Loading...
HomeMy WebLinkAbout07928Reception 1805430 05/14/2009 ORDINANCE NO. 7928 AN ORDINANCE APPROVING THE RIDGE GATE, FILING NO. 5, A SPECIAL AREA PLAN SUBDIVISION PLAT BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO. that: SECTION 1. r The final plat of the Ridge Gate, Filing No. 5, A Special Area Plan Subdivision Plat being a subdivision of land legally described as: A resubdivision of a portion of Ridge Gate, Filing No. 3 A Special Area Plan located in a portion of the NW '/< of Section 12, Township 20 South, — Range 65 West of the 6 Principal Meridian, County of Pueblo, State of Colorado and being more particularly described as follows: o� Considering the West line of the NW '/< of Section 12, Township 20 South, ° Range 65 West of the 6` P.M. to bear N. 00 °31'24" W., and all bearings contained herein being relative thereto. Ems B O All of Lots 28 to 34 both inclusive, Block 8 maw mm -� AND mm o� All of Lots 1 and 2, Block 9 a� m U AND &may o, All of Lots 1 to 7 both inclusive, Block 10 0 v AND All of Lots 2 to 16 both inclusive, Block 11 AND All of Lots 1 to 17 both inclusive, Block 12, all being located in Ridge Gate, Filing No. 3 according to the recorded plat thereof as filed for record at Reception No. 1372730 in the Pueblo County records. Containing 5.38 acres, more or less. is hereby approved, and all dedicated streets, utility and drainage easements, rights -of- way and land set aside for public sites, parks and open spaces shown and dedicated on said plat are hereby accepted for public use. SECTION 2. The acceptance of such dedicated streets, rights -of -way, utility and drainage easements, public sites, parks and open spaces by the City does not obligate the City to maintain or repair same until such streets, rights -of -way, utility and drainage easements, public sites, parks and open spaces have been constructed and installed in compliance and in accordance with the requirements and provisions of Chapter 4, Title XII of the Pueblo Municipal Code, as amended and any agreement entered into pursuant thereto. SECTION 3. Neither the adoption of this Ordinance nor the requirements imposed hereby shall create any duty or obligation of any person, firm, corporation or other entity with regard to the enforcement or nonenforcement of this Ordinance or the City's Subdivision Ordinances and regulations. No person, firm, corporation or other entity shall have any private right of action, claim or demand against the City or its officers, employees or agents, for any injury, damage or liability arising out of or in any way connected with the adoption, enforcement, or nonenforcement of this Ordinance or the Subdivision Ordinance and Regulations of the City, or the engineering, surveying, drainage improvement or other work or improvements required thereby. Nothing in this Ordinance or in the City's subdivision Ordinances and regulations shall create or be construed to create any claim, demand or liability against the City or its officers, employees or agents, or to waive any of the immunities, limitations on liability, or other provisions of the Colorado Governmental Immunity Act, Section 24 -10 -101, et seq. Colorado Revised Statutes, or to waive any immunities or limitations on liability otherwise available to the City or its officers, employees or agents. SECTION 4. This Ordinance shall be approved upon final passage but shall not become effective until (a) all information, documents, drawings, profiles, and plat required by Chapter 4 of Title XII of the Pueblo Municipal Code meeting and complying with the subdivision requirements of the City with such modifications, if any, approved by City Council, have been filed with and approved by the Director of Public Works and (b) the final subdivision plat is recorded in the office of the Pueblo County Clerk and Recorder. If any such filings and approvals have been deferred pursuant to Section 12 -4 -5 (B) (2) of the Pueblo Municipal Code, and are not for any reason filed and approved within one (1) year after final passage of this Ordinance, or within any extended period granted by Resolution of the City Council, this Ordinance shall automatically be rescinded and repealed thirty (30) days after written notice of such rescission and repeal is given to the Subdivider. No vested rights shall accrue to the subdivision or be acquired until this Ordinance becomes effective. INTRODUCED: November 10, 2008 �t *J U,U L ' BY: Randy Thurston COUN L PERSON .r APPROVED: PRESIDENT OF CITY COUNCIL ATTESTED; PASSED AND APPROVE November. 24, 200 . � f 4 aE o :!c Em�a B O rn a mm "� m�a mm o� Noo♦ m— ONN o o� 0 GN � V . . 0 = ac,® E ������ L MOW Background Paper for Proposed ORDINANCE DATE: NOVEMBER 10, 2008 AGENDA ITEM # 26 DEPARTMENT: PLANNING AND COMMUNITY DEVELOPMENT JERRY M. PACHECO, DIRECTOR 1111111114 AN ORDINANCE APPROVING THE RIDGE GATE, FILING NO. 5, A SPECIAL AREA PLAN SUBDIVISION PLAT ISSUE Shall City Council approve a request to resubdivide Ridge Gate, Filing No. 3, A Special Area Plan to increase the width of the lots by removing one lot per block? RECOMMENDATION The Planning and Zoning Commission, at their October 8, 2008 regular meeting, voted 6 -0 to recommend approval. BACKGROUND Ridge Gate, Filing No. 5, A Special Area Plan, is a resubdivision of Ridge Gate, Filing No. 3, A Special Area Plan, which was approved October 23, 2000. Ridge Gate Filing No. 3 created a medium - density residential district in which the minimum front yard setbacks are reduced encouraging unique development. The purpose of Ridge Gate, Filing No. 5 is to increase the width of the lots by removing one lot per block in Blocks 1, 2, 3, 4 and 5. This will decrease the density of the overall development and create larger residential lots. FINANCIAL IMPACT None. Reception 1805432 05/14/2009 SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT is made on `F ' 200 - 9 , between the CITY OF PUEBLO, a Municipal Corporation ( "City "), and Pannunzio, Inc., a Colorado Corporation ( "Subdivider "). RECITALS WHEREAS, Subdivider has subdivided or is about to subdivide a certain tract of land located in the City and legally described in attached Exhibit "A'.': and WHEREAS, the Subdivider, as a condition of approval of the final plat of Ridge Gate, Filing No. 5 -A Special Area Plan ("Subdivision"), wishes to enter into this Subdivision Improvements Agreement as authorized by Chapter 4, Title XII of the Pueblo Municipal Code; and WHEREAS, Subdivider is required by Chapter 4, Title XII of the Pueblo Municipal Code to construct and install public improvements described and set forth in Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by City Council ( "Required Public Improvements "): and WHEREAS, the Required Public Improvements are generally described in the attached Exhibit `B" and shown on approved construction plans and documents on file in the office of the City's Director of Public Works ("Plans and Documents "). WHEREAS, by Chapter 4, 'Title XII of the Pueblo Municipal Code, Subdivider is obligated to provide security or collateral sufficient in the judgement of the Director of Public Works to make reasonable provisions to construct and complete the Required Public Improvements. NOW, THEREFORE, in consideration of the foregoing and the following mutual covenants and agreements. the City and Subdivider agree as follows: Subdivider agrees within one hundred and eighty (180) days after applying for a building permit to construct any building or structure on any building site within the Subdivision, or upon the issuance of a certificate of occupancy for any such building or structure, whichever occurs first, to construct and installl at its sole cost all of the Required Public Improvements. 2. In lieu of installing the Required Public Improvements within the time period prescribed in Paragraph 1, Subdivider or any subsequent owner of the land or any portion thereof shall deposit cash or other collateral with the City Director of Finance, or with any bank or'trust company licensed in the State of Colorado, subject to an DPW 101 Dee. 2007 4 r L escrow agreement approved by the City Attorney. The holder of such cash or collateral shall pay all or any portion thereof to the City upon demand after the time to complete all Required Public Improvements by Subdivider or subsequent owner expires. Such deposit or escrow agreement shall be referred to as the "deposit ". 3. The amount of the deposit shall be computed by the City's Director of Public Works by estimating the total cost of all uncompleted Required Public Improvements within the block at the time application for building permit is made. The amount of the deposit required by this alternative shall not be less than 25% of such estimate plus the cost of extending all required sewer and water lines from nearest existing sewer and water lines to the proposed building site for which a building permit is sought, plus the costs of extending curb, gutter, sidewalk and paving from the edge of the Subdivision or existing improvements of a like nature, whichever is closer to the proposed building site. In any case where the block, as later defined, exceeds one thousand (1000') feet in length between intersecting streets, the estimate of the City Director of Public Works under this paragraph may be reduced to the total costs of all uncompleted Required Public Improvements in at least one half (1/2) of such block, and the required deposit shall be based upon such decreased estimate. The Subdivider, however, shall provide a turnaround of at least sixty (60') feet in diameter at the mid -block point and barricade such street so that no through traffic shall be permitted beyond the point to which the estimate of Director of Public Works is based. 4. Within one hundred eighty (180) days after subsequent application for a building permit to construct any building or structure upon any building site within the block, or upon the issuance of a certificate of occupancy for any such building or structure, whichever occurs first, Subdivider sliall also deposit an amount not less than the estimate of the Director of Public Works for all Required Public Improvements from existing improvements to the proposed building site, less any previous deposits made under this agreement upon building sites lying between the most recent proposed site and existing improvetncrtts. 5. In the event the Subdivider or any subsequent owner of the land fails to complete the Required Public Improvements or to make such deposit within the required time, no additional building permits shall be issued to the Subdivider or the subsequent owner or to any other person to build or construct any building or structure in the Subdivision until such default is remedied. In addition, the City may treat the amount of such deposit as a debt due the City from the Subdivider or subsequent owner, which debt shall he a lien upon all the land in the Subdivision and notice of lien may be filed for record in the office of the County Clerk and Recorder at any time after such default. Action upon such debt may be instituted by the City within six (6) _years from the date of filing such lien for record. All remedies provided for in this agreement are cumulative and the use of one shall not prohibit the use of another. DPW 101 —^ - -- - Dec. 2007 1805432 SUBD RC 05/14/2009 02:03:06 PM Page: 2 of 14 R 71.00 D 0.00 T 71.00 Gilbert Ortiz Clerk /Recorder, Pueblo County, Cc 1111 K MINN th410 %14MW10VAk1A1IN's®1111 6. Upon paying such deposit, the City Director of Public Works shall release the proposed building site from the terms of the Agreement except the terms of Paragraph 7 below. 7. As a condition of approval of this Subdivision, and to meet the requirements of Chapter 4, Title XII of the Pueblo Municipal Code, Subdivider specifically agrees that no certificate of occupancy shall be issued by the Pueblo Regional Building Department until the Required Public Improvements, or those improvements necessary as determined by the City Director of Public Works, to totally serve specific lot(s) or block(s) for which certificates of occupancy are sought, have been properly designed, engineered, constructed and accepted as meeting the specifications and standards o the City. The restrictions oil issuing certificates of occupancy contained in this Paragraph 7 and the restriction on the issuance of building permits contained in Paragraph 5 shall run with the land and shall extend to and be binding upon the heirs, legal representatives, successors, and assigns of the Subdivider and may be specifically enforced by the City. 8. Acceptance of this Subdivision by the City does not constitute an acceptance of the roads, pal ks and other public improvements for maintenance by the City. Until such roads, parks, and other public improvements have been installed and meet the requirements, standards, and specifications of the City, its Subdivision ordinances and any applicable Parks Department specifications, and such are specifically approved and accepted in writing by the City Director of Public Works, and, if appropriate, the City Director of Parks and Recreation, the maintenance, construction, and all other inatters pertaining to or affecting said roads, parks and other public improvements and rialits -of -way are the sole responsibility of the Subdivider or any subsequent owner(s) of the land within the Subdivision. 9. 1lie required time to complete all Required Public Improvements by Subdivider within such block shall be one (1) year from the date of application for the first building permit issued within such block. Upon completion and written approval and acceptance of the Required Public Improvements within the required time and the p,lyment of all inspection costs by Subdivider, the Director of Public Works shall cause all obligations or the Subdivider relating to the Required Public Improvements � %ithin such block to be released. If such Required Public Improvements are not completed within the required time, the City Director of Public Works may cause the proceeds of all deposits or other collateral or monies in escrow to be used to compete tlrc same. If insuffrcient monies are available at the end of the required time to complete all Required Public Improvements for the entire length of such block, the Director of Public Works shall cause all collateral or monies in escrow to be reduced' to cash and shal l deposit the same with the Director of Finance. Such cash shall be used to complete that portion of the Required Public Improvements as the Director of Public Works, in the Director's sole discretion, shall determine. Until all the Required Public Improvements are completed and approved by the Director of Public uPw lol 3 ors. zoos ... - -- - -- — - — — 1805432 SUBD AG 05/14/2009 02:03:06 P% i6e Page 4 : 3 of 1 R 71.00 D 0.00 T 71.00 Gi rt Ortiz Clerk /Recorder, Pueblo County. Cc Works, Subdivider and the subdivided land shall remain liable and responsible for all Required Public Improvements. 10. For purposes of this Agreement, the "block" shall mean both tiers of lots fronting or abutting upon the street which the proposed building or structure shall front, to the rear property line of such lots, or the center line of the alley, if there is an alley, enclosed at either end by a street which intersects both tiers of lots and shall include the full width of all streets upon which such lots abut. 11. 1I'the Required Public Improvements are for a commercial subdivision and include stormwater drainage facilities, stormwater detention facilities, or maintenance and restoration of adjacent drainage channels, and /or associated improvements and revegetation (the "faci li ties"), located either within or outside of the Subdivision, I S shall install the facilities in accordance with plans and specifications therefore approved by, and on file with the City, and thereafter, the facilities shall be repaired, replaced and maintained in good working order and condition by the owners of the Land within the Subdivision. The City is granted the right (but not the obligation) to inspect, control, repair, replace and maintain the facilities and to recover all costs and expenses therefore including an administrative charge of 15% I rom the owners of the Land within the Subdivision. All such City's costs and dministrative charges shall become a perpetual lien on all the land within the Subdivision upon recording in the office of the Pueblo County Clerk and Recorder a statement of lien setting forth the City's costs and describing the land signed by the City's Director of Public Works. Failure of the City to inspect, control, repair, maintain, or replace the facilities shall not subject the City to any liability for such Pa i ture. 12. Subdivider agrees to provide the City with a current title insurance commitment at the time of final platting evidencing that fee simple title of all lands in the Subdivision is toially vested with the Subdivider free and clear of all liens and encumbrances. If such land is not free and clear, the holder of such indebtedness or encumbrance shall subordinate its interest or cncunbrance to this Agreement and all its terns, conditions. and restrictions. 13. 1 he City or the purchaser of any lot(s) within this Subdivision shall have the authority to bring an action in any Court of competent jurisdiction to compel the enforcement of this Agreement or any amendment hereto. Such authority shall include the right to compel rescission of any sale, conveyance, or transfer of any lot(s) or tract(s) con'tary to the provisions of the Ordinances of the City or this Agreement. In the event of any litigation arising out of this Agreement, the Court shall award the prevail ing party its costs and expenses, including reasonable expert witness and attorneys fees. Venue for any such litigation shall be Pueblo County, Colorado. 14. City and Subdivider have attempted by the attached Exhibit "B" and Plans and Documents to describe all Required Public Improvements to be constructed and DPW 101 4 Dec. 2007 1805432 SUBD AG 05/14/2009 02:03:06 PM Pag er[ 4 0r o tiz l Clar /Reco 0 rde 0 r, 0 Pueblo County, Cc 1, installed by Subdivider with respect to the Subdivision. However, if the attached Exhibit "B" and Plans and Documents fail to describe or to include, for any reason, any Required Public Improvement described and set forth in Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by City Council ( "Omitted Public Improvement "), Subdivider shall not be released or discharged from Subdivider's obligation to construct and install the Omitted Public Improvement in the time and manner contained in this Agreement and Chapter 4, Title XII of the Pueblo Municipal Code. I u order to determine whether or not there are Omitted Public Improvements, the following shall be applicable: (a) If the Required Public Improvements are constructed and installed within ten (10) years from the date hereof, or within a five year extension if granted in writing by the Director of Public Works, then Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by the City Council aad interpreted as of the date hereof shall control, unless adherence to a inoi e recent standard does not require significant engineering modifications or major revisions to the plans and documents. For the purposes of this subsection, a major revision is defined as, but not necessarily limited to the relocation or re,- alignment of ally curb and gutter, sanitary sewer storm sewer, manholes or storm inlets, or the change of size or type of sewer mains, inlets, curb and gutter or sidewalk. (b) If the Required Public Improvements are constructed and installed after ten (10) years from the date hereof, or after a five year extension if granted in writing by the irector of Public Works, then Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by the City Coucil and interpreted as of the date the Required Public Improvements are constructed and installed shall control. (c) If Chapter 4 of Title X1I and /or the standards and specifications approved by the City Council are modified or amended to conform with the requirements of federal or state law, rules or regulations prior to the construction and installation of the Required Improvements, they shall control as so modified and amended. 15. 17xcept for guarantee and obligation to correct defects required by Section 12 -4- 70(9) of the Pueblo Municipal Code, nothing in this Agreement shall be construed to extend any obligation of the Subdivider beyond the date of written approval and accepted by the Director of Public Works of the Required Public Improvements described ur attached. Exhibit "B ", provided, however that the obligation of the Developer to construct or install any Omitted Public Improvements will cease following two (2) years from the date of acceptance of the Required Public Improvements described in tine attached Exhibit "B" by the Director of Public Works. DPW 101 1805432 SUBD_AG 05/14/2009 02:03:06 PM Dec.2007 Page: 5 of 14 R 71.00 D 0.00 T 71.00 Gilbert Ortiz Clerk /Recorder, Pueblo County, Co 16. All Required Public Improvements shall be constructed and installed in compliance with all applicable standards and specifications approved by City Council. 17. The parties agree this Agreement may be periodically amended by mutual consent provided such amendment is in writing and signed by all parties. 18. This Agreement shall extend to and be binding upon the successors and assigns of the City and upon the heirs, successors, assigns and legal representatives of Subdivider, and shall he recorded in the office of the County Clerk and Recorder of Pueblo County, Colorado, and shall constitute an agreement running with the land until released as described above. The parties have caused this Agreement to be executed and attested by its duly authorized and acting officer. (SEAL) Pannunzio, Inc. a Colorado Corporation Subdivider By: Y-1 `..o P--. Nick Pannunzio, Presi t By: The foregoing instrument was acknowledged before me on by Nick Pannunzio, President of Pannunzio Inc. , Subdivider. a Colorado Corporation My commission ATT.F.ST: City STATE OF COLORADO ) ) ss. COUNTY OF PUEBLO ) Notar ublic 1 -2 o/ 0Pdj5tVa, CO P /ooY CITY O F PUEBLO, a Municipal Corporation President of City The foregoing instrument was acknowledged before me this 2 / 0 � - 0 - �� by V ci - A Orfc� Presider t I I City Council, and _ shot Uwfcler Pueblo, Colorado. day of of . as as City Clerk of the City of Witness my hand and official seal. DPW 10I - -- . - - -- -_ —_ -- -- Dec. 2007 180 SUBD_AG 05/14/2009 02:03:06 PM Gal6erl6o t l z Cle k /Record e, Pueblo Coun0yy, Co My commission expires: // Zo/ / fa, E A _ L APPROVED AS TO FORM: r City Att c Notary Public 1805432 SUBD_RG 05/14/2009 02:03 :06 PM Pagge: 7 of 14 R 71.00 D 0.00 T 71.00 Gi lhert Ortiz Clerkf Recorder, Pueblo County, Co ®III r1hF:DJNgA#lWW WWAIN HnH 11111 DPW 10[ Dec.2007 SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: RIDGE GATE, FILING NO. 5, A SPECIAL AREA PLAN ]N 0801600 DEVELOPER: PANNUNZIO,INC. ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. 3" Asphalt over 7" Base Course 5250 SY @ $17.50 /SY = $91,900 Curb and Gutter 2556 LF @ $12.00 /LF = $30,700 Square Pan Radius 713 SF . @ $5.00 /SF $3,600 7" Conc. Pan 1366 SF @ $5.00 /SF $6,900 Handicap Ramp 823 SF @ $4.00 /SF $3,300 WATER PVC Water Main 500 LF @ $47.50 /LF = $23,800 Service 8 EA @ $600.00 /EA = $4,800 Fire Hydrant Ass'y 0 EA @ $3,250.00 /EA = $0 SANITARY SEWER: B" PVC Sewer Main 1304 LF @ $35.00 /LF = $45,700 Services 38 EA @ $1,200.00 /EA = $45,600 48" Manholes 5 EA @ $2,500.00 /EA = $12,500 STORM SEWER 24" HDPE Pipe 36 L.F. @ $44.00 /LF = $1,600 18" HDPE Pipe 181 L.F. @ $41.00 /LF = $7,500 15" HDPE Pipe 39 L.F. @ $38.00 /LF = $1,500 Type W Inlet L =14' 2 EA @ $4,940.00 /EA = $9,900 STREET LIGHT 4 EA @ $1,450.00 /EA = $5,800 MONUMENT BOX 8 EA @ $655.00 /EA = $5,300 SIGNAGE T- Intersection (60' R -O -W) 1 EA @ $325.00 /EA = $400 4- Way - Intersection (60' R -O -W) 1 EA @ $435.00 /EA = $500 SUBTOTAL $301,300 1805432 SUBD AG 05/14/2009 02:03:06 PM Page: 8 of 14 R 71.00 D 0.00 T 71.00 Gilbert Ortiz Clerk /Recorder, Puebla County, Cc ®IIIIf�iNhtl �l rh��`t#44XVIRWIkAIR 11111 1805432 SUBD_AG 05/14/2009 02:03:06 PM Page: 9 of 14 R 71.00 D 0.00 T 71.00 Gilbert Ortiz Cler0Reoorder, Pueblo County, Co SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: RIDGE GATE, FILING NO. 5, A SPECIAL AREA PLAN JN 0801600 DEVELOPER: PANNUNZIO,INC. ENGINEER: 13UCHANAN DRIVE NORTHSTAR ENGINEERING AND SURVEYING, INC.. STREETS 3" Asphalt on 8" Base Course 4847 SY @ $19.00 /SY = $92,100 Curb and Gutter (Modified Ramp) 2038 LF @ $12.00 /LF = $24500 Curb and Gutter (Standard) 449 LF @ $12.00 /LF = $5,400 Square Pan Radius 387 SF @ $5.00 /SF $2,000 7" Conc. Pan 539 SF @ $5.00 /SF $2,700 Handicap Ramp 434 SF @ $4.00 /SF $1,800 WATER PVC Water Main 600 LF @ $47.50 /LF = $28,500 Service 14 EA @ $600.00 /EA = $8,400 Fire Hydrant Ass'y 1 EA @ $3,250.00 /EA = $3,300 SANITARY SEWER: 8" PVC Sewer Main 1360 LF @ $35.00 /LF = $47,600 Services 32 EA @ $1,200.00 /EA = $38,400 48" Manholes 5 EA @ $2,500.00 /EA = $12,500 STORM SEWER 18" HDPE Pipe 291 L.F. @ $41.00 /LF = $12,000 15" HOPE Pipe 62 L.F. @ $38.00. /LF = $2,400 Type 1 -B Manhole 2 EA @ $2,465.00 /EA = $5,000 Type W Inlet L =8' 2 EA @ $3,620.00 /EA = $7,300 STREET LIGHT 5 EA @ $1,450.00 /EA = $7,300 MONUMENT BOX 8 EA @ $655.00 /EA = $5,300 SIGNAGE T- Intersection (60' R -O -W) 2 EA @ $325.00 /EA = $700 4- Way - Intersection (60' R -0 -W) 1 EA @ $435.00 /EA = $500 SUBTOTAL $307,700 1805432 SUBD_AG 05/14/2009 02:03:06 PM Page: 9 of 14 R 71.00 D 0.00 T 71.00 Gilbert Ortiz Cler0Reoorder, Pueblo County, Co IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: RIDGE GATE, FILING NO. 5, A SPECIAL AREA PLAN 3N 0801600 DEVELOPER: ENGINEER: RIDGE DRIVE STREETS 3" Asphalt on 13" Base Course 3" Asphalt on 10" Base Course Curb and Gutter WATER PVC Water Main Fire Hydrant Ass'y SANITARY SEWER: 8" PVC Sewer Main 48" Manholes STORM SEWER 30" HDPE Pipe 24" HDPE Pipe 18" HDPE Pipe Type 1 -B Manhole Type W Inlet L =14' Type "13" Inlet STREET LIGHT MONUMENTBOX PANNUNZIO, INC. NORTHSTAR ENGINEERING AND SURVEYING, INC. 1680 SY @ $26.50 /SY = $44,600 4590 SY @ $22.00 /SY = $101,000 2629 LF @ $12.00 /LF = $31,600 0 LF @ $47.50 /LF = $0 1 EA @ $3,250.00 /EA = $3,300 1292 LF @ $35.00 /LF = $45,300 4 EA @ $2,500.00 /EA = $10,000 1362 L.F. @ $66.00 /LF = $89,900 80 L. F. @ $44.00 /LF = $3,600 47 L. F. @ $41.00 /LF = $2,000 5 EA @ $2,465.00 /EA = $12,400 2 EA @ $4,940.00 /EA = $9,900 2 EA @ $2,740.00 /EA = $5,500 8 EA @ $1,450.00 /EA = $11,600 3 EA @ $655.00 /EA = $2,000 SUBTOTAL $372,700 18 2 5432 SUBD AG 05/14/2009 02:03:06 PM Gi Pe CllerkRReoorderD 0 P C unty0 Co mill r �ai�,r��h����nct �a1 r+�r PEI V16 11111 SUBDIVISION NAME: 01;041161]4[x 4MC) ( 1 144j , SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" RIDGE GATE, FILING NO. 5, A SPECIAL AREA PLAN JN 0801600 PANNUNZIO, INC. NORTHSTAR ENGINEERING AND SURVEYING, INC. 3" Asphalt on 6" Base Course Curb and Gutter WATER PVC Water Main Service Fire Hydrant Ass'y SANITARY SEWER: 8" PVC Sewer Main Services 48" Manholes MONUMENT BOX 1711 SY @ $16.00 /SY = $27,400 898 LF @ $12.00 /LF = $10,800 0 LF @ $47.50 /LF = $0 0 EA @ $600.00 /EA = $0 0 EA @ $3,250.00 /EA = $0 335 LF @ $35.00 /LF = $11,800 14 EA @ $1,200.00 /EA = $16,800 2 EA' @ $2,500.00 /EA = $5,000 2 EA @ $655.00 /EA = $1,400 SUBTOTAL $73,200 /2009 02:03:06 PM Ga(b 11 of a 1 4 kR R - lerrD Pu 60o Countty Co Bill SUBDMSION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: RIDGE GATE, FILING NO. 5, A SPECIAL AREA PLAN ]N 0801600 DEVELOPER: PANNUNZIO,INC. ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. GOLDIQNG ROAD STREETS 3" Asphalt on 6" Base Course 3026 SY @ $16.00 /SY = $48,500 Curb and Gutter 1514 LF @ $12.00 /LF = $18,200 Square Pan Radius 176 SF @ $5.00 /SF $900 7" Conc. Pan '269 SF @ $5.00 /SF $1,400 Handicap Ramp 207 SF @ $4.00 /SF $900 WATT PVC Water Main 450 LF @ $47.50 /LF = $21,400 Service 17 EA @ $600.00 /EA = $10,200 SANITARY SEWER: 8" PVC Sewer Main 708 LF @ $35.00 /LF = $24,800 Services 30 EA @ $1,200.00 /EA = $36,000 48" Manholes 3 EA @ $2,500.00 /EA = $7,500 STORM SEWER 18" HDPE Pipe 249 L.F. @ $41.00 /LF = $10,300 15" HDPE Pipe 6 L.F. @ $38.00 /LF = $300 Type 1 -B Manhole 1 EA @ $2,465.00 /EA = $2,500 Type W Inlet L =10' 1 EA @ $4,060.00 /EA = $4,100 STREET LIGHT 2 EA @ $1,450.00 /EA = $2,900 MONUMENT BOX 5 EA @ $655.00 /EA = $3,300 SIGNAGE T- Intersection (60' R -O -W) 1 EA @ $325.00 /EA = $400 MISCELLANEOUS IMPROVEMENTS DETENTION POND 4" Thick -4' Wide Conc. Trickle Pan 818 SF @ $3.00 /SF $2,500. Outlet Structure 1 EA @ $3,300.00 /EA = $3,300 Type "L" Rip Rap 133 CY @ $55.00 /CY = $7,400 Planting /vegetation 0.58 AC @ $13,150.00 /AC = $7,700 SUBTOTAL $214,500 18 SUBO AG 05/14/2009 02:03:06 PM ilbert of l Ort C1 der, Pueblo C untyy, G Ortiz Co ®m �� PJA �F��r� INN Wi MUM NN h 11111 SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: RIDGE GATE, FILING NO. 5, A SPECIAL AREA PLAN ]N 0801600 DEVELOPER: PANNUNZIO,INC. ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. TOTAL PROJECT: 1 269 400 This is an estimate only. Actual construction costs may vary. PREPARED BY: MC FIRM: NORTHSTAR ENGINEERING AND SURVEYING, INC. 1805432 SUBD AG 05/14/2009 02:03:06 PM 13 of 14 R Ortiz C erkReooroer l T , Pueblo County, t , Co Plans and Specifications therefore constitute all of the public improvements required to be installed and constructed for the Subdivision by Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by City Council„ (ii) the quantities of construction elements shown hereon accurately depicts the quantities necessary to construct the Required Public dents and (iii) the unit prices shown hereon are the most current unit prices provided by V V�( � ���KO�. {� L] :w Professional Engineer Date p � F Fss;0 - 0- D BY: En ' ering Division Waste ater Departmen St K ter a ment Tr p anon Division REVIEWED BY: 1aceM,%rA - 1805432 Sl1BD AG 05/14/2009 02:03:06 PM Page: 14 of 13 R 71.00 D 0.00 T 71.00 Gilbert Ortiz Clerkl Recorder, Pueblo County. Co ®III PJ P1MAWW1 F914 M NAP 5 Kh 1111111111 /ice/ 1883843 ADD AGR 08/24/2011 0224 30 PM { „:. P 1 4 R 0 0 76 00 �e ' Gi lbert Ort iz 1 Clerk /Recor76 0der D 0 Pu T County Co 11111K Io , imzl r kiln iiii on, - ADDENDUM= TO:SUBDIVISION IMPROVEMENTS ; AGREEMENT (PHASED CONSTRUCTION) This Addendum shall` be. incorporated in and become a part:of'the Nov. 4, "2008. , Subdivision "'Improvements3Agreement;for Ridge Gate, Filing, No.. 5, SAP (herein the "Subdivision")-and enforceable- as provided in said Subdivision :Improvements Agreement. i The Subdivider will develop the Subdivision in separate phases in t h e sequence described in the attached Exhibit; "A" 2 The.: Subdivider.:shall' construct and install all Require& Public Improveirtents :in the ;manner and, as described in the.Subdivision Improvements Agreement needed and required-to serve all lees: within:each Phase and in the sequence set . forth in the attached. Exhibit ;a`A" a 3 For purposes of determining the extent' and timing! of the R.equired J ublic Improvements, each Phase shall' be considered as a separate subdivision. - r. 4 After completion of all Required Public Improvements for any Phase and approval thereof by the Director of Public Works, the City will release }the lots in that from the Subdivision Improvements Agreement and this Addendum. 5 Any development of the Subdivision contrary to the phasing sequence set forth in paragraph 1 above without the prior written approval of the D,irector of Public 'Works ( "Director ") shall constitute a breach of the Subdivision Improvements Agreement and this Addendum and City may thereafter refuse to approve the is suance of building permits for construction within the Subdivision. 6 No modifications to the phasing sequence set forth in the attached Exhibit "A" shall be approved by the Director until (a) Subdivider's engineer certifies in writing that the requested :modifications will not result in any lot in the Subdivision being inadequately served by. required public .improvements„ (b) Subdivider furnishes title, information satisfactory ato, the3City showing all persons and 'entities, haying a recorded interest in all lots within the Subdivision ( "Interested Parties"), r and (c) : all Interested: =Parties execute;and ;acknowledge their consent to and "N " _ i:er :approval of the:modification the: phasing sequence in form and content approved by .the °.City Attorney" 7 The Subdivision Improvements Agreement as amended by this Addendum„ shall remain in, full force and effect and the, covenants of this Addendum shall run with the land within the Subdivision and shall extend to, be binding upon, and inure to the benefit of the City and Subdivider and their respective heirs, personal representatives, successors, and assigns. Executed . at Pueblo,, Colorado, as of V0/1/ Pannunzio, Inc , a Colorado Corporation Subdivider 4 .: .DPW1 1 /6/04 ;■ 1 By . Nick By STATE OF COLORADO ) ). ss. COUNTY OF PUEBLO ), The foregoing instrument was acknowledged before me this L day of A uju cr . , zoil, by ,Iick Pannunzio , President, Pannunz i,o , , Subdivider ; a 4616i4ido Corporation Witness:my hand•and•officia.1 kat.. My cointnisSion expires. 1 -P I . A dia,=401. Ai [SEAL] Weia' CITY - PUEBLO, R. SCOTT BAUGHMAN a Mu lc' al LC 'oration Notary Public State of Colorado By '• • , My Commission Expirei 04/12/2016 President :OT he C inci1 "r 42 82843 of 14 76 /24/2011 02 24 30 PM 1 Gigaert Ortiz Clerk/Recorder Pirbl Co 1111 liCes'IONIETIMIiiii 11111 DPW 103 1/6/04 „ ,i,f' ■ ' '','..?' ,. ” i 1883843 ADD AGR 08/24/2011 02 24 30 PM r ,,, ....., i' ..t.- ..‘',- ,,- ., Page 3 of 14 R 76 00 D 0 00 T 76 00 Gilbert Ortiz Clerk/Recorder Pueblo County Co ,r , i no InFamwircpareikkoinweiforinwilmii B111 ,. 1 1 4- -4 .!, "f 4A ,, :1 4,, ?;' 4.' 44 4 , -' ,L 4 4, 1; 's - e.'' '.! It ,,,,,,,, ,4 444 , ,- 4. '' A 4.! ' ! t iklESMUStibtjtbii i iSibS 1; IMPlIOVEMiStig` AaIlkEMEN'i 4 - I k ,,,;,. ';■,'* 1: ' ,',"' 'I ,,,ii EXHIBlet-qA0' - 4 1 ,,, a f. -.L t 4 , , , ,. ,.i.- . The Subdivider NVill:;developlheSUbdivisioivin.sepitittephases :4,.. . '4, , 1: 4 tj rA (1:i) ';PhOell.: shall,cOnsiitorthesfollOvdriglot■VidiltOie::SpridiVi§ipti. li 'tots*-1-84. tioek I ,.. z.,i , • , 1, ' .,.' ''' - 1; L4 :'. 'Ldit is A 5 Bloak - '" .4.- 4 4: r..4 , -- -‘,.:: ' ,(.. A' - t , i"' 4 S: A'. :i.,. . , i .ii. 4 ' 4 '1 il F (b) . ... ,, 'A i' ' ' , 4 i'r : ,- , , i„ , , ,, r *,,.. :,., $ % . ,,,, .,17, ,,,,,, :-.,, ,,, e 4: , -1, '.'f• 4- '''' 2"" ' . '4 ' ' . - ,1 . ' -Phtise,,,Jfhtill,don$if,dfdlef011Owi:Pg:lotS,vio.thin-Ille.Subdivis!op. , *-"„: 1 ,„. -4' P; tO P 0 .4 1. , ,.. ,..„ •i- ad 2A4, 1 ; 1, ';';'' * 4 - ' ,,,.,,, tots 944 :Bieck _" .:1 .Y - 4 1 . v i- .44., . 44„. 1. ' .,i- .k ,Phase -2B ' ''' .. ,. .., ' ' ' *4 tOttk:01'4,' ' Lot 5 , 13 - 1 - 6 . .die '34 c- .,p.- 44 1 ,v-.:',. 44. ) .-14'- 44- ' .',i. . 4 4. 44- .: 4 4 T, 4 ' ..,- 4 4 Of 0 . (,$): 4 . Ati 11Tc :0434: , 0'n,k3s,t- tli'd foUoiirit, Icitrj: i4t"41.0: , th4 , ...;Stilicifit1fiOri, ,,, ,, .4„.,i,.,; s/ . ,l ,..,.. ‚-4 i' /' CIt ) g , '..A t10t§ 1-4 444. Et'i '131`OCk 3 -i 1- .L�ts 1 and 'I, .Block 4 1 .4.4 .4. 'Lots 1 ;BIOCk:5 'P 4- ,, 3 4:' 1 44 - 44.. * . t 1 ,,, :'" -' . it a.: :e. -.'• A.4 — ..,;,, j' ,, ''°: -, . .,. , , A, ziA — r , , A ' 'f 14.- 4 v, ' ' , .,' 'AI i ' r■ ' 4 -.."" -, p +- ti , , .4 44, 'k i .4,.. t 'ti- -4 -t , ii ' ,i, ,4' ,,, ,j' ,, f ,,-;-, 4 ,i 1 4 T . -T "..i 4. r 4 t 4 A, ;. --4 '':',' -F' ,,,, , se. ' ,, •. 1: „.„,, tit 1: - i - ti ‘I' 4; 4-4' . I, :1,, f 4. .. t A, 1 , . ,Y '4: r r 4,- * , 1 , ,-- ,;'''' '-i; 1 A. „,_ 4-3- 4- 4. 44 4'■ '1." f ,), , ,,:i''. 4. ,r ,,, :j ' 4 ',7 i,-4- -:' .f:= -i .?=,,, !t, 4 , P ,_i , 4 k, t ,I, (Y" ..," 4 '0 '' 44, 4 ■ 4 . 4 .,' 44' '' (, -412.-4-4 '". " ' ! ' 11.6/64: ,, 9'h 1,..e«. i ' ,3, ,',4 -- ( ,$: 4' '-'• ,,,e,,,,, ,i i ''''' "4, ' ';,, ,f ~:; .., ' ,,, .,:, 4. e, 1 ie 4 '4-, '1 : ?; ,, :, , 4, --,, ;$ i. . ' , i . • 4' :,?' ' 4: e.', :`54 '1 ' . '''' '0,'' •■'; j , . 4- 444 4 ' ;,; 4 ' i '' 4 -"I -4--,---- A';;';" ; '' ' ' .1. 'ti"t1I'I.L. sti'ti:'' 1883843 ADD AGR 08/24/2011 02 24 30 PM Page 4of 14 R7600D000 T 76 00 Gilbert Ortiz Clerk /Recorder Pueblo County Co 10 :14 . 4111114 / 1 1 011 III SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" REVISED 7 -21 -11 SUBDIVISION NAME. RIDGE GATE, FILING NO 5, A SPECIAL AREA PLAN 3N 0801600 DEVELOPER. PANNUNZIO, INC. ENGINEER. NORTHSTAR ENGINEERING AND SURVEYING, INC. TABOR LA E (PHASE 11 STREETS 3" Asphalt on 6" Base Course 1711 SY © $16 00 /SY = $27,400 Curb and Gutter 898 LF @ $12.00 /LF = $10,800 WATER PVC Water Main 0 LF @ $47.50 /LF = $0 Service 0 EA @ $600 00 /EA = $0 Fire Hydrant Ass'y 0 EA @ $3,250 00 /EA = $0 SANITARY SEWER. 8" PVC Sewer Main 335 LF @ $35 00 /LF = $11,800 Services 14 EA © $1,200 00 /EA = $16,800 48" Manholes 2 EA © $2,500 00 /EA = $5,000 MONUMENT BOX 2 EA @ $655 00 /EA = $1,400 SUBTOTAL $73,200 1883843 ADD AGR 08/24/2011 02 24 30 PM Page 50 of 14 R D 0 00 T 76 00 Gilbert rtiz Clerk /R ecorde r Pueblo County Co IIII SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME. RIDGE GATE, FILING NO 5, A SPECIAL AREA PLAN JN 0801600 DEVELOPER. PANNUNZIO, INC. ENGINEER. NORTHSTAR ENGINEERING AND SURVEYING, INC. GOLDKING ROAD (PHASE 1) STREETS 3" Asphalt on 6" Base Course 380 SY © $16 00 /SY = $6,100 Curb and Gutter 200 LF @ $12 00 /LF = $2,400 WATER PVC Water Main 100 LF @ $47.50 /LF = $4,800 Service 4 EA © $600 00 /EA = $2,400 MONUMENT BOX 4 EA @ $655 00 /EA = $2,700 SIGNAGE T- Intersection (60' R -O -W) 1 EA @ $325 00 /EA = $400 SUBTOTAL $18,800 1883843 ADD AGR 08/24/2011 02 24 30 PM ' M e er t !le R 76 00 D 0 00 T 76 00 l �Yr il f II I 1111 SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME RIDGE GATE, FILING NO 5, A SPECIAL AREA PLAN JN 0801600 DEVELOPER. PANNUNZIO, INC. ENGINEER. NORTHSTAR ENGINEERING AND SURVEYING, INC. GOLDKING ROAD (PHASE 2A) STREETS 3" Asphalt on 6" Base Course 2646 SY @ $16.00 /SY = $42,400 Curb and Gutter 1314 LF @ $12.00 /LF = $15,800 Square Pan Radius 176 SF © $5 00 /SF $900 7" Conc. Pan 269 SF © $5 00 /SF $1,400 Handicap Ramp 207 SF © $4 00 /SF $900 WATER PVC Water Main 350 LF @ $47.50 /LF = $16,700 Service 13 EA © $600 00 /EA = $7,800 SANITARY SEWER. 8" PVC Sewer Main 708 LF @ $35 00 /LF = $24,800 Services 30 EA @ $1,200 00 /EA = $36,000 48" Manholes 3 EA @ $2,500 00 /EA = $7,500 STORM SEWER 18" HDPE Pipe 249 L.F @ $41.00 /LF = $10,300 15" HDPE Pipe 6 L.F @ $38.00 /LF = $300 Type 1 -B Manhole 1 EA © $2,465 00 /EA = $2,500 Type W Inlet L =10' 1 EA © $4,060.00 /EA = $4,100 STREET LIGHT 2 EA @ $1,450.00 /EA = $2,900 MONUMENT BOX 2 EA @ $655 00 /EA = $1,400 BARRICADE 1 EA © $940 00 /EA = $1,000 SIGNAGE T- Intersection (60' R -O -W) 1 EA © $325 00 /EA = $400 SUBTOTAL $177,100 1883843 ADD AGR 08/24/2011 02 24 30 PM Page 7 of 1� R 76 00 D 0 00 T 76 00 Gilbee Ortiiz Cle Puueeblo + Courtt a y l Co III hl' P�iTI ��YT�i��� 'ti IA'Y6 11 � it ` �il��o 1 MI111 SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME RIDGE GATE, FILING NO 5, A SPECIAL AREA PLAN JN 0801600 DEVELOPER. PANNUNZIO, INC. ENGINEER. NORTHSTAR ENGINEERING AND SURVEYING, INC. BUCHANAN DRIVE (PHASE 2B) STREETS 3" Asphalt on 8" Base Course 570 SY @ $19 00 /SY = $10,900 Curb and Gutter (Modified Ramp) 300 LF @ $12 00 /LF = $3,600 WATER PVC Water Main 150 LF @ $47.50 /LF = $7,200 Service 4 EA © $600 00 /EA = $2,400 SANITARY SEWER. 8" PVC Sewer Main 1360 LF @ $35 00 /LF = $47,600 Services 32 EA @ $1,200 00 /EA = $38,400 48" Manholes 5 EA @ $2,500 00 /EA = $12,500 STORM SEWER 18" HDPE Pipe 291 L.F @ $41 00 /LF = $12,000 15" HDPE Pipe 62 L.F @ $38 00 /LF = $2,400 Type 1 -B Manhole 2 EA @ $2,465 00 /EA = $5,000 Type W Inlet L =8' 2 EA @ $3,620 00 /EA = $7,300 STREET LIGHT 1 EA © $1,450 00 /EA = $1,500 MONUMENT BOX 1 EA @ $655 00 /EA = $700 BARRICADE 2 EA @ $940 00 /EA = $1,900 SIGNAGE T- Intersection (60' R -O -W) 1 EA © $325 00 /EA = $400 SUBTOTAL $153,800 188 ADD AGR 08/24/2011 02 24 30 PM Gilbert z /Recorde Pu Coun Co iii � ��i �� �' �� �L¢���+� YI 'T,I�ti�� "� III SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME. RIDGE GATE, FILING NO 5, A SPECIAL AREA PLAN JN 0801600 DEVELOPER. PANNUNZIO, INC. ENGINEER NORTHSTAR ENGINEERING AND SURVEYING, INC. RIDGE DRIVE (PHASE 2B1 STREETS 3" Asphalt on 10" Base Course 1947 SY © $22 00 /SY = $42,900 Curb and Gutter 876 LF @ $12.00 /LF = $10,600 5' Sidewalk 2190 SF @ $3.00 /SF = $6,600 WATER PVC Water Main 0 LF @ $47.50 /LF = $0 Fire Hydrant Ass'y 1 EA @ $3,250 00 /EA = $3,300 SANITARY SEWER. 8" PVC Sewer Main 438 LF @ $35 00 /LF = $15,400 48" Manholes 1 EA © $2,500.00 /EA = $2,500 STORM SEWER 27" HDPE Pipe 470 L.F @ $66.00 /LF = $31,100 Type 1 -B Manhole 2 EA © $2,465 00 /EA = $5,000 STREET LIGHT 2 EA @ $1,450 00 /EA = $2,900 BARRICADE 1 EA © $940.00 /EA = $1,000 MONUMENT BOX 1 EA @ $655 00 /EA = $700 SUBTOTAL $122,000 1883843 ADD AGR 08/24/2011 02 24 30 PM Page 90 of 1! R 76 D 0 00 T 7 00 Gilbert rtiz Clerk /Recorder 00 Pueblo County Co III 1111 SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME. RIDGE GATE, FILING NO 5, A SPECIAL AREA PLAN JN 0801600 DEVELOPER. PANNUNZIO, INC. ENGINEER NORTHSTAR ENGINEERING AND SURVEYING, INC. RIDGE DRIVE (PHASE 31 STREETS 3" Asphalt on 10" Base Course 1490 SY © $22 00 /SY = $32,800 Curb and Gutter 670 LF @ $12 00 /LF = $8,100 5' Sidewalk 1675 SF © $3 00 /SF = $5,100 MIER PVC Water Main 0 LF @ $47.50 /LF = $0 Fire Hydrant Ass'y 0 EA @ $3,250 00 /EA = $0 SANITARY SEWER. 8" PVC Sewer Main 270 LF @ $35 00 /LF = $9,500 48" Manholes 2 EA @ $2,500 00 /EA = $5,000 STREET LIGHT 2 EA @ $1,450 00 /EA = $2,900 BARRICADE 1 EA @ $940 00 /EA = $1,000 MONUMENT BOX 2 EA © $655 00 /EA = $1,400 SUBTOTAL $65,800 1883843 ADD AGR 08/24/2011 02 24 30 PM Page 10 .11;3 R 00 pit 00 76 Gilbert Ortiz of Crk /Recor der Pueblo Cou 00 Co III 11/1. P1�,1411r� 1WK1 , ��, �Rit MI Mill 11111 SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME RIDGE GATE, FILING NO 5, A SPECIAL AREA PLAN JN 0801600 DEVELOPER. PANNUNZIO, INC. ENGINEER NORTHSTAR ENGINEERING AND SURVEYING, INC. BUCHANAN DRIVE (PHASE 3) STREETS 3" Asphalt on 8" Base Course 4205 SY @ $19 00 /SY = $79,900 Curb and Gutter (Modified Ramp) 2180 LF @ $12.00 /LF = $26,200 Square Pan Radius 387 SF @ $5 00 /SF $2,000 7" Conc. Pan 539 SF @ $5 00 /SF $2,700 Handicap Ramp 434 SF @ $4 00 /SF $1,800 WATER PVC Water Main 450 LF @ $47.50 /LF = $21,400 Service 10 EA @ $600 00 /EA = $6,000 Fire Hydrant Ass'y 1 EA @ $3,250 00 /EA = $3,300 STREET LIGHT 4 EA @ $1,450 00 /EA = $5,800 MONUMENT BOX 7 EA @ $655 00 /EA = $4,600 BARRICADE 1 EA @ $940 00 /EA = $1,000 SIGNAGE T- Intersection (60' R -O -W) 1 EA @ $325 00 /EA = $400 4 -Way- Intersection (60' R -O -W) 1 EA @ $435 00 /EA = $500 SUBTOTAL $155,600 1883843 ADD AGR 08/24/2011 02 24 30 PM Page 11 of 34 R 76 00 D 0 00 T 76 00 Gilber Ortiz Cler /Recorder Pueblo County Co III " 11,11, rHOIVR 117:16.1119:11, 1 111 SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME RIDGE GATE, FILING NO 5, A SPECIAL AREA PLAN JN 0801600 DEVELOPER. PANNUNZIO, INC. ENGINEER. NORTHSTAR ENGINEERING AND SURVEYING, INC. SIVERQUEEN ROAD (PHASE 3) STREETS 3" Asphalt over 7" Base Course 5250 SY © $17.50 /SY = $91,900 Curb and Gutter 2556 LF @ $12 00 /LF = $30,700 Square Pan Radius 713 SF @ $5 00 /SF $3,600 7" Conc. Pan 1366 SF © $5 00 /SF $6,900 Handicap Ramp 823 SF @ $4 00 /SF $3,300 WATER PVC Water Main 500 LF @ $47.50 /LF = $23,800 Service 8 EA @ $600 00 /EA = $4,800 Fire Hydrant Ass'y 0 EA @ $3,250.00 /EA = $0 SANITARY SEWER. 8" PVC Sewer Main 1304 LF @ $35 00 /LF = $45,700 Services 38 EA @ $1,200.00 /EA = $45,600 48" Manholes 5 EA © $2,500.00 /EA = $12,500 STORM SEWER 24" HDPE Pipe 36 L.F @ $44.00 /LF = $1,600 18" HDPE Pipe 181 L.F @ $41 00 /LF = $7,500 15" HDPE Pipe 39 L.F @ $38 00 /LF = $1,500 Type W Inlet L =14' 2 EA @ $4,940 00 /EA = $9,900 STREET LIGHT 4 EA @ $1,450.00 /EA = $5,800 MONUMENT BOX 8 EA © $655 00 /EA = $5,300 SIGNAGE T- Intersection (60' R -0 -W) 1 EA © $325.00 /EA = $400 4 -Way- Intersection (60' R -O -W) 1 EA © $435 00 /EA = $500 SUBTOTAL $301,300 1883843 ADD AGR 08/24/2011 02 24 30 PM Page 12 14 00 0 00 Gilbert Ortiz of Clerk /RecoR/ 76 D T rder Pueblo Count 76 00 Co i t ' ' M IV 1 111 SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME. RIDGE GATE, FILING NO 5, A SPECIAL AREA PLAN JN 0801600 DEVELOPER. PANNUNZIO, INC. ENGINEER. NORTHSTAR ENGINEERING AND SURVEYING, INC. MISCELLANEOUS IMPROVEMENTS (PHASE 3) DETENTION POND 4" Thick -4' Wide Conc. Trickle Pan 818 SF @ $3 00 /SF $2,500 Outlet Structure 1 EA @ $3,300.00 /EA = $3,300 Type "L" Rip Rap 133 CY @ $55 00 /CY = $7,400 Planting /vegetation 0.58 AC @ $13,150 00 /AC = $7,700 SUBTOTAL $20,900 1883843 ADD AGR 08/24/2011 02 24 30 PM • Page 13 o i4 R 00 0 00 76 00 Co • Gilbe Ortiz Clerk /Reco76 D T rder Puebl Coun SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME RIDGE GATE, FILING NO 5, A SPECIAL AREA PLAN ]N 0801600 DEVELOPER. PANNUNZIO, INC. ENGINEER. NORTHSTAR ENGINEERING AND SURVEYING, INC. TOTAL PHASE 1 $92,000 TOTAL PHASE 2A. $177,100 TOTAL PHASE 2B $275,800 TOTAL PHASE 3 $543,600 TOTAL PROJECT. $1,088,500 This is an estimate only Actual construction costs may vary PREPARED BY MC FIRM NORTHSTAR ENGINEERING AND SURVEYING, INC. The undersigned hereby certifies that (1) the Required Public Improvements shown hereon and 1883843 ADD AGR 08/24/2011 02 24 30 PM Page 14 of 14 R 76 00 D 0 00 T 76 00 Gilbert Ortiz Clerk /Recorder Pueblo County Co III VI al /Alriai I trill1/21f 1 Nil Ilif. Iiiii 11111 Plans and Specifications therefore constitute all of the public improvements required to be installed and constructed for the Subdivision by Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by City Council„ (ii) the quantities of construction elements shown hereon accurately depicts the quantities necessary to construct the Required Public Imftr©ve = ts and (iii) the unit prices shown hereon are the most current unit prices provided by di *lo. r . 4. t'V21 g.e// w . w Professional Engineer Date o SSIONk - F �� . REVIEWED BY to , ,' Director of P ub is Works D