Loading...
HomeMy WebLinkAbout6243RESOLUTION NO. 6243 A RESOLUTION TO ENTER INTO AGREEMENT WITH THE DENVER AND RIO GRANDE WESTERN RAILROAD COMPANY (D &RGW) FOR THE INSTALLATION AND MAINTENANCE OF SIGNALS AND GATES AT THE INTERSECTION OF FORTIETH STREET AND THE D &RGW RAILROAD CROSSING WHEREAS, the City desires the installation of automatic flashing light signals with warning devices and gates at said 40th Street crossing; and WHEREAS, the Railroad Company shall furnish all labor, materials, and supplies for the installation of said signals and gates and shall thereafter operate, maintain, repair and keep said signals and gates in proper working condition at its sole cost and expense; and WHEREAS, funds have been made available under the provi- sions of Section 130 of Title 23, Public Law 100 -17, Surface Trans- portation and Uniform Relocation Assistance Act of 1987, for improvements to hazardous railroad /highway grade crossings; and WHEREAS, the total estimated cost of materials, supplies and labor for said signal installation is $85,809 which 90% shall be from funds available under the Surface Transportation and Uniform Relocation Assistance Act of 1987 and 10% by the City; and WHEREAS, the City agrees to reimburse the railroad company within thirty (30) days following receipt of an invoice for the City's proportionate share of the costs and expenses as set forth; and WHEREAS, upon execution of this Agreement by the City and Railroad Company, the City shall file with the Public Utilities Company of the State of Colorado an application for authority to install new signals and gates at 40th Street, and WHEREAS, the installation of said signals and gates will be in accordance with the specifications of the Public Utilities Commission of the State of Colorado and in accordance with the standards and specifications of the Association of American Rail- roads, now, therefore, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PUEBLO, that: SECTION 1. The President of the City Council is hereby authorized to execute and enter into the Agreement with the Denver and Rio Grande Western Railroad Company for the installation and maintenance of signals and gates at the intersection of Fortieth Street and the D &RGW railroad crossing. Introduced JULY 25 , 1988 By MIKE SALARDINO C ouncilman APPROVED: en 7 � -2- W lTRACT NO. 3 0 2 2 9 1 A G R E E M E N T THIS AGREEMENT, Made and entered into this 23rd day of May, 1988, by and between THE DENVER AND RIO GRANDE WESTERN RAILROAD COMPANY, a Delaware corporation, hereinafter called "Railroad Company ", and CITY OF PUEBLO, a municipal corporation of the State of Colorado, 211 East D Street, Pueblo, Colorado 81003, hereinafter called "City ", WITNESSETH: WHEREAS, there exists a public road crossing at grade, known as 40th Street, over the tracks of the Railroad Company at Mile Post 115.16 at Pueblo, in Pueblo County, Colorado, and WHEREAS, the City desires the installation of automatic flashing light signals with audible warning devices and gates, hereinafter referred to as "signals and gates ", at said 40th Street crossing, and WHEREAS, the Railroad Company is agreeable to the proposed installation on the terms and conditions herein set forth, and WHEREAS, funds have been made available under the provisions of Section 130 of Title 23, Public Law 100 -17, Surface Transportation and Uniform Relocation Assistance Act of 1987, for improvements to hazardous railroad /highway grade crossings, and NOW, THEREFORE, in consideration of the premises and of the mutual covenants and agreements herein contained, the parties hereto promise and agree as follows: (1) The work to be performed and the installation to be made is at a public road crossing at grade, known as 40th Street, over the tracks of the Railroad Company at Mile Post 115.16 at Pueblo, Colorado, as shown on the map identified as "Dwg. No. P -582" hereto attached and hereby made a part hereof. (2) The Railroad Company shall furnish all labor, materials, and supplies for the installation of said signals and gates, including but not limited to, the necessary wiring, bonding of the track rail, etc., at said heretofore described road crossing at grade shown on Dwg. No. P -582. Total estimated cost of materials, supplies and labor for said signal installation is $85,809 as shown on Exhibit "A" attached which 90% shall be from funds available under the Surface Transportation and Uniform Relocation Assistance Act of 1987 and 10% by the City. (3) Upon execution of this Agreement by the City and Railroad Company, the City shall file with the Public Utilities Company of the State of Colorado an application for authority to install new signals and gates at 40th Street. (4) Upon the completion of installation of said signals and gates, the Railroad Company shall thereafter operate, maintain, repair and keep said signals and gates in proper working condition at its sole cost and expense. It is understood and agreed that the Railroad Company does not guarantee the continuous and uninterrupted operation of the signals and gates covered by this Agreement, and the Railroad Company shall not be liable for any failures of the signals and gates regardless of whether such failures result from mechanical causes or other causes whatsoever. (5) The installation of said automatic signals and gates will be in accordance with specifications of the Public Utilities Commission of the State of Colorado and in accordance with the standards and specifications of the Association of American Railroads. (6) Whenever, by reason of railroad changes, the signals and gates must be relocated, removed and /or replaced, any expense incurred shall be borne by the Railroad company. In the event that the City or other party makes any change in the road or related facilities, the City or other party causing the change shall bear the expense of making any change, relocation, removal or replacement of said signals and gates. (7) The City agrees to reimburse the Railroad company within thirty (30) days following receipt of an invoice for the City's proportionate share of the costs and expenses as set forth herein. (8) All the covenants herein contained shall be binding upon and inure to the benefit of the successors and assigns of the parties hereto respectively. IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed by their duly authorized officers the day and year first above written. THE DENVER AND RIO GRANDE WESTERN RAILROAD COMPANY By 9flie Engin er ATTEST: City Cferk CITY OF PUEBLO Mayor 5/23/88 JMH 1 c_ &4 ExI.;b,t 'R" Pa 9e 1 of 2 SIGNAL DEPT. DETAILED ESTIMATE INSTALL HIGHWAY CROSSING SIGNAL AT M.P. 115.16 CROSSING I.O. NO. 253 -137T DATE: 04/05/88 STREET NAME: 40TH ST. PUEBLO MATERIAL;_ _ _ AMOUNT UNIT UNIT PRICE TOTAL PRICE CANTILEVER SIG. COMP. 26 FT. EA. 6,200 0 CANTILEVER SIG. COMP. 24 FT. EA. 5,250 p GATE SIG. COMP. 12" LTS 6 3567 mach. 2 EA. 5,930 11,860 =STD. FLS.— LIGHT SIG. COMP. 12" LTS EA. 940 SIDE LIGHT UNIT 12" 2 LTS EA. 660 p EXTENSION ARM EA. 220 p `HOUSING 32 WAY J.B. W/ FOUNDATION EA, 280 0 HOUSING 31" CASE - 2 EA. 650 0 1,300 HOUSING 4'11" CASE `I EA. 1, 06 0 0 HOUSING 6'9" CASE EA. 1,200 0 HOUSING BUNG. 6' X 8' 1 EA. 4,190 4,190 HOUSING LSD CASE EA. 670 p HOUSING LOD CASE EA. 770 0 FOUNDATION CONCRETE STD. SIGNAL 2 EA. 140 2g0 FOUNDATLON CONCRETE SECTIONAL _ EA. 160 0 FOUNDATION CONCRETE CANTILEVER EA. 2,100 0 FOUNDATION CONCRETE PED. FOR CASE 4 EA. 60 240 FOUNDATION CONCRETE PED. FOR BUNG, 4 EA. 60 240 -- BATTERY PRIMARY EA 70 0 BATTERY STORAGE 60 AH DMP 7 16 EA. 60 960 BATTERY STORAGE 80 AH DMP 9 EA. 70 p BATTERY STORAGE 120 EMP 7 EA. 80 0 `"BATTERY STORAGE 240 AH EMP 13 6 EA. 150 gpp RECTIFIER TRACK TYPE S EA. 200 0 RECTIFIER 3 OR 13.5 V TYPE ST 2 EA. 400 800 RECTIFIER 30 VOLT TYPE S EA. 210 0 RECTIFIER 6MV -12 CRAGG 2 EA. 250 500 RECTIFIER 20 AMP. CRAGG EA. 360 p RELAY K2 -4 OR 500 OHM N.A. EA. 370 0 `_.RELAY K4 -.17._ OHM (FF) _. _- ....____. 1 . EA. 640 640 RELAY K4 -4 OR 500 OHM N.A. 2 EA. 470 940 RELAY K4 -500 OHM S.R. (2.5 SEC.) 2 EA. 610 1,220 RELAY K4 -400 OHM S.R. 2 EA. 540 1,080 RELAY K4 -50/50 OHM P.O. - - 1 EA. 560 560 RELAY K -4 500 OHM H.D. 1 EA. 540 540 RELAY K -6 4 OR 500 OHM N.A. 3 EA. 730 2,190 RELAY K -6 50/50 OHM P.O. EA. 800 0 RELAY - TIMER (MICRON) EA. 1,350 p RELAY MISC. EA 0 RELAY MISC. EA 0 TRANSFORMER CASE -U1 -410 1 EA. 240 240 'TRANSFORMER CASE -M535A EA. 305 0 TRANSFORMER POLE 150 OR 300 KVA 2 EA. 370 740 , ,TRANSFORMER POLE 750 KVA 1 EA. 500 500 _H 0LT RECEIVER 2 EA. 770 1,540 HARMON OLT TRANSMITTER 2 EA. 570 1,140 HARMON OLT ISLAND UNIT 1 EA. 1,050 1,050 HARMON OLT MODULES REC. 1 LOT 630 630 _: HARMON OLT MODULES TM. 1 LOT 410 410 HARMON OLT MODULES ISL. 1 LOT 900 900 HARMON COUPLER 1131A EA. 190 p ` HARMON REACTOR 11808 EA. 100 0 HARMON TIU -3 ___.._. EA. 180 0 POLE LINE HARDWARE EA. TRANS. LOC. 3 LOT 220 660 POLE J.B. (MED) EA. 140 0 POLE J.B. (LARGE) 1 EA. 180 180 TRACK J.B. (W. C. 1233 -12C) 2 EA. 220 440 TRACK CONNECTION 8 EA. 30 240 X -ING SIG. GUARD RAIL 2 EA. 340 680 ,. - CANT. SIG. GUARD RAIL EA. 370 0 ' PEDESTRAIN BELL _.__..._ 1 EA. 240 240 RAIL HEAD BOND (PLUG TYPE) EA. 1.26 0 RAIL HEAD BOND (WELD TYPE) EA. 1.81 0 COMMERCIAL PW. TAP 1 EA. 900 900 HARMON 1186A INDUCTIVE LOAD EA. 20 0 ;MOTION DEVICE PMD -1 EA. 4,140 0 'MOTION DEVICE PMD -2 EA. 8,000 0 .MOTION DEVICE HXP W/ DAX -2 d MOO S EA. 7,220 0 EVENT RECORDER EA. 1,500 0 HARMON TUNED SHUNT EA. 270 0 Pa 9e 2 of 2 SIGNAL DEPT. DETAILED ESTIMATE MISC. SIGNAL MATL. (FLS.) MISC. SIGNAL MATL. (GATES.) 1 MISC. SIGNAL MATL. (CANT.) CONTINGENCY a 15% FREIGHT & HANDLING a 15% STORE HANDLING a 5% TOTAL SIG. MATL. CROSSING I.D. NO. 253 -137T STREET NAME: 40TH ST. PUEBLO UNIT EA. EA. EA. EA. EA. LOT FT. FT. FT. FT. FT. FT. FT. FT. FT. FT. FT. LOT LOT LOT UNIT PRICE TOTAL PRICE 620 INSTALL HIGHWAY CROSSING SIGNAL AT M.P. 115.16 360 DATE: 04/05/88 MATERIAL: 300 AMOUNT - HARMON TJC -2 600 2.28 HARMON WIDE BAND SHUNT 350 INSULATED RAIL JOINTS 0. 96 INSULATED SW. MAIL. 0 35 FOOT LINE POLE W/ X -ARM 0.91 FILL MATL. 1.22 1 CABLE U.G. 10 COND. #F9 250 '__CABLE U. G. _2 COND._ #t8__ __ 300 CABLE U.G. 3 COND. f6 2,700 CABLE U.G. 5 COND. #E9 250 CABLE U.G. 4 COND. N14 F­'. CABLE U.G. 1 COND. ( INS. BOND ST.) 1 CABLE AERIAL 3 COND. #t9 (TRIPLEX) 150 CABLE AERIAL 4 COND. #t14 1,000 CABLE AERIAL 14 COND. #F14 75 CABLE AERIAL 22 COND. ►14 1,980 PIPE 4 IN BLACK LIVING AND TRAVEL ALLOWANCE.-_" 42 MISC. SIGNAL MATL. (FLS.) MISC. SIGNAL MATL. (GATES.) 1 MISC. SIGNAL MATL. (CANT.) CONTINGENCY a 15% FREIGHT & HANDLING a 15% STORE HANDLING a 5% TOTAL SIG. MATL. CROSSING I.D. NO. 253 -137T STREET NAME: 40TH ST. PUEBLO UNIT EA. EA. EA. EA. EA. LOT FT. FT. FT. FT. FT. FT. FT. FT. FT. FT. FT. LOT LOT LOT UNIT PRICE TOTAL PRICE 620 0 140 0 360 0 632 0 300 0 600 600 2.28 570 1. 17 350 1. 10 0 0. 96 240 0. 83 0 0. 35 350 0.91 140 1.22 0 1.28 100 2. 56 0 4. 75 200 2,400 0 2,700 2,700 3, 500 0 - 44,180 6,627 7,621 2,540 --------------- - 60,968 LABOR: JOB CODE AREA CODE ID CODE SHOP WIRING 632 1499 03 1,100 FIELD RETIREMENT 632 1499 03 - FIELD CONSTRUCTION - - 632 1499 03 7,800 8 3 B FOUNDATION WORK 632 1499 03 MACHINE OPERATOR 632 1499 03 TRACK DEPT. 632 1499 03 - COMMUNICATION DEPT. ENGINEERING 632 1000 03 1,000 SUPERVISION a 20% 1,980 LIVING AND TRAVEL ALLOWANCE.-_" 2,750 TOTAL LABOR ---------------- 14,630 SURCHARGES: ;HEALTH & WELFARE a 5% 732 LIABILITY a 14% 2,048 , , -- VACATION 3 HOLIDAY a 10.75% 1, 573 RRR 6 RRU a 23.55% 3,816 SUPP. PENSION 293 EQUIPMENT RENTAL 1,750 TOTAL SURCHARGES --- - - - - -- ___ ___ 10,211 r�TOTAL ESTIMATED SIGNAL COST OF PROJECT $85,809 ,41 ESTIMATE based upon a 2 lane roadway and prices firm for 90 days. _i..- r 4 ' Thereafter cost subject to an escalation of 1X per month.