Loading...
HomeMy WebLinkAbout07664Reception 1801550 04/09/2009 ORDINANCE NO. 7664 AN ORDINANCE APPROVING THE PLAT OF MIDTOWN CIRCLE SUBDIVISION BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. The final plat of Midtown Circle Subdivision, being a subdivision of land legally described as: A parcel of land located in the Northwest Quarter of Section 36, Township 20 South, Range 65 West of the 6th Principal Meridian, City of Pueblo, County of Pueblo, State of Colorado, the bearings contained herein being based upon a line between a CDOT Type II Control Monument, marked on the ground by a 3 1/2" aluminum cap at mile post 54.85, located on the Southerly right -of -way line of State Highway No. 96 (4th Street) at the intersection of Abriendo Ave., and a CDOT Type II Control Monument, marked on the ground by a 3 1/2" aluminum cap at mile post 55.65 located in the center median of State Highway No. 96 (4th Street) at the intersection of Elizabeth St., said line having a bearing of N64 °45'30 "E, a distance of 4270.91 feet being more particularly described as follows: Parcel 1 Beginning at a point on the East line of a property owned by Southern Colorado Power, from where said monument at the intersection of Abriendo Ave. bears S51 0 13'33 "W, 2636.33 feet; thence leaving said East line along the following three (3) courses: 1) N80 °50'13 "E, 156.20 feet, 2) N77 °31'38 "E, 155.79 feet, 3) S70 °52'39 "E, 66.59 feet, to a point on the Northerly Right -of -Way line of Midtown Place; thence along the following five (5) courses: 1) S01 0 21'00 "E, 68.03 feet, 2) S34 °13'08 ", 96.92 feet, 3) S83 °44'45 "W, 119.13 feet, 4) S88 0 39'00 "W, 184.90 feet, 5) 10.03 feet along a curve to the right having a radius of 696.84 feet, a tangent of 5.02 feet, a delta of 0 0 49'29" and a chord of 10.03 feet, bearing S89 °03'44 "W, to a point on said East line; thence along said line, N01 0 21'00 "W, 128.99 feet, to the point of beginning. Parcel 2 1880g 2 1550 OR0 04/09/2009 03:01:32 PM Gifbert0t�m Clerk1ReoordeerO Pueblo l blo Cou Co mill Beginning at the Northwest corner of Lot 1, Block 3, Thatcher & Gasts Subdivision; thence South, 176 feet; thence West, 100 feet; thence North, 176 feet, thence East, 100 feet to the point of beginning. Also, Beginning at the southwest corner of Lot 1, Block 3, Thatcher & Gasts Subdivision; thence South, 56 feet, to the true point of beginning; thence South, 37.49 feet; thence Southwesterly, 105 feet to a point 14.25 feet north of the South line of the North '% of the Northeast %; thence North, 74.75 feet; thence East, 100 feet to the true point of beginning. Property contains 1.778 Acres more or less. is hereby approved, and all dedicated streets, utility and drainage easements, rights -of -way and land set aside for public sites, parks and open spaces shown and dedicated on said plat are hereby accepted for public use. SECTION 2. The acceptance of such dedicated streets, rights -of -way, utility and drainage easements, public sites, parks and open spaces by the City does not obligate the City to maintain or repair same until such streets, rights -of -way, utility and drainage easements, public sites, parks and open spaces have been constructed and installed in compliance and in accordance with the requirements and provisions of Chapter 4, Title XII of the Pueblo Municipal Code, as amended and any agreement entered into pursuant thereto. SECTION 3. Neither the adoption of this ordinance nor the requirements imposed hereby shall create any duty or obligation of any person, firm, corporation or other entity with regard to the enforcement or nonenforcement of this ordinance or the City's Subdivision Ordinances and regulations. No person, firm, corporation or other entity shall have any private right of action, claim or demand against the City or its officers, employees or agents, for any injury, damage or liability arising out of or in any way connected with the adoption, enforcement, or nonenforcement of this ordinance or the Subdivision Ordinance and Regulations of the City, or the engineering, surveying, drainage improvement or other work or improvements required 1801550 ORD 04/09/2009 03:01:32 PM Pa ge: 3 of 3 R 16.00 D 0.00 T 16.00 Gilbert Ortiz Clerk /Reoorder, Pueblo County, Co • 1111 rkFr A410HITW #1MIM6 MIT, A111111111 thereby. Nothing in this ordinance or in the City's subdivision ordinances and regulations shall create or be construed to create any claim, demand or liability against the City or its officers, employees or agents, or to waive any of the immunities, limitations on liability, or other provisions of the Colorado Governmental Immunity Act, Section 24 -10 -101, et seq. Colorado Revised Statutes, or to waive any immunities or limitations on liability otherwise available to the City or its officers, employees or agents. SECTION 4. This ordinance shall be approved upon final passage but shall not become effective until (a) all information, documents, drawings, profiles, and plat required by Chapter 4 of Title XII of the Pueblo Municipal Code meeting and complying with the subdivision requirements of the City with such modifications, if any, approved by City Council, have been filed with and approved by the Director of Public Works, and (b) the final subdivision plat is recorded in the office of the Pueblo County Clerk and Recorder. If any such filings and approvals have been deferred pursuant to Section 12 -4 -5 (B) (2) of the Pueblo Municipal Code, and are not for any reason filed and approved within one (1) year after final passage of this Ordinance, or within any extended period granted by Resolution of the City Council, this ordinance shall automatically be rescinded and repealed thirty (30) days after written notice of such rescission and repeal is given to the Subdivider. No vested rights shall accrue to the subdivision or be acquired until this Ordinance becomes effective. v ., ii 10, INTRODUCED: September 10, 2007 BY Randy Thurston I C NCILPER APPROVED: ��- Ql� PREObENTMF CITY COUNCIL 0 A CITY CLERK PASSED AND APPROVED: September 24, 2007 tea. - , pbl-+ _. Background Paper for Proposed ORDINANCE AGENDA ITEM # 12 DATE: SEPTEMBER 10, 2007 DEPARTMENT: COMMUNITY DEVELOPMENTIJERRY M. PACHECO TITLE AN ORDINANCE APPROVING THE PLAT OF MIDTOWN CIRCLE SUBDIVISION ISSUE Shall City Council approve a request to plat two single lot blocks divided by Midtown Circle, immediately south of 4th Street to facilitate the development of commercial and professional office uses? RECOMMENDATION The Planning and Zoning Commission, at their August 8, 2007 regular meeting, voted 5 -0 to recommend approval. BACKGROUND The proposed Midtown Circle Subdivision consists of a two (2) Lot and two (2) Block land division, immediately south of 4 th Street. The area was originally subdivided as a portion of the Thatcher and Gast Subdivision in 1890. Development of the subdivision never occurred, instead the property was divided into odd shaped parcels and utilized for various industrial uses. The western portion of the property (Lot 1, Block 1) was recently rezoned to B -4 in order to facilitate the development of commercial and professional office uses. FINANCIAL IMPACT None. Reception 1801552 04/09/2009 SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT is made on /A a rA at) , aW 9 between the CITY OF PUEBLO, a Municipal Corporation ( "City "), and Midtown RLLL.P Restrlrtarl Li mited Liability Limited Partnership ( "Subdivider ") RECITALS WHEREAS, Subdivider has subdivided or is about to subdivide a certain tract of land located in the City and legally described in attached Exhibit "A "; and WHEREAS, the Subdivider, as a condition of approval of the final plat of Midtown Subdivision ( "Subdivision "), wishes to enter into this Subdivision Improvements Agreement as authorized by Chapter 4, Title XII of the Pueblo Municipal Code; and WHEREAS, Subdivider is required by Chapter 4, Title XII of the Pueblo Municipal Code to construct and install public improvements described and set forth in Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by City Council ( "Required Public Improvements "); and WHEREAS, the Required Public Improvements are generally described in the attached Exhibit `B" and shown on approved construction plans and documents on file in the office of the City's Director of Public Works ( "Plans and Documents "). WHEREAS, by Chapter 4, Title XII of the Pueblo Municipal Code, Subdivider is obligated to provide security or collateral sufficient in the judgement of the Director of Public Works to make reasonable provisions to construct and complete the Required Public Improvements. NOW, THEREFORE, in consideration of the foregoing and the following mutual covenants and agreements, the City and Subdivider agree as follows: 1. Subdivider agrees within one hundred and eighty (180) days after applying for a building permit to construct any building or structure on any building site within the Subdivision, or upon the issuance of a certificate of occupancy for any such building or structure, whichever occurs first, to construct and install at its sole cost all of the Required Public Improvements. 2. In lieu of installing the Required Public Improvements within the time period prescribed in Paragraph 1, Subdivider or any subsequent owner of the land or any portion thereof shall deposit cash or other collateral with the City Director of Finance, Jl DPW 101 01 /01 /06(Revised 01/11/06) 1801552 SUBD AG 04109/2009 03:01:32 PM Pa e: 2 of 11 R 56.00 D 0.00 T 56.00 Gilbert Ortiz Clerk /Recorder, Pueblo County, Cc r�bri��r� 1111 ri�;���a�rti��,;i�n��R W or with any bank or trust company licensed in the State of Colorado, subject to an escrow agreement approved by the City Attorney. The holder of such cash or collateral shall pay all or any portion thereof to the City upon demand after the time to complete all Required Public Improvements by Subdivider or subsequent owner expires. Such deposit or escrow agreement shall be referred to as the "deposit ". The amount of the deposit shall be computed by the City's Director of Public Works by estimating the total cost of all uncompleted Required Public Improvements within the block at the time application for building permit is made. The amount of the deposit required by this alternative shall not be less than 25% of such estimate plus the cost of extending all required sewer and water lines from nearest existing sewer and water lines to the proposed building site for which a building permit is sought, plus the costs of extending curb, gutter, sidewalk and paving from the edge of the Subdivision or existing improvements of a like nature, whichever is closer to the proposed building site. In any case where the block, as later defined, exceeds one thousand (1000') feet in length between intersecting streets, the estimate of the City Director of Public Works under this paragraph may be reduced to the total costs of all uncompleted Required Public improvements in at least one half (1/2) of such block, and the required deposit shall be based upon such decreased estimate. The Subdivider, however, shall provide a turnaround of at least sixty (60') feet in diameter at the mid -block point and barricade such street so that no through traffic shall be permitted beyond the point to which the estimate of Director of Public Works is based. 4. Within one hundred eighty (180) days after subsequent application for a building permit to construct any building or structure upon any building site within the block, or upon the issuance of a certificate of occupancy for any such building or structure, whichever occurs first, Subdivider shall also deposit an amount not less than the estimate of the Director of Public Works for all Required Public Improvements from existing improvements to the proposed building site, less any previous deposits made under this agreement upon building sites lying between the most recent proposed site and existing improvements. 5. In the event the Subdivider or any subsequent owner of the land fails to complete the Required Public Improvements or to make such deposit within the required time, no additional building permits shall be issued to the Subdivider or the subsequent owner or to any other person to build or construct any building or structure in the Subdivision until such default is remedied. In addition, the City may treat the amount of such deposit as a debt due the City from the Subdivider or subsequent owner, which debt shall be a lien upon all the land in the Subdivision and notice of lien may be filed for record in the office of the County Clerk and Recorder at any time after such default. Action upon such debt may be instituted by the City within six (6) years from the date of filing such lien for record. All remedies provided for in this agreement are cumulative and the use of one shall not prohibit the use of another. DPW 101 01 /01 /06(RevisedOl /11/06) 1801552 SUBD_AG 04/09/2009 03:01:32 PM Page: 3 of 11 R 56.00 D 0.00 1 55.00 Gilbert Ortiz Clerk /Recorder, Pueblo County, Cc 1111 M.11 149104 AWNYWAM'1 ®1111 6. Upon paying such deposit, the City Director of Public Works shall release the - proposed building site from the terms of the Agreement except the terms of Paragraph 7 below. As a condition of approval of this Subdivision, and to meet the requirements of Chapter 4, Title XII of the Pueblo Municipal Code, Subdivider specifically agrees that no certificate of occupancy shall be issued by the Pueblo Regional Building Department until the Required Public Improvements, or those improvements necessary as determined by the City Director of Public Works, to totally serve specific lot(s) or block(s) for which certificates of occupancy are sought, have been properly designed, engineered, constructed and accepted as meeting the specifications and standards of the City. The restrictions on issuing certificates of occupancy contained in this Paragraph 7 and the restriction on the issuance of building permits contained in Paragraph 5 shall run with the land and shall extend to and be binding upon the heirs, legal representatives, successors, and assigns of the Subdivider and may be specifically enforced by the City. 8. Acceptance of this Subdivision by the City does not constitute an acceptance of the roads, parks and other public improvements for maintenance by the City. Until such roads, parks, and other public improvements have been installed and meet the requirements, standards, and specifications of the City, its Subdivision ordinances and any applicable Parks Department specifications, and such are specifically approved and accepted in writing by the City Director of Public Works, and, if appropriate, the City Director of Parks and Recreation, the maintenance, construction, and all other matters pertaining to or affecting said roads, parks and other public improvements and rights -of -way are the sole responsibility of the Subdivider or any subsequent owner(s) of the land within the Subdivision. 9. The required time to complete all Required Public Improvements by Subdivider within such block shall be one (1) year from the date of application for the first building permit issued within such block. Upon completion and written approval and acceptance of the Required Public Improvements within the required time and the payment of all inspection costs by Subdivider, the Director of Public Works shall cause all obligations of the Subdivider relating to the Required Public Improvements within such block to be released. If such Required Public Improvements are not completed within the required time, the City Director of Public Works may cause the proceeds of all deposits or other collateral or monies in escrow to be used to compete the same. If insufficient monies are available at the end of the required time to complete all Required Public Improvements for the entire length of such block, the Director of Public Works shall cause all collateral or monies in escrow to be reduced to cash and shall deposit the same with the Director of Finance. Such cash shall be used to complete that portion of the Required Public Improvements as the Director of Public Works, in the Director's sole discretion, shall determine. Until all the Required Public Improvements are completed and approved by the Director of Public DPW 101 01 /01 /06(Revised0l /11/06) 1801552 SUBD_RG 04/09/2009 03:01:32 PM Page: 4 of 11 R 56.00 D 0.00 T 56.00 Gilbert Ortiz Clerkl Recorder, Pueblo County, Co Works, Subdivider and the subdivided land shall remain liable and responsible for all Required Public Improvements. 10. For purposes of this Agreement, the "block" shall mean both tiers of lots fronting or abutting upon the street which the proposed building or structure shall front, to the rear property line of such lots, or the center line of the alley, if there is an alley, enclosed at either end by a street which intersects both tiers of lots and shall include the full width of all streets upon which such lots abut. 11. If the Required Public Improvements are for a commercial subdivision and include stormwater drainage facilities, stormwater detention facilities, or maintenance and restoration of adjacent drainage channels, and /or associated improvements and revegetation (the "facilities "), located either within or outside of the Subdivision, Subdivider shall install the facilities in accordance with plans and specifications therefore approved by, and on file with the City, and thereafter, the facilities shall be repaired, replaced and maintained in good working order and condition by the owners of the land within the Subdivision. The City is granted the right (but not the obligation) to inspect, control, repair, replace and maintain the facilities and to recover all costs and expenses therefore including an administrative charge of 15% from the owners of the land within the Subdivision. All such City's costs and administrative charges shall become a perpetual lien on all the land within the Subdivision upon recording in the office of the Pueblo County Clerk and Recorder a statement of lien setting forth the City's costs and describing the land signed by the City's Director of Public Works. Failure of the City to inspect, control, repair, maintain, or replace the facilities shall not subject the City to any liability for such failure. 12. Subdivider agrees to provide the City with a current title insurance commitment at the time of final platting evidencing that fee simple title of all lands in the Subdivision is totally vested with the Subdivider free and clear of all liens and encumbrances. If such land is not free and clear, the holder of such indebtedness or encumbrance shall subordinate its interest or encumbrance to this Agreement and all its terms, conditions, and restrictions. 13. The City or the purchaser of any lot(s) within this Subdivision shall have the authority to bring an action in any Court of competent jurisdiction to compel the enforcement of this Agreement or any amendment hereto. Such authority shall include the right to compel rescission of any sale, conveyance, or transfer of any lot(s) or tract(s) contrary to the provisions of the Ordinances of the City or this Agreement. In the event of any litigation arising out of this Agreement, the Court shall award the prevailing party its costs and expenses, including reasonable expert witness and attorney's fees. Venue for any such litigation shall be Pueblo County, Colorado. 14. City and Subdivider have attempted by the attached Exhibit "B" and Plans and Documents to describe all Required Public Improvements to be constructed and DPW 101 01 i01 /06(RevisedO l /I 1/06) 180 SUBD_RG 04/09/2009 03:01:32 P11 Gi8lbertSOrrtizl 11 6.00 County, D r, Pueblo 0 ty 0 , Co ®III 1A1 141"N 1¢1TWON10110 installed by Subdivider with respect to the Subdivision. However, if the attached Exhibit "B" and Plans and Documents fail to describe or to include, for any reason, any Required Public Improvement described and set forth in Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by City Council ("Omitted Public Improvement "), Subdivider shall not be released or discharged from Subdivider's obligation to construct and install the Omitted Public Improvement in the time and manner contained in this Agreement and Chapter 4, Title XII of the Pueblo Municipal Code. In order to determine whether or not there are Omitted Public Improvements, the following shall be applicable: (a) If the Required Public Improvements are constructed and installed within ten (10) years from the date hereof, or within a five year extension if granted in writing by the Director of Public Works, then Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by the City Council and interpreted as of the date hereof shall control, unless adherence to a more recent standard does not require significant engineering modifications or major revisions to the plans and documents. For the purposes of this subsection, a major revision is defined as, but not necessarily limited to the relocation or re- alignment of any curb and gutter, sanitary sewer, storm sewer, manholes or storm inlets, or the change of size or type of sewer mains, inlets, curb and gutter or sidewalk, (b) If the Required Public Improvements are constructed and installed after ten (10) years from the date hereof, or after a five year extension if granted in writing by the Director of Public Works, then Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by the City Coucil and interpreted as of the date the Required Public Improvements are constructed and installed shall control. (c) If Chapter 4 of Title XII and /or the standards and specifications approved by the City Council are modified or amended to conform with the requirements of federal or state law, rules or regulations prior to the construction and installation of the Required Improvements, they shall control as so modified and amended. 15. Except for guarantee and obligation to correct defects required by Section 12-4 - 70)(9) of the Pueblo Municipal Code, nothing in this Agreement shall be construed to extend any obligation of the Subdivider beyond the date of written approval and accepted by the Director of Public Works of the Required Public Improvements described in attached Exhibit "B ", provided, however that the obligation of the Developer to construct or install any Omitted Public Improvements will cease following two (2) years from the date of acceptance of the Required Public Improvements described in the attached Exhibit `B" by the Director of Public Works. DPW 101 5 o 1/0 vo6(RevisedOl /I 1/06) 1801552 B SUBD_RG 04/09/2009 03:01:32 PM Pan rtO It lerk Recorder, Pueblo 6 eblo co^ Cc 1111WirT NUM&L 10MONr,wirAM11 11111 16. All Required Public Improvements shall be constructed and installed in compliance with all applicable standards and specifications approved by City Council. 17. The parties agree this Agreement may be periodically amended by mutual consent provided such amendment is in writing and signed by all parties. 18. This Agreement shall extend to and be binding upon the successors and assigns of the City and upon the heirs, successors, assigns and legal representatives of Subdivider, and shall be recorded in the office of the County Clerk and Recorder of Pueblo County, Colorado, and shall constitute an agreement running with the land until released as described above. The parties have caused this Agreement to be executed and attested by its duly authorized GOHti "'1 and acting officer. 1 ,i r SEtjl)b a a� • � s, � Midtown RLLLP RecrrirraA Limited Liability Limited Subdivider Partnership By: L ui Carleo al Partn dt n, LP By: The foregoing instrument was acknowledged before me on lw . c, . 10 , -2o09 , by Midtown RLLLP (Louie D. Carleo General Partner l Subdivider. My commission expires: 6 -26_o r AT , T: City C rk STATE OF COLORADO ) ss. COUNTY OF PUEBLO ) Notary Public CITY OF PUEBLO, a Municipal Corporation By. ,- 1 / C�, President of City Cou cil The foregoing instrument was acknowledged before me this day of Apr; / 1 by Vc M as President of City Council, and as City Clerk ofthe City of Pueblo, Colorado. DPW 101 01/01/06(RevisedOl /11/06) y 6; `A Eel- " "'. r ya ; G 1?'0, :c EA :- r..`Q.. 0 ., hand and official seal. expires: Y // 7-/ TO FORM: o Notary Public 1801552 SIIBD_RG 04/09/2009 03:01:32 PM Pa 7 of 11 R 56.00 D 0.00 T 56.00 Gilbert Ortiz Cierk /Recorder, Pueblo County, Co ®iii r�+ri��n� "W16 011 AWN A11 11111 DPW 101 01/01 /06(RevisedOl /11 /06) 7 1801552 SUBD_AG 04/09/2009 03:01:32 PM Page: 8 of 11 R 56.00 D 0.00 T 56.00 Gilbert Ortiz Clerk /Recorder, Pueblo Ccunty, Cc °� 1111 EXHIBIT "A" A parcel of land located in the Northwest Quarter of Section 36, Township 20 South, Range 65 West of the 6th Principal Meridian, City of Pueblo, County of Pueblo, State of Colorado, the bearings contained herein being based upon a line between a CDOT Type II Control Monument, marked on the ground by a 3 1/2" aluminum cap at mile post 54.85, located on the Southerly right -of -way line of State Highway No. 96 (4th Street) at the intersection of Abriendo Ave., and a CDOT Type II Control Monument, marked on the ground by a 3 1/2" aluminum cap at mile post 55.65 located in the center median of State Highway No. 96 (4th Street) at the intersection of Elizabeth St., said line having a bearing of N64 °45'30 "E, a distance of 4270.91 feet being more particularly described as follows: Parcel 1 Beginning at a point on the East line of a property owned by Southern Colorado Power, from where said monument at the intersection of Abriendo Ave. bears SS1 °13'33 "W, 2636.33 feet; thence leaving said East line along the following three (3) courses: 1) N80 °50'13 "E, 156.20 feet, 2) N77 °31'38 "E, 155.79 feet, 3) S70 °52'39 "E, 66.59 feet, to a point on the Northerly Right -of -Way line of Midtown Place; thence along the following five (5) courses: 1) S01 0 21'00 "E, 68.03 feet, 2) S34 °13'08 ", 96.92 feet, 3) S83 °44'45 "W, 119.13 feet, 4) S88 °39'00 "W, 184.90 feet, 5) 10.03 feet along a curve to the right having a radius of 696.84 feet, a tangent of 5.02 feet, a delta of 0 1 49'29" and a chord of 10.03 feet, bearing S89 °03'44 "W, to a point on said East line; thence along said line, N01'2 1'00"W, 128.99 feet, to the point of beginning. Parcel 2 Beginning at the Northwest corner of Lot 1, Block 3, Thatcher & Gasts Subdivision; thence South, 176 feet; thence West, 100 feet; thence North, 176 feet, thence East, 100 feet to the point of beginning. Also, Beginning at the southwest corner of Lot 1, Block 3, Thatcher & Gasts Subdivision; thence South, 56 feet, to the true point of beginning; thence South, 37.49 feet; thence Southwesterly, 105 feet to a point 14.25 feet north of the South line of the North '/2 of the Northeast ''/4; thence North, 74.75 feet; thence East, 100 feet to the true point of beginning. Property contains 1.778 Acres more or less. 1801552 SUBD_RG 04/09/2009 03:01:32 PM Galber [ Cl.,k /Reoo der, Pueblo 56 ountt0, CoR 56 00 MaHBIT B DEVELOPMENT: Midtawa Circle Subdivision DEVELOPER: Mldtowe, RLLLP ENGINEER: ABEL CONSULTING SERVICES, INC. IMPROVEMENTS Overlot Grading - 2,626 yd' (a) $2.20 / yd' = $5,777.20 Fine Grading (ponds) 0.37 acre P. $18,165.00 / ACR = $6,72105 Asphalt Patch 890 yd' (d $2.50 / yd' = $2,225.00 Asphalt 3" on 6" (ALLEY) 185 yd' Ca $16.00 / yd = $2,960.00 4" Concrete Sidewalk 2,951 SF (r>, $3.00 / SF = $8,853.00 Concrete Curb & Gutter 664 LF ,y $12.00 I LF = $7,968.00 7" Concrete Drive Cut 870 Sit Cal $5.00 / SF = $4,350.00 Sidewalk Drain 14 LF (aj $30.00 I LF = $420.00 Trench Drain w/ Grate Top 150 LF g $150.00 / LF = $22,500.00 Concrete Drainage Chute 10 LF (1a, 524.00 / LF = $240.00 Seeding of Detention Pond "A" 0.20 AC (a) $13,150.00 / AC = $2,630.00 Pond "A" Outlet Structure I EA a, $3,300.00 / EA = $3,300.00 Gravel for Pond "B" 195 CY n, $26.00 ! CY = $5,070.00 Wall for Pond "B" 235 LF (1a, $75.00 / LF = $17,625.00 Pond "B" Outlet Structure I EA (a, $300.00 / EA = $300.00 Type I B Stnrmsewer Manhole I EA Cal $2,465.00 / EA = S2,465.00 Type "S" Inlet, L=4' 2 EA ,p7, $2,740.00 / EA = $5,480.00 Type M RipRap 142 CY Cad $55.00 / CY = $7,810.00 15" RCP Storm Sewer Pipe 222 LF Oa, $38.00 / LF = $8,436.00 6" Sanitary Sewer Service line 164 LF (a) $30.00 / LF = $4,920.00 Sanitary Sewer Cleanout 2 EA (d, $300.00 / EA = $600.00 Sanitary Sewer Service (at Alley) 2 EA Ca $1,200.00 / EA = $2,400.00 8" Water Main 300 LF CM $47.50 / LF = $14,250.00 Water Service & Meter 1 EA $600.00 I EA = S600.00 Fire Hydrant Assembly I EA C $3,250,00 / EA = $3,250.00 IMPROVEMENTS $141,150.25 1801552 SUED AG 04/09/2009 03:01:32 PM Pagge: 10 of Si R 56.00 D 0.00 T 56.00 Gilbert Ortiz Clerk /Recorder, Pueblo County, Cc mill V16 �i�i "WIT AI,WINJOKMMEh®1111 Page 1 DEVELOPMENT: DEVELOPER: ENGINEER; DEMOLITION FxffIBTT Midterm Circle Subdlvlrioo Midtown, RLLLP 1801552 SUBD AG 04/09/2009 03:01:32 PPI Pa 11 of IT R 56.00 0 0.00 T 56.00 Gilbert Ortiz ClerklRecorder, Pueblo County, Co ABEL CONSULTING SERVICES, INC. Remove Chainlink Fence 500 LF O $3.00 / LF = $1,500.00 Remove Concrete Curb & Gutter 281 LF (ail, $5.00 / LF = $1,405.00 Sawcut Existing Asphalt 1,500 LF (a1 $1.50 / LF = $2,250.00 Remove Existing Asphalt 8,000 SF (aj $3.60 / SF = $28,800.00 Remove Tree Stumps 3 EA (1u, $100.00 / EA = $300.00 Remove Water Service Line 123 LF @ $3.00 / LF = $369.00 Remove Power Poles and Burry Power line 1 EA @ $2,500.00 / EA = $2,500.00 EROSION CONTROL Silt Fence 900 LF (o), $3.00 / LF = $2,700.00 Inlet Protection I EA (a) $200.00 / EA = $200.00 Vehicle Tracking Control 2 EA @ $750.00 / EA = $1,500.00 EROSIONCONTROL $4,400.00 PREPARED BY OF FIRM: Abel Consulting Services, Inc. The undersigned hereby certifies that (i) the REQUIRED Public Improvements shown hereon and on the Plans and Specifications meet the requirements ofand have been designed in accordance with Chapter 4, Title XII ofthe Pueblo Municipal Code as amended and the currents standards and specifications as approved by City Council, (ii) the quantities of construction elements shown hereon accurately depicts the quantities necessary to construct the Required Public Improvements and (iii) the unit prices shown hereon are rf most current unit prices provided by the City of Pueblo. a`I � - Pro ess,onal Engineer Dflle REVIEWED BY: gin ' gDiv. W'asle ater De I. 4 T.Mp.�.r on Di Board of Water Works APPROVED BY: Direct of Public Uror p Date 7 Pape 2