HomeMy WebLinkAbout6149RESOLUTION NO. 6149
A RESOLUTION APPROVING AMENDMENT NO. FOUR TO
A CONTRACT DATED AUGUST 12,1985 BETWEEN ISBILL
ASSOCIATES, INC. AND THE CITY OF PUEBLO, A
MUNICIPAL CORPORATION, AND AUTHORIZING THE
PRESIDENT OF THE COUNCIL TO EXECUTE SAME,
BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PUEBLO,
COLORADO, THAT:
SECTION 1:
AMENDMENT NO. FOUR DATED FEBRUARY 22,1988 TO A CONTRACT
DATED AUGUST 12,1985 BETWEEN ISBILL ASSOCIATES, INC. AND THE
CITY OF PUEBLO, A MUNICIPAL CORPORATION, TO PROVIDE ENGINEERING
SERVICES FOR THE IMPROVEMENTS TO PUEBLO MEMORIAL AIRPORT, A COPY
OF WHICH IS ATTACHED HERETO AND INCORPORATED HEREIN, HAVING BEEN
APPROVED AS TO FORM BY THE CITY ATTORNEY, IS HEREBY APPROVED.
SECTION 2:
CITY FUNDS IN THE AMOUNT OF $433.60 ARE AVAILABLE IN
ACCOUNT NUMBER 036- 1987 - 787 -0- 040 -0020.
SECTION 3:
THE PRESIDENT OF THE CITY COUNCIL IS HEREBY AUTHORIZED
TO EXECUTE SAID CONTRACT ON BEHALF OF PUEBLO, A MUNICIPAL CORPORATION,
AND THE CITY CLERK SHALL AFFIX THE SEAL OF THE CITY THERETO AND
ATTEST THE SAME.
INTRODUCED FEBRUARY 22,1988
BY MIKH OCCH_IATO
COUNCILMAN
APPROVED:
d1i - 9 n
P SIDENT OF THE CITY COUNCIL
IAI No. PUB -1155
AIP No. 3 -08- 0046 -06
AMENDMENT NO. FOUR TO CONTRACT
DATED AUGUST 12, 1985, BETWEEN
ISBILL ASSOCIATES, INC.
AND
CITY OF PUEBLO, COLORADO
The Sponsor and the Engineer agree to amend their contract dated August 12,
1985, for improvements to Pueblo Memorial Airport, Pueblo, Colorado, to include
fees for engineering services associated with AIP Project No. 3 -08- 0046 -06. The
improvement Item No. One is included in the Scope of Work of the original
contract. The items covered by this amendment are described below.
1. Rehabilitate and repair Runway 8L/26R (apply . porous friction on
runway).
The Sponsor agrees to pay the Engineer for the services listed under Article II
of the original contract in the following manner:
FIELD ENGINEERING
The Engineer shall be reimbursed on a Cost Plus Fixed Fee Basis. The
Engineer's costs shall be determined on the basis of Time (i.e., the number of
hours worked), multiplied by the Engineer's standard hourly rates for each
applicable employee classification, plus direct non - hourly expenses including
labor, overhead, and general administrative costs. Overhead costs are based on
the most recent audit on the Engineer's records.
The estimated maximum increase for Field Engineering is:
Item 1. $4,336.00.
For a maximum amount for Field Engineering of $14,336.00.
The Engineer's costs, exclusive of the fixed fee, shall not be exceeded
without the Sponsor's written prior approval.
Method of payment shall be as follows:
For services rendered under PART B - SPECIAL SERVICES, the Sponsor agrees
to make monthly payments based upon the work performed by the Engineer less
ten percent. The final ten percent of the fee shall be due and payable when the
project final inspection and the construction report have been completed, and
when reproducible "Record Drawings" have been submitted to the Sponsor and
when the revised Airport Layout Plan has been approved by the FAA. The ten
percent retainage, at the Engineer's option, shall follow the same procedures as
PART A - BASIC SERVICES. The "Record Drawings" and construction report
shall be submitted within a period of ninety days from end of construction
period. This Amendment shall be considered concurrent with completion of audit.
All other terms and conditions of the original contract shall remain in effect.
Page 1 of 2
IN WITNESS WHEREOF, the parties hereto have affixed their signatures this
22nd day of February 1988 .
SPONSOR:
THE CITY OF PUEBLO, COLORADO
PUEBLO, COLORADO
By
P esident, City Council
Attest 1r
Clty Clerk
ENGINEER:
ISBILL ASSOCI T , INC.
By
Pre ident
Isbill Associates, Inc.
Page 2 of 2