HomeMy WebLinkAbout5130RESOLUTION N0. 513 0
A RESOLUTION APPROVING A CONTRACT BETWEEN
ISBILL ASSOCIATES INC. AND THE CITY OF
PUEBM, COLORAD0 A MUNICIPAL CORPORATION.,
AND AUTHORIZING THE PRESIDENT OF THE COUNCIL
TO EXECUTE SAME.
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO THAT:
SECTION 1:
A CONTRACT DATED APRIL 25,1953 A COPY OF WHICH IS
ATTACHED HERETO AND MADE A PART HEREOF BY REFERENCE AFTER
HAVING BEEN APPROVED AS TO FORM BY THE CITY ATTORNEY, BY AND
BETWEEN ISBILL ASSOCIATES, INC. AND THE CITY OF PUEBLO A
WICIPAL CORPORATION, RELATING TO ENGINEERING SERVICES FOR
AVIATION FUELS STORAGE SYSTEM INSTALLATION AT PUEBLO MEMORIAL
AIRPORT; BE AND THE SAME IS HEREBY APPROVED SUBJECT TO THE
CONDITIONS AS SET FORTH IN SAID CONTRACT.
SECTION 2:
THE PRESIDENT OF THE COUNCIL IS HEREBY AUTHORIZED
TO EXECUTE SAID CONTRACT ON BEHALF OF PUEBLO, A MUNICIPAL
CORPORATION AND THE CITY CLERK SHALL AFFIX THE SEAL OF THE
CITY THERETO AND ATTEST THE SAME,
INTRODUCE April 25, 195,___._,_
BY DOUGLAS L. RING
COUNCILMAN
v•-•9 �
OR
PRESIDMT OF THE COUNCIL-
PUB -0975
ENGINEERING CONTRACT FOR
AVIATION FUELS STORAGE SYSTEM INSTALLATION
The City of Pueblo, Colorado, hereinafter called the "Owner," agrees to employ
the firm of Isbill Associates, Inc., hereinafter called the "Engineer," to perform
the engineering services as outlined below for the project known as Aviation
Fuel Storage System Enlargement at Pueblo Memorial Airport.
L The scope of work contemplated under this agreement is for the enlarge-
ment of an existing aviation fuel storage system at Pueblo Memorial
Airport. Said improvements will include, but are not limited to, the
following items:
1. Installation of a fourth AVJET tank at the existing AVJET fuel
facility;
2. Installation of a 40,000 gallon above ground AVGAS 10OLL fuel
facility to the east of the existing AVJET fuel facility. The system
will consist of two separate 20,000 gallon tanks each complete
with its own pumping, filtering, and metering system.
IL The Engineering services rendered for the above described scope of
work will be in the following steps:
1. Establish system criteria for the two projects. Meet with airport
personnel to review and finalize the criteria;
2. Make a preliminary estimate of construction cost for the systems;
3. Prepare design drawings and obtain bids for the systems. Bids
for installation of the AVJET tank (supplied by Pueblo Memorial
Airport) will be obtained separately to expedite its installation;
4. Prepare detailed design drawings and specifications for equipment
layout, installation, piping, and wiring of the systems, and for
miscellaneous concrete and structural work;
5. Observation of the construction on a limited basis. Field inspection
and observation trips at approximately one week intervals;
6. The Engineer shall prepare periodic estimates during the construc-
tion of the Project and shall prepare the final estimate when the
work is completed;
7. Upon acceptance of the project, the Engineer shall prepare the
"As Built" drawings and construction engineering report and shall
pr:-vide the Owner with one (1) set of reproducible "As Built"
drawings.
Page 1of3
CHANGE OF SCOPE
It is mutually agreed that any change in the scope of the project by
the Owner resulting in extra expense to the Engineer shall be considered
beyond the normal scope of this contract. Payment to the Engineer for
such work because of the change in scope of the project shall be nego-
tiated at the time of the anticipated change and it shall be mutually
agreed to by amending this contract.
III. The Engineer and the Owner mutually agree that:
1. The Owner and the Engineer each bind himself, his partners, succes-
sors, assigns, and legal representatives to the other party to this
contract and the partners, successors, assigns, and legal represen-
tatives of such other party in respect of all covenants of this
contract. Neither the Owner nor the Engineer shall assign, sublet,
or transfer its interest in this contract without the written consent
of the other
2. This contract may be terminated by either party upon seven (7)
days written notice should either party fail substantially to perform
In accordance with its terms through no fault of the other. In
the event of termination due to the fault of others, the Engineer
shall be compensated for the services performed to termination
date at rates shown on the attached fee schedule. In the event
the termination is due to the fault of the Engineer, he shall be
paid only for those services performed satisfactorily (as determined
by the Owner) to the date of termination. Compensation shall
include any reimbursable expenses then due;
3. The original plans and specifications shall remain the property
of the Engineer; however, the Owner will be provided one (1) set
of reproducible plans and .: pecifications whether or not the project
is executed.
IV. The Owner agrees that:
1. The Owner shall make available to the Engineer all technical data
that.is in the Owner's possession including maps, surveys, property
descriptions, borings, and other information required by the Engineer
and relating to his work.
2. The Owner agrees to coon erate with the Engineer in the approval
of all plans and specificaitons, or should they disapprove of any
part of said plans and specifications, shall make a decision timely in
order that no undue expense will be caused the Engineer because of
lack of decisions. If the Engineer is caused extra drafting or other
expense due to changes ordered by the Owner after the completion
and approval of the plans and specifications, the Engineer shall
be equitably paid for such extra expenses and services involved.
Page 2 of 3
3. The Owner shall pay publishing costs for advertisements of notices,
public hearings, requests for bids, and other similar items; shall pay
for all permits and licenses that may be required by Local, State, or
Federal authorities; and shall secure the necessary land, easements,
and rights -of -way required for the project.
V. The Owner agrees to pay the Engineer for the services listed under
Article II in the following manner.
For the services rendered, the Engineer shall be reimbursed on an hourly
rate basis plus expenses (travel, per diem, etc.). See attached rate
schedule. The maximum amount of engineering costs shall not exceed
$22,000 unless so mutually agreed to by the Owner and Engineer.
VI. In consideration of said payment and compensation, the Engineer agrees
to perform said services and work to carry out the provisions of this con-
tract in a good and workmanlike manner and to the satisfaction of the
Owner.
IN WITNESS WHEREOF, the parties hereto have affixed their signatures
this 25TH day of APRIL , 1983.
OWNER:
CITY OF PUEBLO, COLORADO
B J d±4 . aAke c, -W Y-S
President of the City Council
City of Pueblo, Colorado
Attest
1
City Clerk
ENGINEER:
Isbill Associate n
By
President
Isbill Associates, Inc.
APPROVED AS TO FORM:
v
City At ey
Page 3 of 3
ISBILL ASSOCIATES, INC.
STAPLETON INTERNATIONAL AIRPORT a DENVER. COLORADO 80207 a (909) 988 -2414
PEE SCHEDULE AND BILLING PROCEDURES
Principal . . . . . . . . . . . . . $69.80/hr.
Staff Engineer/Planner . . 57.35/hr.
Engineer/Planner /Construction Coordinator 40.'55/hr.
Associate Engineer/Planner . 29.55/hr.
Draftsman . . . . . . . . . . . . . . . . . . . . . . 23.15/hr.
Clerical/Data Processor . . . . . . . . . . . . . . 25.72/hr.
When applicable, mileage and company car usage will be billed at the rate of
$0.20 per mile and $35.00 per day, and out-of=town expenses at per diem rates of
$75.00 (min.) per man (or as may be otherwise negotiated). Auto rental costs will
be billed at actual costs plus ten percent (10%).
A ten percent (10%) charge will be added to reimbursable expenses paid for by
this firm.