Loading...
HomeMy WebLinkAbout07773ORDINANCE NO. 7773 AN ORDINANCE AMENDING THE CITY OF PUEBLO FISCAL YEAR 2008 STAFFING LEVEL FOR THE WASTEWATER DEPARTMENT BY ADDING A WATER RECLAMATION WORKER I POSITION AND BY ELIMINATING A CHIEF WWTP OPERATOR POSITION WHEREAS, the Director of Wastewater, the Director of Human Resources, and the City Manager have determined that the needs of the Wastewater Department will best be met through the addition of a Water Reclamation Worker I position and the elimination of a WWTP Chief Operator position, BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, that: (brackets indicate matter being deleted, underscoring indicates matter being added) SECTION 1. The following portion of the 2008 staffing level for the Wastewater Department is amended as follows: Director of Wastewater 1 WW Engineering Supervisor 1 WW Collections Supervisor 1 WWTP Superintendent 1 WWTP Lab Supervisor 1 WWTP Maintenance Supv 1 WWTP Operations Manager 1 Regulatory Compliance Specialist 1 Associate Engineer II WW 1 Wastewater Data Technician 1 Wastewater Inspector 1 WW Utility Worker IV 7 Wastewater Lift Station Op 2 WW Scada Coordinator 1 Pretreatment Coordinator II 1 Chief WWTP Operator [5] Lab Analyst III 2 Lab Analyst II 1 Pretreatment Specialist 1 WRF Worker I/WRF Worker II [4] Asst WWTP Operator C 1 WWTP Maint Mechanic 2 Sr WWTP Maint Mechanic 1 Inst/Controls Specialist 1 Administrative Technician .5 Sr Clerk Typist 1 Utility Worker/WW Utility Worker I/ WW Utility Worker II 7 Total 48.5 4 5 SECTION 2. This Ordinance shall become effective immediately upon final passage and approval. BY Vera Ortegon Councilperson APPROVE Lim PPI`81f I T' i I LXr PASSED AND APPROVED: Ar INTRODUCED March 24, 2008 ril 14. 2008 0 lZn `i - 1 - 1 3 d � Q Background Paper for Proposed ORDINANCE AGENDA ITEM # 3 Q DATE: March 24, 2008 DEPARTMENTS: WASTEWATER — DIRECTOR GENE MICHAEL HUMAN RESOURCES — ACTING DIRECTOR DOUGLAS FITZGERALD TITLE AN ORDINANCE AMENDING THE CITY OF PUEBLO FISCAL YEAR 2008 STAFFING LEVEL FOR THE WASTEWATER DEPARTMENT BY ADDING A WATER RECLAMATION WORKER I POSITION AND BY ELIMINATING A CHIEF WWTP OPERATOR POSITION ISSUE Should the Wastewater Department be authorized to add a Water Reclamation Worker I position and eliminate a Chief WWTP Operator position to correct current staffing. RECOMMENDATION The Ordinance be approved BACKGROUND Last summer a staffing ordinance modification was approved for the Wastewater Department that abolished a Chief WWTP Operator position and added an entry- level position. That staffing modification was inadvertently missed when the Staffing Ordinance was approved for 2008. This ordinance corrects that error, adds one position of Water Reclamation Worker I, and abolishes one Chief WWTP Operator position to the Wastewater Department. FINANCIAL IMPACT In 2008 this staffing modification will result in salary savings of approximately $6700.