need of major expansion. The Operations Budget for the Airport is allocated by the City of Pueblo. - 72 - Additional funding for capital improvements is available through the Federal Aviation Administration's Entitlement Program. Pueblo Memorial Airport has approximately $2.5 million in proposed improvement projects planned. Federal funding is allocated through a priority system. Projects such as those concerning air -side facilities are priority and receive funding over projects to renovate public areas. It is unlikely that Pueblo will receive the entire $2.5 million as not all proposed projects are top priority. 2. The Airport Industrial Park. The remaining 900 acres not committed to Airport operations have been made available for light industrial uses. This zone (I -1 or I -2) allows for wholesaling activities, printing, warehousing, and some types of manufacturing. Initially, all the land in the AIP was owned by the City. Between 1953 and the early 1980's, a small number of industrial users, including Dana Corporation, Metal Processing, Pueblo Diesel, OK Tooling, the Government Printing Office and Martec, moved into the AIP. In the early 1980's, the Pueblo Economic Development Corporation (PEDCo), a joint public /private economic development effort, was founded. PEDCo began actively marketing the community and promoting the industrial development of the AIP. The first major corporation to respond to the effort was the Sperry Corporation, now Unisys, which announced their intention to locate in Pueblo in 1984. They were followed by the Target Distribution Center, McDonnell Douglas Astronautics, Kurt Manufacturing, PCL Packaging, Atlas Pacific, Pryor Giggey, Trane Company, Glenn Trucking Company, Kaiser Aerospace Electronics, and B. F. Goodrich. There are 496 acres of developable land still available at the AIP. Employment has grown from an available average AIP census prior to the Sperry announcement of 660 to an actual census of approximately 2,500 in October of 1987. With the facilities currently under construction, employment is anticipated to grow to 3,000 in 1988. This is a fourfold increase between 1984 and 1988. 3. Fire Protection -- Airport and Airport Industrial Park (AIP A City Fire Station is located at the Pueblo Memorial Airport. It is equipped with a three -way pumper truck, two crash trucks with foam and powder fire retardant, and three two - person shifts. This station's protection service area includes the Airport terminal, air side facilities, and the industrial park. Presently, the annual operation's expenditure for the Airport station is $248,000 (1988). In the case of an emergency, the Airport firefighters and at least one station from the City are simultaneously dispatched. The Airport crew arrives within minutes and after assessing the scene can request additional support. If an emergency occurs in the AIP, the same sequence is followed; however, when sufficient support crews arrive the Airport team must return to its station so as to ready itself for any air -side emergency. The City Fire and County Volunteer Rural Fire Departments have a standing Mutual Aid A which provides that either department will respond to aid the other on request. The one exception is in the event of an air -side emergency, in which case the Rural County firefighters are immediately dispatched. - 73 - Rural Station Number Two, located on Baxter Road, is two miles from the Airport and has a response time of two to three minutes. It is staffed by a four - person crew and equipped with a pumper truck and foam fire retardants. 4. Emergency Services. The greatest shortfall in emergency services at the Airport, according to the Aviation Director, is that of medical attention. Firemen and police officers are often licensed as Emergency Medical Technicians (EMTs), but any advanced aid or transportation to a medical facility must first be dispatched to the Airport from the City. A rather lengthy delay is incurred and this could be detrimental in the case of an emergency. 5. Airport Police Protection. The Airport and the AIP are primarily a City development project on City land. Currently, all law enforcement and regulation is provided by the Pueblo City Police Department with the assistance of Airport and private agency security personnel. The City Police have incorporated the Airport into the City's southeast area police beat. However, because of the busy nature of this patrol, frequently the Airport is not accommodated. Night shifts are not scheduled to patrol the Airport or the AIP. Federal law requires that a uniformed police officer be present at the Airport terminal when departing passengers are screened. No officer is permanently assigned to this duty. When a commercial airline is scheduled for departure, a City Police officer must fill the duties at the Airport. City Law Enforcement Code 3 -1 -4 states that all Pueblo City traffic ordinances apply to the Airport and that the Airport Director is responsible for the enforcement of these ordinances. Currently, Airport personnel enforce parking regulations and City Police enforce all other traffic ordinances. City ordinances on personal conduct also apply at the Airport and are enforced by City Police. There are no formal, written agreements with the County indicating under whose jurisdiction the Airport falls, County or City. There are also no written guarantees with the individual industries that City Police shall provide the protection. Airport security personnel patrol the Airport and will assist any law enforcement officer or private agency security guard. The Airport security guards are issued a police commission which allows them to detain suspects and issue traffic and parking citations. They do not carry firearms. Target and Unisys are the only industries employing security personnel. These guards carry firearms, but do not leave the premises of their respective employers. - 74 - If law enforcement services continue as are currently practiced, and if the Airport builds out, a new City patrol beat may be needed. Annexation will necessitate this beat and include the revenue to pay for it. Currently, City Police protection to the Airport, terminal, and Industrial Park is provided from other City patrol beats and not paid for from Airport revenue or industry service fees. 6. Pueblo Memorial Airport Noise Zones. Pueblo Memorial Airport, located four miles east of the City of Pueblo, is classified in the National Airport System Plan as a non -hub, medium - density, secondary air - carrier airport. It's annual aircraft operations range falls between 100,000- 250,000 and 50,000- 100,000 annual passenger enplanements (departures). In 1987, there were 49,177 enplaned passengers. Air carrier service is provided by Continental Express, Trans World Airways, and American West Airlines. The Airport facilities are available to both civilian and military uses. Flight training occurs 24 hours daily by the Army, United Airlines, Aspen Airlines, Continental Express Airlines, Trans Colorado Airlines, Evergreen International (for United Postal Service), and Emery Air Freight. The Airport has two runways. The main runway is 10,496 x 150 feet east /west. The secondary runway is 7,000 x 150 feet north /south. Over 90 percent of all general aviation and military operations occur on the east -west runway. Isbill Associates, Inc., prepared an Airport Master Plan for the Airport in 1975. Noise zones, or those areas significantly impacted by aircraft noise, were measured by Composite Noise Ratings (CNR's). Three following zones were identified: Zone 5 - -115+ CNR's - -the highest next to the runway; Zone 2-- 100 -115 CNR's in the takeoff and landing areas; and Zone 1 - -90 -100 CNR's outside those areas (See Map XXVII). Residential land uses were "Normally Acceptable" by these FAA standards in Zone 1, "Normally Unacceptable" in Zone 2, and "Clearly Unacceptable" in Zone 3. These FAA standards are guidelines and "are not intended to substitute Federally determined land uses for those determined to be appropriate by local authorities in response to locally determined needs and values in achieving noise compatible land uses." These zones are indicative of older aircraft with noisier engines using different takeoff and landing patterns than today's quieter planes. Pursuant to the Airport and Airway Improvement Act of 1982, the FAA has streamlined the process for determining noise exposure levels and land use capabilities around airports. All Federal noise levels are now measured in Average Day -Night Sound Levels (LDN). Through the use of quieter aircraft and different takeoff and landing patterns, the noise zones have changed since 1975 (See Map XXVIII). Through the use of a sophisticated computer modeling program developed by the FAA, aircraft types and takeoff and landing patterns are computed for a more accurate depiction of today's noise levels. M17M - 76 - These new zones which were prepared in 1987 by the State Department of Local Affairs for the City of Pueblo depict noise areas, especially in Zone 2, differently than in 1975. This study, while not approved by the FAA, is _ indicative of a change in zone areas. A new Federal Aviation Regulation (FAR) 150 noise study will be forthcoming in 1989. This new study will be the most accurate study yet prepared. It will use manual calculations, actual field measurements, and computer modeling. The CNR and LDN noise levels are compared in Table VII. Land use compatibility tables, recommended by the FAA are listed in Table VIII. Zone 3 is recommended only for open space, agriculture, or industrial development. In Zones 1 and 2, residential development and other land uses are recommended only with noise abatement construction. TABLE VII COMPARISON OF CNRADN NOISE LEVELS RELATING TO LAND USE IMPACT MI:W LDN* CNR (AVERAGE DAY -NIGHT LAND USE IMPACT (COMPOSITE NOISE _ ZONE SOUND LEVELS) (RESIDENTIAL) RATING) ZONE - -- 0 -55 Clearly Acceptable - -- --- ZONE 1 - -- 55 -65 Normally Acceptable 90 -100 (90 -100) ZONE 1 — (65 -70) ZONE 2 ZONE 2 (70 -75) 65 -75 Normally Unacceptable 100 -115 (100 -115) ZONE 3 ZONE 3 (75 +) 75+ Clearly Unacceptable 115+ (115 +) *65 LDN = 100 Decibels 75 LDN = 110 Decibels MI:W TABLE VIII LAND USES NORMALLY COMPATIBLE WITH VARIOUS NOISE LEVELS Land Use* Yearly Day -Night Average Sound Level (Ldn) in Decibels Below ZONE 1 ZONE 2 ZONE 3 ZONE 3 ZONE 3 65 65 -70 70 -75 75 -80 80 -e5 Over 8 Residential: Res n idential, other than mobile hoes and transient Y M -1 N-1 N N N lodgings Mobile home parks Y N N N N N Transient lodgings Y N -1 10-1 N -1 N N Public Use: Schools, hospitals and nursing homes Y 25 30 N N N Churches, auditoriums, and concert halls Y 25 30 N N N Governmental services Y Y 25 30 N N Transportation Y Y Y -2 Y -3 Y -4 Y -4 Parking Y Y Y -2 Y -3 Y -4 N Commercial use: Offices, business and professional Y Y 25 30 N N Wholesale and retail -- building materials, hardware Y Y Y -2 Y -3 Y -4 N and farm equipment Retail trade -- general Y Y 25 30 N N Utilities Y Y Y -2 Y -3 Y -4 N Communication Y Y 25 30 N N Manufacturing and production: Manufacturing -- general Y Y Y -2 Y -3 Y -4 N Photographic and optical Y Y 25 30 N N Agricultural (except livestock) and forestry Y Y-6 Y -7 Y -8 Y -8 Y -8 Livestock farming and breeding Y Y -6 Y -7 N N N Mining and fishing, resource production and Y Y Y Y Y Y extraction Recreational: Outdoor sports arenas and spectator sports Y Y -5 Y-5 N N N Outdoor music shells, amphitheaters Y N N N N N Nature exhibits and Zoos Y Y N N N N Amusements, parks, resorts and camps Y Y Y N N N Golf courses, riding stables and water recreation Y Y 25 30 N N *The designations contained in this table do not constitute a Federal determination that any use or land covered by the program is acceptable or unacceptable under Federal. State, or local law. The responsibility for determining the acceptable and permissible land uses remains with the local authorities. FAA determinations under FAR Part 150 are not intended to substitute federally- determined land uses for those determined to be appropriate by local authorities In response to locally- determined needs and values in achieving noise compatible land uses. Y (Yes) -- Land use and related structures compatible without restrictions. N (No) -- Land Use and related structures are not compatible and should be prohibited. NLR -- Noise Level Reduction (outdoor to indoor) to be achieved through incorporation of noise attenuation Into the design and construction of the structure. 20, 25, or 30 -- Land use and related structure generally Compatible, measures to achieve NLR or 25, 30, or 35 must be incorporated into design and construction of structure. 1- Where the community determines that residential uses must be allowed, measures to achieve outdoor to indoor Noise Level Reduction (NLR) or at least 25 d6 and 30 48 should be Incorporated Into building codes and be con- sidered in individual approvals. Normal construction can be expected to provide a NLR of 20 d8, thus, the reduction requirements are often stated as 5, 10, or 15 d8 over standard construction and normally assume mechanical ventilation and closed windows year round. However, the use of NLR criteria will not eliminate out- door noise problems. 2- Measures to achieve NLR of 25 must be Incorporated into the design and construction of portions of these build- ings where the public is received, office areas, noise - sensitive areas or where the normal noise level Is low. 3- Measures to achieve NLR of 30 must be incorporated into the design and construction of portions of these build- ings where the public is received, office areas, noise- sensitive areas or where the normal noise level Is low. 4- Measures to achieve NLR or 35 must be Incorporated Into the design and construction of portions of these build- ings where the public Is received, office areas, noise- sensltive areas or where the normal noise level is low. S- Land use Compatible provided special sound reinforcement systems are installed. 6- Residential buildings require an NLR of 25. 7- Residential buildings require an NLR of 30. 8- Residential buildings not permitted. Sources: FAR Part 150, Airport Noise Compatibility Planning, DOT -FAA, January 1981, Appendix A - Table 2, page 11. — 79 — APPENDIX :� SITANDARD AVIGATION EASEMENT KHES'EAS . 'rereinaft r calla ±:'t. Grantor, is the owner in fee simple of that certain tract of land situated in Pueblo County, Colorado, described on Exhibit "A" hereto, hereinafter called Grantor's Property. NOW, THEREFORE, in consideration of the sum of One Dollar ($1.00) and other good and valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the Grantor, for itself, its successors and assigns, does rY--reby grant, bargain, sell and convey unto the City of Pueblo, hereinafter called the Grants, its successors ar�d assigns, for the use acid benefit of try public, an easement and right -of -way, appurtenant to the City of Pueblo's Merriorial Airport, for trxr passage of all aircraft ( "aircraft" being defined for the purposes of this instrturerit as any device now known or hereafter invented, used, or designed for navigation of or flight in the air) by whomsoever owned and operated, in the airspace above the surface of Grantor's Property to an infinite height above said Grantor's Property, together with the right to cause in said airspace such noise, vibration, and all other effects that may be caused by the operation of aircraft landing at or taking, off from or operating at or on said Airport. Grantor further covEnants and agrees for itself, its successors and assigns that no manmade or non- rrrarxede obstructions on Grantor's Property shall penetrate the 40: 1 approach surface of said Airport; that Grantor's Property shall not be used in a manner as to result in or cause electromagnetic, light, or any other physical emissions which interfere with aircraft, avigation, communications or navigational aids, radio corrm3nication between said Airport and aircraft, flyers" ability to distinguish between said Airport's lights and others, glare in the eyes of flyers using said Airport, impaired visibility, or otherwise endanger the landing, taking off or rraneuvering of aircraft. TO HAVE AND TO HOLD said easement and right -of -way and all rights appertaining thereto unto the Grantee, its successors and assigns, until said Airport shall be abandoned and shall cease to be used for public airport purposes it being understood and agreed that these covenants and agreements shall run with the land and may be enforced by specific perforrrance. IN WITNESS WHEREOF, the Grantor has hereunto set its hand and seal, this - --- --- day of A. D. Attest: _ By: State of Colorado {ss} _ City of Pueblo The forgoing instrument was acknowledged before me this day of 1985, by Notary Public My corrtrtission expire [SEAL]