Loading...
HomeMy WebLinkAbout6074RESOLUTION NO. 6074 A RESOLUTION AUTHORIZING THE EXECUTION OF A SUPPLEMENTAL AGREEMENT WITH ADAMS- MANGINI, INC. /CLYDE B. YOUNG & COMPANY, A JOINT VENTURE, FOR PROFESSIONAL SERVICES CONCERNING THE PUEBLO MEMORIAL AIRPORT INDUSTRIAL PARK BE IT RESOLVED'BY THE CITY COUNCIL OF PUEBLO, COLORADO, that: gprTTnN 1 A Supplemental Agreement between the City of Pueblo and Adams - Mangini, Inc. /Clyde B. Young & Company, a Joint Venture, the original of which is on file in the office of the City Clerk and is made a part hereof by reference, for professional services in the preparation of final subdivision plats and other related docu- ments for the Pueblo Memorial Airport Industrial Park, for com- pensation not to exceed $60,130.75, with such terms as the City Manager may require, and upon approval as to form by the City At- torney, be and hereby is authorized and approved. SECTION 2. The City Manager is hereby authorized to execute said Agreement on behalf of the City of Pueblo, a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 3. Funds for said services shall be paid from Account Number 034 -1986- 100 - 000 -040 -0020. INTRODUCED August 10 , 1987 By Kenneth.Hunter Councilman APPROVED: Z -6��K(2 1 2>?v - President - 6T the Cmuffbil ATTEST: City erk - 2 - SUPPLEMENTAL AGREEMENT This supplemental Agreement dated /9 a <3 ,1987, between the City of Pueblo, a Municipal Corporation (Owner), and Adams- Mangini, Inc./ Clyde B. Young & Company, a Joint Venture (Engineer), amends and modifies that Agreement between the parties dated October 27, 1986, concerning technical and professional engineering and surveying services associated with subdivision of Pueblo Memorial Airport Industrial Park. The aforementioned Agreement is modi- fied as follows: 1. "Section 2 - Phase II Services" is deleted in its entirety and replaced by the following: Section 2 - Phase II Services 2.1 In accordance with the terms of this Agreement, Engineer shall perform the following Phase II services: 2.1.1 Prepare final subdivision plat for Pueblo Memorial Airport Industrial Park with related calculations and closure sheets. All documentation required for both preliminary subdivision plan and the final subdivision plat will be produced by Engineer except as otherwise indicated in this section 2.1. 2.1.2 Prepare or provide all supporting documents, including supplemental plats, reports, forms and textual information re- quired by Pueblo County Subdivision Regulations, except for the following which are to be furnished by City or other consultants of City: a. language of City's restrictive covenants b. geologic and soil reports c. evidence of sewage treatment capacity to serve subdivision d. evidence of water supply availability e. profile and typical cross section drawings of roads and bridges f. arrangements to secure construction of required public improvements g. finish grading plan for individual lots h. detailed design and drainage plans and drawings for all sanitary and storm sewer mains, except Engineer will be revising the drainage plan to reflect new pipe coeffecients, determining 100 year flood plain dileneations on the final plat, expanding on the downstream effects of the development, determining detention pond volumes and discharges, revising cost estimates, and preparing the final drainage report and related drawings for submittal to Pueblo County. The final hydrology for the Devine basin and the 28th Lane basin will proceed under direction from the City of Pueblo. 2.1.3 Locate and furnish maps and drawings of all above ground and underground utilities, including gas, water, sewer, electric, telephone, and pipelines and showing all easements for same. 2. 3. 2.1.4 Provide all incidental mapping, calculations and other services related to the services specified in subparagraph 2.1.3. 2.1.5 Set all boundary survey monuments in accordance with all requirements of C.R.S. 38 -51 -101 (1). 2.1.6 Establish location of all street, lot and easement lines in consultation with Owner. 2.1.7 Furnish all title evidence required for plat approval by the County of Pueblo. 2.1.8 Attendance and testimony at public meetings and hearings related to subdivision review and approval. 2.1.9 Provide incidental survey and engineering work required to accomplish the foregoing. Paragraph 4.1 of the Agreement is amended by the addition of a new subparagraph 4.1.2 to read as follows: 4.2.1 Owner shall pay Engineer for services rendered under Phase II Services at the time and material rates set forth in Exhibit B for actual reasonable time or materials expended upon the Project performing required services, provided, however, that the total compensation to Engineer hereunder for Phase II Services shall not exceed $60,130.75. It is specifically understood that with respect to consultants or subcontractors of Engineer, including but not limited to real estate title work, compensation to Engineer shall not exceed the actual reasonable cost to Engineer of said subcon- tractor or consultants, and that such compensation is intended to be included within the foregoing not to exceed compensation amount set forth above. It is further understood that all discounts or rebates afforded to or obtained by Engineer shall be passed along to Owner and commensurately reduce the amount of compensation to be paid by Owner hereunder. Engineer shall not, under any circum- stances, be compensated for work required as the result of Engineer's negligence or inefficiency or to correct Engineer's mistakes. All other terms of the Agreement shall remain in full force and effect and shall apply to Engineer's provision of Phase II Services. - 2 - DATED at Pueblo, Colorado, this day of 1 1987. ATTEST: i 4erK ATTEST.. '-Sandra Your@ "Secretary, Clyde B. Young Tcomp an y CITY OF P EBLO, A MUNICIPAL CORPORATION By > Mic 1 A. Occhiato President of the Council ADAMS- MANGINI, INC. /CLYDE B. YOUNG & COMPANY, A JOINT VENTURE By Fred L. Adams President of Adams - Mangini, Inc. By Clyde B. Young President, Clyde B. g & Com y - 3 -