HomeMy WebLinkAbout07458Reception 1676826
05/23/2006
ORDINANCE NO. 7458
AN ORDINANCE APPROVING THE PLAT
OF CRESTVIEW HILLS SUBDIVISION, FILING NO. 2,
1 sT AMENDMENT
BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
The final plat of Crestview Hills Subdivision, Filing No. 2, 1 st Amendment being a
subdivision of land legally described as:
A parcel of land located in a portion of Block 3 in Crest4w Hills, Filing
No. 2 according to the recorded plat thereof as filed for record at
Reception No. 1473070 in the County of Pueblo and State of Colorado
and being more particularly described as follows:
All of Lots 2 through 23 both inclusive in Block 3 of Crestview Hills, Filing
No. 2, Containing 3.333 acres more or less,
is hereby approved, and all dedicated streets, utility and drainage easements, rights -of-
way and land set aside for public sites, parks and open spaces shown and dedicated on
said plat are hereby accepted for public use.
SECTION 2.
The acceptance of such dedicated streets, rights -of -way, utility and drainage
easements, public sites, parks and open spaces by the City does not obligate the City to
maintain or repair same until such streets, rights -of -way, utility and drainage easements,
public sites, parks and open spaces have been constructed and installed in compliance
and in accordance with the requirements and provisions of Chapter 4, Title XII of the
Pueblo Municipal Code, as amended and any agreement entered into pursuant thereto.
SECTION 3. II II II I I III I II II I IIII I II I II II
Page: 67682639P
Chris C. Munoz PuebloCtyClk &Reo ORD R 16.00 D 0.00
Neither the adoption of this ordinance nor the requirements imposed hereby shall
create any duty or obligation of any person, firm, corporation or other entity with regard
to the enforcement or nonenforcement of this ordinance or the City's Subdivision
Ordinances and regulations. No person, firm, corporation or other entity shall have any
private right of action, claim or demand against the City or its officers, employees or
agents, for any injury, damage or liability arising out of or in any way connected with the
adoption, enforcement, or nonenforcement of this ordinance or the Subdivision
Ordinance and Regulations of the City, or the engineering, surveying, drainage
improvement or other work or improvements required thereby. Nothing in this
ordinance or in the City's subdivision ordinances and regulations shall create or be
construed to create any claim, demand or liability against the City or its officers,
employees or agents, or to waive any of the immunities, limitations on liability, or other
provisions of the Colorado Governmental Immunity Act, Section 24 -10 -101, et seq.
Colorado Revised Statutes, or to waive any immunities or limitations on liability
otherwise available to the City or its officers, employees or agents.
SECTION 4.
This ordinance shall be approved upon final passage but shall not become
effective until (a) all information, documents, drawings, profiles, and plat required by
Chapter 4 of Title XII of the Pueblo Municipal Code meeting and complying with the
subdivision requirements of the City with such modifications, if any, approved by City
Council, have been filed with and approved by the Director of Public Works, and (b) the
final subdivision plat is recorded in the office of the Pueblo County Clerk and Recorder.
II IIII I III I II II IIII III II II II 1676
3 of 3 P
Chris C. Munoz Pueb1oCtyC1k &Rec ORD R 16.00 D 0.00
If any such filings and approvals have been deferred pursuant to Section 12 -4 -5 (B) (2)
of the Pueblo Municipal Code, and are not for any reason filed and approved within one
(1) year after final passage of this Ordinance, or within any extended period granted by
Resolution of the City Council, this ordinance shall automatically be rescinded and
repealed thirty (30) days after written notice of such rescission and repeal is given to the
Subdivider. No vested rights shall accrue to the subdivision or be acquired until this
Ordinance becomes effective.
1 41
r Y
� � 1� 4 \ � 1 `�1
INTRODUCED: March 27, 2006
BY: Randy Thurston
C CILPERSON
APPROVED: " 0
PR SIDENT OF CITY COUNCIL
- 0-- , E on' -ti" CITY CLERK
PASSED AND APPROVED: April 10. 2006
Background Paper for Proposed
ORDINANCE
AGENDA ITEM # K 24
DATE: MARCH 27, 2006
DEPARTMENT: COMMUNITY DEVELOPMENT /JIM MUNCH
LAND USE ADMINISTRATORMERRY M. PACHECO
TITLE
AN ORDINANCE APPROVING THE PLAT OF CRESTVIEW HILLS
SUBDIVISION, FILING NO. 2, 1 sT AMENDMENT
ISSUE
Shall City Council approve a request to replat 22 lots into 20 lots for the purpose
of residential development?
RECOMMENDATION
The Planning and Zoning Commission, at their February 8, 2006 regular
meeting, voted 6 -0 to recommend approval.
BACKGROUND
Crestview Hills Subdivision, Filing No. 2, 1 st Amendment, is generally located
northeast of the intersection of Wills Boulevard and Meadowlark Lane, south of
Inspiration Lane.
On March 25, 2002, City Council approved the Crestview Hills Subdivision, 2nd
Filing. This application proposes to replat 22 single - family residential lots located
within Block 3, Crestview Hills Subdivision, 2 "d Filing, into 20 lots.
Public Works staff confirmed that the applicant has complied with all items listed
in the Subdivision Review Committee memo dated January 18, 2006.
FINANCIAL IMPACT
None.
Reception 1676828
05/23/2006
SUBDIVISION IMPROVEMENTS AGREEMENT
THIS AGREEMENT is made on -An l & oo(v between the
CITY OF PUEBLO, a Municipal Corporation ( "City "), and T -E -H Development, Inc.,
a Colorado Corporation as Manager for Crestwood Management, LLC, a Colorado
Limited Liability Company
( "Subdivider ").
RECITALS
WHEREAS, Subdivider has subdivided or is about to subdivide a certain tract of land
located in the City and legally described in attached Exhibit "A"; and
WHEREAS, the Subdivider, as a condition of approval of the final plat of
Crestview Hills, 2nd Filing, 1st Amendment
( "Subdivision "), wishes to enter into this Subdivision Improvements Agreement as authorized by
Chapter 4, Title XII of the Pueblo Municipal Code; and
WHEREAS, Subdivider is required by Chapter 4, Title XII of the Pueblo Municipal Code
to construct and install public improvements described and set forth in Chapter 4, Title XII of the
Pueblo Municipal Code and the standards and specifications approved by City Council
( "Required Public Improvements "); and
WHEREAS, the Required Public Improvements are generally described in the attached
Exhibit `B" and shown on approved construction plans and documents on file in the office of the
City's Director of Public Works ( "Plans and Documents ").
WHEREAS, by Chapter 4, Title XII of the Pueblo Municipal Code, Subdivider is
obligated to provide security or collateral sufficient in the judgement of the Director of Public
Works to make reasonable provisions to construct and complete the Required Public
Improvements.
NOW, THEREFORE, in consideration of the foregoing and the following mutual
covenants and agreements, the City and Subdivider agree as follows:
Subdivider agrees within one hundred and eighty (180) days after applying for a
building permit to construct any building or structure on any building site within the
Subdivision, or upon the issuance of a certificate of occupancy for any such building
or structure, whichever occurs first, to construct and install at its sole cost all of the
Required Public Improvements.
2. In lieu of installing the Required Public Improvements within the time period
prescribed in Paragraph 1, Subdivider or any subsequent owner of the land or any
portion thereof shall deposit cash or other collateral with the City Director of Finance,
DPW 101
01 /01 /06(Revised 01/11/06)
II II II I IIII
1111 IIII 11 � 11 1 II II
Page: 2 of It P
Chris C. Munoz Pueb1oCtyC1k$Reo SUED PGR 56.00 D 0.00
or with any bank or trust company licensed in the State of Colorado, subject to an
escrow agreement approved by the City Attorney. The holder of such cash or
collateral shall pay all or any portion thereof to the City upon demand after the time to
complete all Required Public Improvements by Subdivider or subsequent owner
expires. Such deposit or escrow agreement shall be referred to as the "deposit ".
3. The amount of the deposit shall be computed by the City's Director of Public Works
by estimating the total cost of all uncompleted Required Public Improvements within
the block at the time application for building permit is made. The amount of the
deposit required by this alternative shall not be less than 25% of such estimate plus
the cost of extending all required sewer and water lines from nearest existing sewer
and water lines to the proposed building site for which a building permit is sought,
plus the costs of extending curb, gutter, sidewalk and paving from the edge of the
Subdivision or existing improvements of a like nature, whichever is closer to the
proposed building site. In any case where the block, as later defined, exceeds one
thousand (1000') feet in length between intersecting streets, the estimate of the City
Director of Public Works under this paragraph may be reduced to the total costs of all
uncompleted Required Public Improvements in at least one half (1/2) of such block,
and the required deposit shall be based upon such decreased estimate. The
Subdivider, however, shall provide a turnaround of at least sixty (60') feet in diameter
at the mid -block point and barricade such street so that no through traffic shall be
permitted beyond the point to which the estimate of Director of Public Works is
based.
4. Within one hundred eighty (180) days after subsequent application for a building
permit to construct any building or structure upon any building site within the block,
or upon the issuance of a certificate of occupancy for any such building or structure,
whichever occurs first, Subdivider shall also deposit an amount not less than the
estimate of the Director of Public Works for all Required Public Improvements from
existing improvements to the proposed building site, less any previous deposits made
under this agreement upon building sites lying between the most recent proposed site
and existing improvements.
In the event the Subdivider or any subsequent owner of the land fails to complete the
Required Public Improvements or to make such deposit within the required time, no
additional building permits shall be issued to the Subdivider or the subsequent owner
or to any other person to build or construct any building or structure in the
Subdivision until such default is remedied. In addition, the City may treat the amount
of such deposit as a debt due the City from the Subdivider or subsequent owner,
which debt shall be a lien upon all the land in the Subdivision and notice of lien may
be filed for record in the office of the County Clerk and Recorder at any time after
such default. Action upon such debt may be instituted by the City within six (6) years
from the date of filing such lien for record. All remedies provided for in this
agreement are cumulative and the use of one shall not prohibit the use of another.
DPW 101
01 /01 /06(Revi sed01 / 11 /06)
IIIIII IIII IIIIII I II IIII IIIIII IIII III VIII I VIII
05/23/2006 11 9P
Chris C. Munoz Pueb1oCtyC1k &Rec BUBD RGR 56.00 D 0.00
6. Upon paying such deposit, the City Director of Public Works shall release the
proposed building site from the terms of the Agreement except the terms of Paragraph
7 below.
As a condition of approval of this Subdivision, and to meet the requirements of
Chapter 4, Title XII of the Pueblo Municipal Code, Subdivider specifically agrees that
no certificate of occupancy shall be issued by the Pueblo Regional Building
Department until the Required Public Improvements, or those improvements
necessary as determined by the City Director of Public Works, to totally serve specific
lot(s) or block(s) for which certificates of occupancy are sought, have been properly
designed, engineered, constructed and accepted as meeting the specifications and
standards of the City.
The restrictions on issuing certificates of occupancy contained in this Paragraph 7 and
the restriction on the issuance of building permits contained in Paragraph 5 shall run
with the land and shall extend to and be binding upon the heirs, legal representatives,
successors, and assigns of the Subdivider and may be specifically enforced by the
City.
Acceptance of this Subdivision by the City does not constitute an acceptance of the
roads, parks and other public improvements for maintenance by the City. Until such
roads, parks, and other public improvements have been installed and meet the
requirements, standards, and specifications of the City, its Subdivision ordinances and
any applicable Parks Department specifications, and such are specifically approved
and accepted in writing by the City Director of Public Works, and, if appropriate, the
City Director of Parks and Recreation, the maintenance, construction, and all other
matters pertaining to or affecting said roads, parks and other public improvements and
rights -of -way are the sole responsibility of the Subdivider or any subsequent owner(s)
of the land within the Subdivision.
9. The required time to complete all Required Public Improvements by Subdivider
within such block shall be one (1) year from the date of application for the first
building permit issued within such block. Upon completion and written approval and
acceptance of the Required Public Improvements within the required time and the
payment of all inspection costs by Subdivider, the Director of Public Works shall
cause all obligations of the Subdivider relating to the Required Public Improvements
within such block to be released. If such Required Public Improvements are not
completed within the required time, the City Director of Public Works may cause the
proceeds of all deposits or other collateral or monies in escrow to be used to compete
the same. If insufficient monies are available at the end of the required time to
complete all Required Public Improvements for the entire length of such block, the
Director of Public Works shall cause all collateral or monies in escrow to be reduced
to cash and shall deposit the same with the Director of Finance. Such cash shall be
used to complete that portion of the Required Public Improvements as the Director of
Public Works, in the Director's sole discretion, shall determine. Until all the
DPW 101
01/0 1 /06(Revised01 / 11/06)
VIII VIII IIII I IIII VIII IIIIII IIII III VIII IIII III
05/23/2006 02?39P
Chris C. Munoz Pueb10CtyC1k &Rec SUED PGR 56.00 D 0.00
Required Public Improvements are completed and approved by the Director of Public
Works, Subdivider and the subdivided land shall remain liable and responsible for all
Required Public Improvements.
10. For purposes of this Agreement, the "block" shall mean both tiers of lots fronting or
abutting upon the street which the proposed building or structure shall front, to the
rear property line of such lots, or the center line of the alley, if there is an alley,
enclosed at either end by a street which intersects both tiers of lots and shall include
the full width of all streets upon which such lots abut.
11. If the Required Public Improvements are for a commercial subdivision and include
stormwater drainage facilities, stormwater detention facilities, or maintenance and
restoration of adjacent drainage channels, and/or associated improvements and
revegetation (the "facilities "), located either within or outside of the Subdivision,
Subdivider shall install the facilities in accordance with plans and specifications
therefore approved by, and on file with the City, and thereafter, the facilities shall be
repaired, replaced and maintained in good working order and condition by the owners
of the land within the Subdivision. The City is granted the right (but not the
obligation) to inspect, control, repair, replace and maintain the facilities and to
recover all costs and expenses therefore including an administrative charge of 15%
from the owners of the land within the Subdivision. All such City's costs and
administrative charges shall become a perpetual lien on all the land within the
Subdivision upon recording in the office of the Pueblo County Clerk and Recorder a
statement of lien setting forth the City's costs and describing the land signed by the
City's Director of Public Works. Failure of the City to inspect, control, repair,
maintain, or replace the facilities shall not subject the City to any liability for such
failure.
12. Subdivider agrees to provide the City with a current title insurance commitment at the
time of final platting evidencing that fee simple title of all lands in the Subdivision is
totally vested with the Subdivider free and clear of all liens and encumbrances. If
such land is not free and clear, the holder of such indebtedness or encumbrance shall
subordinate its interest or encumbrance to this Agreement and all its terms,
conditions, and restrictions.
13. The City or the purchaser of any lot(s) within this Subdivision shall have the authority
to bring an action in any Court of competent jurisdiction to compel the enforcement
of this Agreement or any amendment hereto. Such authority shall include the right to
compel rescission of any sale, conveyance, or transfer of any lot(s) or tract(s) contrary
to the provisions of the Ordinances of the City or this Agreement. In the event of any
litigation arising out of this Agreement, the Court shall award the prevailing party its
costs and expenses, including reasonable expert witness and attorney's fees. Venue
for any such litigation shall be Pueblo County, Colorado.
DPW 101
01 /01/06(Revised0l / 11/06)
VIIIII I III I VIII III I III IIII I III 167 of 11 P
Chris C. Munoz Pueh1oCtyC1k &Reo SUBD RGR 56.00 D 0.00
14. City and Subdivider have attempted by the attached Exhibit `B" and Plans and
Documents to describe all Required Public Improvements to be constructed and
installed by Subdivider with respect to the Subdivision. However, if the attached
Exhibit `B" and Plans and Documents fail to describe or to include, for any reason,
any Required Public Improvement described and set forth in Chapter 4, Title XII of
the Pueblo Municipal Code and the standards and specifications approved by City
Council ( "Omitted Public Improvement "), Subdivider shall not be released or
discharged from Subdivider's obligation to construct and install the Omitted Public
Improvement in the time and manner contained in this Agreement and Chapter 4,
Title XII of the Pueblo Municipal Code.
In order to determine whether or not there are Omitted Public Improvements, the
following shall be applicable:
(a) If the Required Public Improvements are constructed and installed within ten
(10) years from the date hereof, or within a five year extension if granted in
writing by the Director of Public Works, then Chapter 4, Title XII of the
Pueblo Municipal Code and the standards and specifications approved by the
City Council and interpreted as of the date hereof shall control, unless
adherence to a more recent standard does not require significant engineering
modifications or major revisions to the plans and documents.
For the purposes of this subsection, a major revision is defined as, but not
necessarily limited to the relocation or re- alignment of any curb and gutter,
sanitary sewer, storm sewer, manholes or storm inlets, or the change of size or
type of sewer mains, inlets, curb and gutter or sidewalk.
(b) If the Required Public Improvements are constructed and installed after ten
(10) years from the date hereof, or after a five year extension if granted in
writing by the Director of Public Works, then Chapter 4, Title XII of the
Pueblo Municipal Code and the standards and specifications approved by the
City Coucil and interpreted as of the date the Required Public Improvements
are constructed and installed shall control.
(c) If Chapter 4 of Title XII and /or the standards and specifications approved by
the City Council are modified or amended to conform with the requirements
of federal or state law, rules or regulations prior to the construction and
installation of the Required Improvements, they shall control as so modified
and amended.
15. Except for guarantee and obligation to correct defects required by Section 12-4 -
70)(9) of the Pueblo Municipal Code, nothing in this Agreement shall be construed to
extend any obligation of the Subdivider beyond the date of written approval and
accepted by the Director of Public Works of the Required Public Improvements
described in attached Exhibit `B ", provided, however that the obligation of the
DPW 101
01/0 1 /06(RevisedO l /11 /06)
IIIIII VIII IIIIII IIII IIIIII IIIIII VIII III VIII IIII IIII 1676 of 11
Page; 6 Chris C, Munoz PuebloCtyClk &Rec SUED PGR 56.00 D 0.00
(SEAL)
Developer to construct or install any Omitted Public Improvements will cease
following two (2) years from the date of acceptance of the Required Public
Improvements described in the attached Exhibit `B" by the Director of Public Works.
16. All Required Public Improvements shall be constructed and installed in compliance
with all applicable standards and specifications approved by City Council.
17. The parties agree this Agreement may be periodically amended by mutual consent
provided such amendment is in writing and signed by all parties.
18. This Agreement shall extend to and be binding upon the successors and assigns of the
City and upon the heirs, successors, assigns and legal representatives of Subdivider,
and shall be recorded in the office of the County Clerk and Recorder of Pueblo
County, Colorado, and shall constitute an agreement running with the land until
released as described above.
The parties have caused this Agreement to be executed and attested by its duly authorized
and acting officer. T -E -H Development, Inc., a Colorado Corporation
as Manager for Crestwood Management, LLC, a
Colorado Limited Liability Company
Sub ' i r
Thomas E. Hausman, President
By:
The foregoing instrument was acknowledged before me on _
,,7 00& by Thomas E. Hausman, President of T -E -H
oloraao corporation as Ma
B0 orado Limited Liability
MY
NOTARY
uj PUBLIC o
P�
9� OF GoL�
F,,g3LQ A
My commission expires l0 28 -2009 A
STATE OF COLORADO )
ss.
COUNTY OF PUEBLO )
, Inc., Subdivider.
anagement, LLC,
Notary Public
CITY OF P BLO, a Municipal Corporation
President of City Council
DPW 101
01 /01 /06(RevisedOl /I 1/06)
The foregoing instrument was acknowledged before me this q ° day of
2006 by Michael A. Occhiato ,as
President of C ty Council, and Gina Dutrhar as City Clerk of the City of
Pueblo, Colorado.
hand and official seal.
,- My bFritM ion expires: A -21 -2007
:- as ,iG,_oo Notary Public
• •.1I
City
IIIIII VIII IIIIII IIII IIIIII IIIIII VIII III VIII IIII IIII 1676828 /Z / 6
05 02:39P
0
DPW 101
01 /01 /06(RevisedOl /11/06)
IIIIII VIII IIIIII IIII IIIIII IIIIII VIII III VIII IIII IIII O Page: 6828
05 39P
EXHIBIT "A"
LAND DESCRIPTION
A parcel of land located in a portion of Block 3 in Crestview Hills, 2 Filing according to
the recorded plat thereof as filed for record at Reception No. 1473070 in the County of
Pueblo and State of Colorado and being more particularly described as follows:
All of Lots 2 through 23 both inclusive in Block 3 of Crestview Hills, 2nd Filing
Containing 3.333 acres more or less.
Prepared by: NORTHSTAR ENGINEERING AND SURVEYING, INC.
111 E. 51h Street
Pueblo, Colorado 81003
November 8, 2005
IN 01 038 03
R1
IIIIII VIII IIIIII IIII IIIIII IIIIII VIII III VIII IIII IIII
05/ : 9 1 1
Chris C. Munoz PUeb1oCtyC1k &Reo SUED RGR 56.00 D 0.00
SUBDIVISION IMPROVEMENTS AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME:
DEVELOPER:
ENGINEER:
Streets (MEADOWLARK LN.)
Asphalt (3" Asphalt on 18" Base)
Modified Ramp Curb and Gutter
Water
8" PVC Water Main
Fire Hydrant Ass'y.
Services (60' ROW)
Sanitary Sewer
8" PVC Sewer Main
48" Manholes
Services (60' ROW)
Street Lights
CRESTVIEW HILLS, 2ND FILING, 1ST AMENDMENT
PHASE 1
CRESTVIEW MANAGEMENT, LLC
NORTHSTAR ENGINEERING AND SURVEYING, INC.
2640
SY
@
$24.50
/SY =
$64,680
1320
LF
@
$10.50
/LF =
$13,860
660
LF
@
$45.00
/LF =
$29,700
1
EA
@
$3,000.00
/EA =
$3,000
10
EA
@
$500.00
/EA =
$5,000
604
LF
@
$31.00
/LF =
$18,724
2
EA
@
$2,273.00
/EA =
$4,546
10
EA
@
$1,033.00
/EA =
$10,330
3
EA
@
$1,343.00
/EA =
$4,029
TOTAL - PHASE
1
$153,869
V ol
IIIIII VIII III II IIII IIIIII IIIIII VIII III IIIIII III IIII Page: 10
00o of 1 1
Chris C. Munoz Pueb1oCtyC1k4Reo SUBD PGR 56.00 D 0.00
SUBDIVISION IMPROVEMENTSAGREEMENT
EXHIBIT "B"
SUBDIVISION NAME:
DEVELOPER:
ENGINEER:
Streets (INSPIRATION LN.)
Asphalt (3" Asphalt on 15" Base)
Modified Ramp Curb and Gutter
Handicap Ramps
Water
8" PVC Water Main
Fire Hydrant Ass'y.
Services (60' ROW)
Sanitary Sewer
8" PVC Sewer Main
48" Manholes
Services (60' ROW)
Storm Sewer
18" RCP Pipe
Type "S" Inlet L =4'
Type "S" Inlet L =7'
Type "S" Inlet L =11'
Type I -B Manhole
Monuments
Street Lights
Baracade, L =16'
CRESTVIEW HILLS, 2ND FILING, 1ST AMENDMENT
PHASE 2
CRESTVIEW MANAGEMENT, LLC
NORTHSTAR ENGINEERING AND SURVEYING, INC.
2790
SY
@
$21.50 /SY =
$59,985
1325
LF
@
$10.50 /LF =
$13,913
531
SF
@
$3.00 /SF =
$1,593
740
LF
@
$45.00 /LF =
$33,300
1
EA
@
$3,000.00 /EA =
$3,000
10
EA
@
$500.00 /EA =
$5,000
660
LF
@
$31.00 /LF =
$20,460
3
EA
@
$2,273.00 /EA =
$6,819
10
EA
@
$1,033.00 /EA =
$10,330
332
LF
@
$39.00 /LF =
$12,948
1
EA
@
$2,583.00 /LF =
$2,583
1
EA
@
$3,204.00 /LF =
$3,204
1
EA
@
$4,032.00 /LF =
$4,032
1
EA
@
$2,324.00 /EA =
$2,324
1
EA
@
$594.00 /EA =
$594
1
EA
@
$1,343.00 /EA =
$1,343
1
EA
@
$852.00 /EA =
$852
TOTAL - PHASE 1
TOTAL - PHASES 1 & 2
This is an estimate only. Actual construction costs may vary.
$182,280
10
III I II I VIII I II III IIIIII III II IIIIII I II 1678268
11 of 11 P
Chris C. Munoz Pueb1cCtyC1k &Rec SUBD RGR 55.00 D 0.00
SUBDIVISION IHPROVEAfENTSAGREEHENT
EXHIBIT 'B"
PREPARED BY: MSW
FIRM:
NORTHSTAR ENGINEERING AND SURVEYING, INC.
The undersigned hereby certifies that (i) the Required Public Improvements shown hereon and the
Plans and Specifications therefore constitute all of the public improvements required to be installed
and constructed for the Subdivision by Chapter 4, Title XII of the Pueblo Municipal Code and the
standards and specifications approved by City Council, (ii) the quantities of construction elements
shown hereon accurately depicts the quantities necessary to construct the Required Public
Improvements and (iii) the unit prices shown hereon are the most current unit prices provided by
REVIEWED BY:
Professional
of
11
Reception 1676829
05/23/2006
ADDENDUM TO SUBDIVISION IMPROVEMENTS AGREEMENT
(PHASED CONSTRUCTION)
This Addendum shall be incorporated in and become a part of the ?`�' ( o Zoo ,
Subdivision Im rovements A eement for Crestview Hills, 2nd F
h gr Est Amendment (herein
the "Subdivision ") and enforceable as provided in said Subdivision Improvements Agreement.
1. The Subdivider will develop the Subdivision in separate phases in the sequence
described in the attached Exhibit "A ".
2. The Subdivider shall construct and install all Required Public Improvements in
the manner and as described in the Subdivision Improvements Agreement needed and required to
serve all lots within each Phase and in the sequence set forth in the attached Exhibit "A ".
3. For purposes of determining the extent and - timing of the Required Public
Improvements, each Phase shall be considered as a separate subdivision.
4. After completion of all Required Public Improvements for any Phase and
approval thereof by the Director of Public Works, the City will release the lots in that Phase from
the Subdivision Improvements Agreement and this Addendum.
5. Any development of the Subdivision contrary to the phasing sequence set forth in
paragraph 1 above without the prior written approval of the Director of Public Works
( "Director ") shall constitute a breach of the Subdivision Improvements Agreement and this
Addendum and City may thereafter refuse to approve the issuance of building permits for
construction within the Subdivision.
6. No modifications to the phasing sequence set forth in the attached Exhibit "A"
shall be approved by the Director until (a) Subdivider's engineer certifies in writing that the
requested modifications will not result in any lot in the Subdivision being inadequately served by
required public improvements, (b) Subdivider furnishes title information satisfactory to the City
showing all persons and entities having a recorded interest in all lots within the Subdivision
( "Interested Parties "), and (c) all Interested Parties execute and acknowledge their consent to and
approval of the modification to the phasing sequence in form and content approved by the City
Attorney.
7. The Subdivision Improvements Agreement as amended by this Addendum shall
remain in full force and effect and the covenants of this Addendum shall run with the land within
the Subdivision and shall extend to, be binding upon, and inure to the benefit of the City and
Subdivider and their respective heirs, personal representatives, successors, and assigns.
Executed at Pueblo, Colorado, as of
T -E -H Development, Colorado
Corporation as Manager Inc., for
Crestwood Mana¢ement LLC a Col orado
Subdivider Limited Liability Company
DPW 103
1/6/04
STATE OF COLORADO )
ss.
COUNTY OF PUEBLO )
B y
Thomas E. Hausman, President of
B T -E -H Development, Inc., a Colorado Corporati
as Manager for Crestwood Management, LLC
a Colorado Limited Liability Company
n The foregoing instrument was acknowledged before me this & — day of
,&J�, by Thomas E. Hausman, President of , Subdivider.
T -E-H
zrclaf Dev c1 elpoment, Inc., a Colorado Corporation as Manager for
Witness my hand 3L1C1201ttlSCalanagement, LLC a Colorado Limited Liability Company
My co ssion expires: 10 -,� 8- A,00 g
P(L B0 Gy
NOTARY
S I * * * Notary P
uj PUBLIC
5r P CB
op C OL� 44y �.a, cp
My commission expires 10-28 -2009 TY OF PUEBLO,
� � � � hf unjsjpal Corporation
of the Council
III IIII I IIII I iIII II II IIII I III II 5 67 2 of 3 P
Chris C. Munoz Pueb1OCtyC1kSRec ADD AGAR 16.00 D 0.00
DPW 103
1/6/04
IIIIII VIII IIIIII IIII IIIIII IIIIII VIII III VIII IIII IIII 60 6 D682939P 0 0.00
Chris C. Munoz PuebloCtyCik&Rec ADD AGAR 16.0
ADDENDUM TO SUBDIVISION IMPROVEMENTS AGREEMENT
EXHIBIT "A"
The Subdivider will develop the Subdivision in separate phases in the following sequence:
(a) Phase I shall consist of the following lots within the Subdivision:
Lots 1 through 10, Block 1
(b) Phase lI shall consist of the following lots within the Subdivision:
Lots 11 through 20, Block 1
DPW 103
1/6/04