HomeMy WebLinkAbout07999ORDINANCE NO. 7999
AN ORDINANCE APPROVING A GRANT AGREEMENT BETWEEN PUEBLO, A
MUNICIPAL CORPORATION, AND THE UNITED STATES OF AMERICA,
AUTHORIZING THE PRESIDENT OF CITY COUNCIL TO EXECUTE THE SAME,
AUTHORIZING THE ACCEPTANCE OF THE GRANT AWARD, AND
APPROPRIATING FUNDS THEREFORE
WHEREAS, City of Pueblo Transit will received a grant from the American
Recovery and Reinvestment Act (ARRA), to fund the procurement of Transit Capital
equipment, subject to the execution of a grant agreement; now Therefore
BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, that:
SGrTlr)Kl 1
The Grant Agreement between the City of Pueblo, a Municipal Corporation and
the United States of America, making available $2,390,313 Federal funds for the
purpose of purchasing four (4) 35-40' ADA transit coaches, one (1) 35' Hybrid ADA
transit coach, one (1) support vehicle, five (5) Citi -Lift vans for replacement, an
Automated Voice Enunciation System for buses, and spare parts for the electronic
fareboxes, the "Project ", a copy of which is attached hereto, having been approved as to
form by the City Attorney, is hereby approved.
SGrTlr)Kl ')
The President of City Council is hereby authorized to execute said Grant
Agreement on behalf of Pueblo, a Municipal Corporation, and the City Clerk shall affix
the Seal of the City to the Grant Agreement and attest the same.
SECTION 3.
Project # BC09 is hereby established in the amount of $2,390,313 for the Project.
SECTION 4
The City of Pueblo is authorized to accept an assignment of a procurement
option of five (5) ADA transit coaches from the Akron, OH Contract under its contract
with Gillig Corporation. The City Purchasing Agent is authorized to issue a purchase
order to Gillig Corporation in the amount of $1,881,644 for the purchase of five (5)
accessible transit coaches. The procurement for the five (5) Citi -Lift vans will also be
done through piggyback from a larger transit authority with available options.
A77TSTDD SY:
CITY CLERK
INTRODUCED: April 13, 2009
BY: Randy Thurston
} Councilperson
APPR D' } �-
PRESIDENTaf Cfty Council
PASSED AND APPROVED: April 27, 2009
4
Background Paper for Proposed
ORDINANCE
AGENDA ITEM # 29
DATE: April 13, 2009
DEPARTMENT: PUEBLO TRANSIT
BRENDA BROYLES
TRANSIT SUPERINTENDENT
10011=
AN ORDINANCE APPROVING A GRANT AGREEMENT BETWEEN PUEBLO, A MUNICIPAL
CORPORATION, AND THE UNITED STATES OF AMERICA, AUTHORIZING THE
PRESIDENT OF CITY COUNCIL TO EXECUTE THE SAME, AUTHORIZING THE
ACCEPTANCE OF THE GRANT AWARD, AND APPROPRIATING FUNDS THEREFORE
ISSUE
Should the City Council enter into a Grant Agreement with the United States of America to
accept the American Recovery and Reinvestment Act (ARRA) funds in the amount of
$2,390,313 for Transit Capital expenditures.
RECOMMENDATION
Approval of Ordinance.
BACKGROUND
Pueblo Transit has obtained certain unencumbered funds from the American Recovery and
Reimbursement Act (ARRA) program for the purchase of capital rolling stock and capital
equipment for the provision of public transportation. The funding is 100% Federal share with no
City match required.
Pueblo Transit will purchase four (4) 35-40' ADA buses, one (1) 35' Hybrid bus, one (1) support
vehicle, five (5) Citi -Lift vans for replacement, an Automated Voice Enunciation System for
buses to call out bus stops and spare parts for electronic fareboxes.
Buses will be purchased through a piggyback option from Akron, OH Transit Authority. The Citi-
Lift vans will also be purchased through an available piggyback option and the support vehicle
and voice enunciator equipment will be bid through competitive procurement.
FINANCIAL IMPACT
The total project cost is $2,390,313 and it is 100% Federal match
✓iew Print .
U.S. Department of Transportation
Application
Page 1 of 1
iWA
Federal Transit Administration
Recipient ID:
1140
Recipient Name:
CITY OF PUEBLO
Project ID:
CO -96- X001 -00
Budget Number:
1 - Budget Approved
Project Information:
ARRA: Rolling Stock
part 1: Recipient Information
Project Number:
CO -96- X001 -00
Recipient ID:
1140
Recipient Name:
CITY OF PUEBLO
Address:
1 CITY HALL PLACE , PUEBLO, CO 81003 0000
Telephone:
(719) 553 -2655
Facsimile:
(719) 553 -2698
Jnion Information
Recipient ID:
1140
Union Name:
ATU LOCAL 662
Address 1:
28936 Everette Rd.
Address 2:
Citv
City:
Pueblo, CO 81006 0000
Contact Name:
Anthony DeJoy
Telephone:
(719) 948 -9294
Facsimile:
(719) 553 -2724
E -mail:
Website:
'art 2: Project Information
Project Type:
Gran
Project Number:
CO- 96- X001 -00
Project Description:
ARRA: Rolling Stock
Recipient Tvoe:
Citv
Gross Project $2,390,313
Cost:
Adjustment Amt: $0
Total Eligible Cost: $2,390,313
ittps:Hftateamweb.fta. dot. gov /teamweb/ Applications NiewPrint /V iewPrintRes.asp ?GUID= PRODUCTION... 6/11/2001
Jiew Print.,
FTA Project Mgr:
ec
Ripie� nt Contact
NewlAmendment
Amender Reason
Larry Sq uires
Brenda Broyles
No Sp
Initial Application
Fed Dom Asst. #:
20507
Sec. of Statute:
5307 -4
State Appl. I D:
None Specified
StartlEnd Date:
Apr. 01, 2009 - Apr. 01, 2011
Recvd. By State:
Apr. 09, 2009
EO 12372 Rev:
Not Applicable
Review Date:
None Specified
Planning Grant ?:
NO
Program Date
(STIP /UPWP /FTA
Prm Plan) :
May. 06, 2009
Program Page:
None Specified
Application Type:
Electronic
i Supp.Agreement ?: INo
Debt. Delinq. Details:
Jrbanized Areas
UZA ID I UZA Name
81760 1PUEBLO,CO
ongressiona_ D is nets
Sta ID I Di stric t Code I District Official
8 13 John T Salazar
Total FTA Amt
To State A mt:
Total Local A mt:
Other Federal
Amt:
Special Cond Amt
$2,390,313
$0
$0
$0
$0
Special Condition:
I None Specified
S.C. Tgt. Date:
None Specified
S.C. Eff. Date:
None Specified
Est. Oblig Date:
None Specified
Pre -Award
Yes
Authority ?:
Fed. Debt
No
I Final Budoet ?: No I
Page 2 of 2:
project D
this grant applies the 2009 ARRA Formula allocation of $2,390,313 to bus replacement and bus equipment acquisition.
Ne will purchase two (2) 40' low floor buses, two(2) 35' low floor buses and one (1) 35' hybrid bus that have an expected useful life
if 500,000 miles or 12 years. The vehicles being replaced have met their useful life of 500,000 and 12 years. A Federal ratio of
100 /0 will apply. These buses will meet the Clean Air Act standards (CAA) and the Americans with Disabilities Act (ADA)
'equirements.
The City of Pueblo will also purchase a total of five (5) paratransit vans for replacement, one (1) support vehicle, and spare parts
'or newly purchased electronic fareboxes in the ADA vehicles. Additionally Pueblo will be purchasing automated voice enunciation
>ystem to call out stops on fixed route buses.
The fleet status section of TEAM has been updated to reflect this fleet addition.
Ne are able to operate and maintain this vehicle replacement project.
These grant activities are a categorical exclusion under NEPA.
ittps: / /ftateamweb.fta. dot. gov /teamweb /Applications /ViewPrint/V iewPrintRes .asp ?GUID= PRODUC "PION... 6/11/200!
/iew Print,
- arm—arks
armark Details
Earmark ID
Earmark Name
Orig. Balance
Amount
SCOPE
111 -00 BUS - ROLLING STOCK
Applied
D2009 -ERUF -0001
I ARRA Urbanized Area Formula
$5,967,852,039
$2,390,313
Dumber of Earmar 1
T otal Amount A pplied: 2 390,313
)at Sent for Relea 5/1312009 4:52:27 PM
)ate Released: 6/10/
) ecurity(
Jo — We will not expend at least 1% of the 5307 fiords in this grant application for security purposes.
Page 3 of 2:
!. Top 20 Security Action items met.
3rant applicant can answer affirmatively to each of the Top 20 Security Action items set out by PTA, and, hence, no
dditional investment in security projects is required at this time. [Those items are described at http: / /transit-
:afety.volpe.dot.gov /sec urity/ Security lnitiatives /Top20 /default.asp]
Other, please describe below.
'art 3: Budget
'roj Bud get
ittps: / /ftateamweb.tla.dot.gov /teamweb /Applications /ViewPrint /V iewPrintRes.asr)?GUID= PRODUCTION... 6/11/200(,
(Quantity
FTA Amount
I Tot. E lia. Cost
SCOPE
111 -00 BUS - ROLLING STOCK
10
$2,180,744.00
$2,180,744.00
ACTIVITY
11.12.01 BUY REPLACEMENT 40 -FT
BUS
2
$668,380.00
$668,380.00
11.12.02 BUY REPLACEMENT 35 -FT
BUS
2
$658,264.00
$658,264.00
11.12.02 BUY REPLACEMENT 35 -FT
BUS
1
$555,000.00
$555,000.00
11.12.15 BUY REPLACEMENT VAN
5
$275,000.00
$275,000.00
11.14.40 REHAB /REBUILD SPARE
PARTS
0
$24,100.00
$24,100.00
S COPE
114 -00 BUS: SUPPORT EQUIP AND
FACILITIES
1
1 $209,569.00
$209,569.00
ACTIVITY
11.42.20 ACQUIRE - MISC SUPPORT
0
$184,569.00
$184,569.00
ittps: / /ftateamweb.tla.dot.gov /teamweb /Applications /ViewPrint /V iewPrintRes.asr)?GUID= PRODUCTION... 6/11/200(,
liew Print,
EQUIPMENT
Accou nting
Classif ication
FPC
FY
11.42.11 ACQUIRE - SUPPORT
VEHICLES
1
$25,000.00
$25,000.00
Hybrid Electric
Estimated Total Eligible Cost:
$2,390,313.00
2009.26.96.91.1
Federal Share:
$2,390,313.00
Purchase 2 -35' ADA buses diesel fuel for replacement.
Local Share:
$0.00
ETHER (Scopes and Activities not included in Project Budg Totals
None
iOURCES OF F EDERAL FI NANCIAL ASSISTAN
LIZA
ID
Accou nting
Classif ication
FPC
FY
SEC
Previou
Ap proved
Amendment
Amount
Total
Hybrid Electric
11.12.15
81760
2009.26.96.91.1
jOO
12009196
Purchase 2 -35' ADA buses diesel fuel for replacement.
1 $0.001
$2,390,313.00
$2,390,313.00
1
Total Previously Approved:
$0.00
Total Amendment Amount:
$2,390,313.00
Total from all Funding Sources:
$2,390,313.00
\lt ernative Fuel Codes
11.12.01
BUY REPLACEMENT 40 -FT BUS
Diesel Fuel
11.12.02
BUY REPLACEMENT 35 -FT BUS
Diesel Fuel
11.12.02
BUY REPLACEMENT 35 -FT BUS
Hybrid Electric
11.12.15
BUY REPLACEMENT VAN
Diesel Fuel
xtend Buff Descriptions
11.12.01
1 BUY REPLACEMENT 40 -FT BUS
12
1$668,380.00
$668,380.00
Purcahse 2-40' ADA diesel fuel buses for replacement.
11.12.02
BUY REPLACEMENT 35 -FT BUS
2
1 $658,264.00 1 $658,264.00
Purchase 2 -35' ADA buses diesel fuel for replacement.
11.12.02
BUY REPLACEMENT 35 -FT BUS
1
1$555,000.001$555,000.00
Page 4 of 1
rttps : / /ftateamweb.fta.dot.gov /teamweb /Applications /V iewPrint/V iewPrintRes.asp ?GUID= PRODUCTION... 6/11/200(
✓iery Print;
Purchase one (1) hybrid bus, ADA accessible for replacement.
changes since the Prior Budget
UnaWe_to find ch ange_a_mou nt i nf orm ation..
'art 4. Milestones
11.12.01 BUY REPLACEMENT 40 -FT BUS
$668,380 $668,380
11.12.15
BUY REPLACEMENT VAN
1 5
1 $275,000.00
Mar. 20, 2009
Purchase 5 paratransit vans for replacement.
11.14.40
REHAB /REBUILD SPARE PARTS
101
$24,100.001
$24,100.00
Purchase spare parts for newly purchased farebox collection system.
years and mileage their useful life.
11.42.20
1 ACQUIRE - MISC SUPPORT EQUIPMENT
1 0
1$184,569.00
3.
RFP /IFB OUT FOR BID
Purchase Automated Voice Enunciation System for buses.
11.42.11
JACQUIRE - SUPPORT VEHICLES
111
$25,000.001 $25,000.00
Purchase one (1) support vehicle for replacement.
fuel, ADA accessible, for replacement of buses that have exceeded in both
changes since the Prior Budget
UnaWe_to find ch ange_a_mou nt i nf orm ation..
'art 4. Milestones
11.12.01 BUY REPLACEMENT 40 -FT BUS
$668,380 $668,380
11.12.02 BUY REPLACEMENT 35 -FT BUS
$658,264 $658,264
Page 5 of 2:
ittps: / /ftateamweb.fta.dot.gov /teamweb /Applications/ V iewPrint /V iewPrintRes. asp ?GUID = PRODUCTION... 6/11/2001
Mil eston e Description
Est. Com Date
1.
RFP /IFB OUT FOR BID
Mar. 20, 2009
The purchase of these buses will be through a piggyback option from Akron,
OH through the Gillig Corporation. These are a total of two(2) buses, diesel
fuel, ADA accessible, for replacement of buses that have exceeded in both
years and mileage their useful life.
2.
CONTRACTAWARDED
Mar. 20, 2009
3.
RFP /IFB OUT FOR BID
Mar. 20, 2009
The purchase of these buses will be through a piggyback option from Akron,
OH through the Gillig Corporation. These are a total of two(2) buses, diesel
fuel, ADA accessible, for replacement of buses that have exceeded in both
years and mileage their useful life.
4.
FIRST VEHICLE DELIVERED
Sep. 30, 2010
5.
JALL VEHICLES DELIVERED
Sep. 30, 2010
6.
1 CONTRACT COMPLETE
Oct. 31, 2010
11.12.02 BUY REPLACEMENT 35 -FT BUS
$658,264 $658,264
Page 5 of 2:
ittps: / /ftateamweb.fta.dot.gov /teamweb /Applications/ V iewPrint /V iewPrintRes. asp ?GUID = PRODUCTION... 6/11/2001
✓iely Print,
Page 6 of 2:
11.12.02 BUY REPLACEMENT 35 -FT BUS
$555,000 $555,000
Milestone Description
Est. Comp. Date
1.
RFP /IFB OUT FOR BID
Mar. 20, 2009
2.
The purchase of these buses will be through piggyback option from Akron,
OH through the Gillig Corporation. These are a total of two(2) buses, diesel
fuel, ADA accessible, for replacement of buses exceeding their useful life.
May. 15, 2009
2.
CONTRACTAWARDED
Mar. 20, 2009
3.
FIRST VEHICLE DELIVERED
Sep. 30, 2010
4.
ALL VEHICLES DELIVERED
Sep. 30, 2010
5.
CONTRACT COMPLETE
Oct. 31, 2010
11.12.02 BUY REPLACEMENT 35 -FT BUS
$555,000 $555,000
11.12.15 BUY REPLACEMENT VAN
5 $275,000 $275,000
Milestone Descri
Est. Comp. Date
1.
RFP /IFB OUT FOR BID
Mar. 20, 2009
2.
The purchase of this bus will be through a piggyback option from Akron, OH,
through Gillig Corporation. This is an ADA hybrib fuel bus, ADA accesible that
will replace a bus that have exceeded it's useful life.
May. 15, 2009
2.
CONTRACT AWARDED
Mar. 20, 2009
3.
RFP /IFB OUT FOR BID
Mar. 20, 2009
4.
The purchase of these buses will be through piggyback option from Akron,
OH through the Gillig Corporation. These are a total of two(2) buses, diesel
fuel, ADA accessible, for replacement of buses exceeding their useful.life.
May. 30, 2010
4.
FIRST VEHICLE DELIVERED
Sep. 30, 2009
5. IALL
VEHICLES DELIVERED
Sep. 30, 2009
6. 1
CONTRACT COMPLETE
Oct. 31, 2009
11.12.15 BUY REPLACEMENT VAN
5 $275,000 $275,000
11.14.40 REHAB /REBUILD SPARE PARTS
0 $24,100 $24,100
Mile stone Descri
Est. Comp. Date
1.
RFP /IFB OUT FOR BID
May. 01, 2009
2.
This is the purchase of five (5) paratransit vehicles, ADA accessible, to
replace five vehicles that have exceeded in both years and mileage their
useful life.
May. 15, 2009
2.
CONTRACT AWARDED
May. 30, 2009
3.
FIRST VEHICLE DELIVERED
May. 30, 2010
4.
ALL VEHICLES DELIVERED
May. 30, 2010
5.
CONTRACT COMPLETE
Jun. 30, 2010
11.14.40 REHAB /REBUILD SPARE PARTS
0 $24,100 $24,100
ittps: / /ftateamweb.fta.dot.gov /teamweb /Applications /V iewPrint /V iewPrintRes.asp ?GUID= PRODUCTION... 6/11/2001
Milesto D
Est Com Date
1.
RFP /IFB Issued
Apr. 30, 2009
2.
Contract Award
May. 15, 2009
ittps: / /ftateamweb.fta.dot.gov /teamweb /Applications /V iewPrint /V iewPrintRes.asp ?GUID= PRODUCTION... 6/11/2001
Jieiv Print,
3. I Contract Complete
11.42.20 ACQUIRE - MISC SUPPORT EQUIPMENT
May.30,2009
0 $184,569 $184,569
11.42.11 ACQUIRE -SUPPORT VEHICLES
1 $25,000 $25,000
Mi lestone De scription
Est. Como. Date
1.
RFP /IFB Issued
Apr. 30, 2009
2.
This is the purchase of an Automated Voice Enunciation System for buses to
allow for calling out bus stops. This system will be supported by GPS
technology.
May. 15, 2009
2.
Contract Award
May. 30, 2009
1
Contract Complete
Dec. 31, 2009
11.42.11 ACQUIRE -SUPPORT VEHICLES
1 $25,000 $25,000
'art 5. Environmental Findings
111201 BUY REPLACEMENT 40 -FT BUS 2 $668,380 $668,380
_inding No. 1 - Cla ss-11(c)
Page 7 of 2:
C17 - Purchase of vehicles
The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing facilities or by
new facilities which themselves are within a CE.
111202 BUY REPLACEMENT 35 -FT BUS 2 $658,264 $658,264
=indin 1 - Class II c)
C17 - Purchase of vehicles
The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing facilities or by
new facilities which themselves are within a CE.
111215 BUY REPLACEMENT VAN 5 $275,000 $275,000
"inding No. 1 - Class II
C17 - Purchase of vehicles
ittps: / /ftateamweb.fta. dot. gov /teamweb/ Applications /V iewPrintIV iewPrintRes. asp ?GUID = PRODUCTION... 6/11/20W
Milestone D
Est. Comp. Date
1.
RFP /IFB Issued
Apr. 30, 2009
2.
Contract Award
May. 15, 2009
3.
Contract Complete
Jun. 30, 2009
'art 5. Environmental Findings
111201 BUY REPLACEMENT 40 -FT BUS 2 $668,380 $668,380
_inding No. 1 - Cla ss-11(c)
Page 7 of 2:
C17 - Purchase of vehicles
The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing facilities or by
new facilities which themselves are within a CE.
111202 BUY REPLACEMENT 35 -FT BUS 2 $658,264 $658,264
=indin 1 - Class II c)
C17 - Purchase of vehicles
The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing facilities or by
new facilities which themselves are within a CE.
111215 BUY REPLACEMENT VAN 5 $275,000 $275,000
"inding No. 1 - Class II
C17 - Purchase of vehicles
ittps: / /ftateamweb.fta. dot. gov /teamweb/ Applications /V iewPrintIV iewPrintRes. asp ?GUID = PRODUCTION... 6/11/20W
hew Print, Page 8 of 2:
The purchase of vehicles by the appucant where the use of these vehicles can be accommodated by existing facilities or by
new facilities which themselves are within a CE.
114220 ACQUIRE - MISC SUPPORT
QUIPMENT 0 $184,569 $184,569
=indin No 1 -Class II (c)
C14 - Bus & rail car rehabilitation
Bus and rail car rehabilitation.
111202 BUY REPLACEMENT 35 -FT BUS 1 $555,000 $555,000
=indin No. — 1- C lass II (c)
C17 - Purchase of vehicles
The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing facilities or by
new facilities which themselves are within a CE.
111440 REHAB /REBUILD SPARE PARTS
=inding No. 1 - Class II(
C14 - Bus & rail car rehabilitation
Bus and rail car rehabilitation.
114211 ACQUIRE - SUPPORT VEHICLES
=ind No. 1 - Cla II(c)
0 $24,100 $24,100
$25,000 $25,000
C17 - Purchase of vehicles
The purchase of vehicles by the applicant where the use of these vehicles can be accommodated by existing facilities or by
new facilities which themselves are within a CE.
'art 6: Fleet Status
=fixed Route
ittps:Hftateamweb.fta. dot. gov /teamweb/ Applications/ ViewPrint IViewPrintRes.asp ?GUID= PRODUCTION... 6/11/2001
Before
Chang
After
I.
Active Fleet
A. Peak Requirement
121
01
12
ittps:Hftateamweb.fta. dot. gov /teamweb/ Applications/ ViewPrint IViewPrintRes.asp ?GUID= PRODUCTION... 6/11/2001
✓iew Print.
=feet Replacement as follows:
1. Unit #200
Year Manufacture: 1992
Make /Model:TMC RTS 6
✓in #:1 TU P DT9A5N R828791
MonthNear placed in revenue: 1992
4ccumulated Revenue Miles:695763
Estimated MonthNear taken out of revenue: December 2010
Condition:Poor
Original Grant Purchased Under:CO -90- X057 -04
2. Unit #210
Year Manufacture: 1996
Make /Model:TMC RTS 6
✓in #:4RKPDTGA1TR83
Month /Year placed in revenue: 1996
4ccumulated Revenue Miles:569757
Estimated MonthNear taken out of revenue: December 2010
Condition: Poor
Original Grant Purchased Under:CO -90- X085 -00
3. Unit #220
Year Manufacture:1996
Make /Model:TMC RTS 6
✓in #:4RKPDTGA3TR83
Month/Year placed in revenue: 1996
4ccumulated Revenue Miles:577933
Estimated MonthlYear taken out of revenue:December 2010
Condition: Poor
Original Grant Purchased Under:CO -90- X085 -00
1. Unit #230
Year Manufacture: 1996
Make /Model:TMC RTS 6
✓in #:4RKPDTGA5TR83
MonthNear placed in revenue: 1996
4ccumulated Revenue Miles:572199
Estimated Month/Year taken out of revenue: December 2010
Condition: Poor
Original Grant Purchased Under:CO -90- X085 -00
5. Unit #15
Year Manufacture:2001
Make /Model:RT 52
✓in #:1 C9M2RFS01 W535850
Month/Year placed in revenue:2001
4ccumulated Revenue Miles:147741
Estimated Month/Year taken out of revenue: December 2010
Condition:Poor
Original Grant Purchased Under:CO -90- X123 -00
'aratransit
Page 9 of 2:
tttps:Hftateamweb.fta. dot. gov /teamweb/ Applications NiewPrintNiewPrintRes,asp ?GUID = PRODUCTION... 6/11/2001.
B. Spares
4
0
4
C. Total (A +B)
16
0
16
D. Spare Ratio (B /A)
33.33%
0.00%
33.33%
II.
Inactive Fleet
A. Other
0
0
0
B. Pending Disposal
01
51
5
C. Total (A +B)
01
5
5
III.
Total (1.0 and II.C)
161
51
21
=feet Replacement as follows:
1. Unit #200
Year Manufacture: 1992
Make /Model:TMC RTS 6
✓in #:1 TU P DT9A5N R828791
MonthNear placed in revenue: 1992
4ccumulated Revenue Miles:695763
Estimated MonthNear taken out of revenue: December 2010
Condition:Poor
Original Grant Purchased Under:CO -90- X057 -04
2. Unit #210
Year Manufacture: 1996
Make /Model:TMC RTS 6
✓in #:4RKPDTGA1TR83
Month /Year placed in revenue: 1996
4ccumulated Revenue Miles:569757
Estimated MonthNear taken out of revenue: December 2010
Condition: Poor
Original Grant Purchased Under:CO -90- X085 -00
3. Unit #220
Year Manufacture:1996
Make /Model:TMC RTS 6
✓in #:4RKPDTGA3TR83
Month/Year placed in revenue: 1996
4ccumulated Revenue Miles:577933
Estimated MonthlYear taken out of revenue:December 2010
Condition: Poor
Original Grant Purchased Under:CO -90- X085 -00
1. Unit #230
Year Manufacture: 1996
Make /Model:TMC RTS 6
✓in #:4RKPDTGA5TR83
MonthNear placed in revenue: 1996
4ccumulated Revenue Miles:572199
Estimated Month/Year taken out of revenue: December 2010
Condition: Poor
Original Grant Purchased Under:CO -90- X085 -00
5. Unit #15
Year Manufacture:2001
Make /Model:RT 52
✓in #:1 C9M2RFS01 W535850
Month/Year placed in revenue:2001
4ccumulated Revenue Miles:147741
Estimated Month/Year taken out of revenue: December 2010
Condition:Poor
Original Grant Purchased Under:CO -90- X123 -00
'aratransit
Page 9 of 2:
tttps:Hftateamweb.fta. dot. gov /teamweb/ Applications NiewPrintNiewPrintRes,asp ?GUID = PRODUCTION... 6/11/2001.
✓iew Print,
=feet Replacement as follows:
1. Unit #826
Year Manufacture: 1996
Make /Model:Ford E350
Vin #:1 FDJE30G7SHB40096
MonthNear placed in revenue: 1996
4ccumulated Revenue Miles:282187
Estimated Month/Year taken out of revenue: December 2009
Condition:Poor
Original Grant Purchased Under:
2. Unit #827
Year Manufacture: 1996
Make /Model:ford E350
Vin #:1 FDJE30G9SHB40097
Month/Year placed in revenue:1996
4ccumulated Revenue Miles:313555
E stimated MonthNear taken out of revenue: December 2009
ConditiomPoor
Original Grant Purchased Under:
3. Unit #829
Year Manufacture:2001
Make /Model: Ford E350
Vin #:1 FDWE35F11 H677455
MonthNear placed in revenue:2001
4ccumulated Revenue Miles:194861
Estimated Month/Year taken out of revenue: December 2009
Condition:Poor
Original Grant Purchased Under: CO-03-01 23-00
3. Unit #830
Year Manufacture:2001
Make /Model: Ford E350
Vin #:1 FD WE35F31 H B77456
Month/Year placed in revenue:2001
4ccumulated Revenue Miles:201722
Estimated Month/Year taken out of revenue: December 2009
Condition: Poor
Original Grant Purchased UndeCCO -03- 0123 -00
5. Unit #831
Year Manufacture:2001
Make /Model:Ford E350
Vin #:1 FDWE35F11 HB76810
Month/Year placed in revenue:2001
4ccumulated Revenue Miles:203032
Estimated Month/Year taken out of raven ua:December 2009
Condition:Poor
Page 10 of 2:
ittps: / /ftateamweb.fta.dot.gov /teamweb /Applications /V iewPrint[V iewPrintRes.asp ?GUID= PRODUCTION... 6/11/2001
Before
Cha
After
I.
Active Fleet
A. Peak Requirement
11
0
11
B. Spares
0
0
0
C. Total (A +B)
11
0
11
D. Spare Ratio (B /A)
0.00%
0.00%
0.00%
II.
Inactive Fleet
A. Other
0
0
0
B. Pending Disposal
0
5
5
C. Total (A +B)
0
5
5
III.
Total (I.0 and II.C)
11
5
16
=feet Replacement as follows:
1. Unit #826
Year Manufacture: 1996
Make /Model:Ford E350
Vin #:1 FDJE30G7SHB40096
MonthNear placed in revenue: 1996
4ccumulated Revenue Miles:282187
Estimated Month/Year taken out of revenue: December 2009
Condition:Poor
Original Grant Purchased Under:
2. Unit #827
Year Manufacture: 1996
Make /Model:ford E350
Vin #:1 FDJE30G9SHB40097
Month/Year placed in revenue:1996
4ccumulated Revenue Miles:313555
E stimated MonthNear taken out of revenue: December 2009
ConditiomPoor
Original Grant Purchased Under:
3. Unit #829
Year Manufacture:2001
Make /Model: Ford E350
Vin #:1 FDWE35F11 H677455
MonthNear placed in revenue:2001
4ccumulated Revenue Miles:194861
Estimated Month/Year taken out of revenue: December 2009
Condition:Poor
Original Grant Purchased Under: CO-03-01 23-00
3. Unit #830
Year Manufacture:2001
Make /Model: Ford E350
Vin #:1 FD WE35F31 H B77456
Month/Year placed in revenue:2001
4ccumulated Revenue Miles:201722
Estimated Month/Year taken out of revenue: December 2009
Condition: Poor
Original Grant Purchased UndeCCO -03- 0123 -00
5. Unit #831
Year Manufacture:2001
Make /Model:Ford E350
Vin #:1 FDWE35F11 HB76810
Month/Year placed in revenue:2001
4ccumulated Revenue Miles:203032
Estimated Month/Year taken out of raven ua:December 2009
Condition:Poor
Page 10 of 2:
ittps: / /ftateamweb.fta.dot.gov /teamweb /Applications /V iewPrint[V iewPrintRes.asp ?GUID= PRODUCTION... 6/11/2001
✓ietiv Print
Original Grant Purchased Under:CO- 03- u123 -00
3 art 7. FTA Comments
3eneral Review
Comment Title:
Civil Rights - Preliminary
Comment By:
Rebecca U Tanrath
Date Created:
Apr. 09, 2009
Date Updated:
May. 11, 2009
Ref Section:
Unknown
Comment:
Preliminary review of grantee's civil rights program indicates Title VI is current and a DBE
goal for FFY09 was submitted. This grant has rolling stock. Please advise grantee that
they must ensure that Transit Vehicle Manufacturers (TVMs) must have an approved FTA
DBE program and current DBE goal prior to bidding on a contraact. The listing of
approved TVMs is on FTA's website or contact Cynthia Phifer at 202.366.4018. Finally,
ensure buses to be purchased meet ADA compliance requirements. OK to process this
grant.
Comment Title:
Civil Rights - Final
Comment By:
Rebecca U Tanrath
Date Created:
May. 11, 2009
Date Updated:
None Specified
Ref Section:
Unknown
Comment:
The Office of Civil Rights concurs in the approval of this grant.
:onditio_ns of Alward
Comment Title:
ARRA Special Provisions
Comment By:
Larry Squires
Date Created:
Apr. 09, 2009
Date Updated:
Apr. 30, 2009
Ref Section:
Project Overview
Comment:
Special Provisions for Projects Financed Under the American Recovery and
Reinvestment Act (Recovery Act).
The Recipient agrees that the following provisions apply to American Recovery and
Reinvestment Act of 2009 (Recovery Act) funds authorized under Pub. L. 111 -5, February
17, 2009, and agrees to comply with the requirements thereof, except to the extent FTA
determines otherwise in writing:
a. Identification of Recovery Act Funding. A Grant Agreement or Cooperative Agreement
financed with Recovery Act funds will indicate that the Recovery Act is the source of
funding as follows:
(1) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement
displays "49 USC 5307 — Urbanized Area - Economic Recovery," the Project or Projects
are financed with Recovery Act funds appropriated for the Transit Capital Assistance for
the Urbanized Area Formula Grant Program authorized by 49 U.S.C. § 5307.
Page 11 of I
iUps: / /ftateamweb.fta. dot. gov /teamweb/ Applications /ViewPrintIViewPrintRes .asp ?GUID = PRODUCTION... 6/11/2001
✓iew Print,
(2) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement
displays "49 USC 5307 — Urbanized Area - Economic Recovery Flex," the Project or
Projects are financed with Recovery Act appropriations for highways transferred to
support the FTA Urbanized Area Formula Grant Program authorized by 49 U.S.C. § 5307.
(3) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement
displays "49 USC 5309 — New Starts - Economic Recovery," the Project is financed with
Recovery Act appropriations for Capital Investment Grants authorized for Small Starts or
Vew Starts by 49 U.S.C. §§ 5309(d) or (e), respectively.
(4) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement
iisplays "49 USC 5309 — Fixed Guideway - Economic Recovery," the Project is financed
vith Recovery Act appropriations for Fixed Guideway Infrastructure Investment for
Modernization, authorized by 49 U.S.C. 5309(b)(2).
(5) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement
49 USC 5311 — Nonurbanized Area - Economic Recovery," the Project is financed with
Recovery Act appropriations for Transit Capital Assistance for the Nonurbanized Area
-ormula Program authorized by 49 U.S.C. § 5311.
(6) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement
iisplays "49 USC 5311 — Nonurbanized Area - Economic Recovery Flex," the Projector
'rojects are financed with Recovery Act appropriations for highways transferred to
upport the Nonurbanized Area Formula Grant Program authorized by 49 U.S.C. § 5311.
(7) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement
)r Cooperative Agreement displays "77 — Transportation Investments for Greenhouse
3as & Energy Reduction ARRA," the Project is financed with Recovery Act funds
pecified for capital investments that will assist in reducing the energy consumption or
Ireenhouse gas emissions of their public transportation systems.
. Identification of Project(s). The Project or Projects for which Recovery Act funding is
provided are set forth in the Recipient's application and reflected in the Approved Project
tudget.
. Federal Requirements. In addition to applicable Recovery Act statutory and regulatory
aquirements, the Recipient agrees that applicable requirements of 49 U.S.C. chapter 53
pply to federally assisted transit projects t nanced with Recovery Act funds and the
tecovery Act funding, except that the Federal share of the costs for which any Grant is
lade under this heading shall be, at the option of the recipient, up to 100 percent.
. U.S. OMB Provisions, The Recipient agrees to comply with applicable provisions of
I.S. Office of Management and Budget, "Requirements for Implementing Sections 1512,
605, and 1606 of the American Recovery and Reinvestment Act of 2009 for Financial
,ssistance Awards," 2 C.F.R. Part 176, 74 Fed. Reg. 18449 et seq., April 23, 2009.
pecifically, the Recipient acknowledges and agrees to comply with the following
rovisions
(1) Reporting and Registration Requirements under Section 1512 of the Recovery Act.
(a) This award requires the recipient to complete projects or activities which are
ended under the Recovery Act and to report on use of Recovery Act funds provided
vough this award. Information from these reports will be made available to the public.
(b) The Recipient agrees to submit the requisite reports no later than ten calendar
ays after each calendar quarter in which it receives the Federal assistance award funded
i whole or in part by the Recovery Act.
(c) The Recipient agrees to maintain, and to require its first -tier subrecipients to
iaintain, current registrations in the Central Contractor Registration (http: / /www.ccr.gov)
t all times during which they have active federal awards funded with Recovery Act funds.
Dun and Bradstreet Data Universal Numbering System (DUNS) Number
Page 12 of 2;
ittps:Hftateamweb.fta. dot. gov /teamweb/ Applications/ ViewPrint/ViewPrintRes.asp ?GUID= PRODUCTION... 6/11/2001
I ie�N Print,
(http: / /www.dnb.com) is one of the requirements for registration in the Central Contractor
Registration.
(d) The recipient agrees to report the information described in section 1512(c) of the
Recovery Act using the reporting instructions and data elements that will be provided
online at http: / /www.FederalReporting.gov and ensure that any information that is pre -
filled is corrected or updated as needed.
(2) Buy America Requirements under Section 1605 of the Recovery Act. Statutory
provisions of 49 U.S.C. Chapter 53 impose Buy America requirements sufficient for
compliance with Section 1605 of the Recovery Act
(3) Wage Rate Requirements under Section 1606 of the Recovery Act. Statutory
provisions of 49 U.S.C. Chapter 53 impose Wage Rate requirements involving
construction, alteration, maintenance, or repair sufficient for compliance with Section 1606
of the Recovery Act.
(4) Recovery Act Transactions Listed in Schedule of Expenditures of Federal Awards
and Recipient Responsibilities for Informing Subrecipients.
(a) To maximize the transparency and accountability of funds authorized under the
Recovery Act as required by Congress and in accordance with 49 C.F.R. § 18.20 or 49
C.F.R. § 19.21, as applicable, the Recipient agrees to maintain records that identify
adequately the source and application of Recovery Act funds.
(b) A Recipient covered by the Single Audit Act Amendments of 1996 and OMB
Circular A -133, "Audits of States, Local Governments, and Non - Profit Organizations,"
agrees to separately identify the expenditures for Federal awards under the Recovery Act
on the Schedule of Expenditures of Federal Awards (SEFA) and the Data Collection Form
(SF -SAC) required by OMB Circular A -133. The Recipient agrees to accomplish this by
identifying expenditures for Federal awards made under Recovery Act separately on the
SEFA, and as separate rows under Item 9 of Part III on the SF -SAC by CFDA number,
and inclusion of the prefix "ARRA in identifying the name of the Federal program on the
SEFA and as the first characters in Item 9d of Part III on the SF -SAC.
(c) The Recipient agrees to separately identify to each subrecipient, and document at
the time of subaward and at the time of disbursement of funds, the Federal award
number, CFDA number, and amount of Recovery Act funds. When the Recipient awards
Recovery Act funds for an existing program, the Recipient agrees to furnish sufficient
information to each subrecipient that distinguishes the subawards of incremental
Recovery Act funds from regular subawards under the existing program.
(d) The Recipient agrees to require each subrecipient to include on its SEFA
information to specifically identify Recovery Act funding similar to the requirements for the
recipient SEFA described above. This information is needed to allow the Recipient to
properly monitor subrecipient expenditure of ARRA funds as well as oversight by FTA,
DOT, Offices of Inspector General and the Government Accountability Office.
e. One -Time Funding, The Recipient acknowledges that receipt of Recovery Act funds is
a "one -time' disbursement that does not create any future obligation by the FTA to
advance similar funding amounts.
f. Integrity. The Recipient agrees that all data it submits to FTA in compliance with
Recovery Act requirements will be accurate, objective, and of the highest integrity.
g. Violations of Law. The Recipient agrees that it and each of its subrecipients shall
report to the U.S. DOT Inspector General or other appropriate Inspector General any
credible evidence that a principal, employee, agent, contractor, subrecipient,
subcontractor, or other person has submitted a false claim under the False Claims Act, 31
U.S.C. §§ 3729 et seq., or has committed a criminal or civil violation of law pertaining to
fraud, conflict of interest, bribery, gratuity, or similar misconduct involving Recovery Act
funds.
h. Maintenance of Effort. A Recipient that is a State agrees to comply with the
Page 13 of 2:
rttps: / /ftatearnweb. fta.dot.gov /teamweb /Applications /V iewPrintIViewPrintRes .asp ?GUID = PRODUCTION... 6/11/2001
✓ieyv Print, Page 14 of 2:
maintenance of effort certification it has made in compliance with 6ection 1201 of
Recovery Act.
i. Emblems. The Recipient agrees to use signs and materials that display both the
American Recovery and Reinvestment Act (Recovery Act) emblem and the Transportation
Investment Generating Economic Recovery (TIGER) program emblem to identify its
Project(s) financed with Recovery Act funds that are provided by U.S. DOT in a manner
consistent with Federal guidance, and to include this provision in any subagreements,
leases, third party contracts, or other similar documents used in connection with its
Recovery Act Project(s).
j. Further Requirements. The Recipient agrees to comply with. applicable future Federal
requirements that may be imposed on the use of Recovery Act funds.
'art 8: Results of Reviews
'he reviewer did not find any errors
'art 9: Agreement
UNITED STATES OF AMERICA
DEPARTMENT OF TRANSPORTATION
FEDERAL TRANSIT ADMINISTRATION
GRANT AGREEMENT
(FTA G -15, October 1, 2008)
)n the date the authorized U.S. Department of Transportation, Federal Transit Administration (FTA) official's electronic signature is
entered for this Grant Agreement, FTA has Awarded Federal assistance in support of the Project described below. Upon Execution
if this Grant Agreement by the Grantee named below, the Grantee affirms this FTA Award, and enters into this Grant Agreement
vith FTA. The following documents are incorporated by reference and made part of this Grant Agreement:
1) \ "Federal Transit Administration Master Agreement,\" FTA MA(15), October 1, 2008,
http://www.fta.dot.gov/documents/15-Master.pdf
2) The Certifications and Assurances applicable to the Project that the Grantee has selected and provided to FTA, and
3) Any Award notification containing special conditions or requirements, if issued.
-TA OR THE FEDERAL GOVERNMENT MAY WITHDRAW ITS OBLIGATION TO PROVIDE FEDERAL ASSISTANCE IF THE
iRANTEE DOES NOT EXECUTE THIS GRANT AGREEMENT WITHIN 90 DAYS FOLLOWING THE DATE OF THIS FTA
iWARD SET FORTH HEREIN.
FTA AWARD
:TA hereby awards a Federal grant as follows:
'roject No: CO -96- X001 -00
3rantee: CITY OF PUEBLO
:itation of Statute (s) A uthorizing Prot: 49 USC 5307 - Urbanized Area Formula - Economic Recovery
sti mated Total E li ig ble Cost_( U. S_Dgllars : $2,390,313
4axim.um FTA Amount [I ncluding Al l A_men U.S. Dollars): $2,390,313
\mou of Th is FTA Award (in U.S Dollars): $2,390,313
9aximum Perce of FTA Par
rttps: / /ftateamweb.fta. dot. gov /teamweb / Applications NiewPrint /ViewPrintRes .asp ?GUID = PRODUCTION... 6/11/2001
✓iew Prin;
Page 15 of2.
3 ercentages of Federal participation are based on amounts included in the Approved Project Budget, modified as set forth in the
ext following the Project Description.
J_S_De partment of L abor C ertifi cat ion of Publ Trans portation Em Pr otective Arrangem
Original Project Certification Date: 4/24/2009
?roject Description:
1RRA: Rolling Stock
'he Project Description includes information describing the Project within the Project Application submitted to FTA, and the
kpproved Project Budget, modified by any additional statements displayed in this Grant Agreement, and, to the extent FTA concurs
- tatements in other documents including Attachments entered into TEAM -Web.
;pecial Provisions for Projects Financed Under the American Recovery and Reinvestment Act (Recovery Act).
"he Recipient agrees that the following provisions apply to American Recovery and Reinvestment Act of 2009 (Recovery Act) fund.
iuthorized under Pub. L. 111 -5, February 17, 2009, and agrees to comply with the requirements thereof, except to the extent FTA
letermines otherwise in writing:
i. Identification of Recovery Act Funding, A Grant Agreement or Cooperative Agreement financed with Recovery Act funds will
idicate that the Recovery Act is the source of funding as follows:
(1) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement displays "49 USC 5307 — Urbanized Area -
conomic Recovery," the Project or Projects are financed with Recovery Act funds appropriated for the Transit Capital Assistance
w the Urbanized Area Formula Grant Program authorized by 49 U.S.C. § 5307.
(2) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement displays "49 USC 5307 — Urbanized Area -
conomic Recovery Flex," the Project or Projects are financed with Recovery Act appropriations for highways transferred to supper
ie FTA Urbanized Area Formula Grant Program authorized by 49 U.S.C. § 5307.
(3) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement displays "49 USC 5309 — New Starts -
conomic Recovery," the Project is financed with Recovery Act appropriations for Capital Investment Grants authorized for Small
;tarts or New Starts by 49 U.S.C. §§ 5309(d) or (e), respectively.
(4) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement displays "49 USC 5309 — Fixed Guideway
:conomic Recovery," the Project is financed with Recovery Act appropriations for Fixed Guideway Infrastructure Investment for
rlodernization, authorized by 49 U.S.C. 5309(b)(2).
(5) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement "49 USC 5311 — Nonurbanized Area -
conomic Recovery," the Project is financed with Recovery Act appropriations for Transit Capital Assistance for the Nonurbanized
lrea Formula Program authorized by 49 U.S.C. § 5311.
(6) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement displays "49 USC 5311 — Nonurbanized
area - Economic Recovery Flex," the Project or Projects are financed with Recovery Act appropriations for highways transferred to
support the Nonurbanized Area Formula Grant Program authorized by 49 U.S.C. § 5311.
(7) If the "Citation of Statute(s) Authoring Project" of the underlying Grant Agreement or Cooperative Agreement displays "77 —
ransportation Investments for Greenhouse Gas & Energy Reduction ARRA," the Project is financed with Recovery Act funds
pecified for capital investments that will assist in reducing the energy consumption or greenhouse gas emissions of their public
'ansportation systems.
1 . Identification of Project(s). The Project or Projects for which Recovery Act funding is provided are set forth in the Recipient's
application and reflected in the Approved Project Budget.
:. Federal Requirements. In addition to applicable Recovery Act statutory and regulatory requirements, the Recipient agrees that
applicable requirements of 49 U.S.C. chapter 53 apply to federally assisted transit projects financed with Recovery Act funds and
ie Recovery Act funding, except that the Federal share of the costs for which any Grant is made under this heading shall be, at the
option of the recipient, up to 100 percent.
I. U.S. OMB Provisions. The Recipient agrees to comply with applicable provisions of U.S. Office of Management and Budget,
Requirements for Implementing Sections 1512, 1605, and 1606 of the American Recovery and Reinvestment Act of 2009 for
-inancial Assistance Awards," 2 C.F.R. Part 176, 74 Fed. Reg. 18449 et seq., April 23, 2009. Specifically, the Recipient
rttos:llftateamweb.fta. dot. eovl teamwebl Annlications/ ViewPrintf ViewPrintRes .asn ?CiT1in= PRODITCTTON 6/11 /?00(
Jie Print, Page 16 of 2:
acknowledges and agrees to comply wit„ , ie following provisions
(1) Reporting and Registration Requirements under Section 1512 of the Recovery Act.
(a) This award requires the recipient to complete projects or activities which are funded under the Recovery Act and to report
)n use of Recovery Act funds provided through this award. Information from these reports will be made available to the public.
(b) The Recipient agrees to submit the requisite reports no later than ten calendar days after each calendar quarter in which it
sceives the Federal assistance award funded in whole or in part by the Recovery Act.
(c) The Recipient agrees to maintain, and to require its first -tier subrecipients to maintain, current registrations in the Central
:ontractor Registration (http: / /www.ccr.gov) at all times during which they have active federal awards funded with Recovery Act
ands. A Dun and Bradstreet Data Universal Numbering System (DUNS) Number (http: / /www.dnb.com) is one of the requirements
or registration in the Central Contractor Registration.
(d) The recipient agrees to report the information described in section 1512(c) of the Recovery Act using the reporting
istructions and data elements that will be provided online at http: / /www.FederalReporting.gov and ensure that any information that
> pre - filled is corrected or updated as needed.
(2) Buy America Requirements under Section 1605 of the Recovery Act. Statutory provisions of 49 U.S.C. Chapter 53 impose
3uy America requirements sufficient for compliance with Section 1605 of the Recovery Act
(3) Wage Rate Requirements under Section 1606 of the Recovery Act. Statutory provisions of 49 U.S.C. Chapter 53 impose
Nage Rate requirements involving construction, alteration, maintenance, or repair sufficient for compliance with Section 1606 of the
tecovery Act.
(4) Recovery Act Transactions Listed in Schedule of Expenditures of Federal Awards and Recipient Responsibilities for
iforming Subrecipients.
(a) To maximize the transparency and accountability of funds authorized under the Recovery Act as required by Congress and
i accordance with 49 C.F.R. § 18.20 or 49 C.F.R. § 19.21, as applicable, the Recipient agrees to maintain records that identify
adequately the source and application of Recovery Act funds.
(b) A Recipient covered by the Single Audit Act Amendments of 1996 and OMB Circular A -133, "Audits of States, Local
3overnments, and Non - Profit Organizations," agrees to separately identify the expenditures for Federal awards under the Recovery
kct on the Schedule of Expenditures of Federal Awards (SEFA) and the Data Collection Form (SF -SAC) required by OMB Circular
033. The Recipient agrees to accomplish this by identifying expenditures for Federal awards made under Recovery Act
eparately on the SEFA, and as separate rows under Item 9 of Part III on the SF -SAC by CFDA number, and inclusion of the prefix
ARRA -" in identifying the name of the Federal program on the SEFA and as the first characters in Item 9d of Part III on the SF-
;AC.
(c) The Recipient agrees to separately identify to each subrecipient, and document at the time of subaward and at the time of
lisbursement of funds, the Federal award number. CFDA number, and amount of Recovery Act funds. When the Recipient awards
iecovery Act funds for an existing program, the Recipient agrees to furnish sufficient information to each subrecipient that
listinguishes the subawards of incremental Recovery Act funds from regular subawards under the existing program.
(d) The Recipient agrees to require each subrecipient to include on its SEFA information to specifically identify Recovery Act
.coding similar to the requirements for the recipient SEFA described above. This information is needed to allow the Recipient to
troperly monitor subrecipient expenditure of ARRA funds as well as oversight by FTA, DOT, Offices of Inspector General and the
3overnment Accountability Office.
One -Time Funding. The Recipient acknowledges that receipt of Recovery Act funds is a "one -time' disbursement that does not
:reate any future obligation by the FTA to advance similar funding amounts.
Integrity. The Recipient agrees that all data it submits to FTA in compliance with Recovery Act requirements will be accurate,
ibjective, and of the highest integrity.
I. Violations of Law. The Recipient agrees that it and each of its Subrecipients shall report to the U.S. DOT Inspector General or
ther appropriate Inspector General any credible evidence that a principal, employee, agent, contractor, subrecipient,
ubcontractor, or other person has submitted a false claim under the False Claims Act, 31 U.S.C. §§ 3729 et seq., or has committe(
i criminal or civil violation of law pertaining to fraud, conflict of interest, bribery, gratuity, or similar misconduct involving Recovery
tct funds.
. Maintenance of Effort. A Recipient that is a State agrees to comply with the maintenance of effort certification it has made in
:ompliance with Section 1201 of Recovery Act. . ,
rttns: / /ftateamweb.fta. dot. eov/ teamweb/ Annlications NiewPrintNiewPrintRes.asn ?CyI JID= PRn13t 1CT1t7N... 6/11/200(
Jiew Prin',
Page 17 of 2:
Emblems. The Recipient agrees to use signs and materials that display both the American Recovery and Reinvestment Act
Recovery Act) emblem and the Transportation Investment Generating Economic Recovery (TIGER) program emblem to identify its
)roject(s) financed with Recovery Act funds that are provided by U.S. DOT in a manner consistent with Federal guidance, and to
iclude this provision in any subagreements, leases, third party contracts, or other similar documents used in connection with its
Recovery Act Project(s).
Further Requirements. The Recipient agrees to comply with applicable future Federal requirements that may be imposed on the
Ise of Recovery Act funds.
awarded By:
/Is. Charmaine Knighton
)eputy Regional Administrator
:EDERAL TRANSIT ADMINISTRATION
J.S. DEPARTMENT OF TRANSPORTATION
16/10/2009
EXECUTION OF GRANT AGREEMENT
'he Grantee, by executing this Grant Agreement, affirms this FTA Award; adopts and ratifies all statements, representations,
varranties, covenants, and materials it has submitted to FTA; consents to this FTA Award; and agrees to all terms and conditions
et forth in this Grant Agreement.
3y executing this Grant Agreement, I am simultaneously executing any Supplemental Agreement that may be required to effectuate
i is Grant Agreement.
xecuted by:�
4s. Brenda Broyles
ransit Superintendent
:ITY OF PUEBLO
16/11/2009
CO -96- X001 -00 Quarterly Narrative Report
Jan. 01, 2009 through Mar. 31, 2009
As Of Jun. 11, 2009
MSIP Report Submitted, FSR Submitted
part 1: Recipient Information
Project Number:
CO -96- X001 -00
Recipient ID:
1140
Recipient Name:
CITY OF PUEBLO
Address:
1 CITY HALL PLACE. PUEBLO, CO 81003 0000
Telephone:
(719) 553 -2655
Facsimile:
(719) 553 -2698
part 2: Project Information
rttDS: / /ftateamweb.fta. dot. eov/ teamweb/ Annlications/ ViewPrint/ ViewPrintRe s.a-n ?CTTTTTI= PRC131TTCTION 6111 /?()()(
✓iew Prim
Project No:
CO -96- X001 -00
Brief Desc:
ARRA: Rolling Stock
i FTA Project Mgr:
Larry Squires
StartlEnd Date:
Apr, 01, 2009 -Apr. 01, 2011
Gross Project Cost:
$2,390,313
; Adjustment Amt:
$0
i Total Eligible Cost:
$2,390,313
Total FTAAmt:
$2,390,313
Total State Amt:
$0
:Total Local Amt:
$0
,Other Federal Amt:
$0
'art 3: Financial Status Report
°ina_nc Status
7ostPlan
Type of Rate
Previous
This Period
Cumulative
A. Total Outlays
$0
$0
$0
B. Recipient Share of Outlays
$0
$0
$0
C. Federal Share of Outlays
$0
$0
$0
D. Total Unliquidated Obligations
$0
E. Recipient Share of Unliq. Obligations
$0
F. Federal Share of Unliq. Obligations
$0
G. Total Federal Share (C + F)
$0
H. Total Federal Funds
$0
I. Unobl. Bal. of Fed. Funds ( H - G)
$0
7ostPlan
Type of Rate
N/A
Rate
0.00%
Base
$0
Total Amount
$0
Federal Amount
$0
'art 4. Milestone /Progress Report
11.12.01 BUY REPLACEMENT 40 -FT BUS
Qu ETA Amount Ems Proj Cost
2 $668,380 $668,380
Page 18 of 2:
cans: / /ftateamweb.fta.dot. env /teamweh /Annlica ti onsNiewPrint NiewPrintRes_asn?C}T ITT)= PRf1T)T TCTT(1N 6111 / ? flrlr
Milestone Descri
Qjg_Est.
Com Date
Rev. Est.
Comp Date
# Rev
Actual
Comp. Date
Cont.
Code
1.
RFP /IFB OUT FOR BID
3/20/2009
4/29/2009
Page 18 of 2:
cans: / /ftateamweb.fta.dot. env /teamweh /Annlica ti onsNiewPrint NiewPrintRes_asn?C}T ITT)= PRf1T)T TCTT(1N 6111 / ? flrlr
helw Print
11.12.02 BUY REPLACEMENT 35 -FT BUS
Quanti ETA Amount Elig Emi. Cost
2 $658,264 $658,264
DETAILED
O0 g_Est.
Comp. Da
Rev. Est.
Comp. Date
#Rev
Actual
Com Date
Cont.
Code
DESCRIPTION: The
RFP /IFB OUT FOR BID
3/20/2009
4/29/2009
purchase of these buses will
be through a piggyback option
from Akron, OH through the
Gillig Corporation. These are a
total of two(2) buses, diesel
fuel, ADA accessible, for
replacement of buses that
have exceeded in both years
and mileage their useful life.
PROGRESS: 6/11/09
The purchase of these buses
will be through a piggyback
option from Akron, OH through
the Gillig Corporation. These
are a total of two(2) buses,
diesel fuel, ADA accessible,
for replacement of buses that
have exceeded in both years
and mileage their useful life.
2.
CONTRACT AWARDED
3/20/2009
4/29/2009
N/A
PROGRESS: This purchase
will be from the Gillig
Corporation.
3.
RFP /IFB OUT FOR BID
3/20/2009
DETAILED
DESCRIPTION: The
purchase of these buses will
be through a piggyback option
from Akron, OH through the
Gillig Corporation. These are a
total of two(2) buses, diesel
fuel, ADA accessible, for
replacement of buses that
have exceeded in both years
and mileage their useful life.
PROGRESS: 6/11/09 The
purchase of these buses will
be through a piggiback option
from Akron, OH from the Gillig
Corporation. A purchase order
will be process for these
buses.
4
FIRST VEHICLE
9/30/2010
DELIVERED
5.
ALL VEHICLES DELIVERED
913 012 0 1 0
6.
CONTRACT COMPLETE
10/31/2010
11.12.02 BUY REPLACEMENT 35 -FT BUS
Quanti ETA Amount Elig Emi. Cost
2 $658,264 $658,264
Page 19 of 1
lttos: / /ftateamweb.fta. dot. eov/ teamweb/ Annlications NiewPrint /ViewPrintRe.e_asn ?C T1TI =PRnni fCTTf1N A /11 / ?nn(
Milestone Descriptio
O0 g_Est.
Comp. Da
Rev. Est.
Comp. Date
#Rev
Actual
Com Date
Cont.
Code
1.
RFP /IFB OUT FOR BID
3/20/2009
4/29/2009
Page 19 of 1
lttos: / /ftateamweb.fta. dot. eov/ teamweb/ Annlications NiewPrint /ViewPrintRe.e_asn ?C T1TI =PRnni fCTTf1N A /11 / ?nn(
Jie;N Print.
Guano FTA Amount Elig_Proj.Cost
11.12.15 BUY REPLACEMENT VAN 5 $275,000 $275,000
DETAILED
Orig__Est.
Re v. Est.
#Rev
Actual
Cont
DESCRIPTION: The
Ca mp. Date
_Comp. _D
Comp. Date
Code
1.
purchase of these buses will
5/1/2009
5/1/2009
be through piggyback option
from Akron, OH through the
Gillig Corporation. These are a
total of two(2) buses, diesel
fuel, ADA accessible, for
replacement of buses
exceeding their useful life.
PROGRESS: 6/11/09
The purchase of these buses
will be through piggyback
option from Akron, OH through
the Gillig Corporation. These
2.
are a total of two(2) buses,
5/3012009
3
diesel fuel, ADA accessible,
(30/2010
5
for replacement of buses
4.
exceeding their useful life.
5/30/2010
2.
CONTRACT AWARDED
3/20/2009
4/29/2009
N/A
PROGRESS: These buses
will be purchased from the
Gillig Corporation.
3
FIRST VEHICLE
g
/30/2010
DELIVERED
4.
ALL VEHICLES DELIVERED 1
9/30/2010
5. 1
CONTRACT COMPLETE 1
10/31/2010
Guano FTA Amount Elig_Proj.Cost
11.12.15 BUY REPLACEMENT VAN 5 $275,000 $275,000
Page 20 of I
rttps: / /ftateamweb.fta. dot. gov/ teamweb /ApplicationsNiewPrintIV iewPrintRes.asp ?GUID= PRODUCTION... 6/11/200(
Mile Des
Orig__Est.
Re v. Est.
#Rev
Actual
Cont
Ca mp. Date
_Comp. _D
Comp. Date
Code
1.
RFP /IFB OUT FOR BID
5/1/2009
5/1/2009
DETAILED
DESCRIPTION: This is the
purchase of five (5) paratransit
vehicles, ADA accessible, to
replace five vehicles that have
exceeded in both years and
mileage their useful life.
PROGRESS: The purchase
of the paratransit vans is from
a State bid from the State of
Minnesota DOT through
Startrans.
2.
CONTRACT AWARDED
5/3012009
3
FIRST VEHICLE
(30/2010
5
DELIVERED
4.
ALL VEHICLES DELIVERED
5/30/2010
5.
CONTRACT COMPLETE
6/30/2010
Page 20 of I
rttps: / /ftateamweb.fta. dot. gov/ teamweb /ApplicationsNiewPrintIV iewPrintRes.asp ?GUID= PRODUCTION... 6/11/200(
✓ie w Prir. t
Quant
11.42.20 ACQUIRE - MISC SUPPORT 0
EQUIPMENT
Page 21 of 2:
FTA r nount Big. Pro Co
$184,569 $184,569
11.12.02 BUY REPLACEMENT 35 -FT BUS
Quantit FTA Amount Elig Proj. Cost
1 $555,000 $555,000
Milestone Descrip
Orig. Est.
Rev. Es
# Re v
Actual
Cont.
Com p. Date
Comp. Da
3/20/2009
Com Date
C ode
4/29/2009
1.
Contract Award
5/30/2009
2.
Contract Complete
12/31/2009
3.
RFP /IFB Issued
4/30/2009
7/31/2009
1
DETAILED
through a piggyback option
DESCRIPTION: This is the
from Akron, OH, through Gillig
purchase of an Automated
Corporation. This is an ADA
Voice Enunciation System for
hybrib fuel bus, ADA accesible
buses to allow for calling out
that will replace a bus that
bus stops. This system will be
have exceeded it's useful life.
supported by GPS technology.
PROGRESS: 6/11/09
PROGRESS: 6/11/09
The purchase of this bus will
This is the purchase of an
be through a piggyback option
Automated Voice Enunciation
from Akron, OH, through Gillig
System for buses to allow for
Corporation. This is an ADA
calling out bus stops. This
hybrib fuel bus, ADA accesible
system will be supported by
that will replace a bus that
GPS technology. We will be
have exceeded it's useful life.
bidding this project in July.
CONTRACT AWARDED
3/20/2009
4/29/2009
11.12.02 BUY REPLACEMENT 35 -FT BUS
Quantit FTA Amount Elig Proj. Cost
1 $555,000 $555,000
ittps: / /ftateamweb.fta. dot. gov /teamweb /Applications /ViewPrint/V iewPrintRes.asp ?GUID= PRODUCTION... 6/11/2001,
Milesto Descr iption
Orig. E st.
Comp. Date
Rev. Est.
Com p_Date
#Rev
Actu
Com p. Date
Cont.
Code
1.
RFP /IFB OUT FOR BID
3/20/2009
4/29/2009
DETAILED
DESCRIPTION: The
purchase of this bus will be
through a piggyback option
from Akron, OH, through Gillig
Corporation. This is an ADA
hybrib fuel bus, ADA accesible
that will replace a bus that
have exceeded it's useful life.
PROGRESS: 6/11/09
The purchase of this bus will
be through a piggyback option
from Akron, OH, through Gillig
Corporation. This is an ADA
hybrib fuel bus, ADA accesible
that will replace a bus that
have exceeded it's useful life.
2.
CONTRACT AWARDED
3/20/2009
4/29/2009
NIA
PROGRESS: This bus will be
purchased from the Gillig
Corporation.
3.
RFP /IFB OUT FOR BID
3/20/2009
ittps: / /ftateamweb.fta. dot. gov /teamweb /Applications /ViewPrint/V iewPrintRes.asp ?GUID= PRODUCTION... 6/11/2001,
lie iv Prir,
DETAILED
DESCRIPTION: The
purchase of these buses will
be through piggyback option
from Akron, OH through the
Gillig Corporation. These are a
total of two(2) buses, diesel
fuel, ADA accessible, for
replacement of buses
exceeding their useful life.
4 FIRST VEHICLE 9
DELIVERED !30/2009
5. ALL VEHICLES DELIVERED 9/30/2009
6. CONTRACT COMPLETE 10/31/2009
11.14.40 REHAB /REBUILD SPARE PARTS
Quanti FTA Amount Elig. Proj Cost
0 $24,100 $24,100
11.42.11 ACQUIRE -SUPPORT VEHICLES
Quantity ETA Amount Elg Pro j. Cost
1 $25,000 $25,000
Milestone Desc ription
� Est.
Rev. Est.
# Rev
Actual
Cont.
Comp_Date
Comp, Date
Comp. Date
Code
1.
Contract Award
5/15/2009
6/9/2009
2.
Contract Complete
5/30/2009
3.
RFP /IFB Issued
4/30/2009
6/30/2009
1
PROGRESS: These are
spare parts for the newly
purchased electronic
fareboxes. The parts will be
2.
purchaed from same vendor,
1 5/15/2009
3.
GFI.
1 6/30/2009
11.42.11 ACQUIRE -SUPPORT VEHICLES
Quantity ETA Amount Elg Pro j. Cost
1 $25,000 $25,000
Page 22 of I
ittps: / /ftateamweb. fta.dot.gov /teamweb /Applications /V iewPrint /V iewPrintRes .asp ?GUID = PRODUCTION... 6/11/2001
Mi lestone Description
Orig Est.
Rev Est.
# Rev
Actual
Cont.
Comp Date
Comp. Dat
Com p. Date
Code
1.
RFP /IFB Issued
4/30/2009
6/9/2009
PROGRESS: 6/11/09
This vehicle was bidded and
bid was granted to Spradley
Barickman Ford. The support
vehicle is a hybrid. Delivery
will be approx. 6 -15 weeks.
2.
Contract Award
1 5/15/2009
3.
Contract Complete
1 6/30/2009
Page 22 of I
ittps: / /ftateamweb. fta.dot.gov /teamweb /Applications /V iewPrint /V iewPrintRes .asp ?GUID = PRODUCTION... 6/11/2001