HomeMy WebLinkAbout05000RESOLUTION NO. 5000
A RESOLUTION APPROVING AN AGREEMENT AMENDMENT
BET[ ^TEEN THE CITY OF PUEBLO, A MUNICIPAL
CORPORATION AND SELLARDS & GRIGG, INC.,
DATED JUNE 28, 1982 AND RELATING TO CONSULTING
ENGINEERING SERVICES FOR THE CITY'S SANITARY
SEWER SYSTEM.
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, COLORADO, that:
SECTION 1.
The Agreement Amendment between the City of Pueblo, a
Municipal Corporation and Sellards & Grigg, Inc. dated June 28,
1982 relating to consulting engineering services for the City's
sanitary sewer system, a copy of which is attached hereto and
incorporated herein, having been approved as to form by the
City Attorney, is hereby approved.
SECTION 2.
The City Manager is hereby authorized and directed to
execute said Agreement Amendment for and on behalf of the City and
the City Clerk is directed to affix the seal of the City thereto
and attest same.
INTRODUCED June 28 , 1982
By HAROLD MABIE, JR.
Councilman
APPROVED:
ATTEST.
President of the City Council
C i y
AGREEMENT AMENDMENT
The following is an amendment to the Engineering Agreement
between the City of Pueblo, Pueblo, Colorado and Sellards &
Grigg, Inc., Lakewood, Colorado, originally dated October 30,
1974 and redefined by letter negotiations on May 5, 1977 and
May 16, 1978.
This Amendment is for the purpose of: redefining the
scope of work to include items not previously defined; including
subcontractors for soil testing and other analytical testing and
archeological monitoring previously required; and to renegotiate
a not to exceed total price due to these and other factors.
The scope of work is amended to include all the applicable
requirements of the Minority Business Enterprise System, redesign
of inlets to meet new City Standards, inspection of on- the -job
manufacture of drainage conduit, evaluation of sewer routes and
patterns due to Main Street Mall and consideration of the
possible convention complex, together with other items related
to construction observation, coordination and administration.
The estimated cost, fixed fee and total price for this
amendment increase, as shown on the attachment (EPA Form 5700 -41
(2 -76)) are based upon a completion date on or before December
31, 1983 and includes the following increase to the previously
agreed upon values.
Total Estimated Cost $279,170.00
Profit 35,877.00
Total Price Increase $315,047.00
The basis for payment for the total contract, as amended
by this Agreement Amendment, shall be a cost reimbursement which
provides for the following:
Total Estimated Cost $647,923.00
Profit (Fixed Fee) 90,777.00
Total Price $738,700.00
The total price of $738,700 may not be exceeded without formally
amending the contract and the fixed dollar profit of $90,777 may
not be increased except in case of a contract amendment.
This Amendment, to be attached and made a part of the
original agreement, includes the following attachments:
Attachment 1: EPA Form 5700 - 41(2 -76) entitled, "Cost or Price
Summary Format for Subagreements Under U.S. E.P.A.
Grants."
Attachment 2: Appendix C -1, "Required Provision - Consult_in
Engineering Agreements."
Executed this ak //, day of �,wz- , 1982.
ATTEST:
U
ATTEST:
CITY OF PUEBLO
SELLARDS & GRIGG, INC.
B b�
Presid nt•
ATTACHMENT OF FORM 5700 -41
ESTIMATE OF LABOR COST
- Page 2 -
Phase E
Associate
Branch Operations Manager
Engineer II
Technical Supervisor
Technician
Drafter
Survey Part Chief
Surveyor
Field Construction Manager
Construction. Observer
Construction Observer
Secretary ( ^echnical Typist)
300
$22.35
$ 6,705.00
400
13.65
5,460.00
80
15.70
1,256.00
40
13.30
532.00
80
9.75
780.00
160
9.50
1,520.00
360
10.75
3,870.00
260
9.75
2,535.00
484
12.50
6,050.00
300
10.75
3,225.00
300
9.75
2,925.00
60
8.25
495.00
$ 35,353.00
This labor estimate is adjusted to reflect
1983 labor rates assumed to be loo above
1982 rates. Total Est. Labor = $ 38,888.30
Summary of Labor Rates
Phase B $ 647.40
Phase C 25,006.50
Phase D 63,988.00
Phase E 38,888.30
Total $128,530.20