RESOLUTION NO. 5 161
A RESOLUTION APPROVING AN AGREEMENT BETWEEN THE
CITY OF PUEBLO, A MUNICIPAL CORPORATION, AND
SELLARDS AND GRIGG, INC., FOR ENGINEERING SER-
VICES ASSOCIATED WITH THE PORTLAND AVENUE DRAIN-
AGE STUDY
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, COLORADO, that:
CFrTTnN 1
A certain Agreement to perform professional engineering services
in the form of a drainage study of a portion of the city's east side,
namely the Portland -Ogden drainage basin, a copy of which is attached here-
to and made a part hereof by reference, after having been approved as to
form by the City Attorney, by and between the City of Pueblo, a Municipal
Corporation, and Sellards and Grigg, Inc., a Corporation, 143 Union Blvd.,
Suite 280, Lakewood, Colorado, be and the same is hereby approved.
cGrTTnN 9
The City Manager, Fred E. Weisbrod, is hereby authorized to exe-
cute said Agreement on behalf of the City of Pueblo, a Municipal Corpora-
tion, and the City Clerk shall affix the seal of the City thereto and at-
test the same.
INTRODUCED May 23 ,1983
By REIMAR VON KALBEN
Councilman
APPROVED:
- President of the Council
ATTEST:
j
City Clerk
CONSULTING
ENGINEERS
SELLARDS & GRIGG, INC.
One Union Square • 143 Union Boulevard, Suite 280
Lakewood, Colorado 80228 (303) 986-1444
May 9, 1983
Mr, Tom Cvar, P.E.
Director of Public Works
City of Pueblo
211 East "D" Street
Pueblo, Colorado 81003
Re: Proposal Agreement - Portland Ogden Storm
Drainage Study
Dear Mr. Cvar:
This letter is our proposal to perform professional engineering services in
connection with the Portland -Ogden Storm Drainage Study. The scope of work
for this study is as follows:
I. Delineate Drainage Basin Boundaries
II. Determine Major and Minor Drainage Routes and Patterns
III. Ascertain Drainage Problems Affecting:
A. Private Property
B. Public Rights -of -Way
C. Ground Water
D. Infiltration of Sanitary Sewers
E. Irrigation Facilities
IV. Identify Drainage Constraints
A. Conduits- Culverts
B. Open Channels
C. Embankments and Other Barriers
V. Identify Drainage Options
A. Open Channels
B. Storm Sewers
C. Detention Ponds
VI. Prepare Preliminary Plan
VII. Develop Cost Estimates (Construction - Engineering)
VIII. Write Report
The project site is the natural drainage basin tributary to the intersection
of Portland Avenue and Ogden Street in Pueblo, Colorado. Also included in
the study area is the route location for storm water disposal to the
Arkansas River.
Mr. Tom Cvar
May 9, 1983
Page Two
We propose to perform the services described on an hourly rate basis for
various classifications of personnel. Compensation shall be made in
accordance with the "General Schedule of Hourly Rates" in effect at the time
the work is performed. A copy of the current schedule is attached as
Exhibit "A." Exhibit "A" will be modified on January 1 of each year and a
Revised Exhibit "A" shall become a part of this agreement. We estimate that
the total cost to perform the services described will be approximately
$10,000.00. In the event the scope of work should be increased, or if
other conditions should arise that would affect this total dollar estimate,
the City shall be notified and fees in excess of the estimated amount shall
not be charged without approval by the City.
All original survey books, notes, calculations, working papers and files
generated in the course of the work shall remain the property of Sellards
& Grigg, Inc.
We estimate that the work may be completed within eight to ten weeks. The
engineering fee estimate includes ten copies of the report, however,
additional copies may be obtained if requested.
We appreciate this opportunity to provide engineering services in connection
with the Portland -Ogden Storm Drainage Study. If this proposal- agreement
meets with your approval, please sign in the space provided and return one
copy to me.
Very truly yours,
SELLARDS & GRIGG, INC.
0 i��
George D. Sellards, P.E., L.S.
GDS:lb
Approved:
Date
CONSULTING l e a SELLARDS & GRIGG, INC.
E N G I N E E R S One Union Square • 143 Union Boulevard, Suite 280
Lakewood, Colorado 80228 (303) 986.1444
- SCHEDULE XII
General Schedule of Hourly Rates Effective January 1, 1983
DUTY
CLASSIFICATION
13,14,15
Principal
16
Sr. Project Manager
17
Project Manager
19
Branch Operations Manager
20
Sr. Project Engineer
21
Project Engineer
23
Engineer II
25
Engineer I
27
Designer II
29
Designer I
31
Technical Supervisor
33
Technician II
35
Technician I
41
Graphics-Supervisor
43
Drafter III
45
Drafter II
47
Drafter I
53
Resident Engineer
55
Field Construction Manager
57
Construction Observer
63
Chief of Surveys
65
Survey Party Chief
67
Surveyor II
69
Surveyor I
73
Secretary II
75
Secretary I
77
Technical Typist
79
Reproduction Assistant
Mileage:
Inspectors
Other
Printing:
Blue Line
Sepia Line
Xerox
.25 per mile
.20 per mile
HOURLY RATE
$ 55 -70
50.00
45.00
37.50
45.00
45.00
40.00
35.00
33.00
29.00
35.00
30.00
25.00
35.00
27.00
23.00
20.00
43.00
35.00
�►X1KtZI]
33.00
26.00
23.00
20.00
21.00
20.00
20.00
12.00
Other:
EDMI $25 per hour
Office Computer $10 /hour
.10 per s.f. /sheet
.25 per s.f.
.10 per s.f.