Loading...
HomeMy WebLinkAbout6013RESOLUTION NO. 6013 A RESOLUTION APPROVING AN AGREEMENT BETWEEN THE CITY OF PUEBLO AND SELLARDS AND GRIGG, INC., FOR PROFESSIONAL SERVICES ASSOCIATED WITH THE GRADING DESIGN OF A PORTION OF THE PUEBLO MEMORIAL AIR- PORT INDUSTRIAL PARK BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF PUEBLO, COLORADO, that: SECTION 1. An Agreement dated April 24, 1987, a copy of which is on file at the office of the City Clerk and made a part hereof by reference, after having been approved as to form by the City Attorney, by and between Pueblo, a Municipal Corporation, and Sellards and Grigg, Inc., is hereby approved. CFrTTnN 7 Funds for said professional services, which are estimated to cost $38,000, shall be paid from Account No. 034 -1987- 100 - 000 - 040 -8705. cFrTTnm i The President of the City Council is hereby authorized to execute the said Agreement on behalf of Pueblo, a Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. INTRODUCED May 11 ,1987 By KENNETH HUNTER C ncilman APPROVED esident df the Council ATTEST: 7 CONSULTING ENGINEERS SELLARDS & GRIGG, INC. One Union Square 0 143 Union Boulevard. Suite 280 Lakewood, Colorado 80228 (303) 986-1444 April 24, 1987 Mr. Tom Cvar, P.E. Director of Public Works City of Pueblo 211 East "D" Street Pueblo, CO 81002 Re: Agreement Pueblo Memorial Airport Industrial Park Dear Mr. Cvar: Sellards & Grigg, Inc., is pleased to present this Agreement to provide professional engineering services in connection with the Pueblo Memorial Airport Industrial Park located east of Pueblo at the Pueblo Memorial Airport. We have familiarized ourselves with the work involved and suggest the following Scope of Work and other Agreement Conditions: Scope of Work In evaluation of the proposed Pueblo Memorial Airport Industrial Park overlot grading project, we find it similar to others in our experience that it requires mutli- engineering disciplines, i.e. civil and water resources. The following is our interpretation of the Scope of Work based upon our joint work efforts to date. The project site is located primarily in Section 26, T20S, R64W of the 6th P.M. and consists of approximately 350 + acres. A. Project Design Phase Sellards & Grigg, Inc. will provide the following specifically identified services: 1. Review of required storm drainage channel improvements for the drainage basins associated with the proposed overlot grading project ( "Westerly channel at 1350 cfs + flow and easterly channel at 9000 cfs + flow). Scope of Work will include review of relevant portions of the Master Storm Drainage Plan Report dated March 1987, as prepared by Clyde B. Young Co. and William White Blvd. Bridge Report, dated February 1985, as prepared by WRC Engineering, Inc. Topographic information utilized will be the November 1986 Pueblo Memorial Airport Industrial Park mapping as prepared by Analytical Surveys, Inc. The results of the Mr. Tom Cvar, P.E. Page 2 review will be a letter report identifying the associated channel's flood plain and recommended channel improvements, if any. It is anticipated that the recommended grading improvements for these (2) channels will be incorporated into the overlot grading project. 2. Preparation of construction documents for on -site overlot grading. It is anticipated that the City of Pueblo will formalize the final bid documents, i.e. Sellards & Grigg, Inc. will prepare the necessary drawings, special conditions and technical specifications only. Scope of Work will include the preliminary roadway design profile for the extension of William M. White Boulevard approximately 6600 L.F. Necessary geotechnical services by Lincoln- DeVore for the overlot grading design and roadway design are included. Engineering time has been included to allow for minimal assistance during project bidding. Reproduction costs have been included for ten (10) sets of final plans and specifications. For reference, Sellards & Grigg, Inc. has not included engineering or surveying services for utility coordination, i.e. CIG Company gas main relocation, telephone or water main coordination or any construction phase related service. Term of Performance We estimate that the services described within the Scope of Work will be performed by May 8, 1987. Compensation for Services Compensation for the services described under the Scope of Work above shall be made on an hourly rate basis in accordance with the "General Schedule for Hourly Rates" plus other related fees in effect at the time the work is performed. A copy of the current hourly rate and other related fee schedules is attached as Exhibit A. Exhibit A shall be modified January 1 of each year and a revised Exhibit A shall become a part of this contract. Invoices may be submitted on a monthly basis for work performed in the previous month. Interest at the rate of 1 -112% per month shall be charged on payments not received within 30 days of the invoice date. With the following estimated fees: A. Project Design Phase 1. Review of required storm drainage channel $ 4,000 - $ 5,000 improvements Mr. Tom Cvar, P.E. Page 3 2. Preparation of construction documents for $28,000 - $33,000 on -site overlot grading (estimated fee includes allowance of $5400 for geotechnical work by Lincoln- DeVore and $1100 for obtaining aerial mapping data from Analytical Surveys, Inc.) Ownership of Documents All drawings, plans, specifications, designs, mylars, sepias, mock -ups, written opinions and other documents prepared in connection with responsibilities under this agreement shall be the property of Sellards & Grigg, Inc. The City of Pueblo, at its expense, shall be entitled to receive copies in excess of the number specified in the attached Scope of Work of all drawings, plans, specifications, designs, mylars, sepias, models, mock -ups, and other documents prepared. Said materials and documents may not be utilized on any other Project without the express written consent of Sellards & Grigg, Inc., which express written consent shall contain the terms and conditions mutually acceptable to the City of Pueblo and Sellards & Grigg, Inc. We appreciate this opportunity to provide engineering services in connection with the Pueblo Municipal Airport Industrial Park. If this meets with your approval, please sign in the space provided and return one copy to me. Your signature and date shall serve to initiate the contract described herein. Very truly yours, SELLARDS & GRIGG, INC. Thomas A. Young, P.E. Vice President TAY:mc encl. Approved �,va -ter �-,-- Date CONSULTING SELLARDS & GRIGG, INC. E N G I N E E R Ic 1 One Union Square • 143 Union Boulevard, Suite 280 Party Chief III Lakewood, Colorado 80228 (303) 986.1444 EXHIBIT A Party Chief II GENERAL SCHEDULE OF HOURLY RATES EFFECTIVE JANUARY 1. 1987 DUTY NO. CLASSIFICATION HOURLY RATE 13 Principal $75.00 14 Principal $68.00 21 Engineer IX $68.00 22 Engineer VIII $63.00 23 Engineer VII $58.00 24 Engineer VI $54.50 25 Engineer V $50.50 26 Engineer IV $47.00 27 Engineer III $43.00 28 Engineer II $39.00 29 Engineer I $33.50 30 Technician V $42.00 31 Technician IV $39.50 33 Technician III $36.50 35 Technician 11 -- $30.50 37 Technician I $26.00 39 Technician 0 $22.00 40 Drafter V $42.00 41 Drafter IV $36.50 43 Drafter III $31.50 45 Drafter II $26.00 47 Drafter I $22.00 49 Drafter 0 $19.00 51 Director Field Operations $50.00 53 Resident Engineer $50.00 55 Field Construction Manager $44.00 56 Construction Observer III $36.50 57 Construction Observer II $33.50 58 Construction Observer I $27.50 60 Survey flanager $43.00 61 Party Chief III $38.50 62 Party Chief II $35.00 63 Party Chief I $31.50 64 Surveyor IV $31.50 65 Surveyor III $27.50 66 Surveyor II $24.00 67 Surveyor I $21.00 68 Surveyor /Technician II $33.50 69 Surveyor /Technician I $26.00 73 Secretary II $25.00 75 Secretary I $22.00 77 Technical Typist $22.00 79 Reproduction Assistant $15.00 Mileage: Equipment: Survey Vehicles .40 /mile EMI 25.00 /hr Inspection Vehicles .25 1mile IBII Computer 20.00 /hr Other .20 /mile Office Computer 10.00 /hr Printing: Supplies: Blue Line .15 /sf Hubs .15ea Sepia .25 /sf Lath .15ea Reproducible llylar 1.00 /sf PK flails .20ea Xerox 8 1 /2'41' .10ea Wood Stakes .15ea Xerox 8 1/2'x14• .10ea Guineas .10ea Oversize .15ea Rebar 1.00ea StickyBack 8 1 /2x11 .50ea Survey Caps .75ea StickyBack 8 1/2x14 .75ea Brass Cap 2.00ea Vellum .35ea Subconsultants: Cost plus 101