Loading...
HomeMy WebLinkAbout05000RESOLUTION NO. 5000 A RESOLUTION APPROVING AN AGREEMENT AMENDMENT BET[ ^TEEN THE CITY OF PUEBLO, A MUNICIPAL CORPORATION AND SELLARDS & GRIGG, INC., DATED JUNE 28, 1982 AND RELATING TO CONSULTING ENGINEERING SERVICES FOR THE CITY'S SANITARY SEWER SYSTEM. BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, COLORADO, that: SECTION 1. The Agreement Amendment between the City of Pueblo, a Municipal Corporation and Sellards & Grigg, Inc. dated June 28, 1982 relating to consulting engineering services for the City's sanitary sewer system, a copy of which is attached hereto and incorporated herein, having been approved as to form by the City Attorney, is hereby approved. SECTION 2. The City Manager is hereby authorized and directed to execute said Agreement Amendment for and on behalf of the City and the City Clerk is directed to affix the seal of the City thereto and attest same. INTRODUCED June 28 , 1982 By HAROLD MABIE, JR. Councilman APPROVED: ATTEST. President of the City Council C i y AGREEMENT AMENDMENT The following is an amendment to the Engineering Agreement between the City of Pueblo, Pueblo, Colorado and Sellards & Grigg, Inc., Lakewood, Colorado, originally dated October 30, 1974 and redefined by letter negotiations on May 5, 1977 and May 16, 1978. This Amendment is for the purpose of: redefining the scope of work to include items not previously defined; including subcontractors for soil testing and other analytical testing and archeological monitoring previously required; and to renegotiate a not to exceed total price due to these and other factors. The scope of work is amended to include all the applicable requirements of the Minority Business Enterprise System, redesign of inlets to meet new City Standards, inspection of on- the -job manufacture of drainage conduit, evaluation of sewer routes and patterns due to Main Street Mall and consideration of the possible convention complex, together with other items related to construction observation, coordination and administration. The estimated cost, fixed fee and total price for this amendment increase, as shown on the attachment (EPA Form 5700 -41 (2 -76)) are based upon a completion date on or before December 31, 1983 and includes the following increase to the previously agreed upon values. Total Estimated Cost $279,170.00 Profit 35,877.00 Total Price Increase $315,047.00 The basis for payment for the total contract, as amended by this Agreement Amendment, shall be a cost reimbursement which provides for the following: Total Estimated Cost $647,923.00 Profit (Fixed Fee) 90,777.00 Total Price $738,700.00 The total price of $738,700 may not be exceeded without formally amending the contract and the fixed dollar profit of $90,777 may not be increased except in case of a contract amendment. This Amendment, to be attached and made a part of the original agreement, includes the following attachments: Attachment 1: EPA Form 5700 - 41(2 -76) entitled, "Cost or Price Summary Format for Subagreements Under U.S. E.P.A. Grants." Attachment 2: Appendix C -1, "Required Provision - Consult_in Engineering Agreements." Executed this ak //, day of �,wz- , 1982. ATTEST: U ATTEST: CITY OF PUEBLO SELLARDS & GRIGG, INC. B b� Presid nt• ATTACHMENT OF FORM 5700 -41 ESTIMATE OF LABOR COST - Page 2 - Phase E Associate Branch Operations Manager Engineer II Technical Supervisor Technician Drafter Survey Part Chief Surveyor Field Construction Manager Construction. Observer Construction Observer Secretary ( ^echnical Typist) 300 $22.35 $ 6,705.00 400 13.65 5,460.00 80 15.70 1,256.00 40 13.30 532.00 80 9.75 780.00 160 9.50 1,520.00 360 10.75 3,870.00 260 9.75 2,535.00 484 12.50 6,050.00 300 10.75 3,225.00 300 9.75 2,925.00 60 8.25 495.00 $ 35,353.00 This labor estimate is adjusted to reflect 1983 labor rates assumed to be loo above 1982 rates. Total Est. Labor = $ 38,888.30 Summary of Labor Rates Phase B $ 647.40 Phase C 25,006.50 Phase D 63,988.00 Phase E 38,888.30 Total $128,530.20