Loading...
HomeMy WebLinkAbout07458Reception 1676826 05/23/2006 ORDINANCE NO. 7458 AN ORDINANCE APPROVING THE PLAT OF CRESTVIEW HILLS SUBDIVISION, FILING NO. 2, 1 sT AMENDMENT BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. The final plat of Crestview Hills Subdivision, Filing No. 2, 1 st Amendment being a subdivision of land legally described as: A parcel of land located in a portion of Block 3 in Crest4w Hills, Filing No. 2 according to the recorded plat thereof as filed for record at Reception No. 1473070 in the County of Pueblo and State of Colorado and being more particularly described as follows: All of Lots 2 through 23 both inclusive in Block 3 of Crestview Hills, Filing No. 2, Containing 3.333 acres more or less, is hereby approved, and all dedicated streets, utility and drainage easements, rights -of- way and land set aside for public sites, parks and open spaces shown and dedicated on said plat are hereby accepted for public use. SECTION 2. The acceptance of such dedicated streets, rights -of -way, utility and drainage easements, public sites, parks and open spaces by the City does not obligate the City to maintain or repair same until such streets, rights -of -way, utility and drainage easements, public sites, parks and open spaces have been constructed and installed in compliance and in accordance with the requirements and provisions of Chapter 4, Title XII of the Pueblo Municipal Code, as amended and any agreement entered into pursuant thereto. SECTION 3. II II II I I III I II II I IIII I II I II II Page: 67682639P Chris C. Munoz PuebloCtyClk &Reo ORD R 16.00 D 0.00 Neither the adoption of this ordinance nor the requirements imposed hereby shall create any duty or obligation of any person, firm, corporation or other entity with regard to the enforcement or nonenforcement of this ordinance or the City's Subdivision Ordinances and regulations. No person, firm, corporation or other entity shall have any private right of action, claim or demand against the City or its officers, employees or agents, for any injury, damage or liability arising out of or in any way connected with the adoption, enforcement, or nonenforcement of this ordinance or the Subdivision Ordinance and Regulations of the City, or the engineering, surveying, drainage improvement or other work or improvements required thereby. Nothing in this ordinance or in the City's subdivision ordinances and regulations shall create or be construed to create any claim, demand or liability against the City or its officers, employees or agents, or to waive any of the immunities, limitations on liability, or other provisions of the Colorado Governmental Immunity Act, Section 24 -10 -101, et seq. Colorado Revised Statutes, or to waive any immunities or limitations on liability otherwise available to the City or its officers, employees or agents. SECTION 4. This ordinance shall be approved upon final passage but shall not become effective until (a) all information, documents, drawings, profiles, and plat required by Chapter 4 of Title XII of the Pueblo Municipal Code meeting and complying with the subdivision requirements of the City with such modifications, if any, approved by City Council, have been filed with and approved by the Director of Public Works, and (b) the final subdivision plat is recorded in the office of the Pueblo County Clerk and Recorder. II IIII I III I II II IIII III II II II 1676 3 of 3 P Chris C. Munoz Pueb1oCtyC1k &Rec ORD R 16.00 D 0.00 If any such filings and approvals have been deferred pursuant to Section 12 -4 -5 (B) (2) of the Pueblo Municipal Code, and are not for any reason filed and approved within one (1) year after final passage of this Ordinance, or within any extended period granted by Resolution of the City Council, this ordinance shall automatically be rescinded and repealed thirty (30) days after written notice of such rescission and repeal is given to the Subdivider. No vested rights shall accrue to the subdivision or be acquired until this Ordinance becomes effective. 1 41 r Y � � 1� 4 \ � 1 `�1 INTRODUCED: March 27, 2006 BY: Randy Thurston C CILPERSON APPROVED: " 0 PR SIDENT OF CITY COUNCIL - 0-- , E on' -ti" CITY CLERK PASSED AND APPROVED: April 10. 2006 Background Paper for Proposed ORDINANCE AGENDA ITEM # K 24 DATE: MARCH 27, 2006 DEPARTMENT: COMMUNITY DEVELOPMENT /JIM MUNCH LAND USE ADMINISTRATORMERRY M. PACHECO TITLE AN ORDINANCE APPROVING THE PLAT OF CRESTVIEW HILLS SUBDIVISION, FILING NO. 2, 1 sT AMENDMENT ISSUE Shall City Council approve a request to replat 22 lots into 20 lots for the purpose of residential development? RECOMMENDATION The Planning and Zoning Commission, at their February 8, 2006 regular meeting, voted 6 -0 to recommend approval. BACKGROUND Crestview Hills Subdivision, Filing No. 2, 1 st Amendment, is generally located northeast of the intersection of Wills Boulevard and Meadowlark Lane, south of Inspiration Lane. On March 25, 2002, City Council approved the Crestview Hills Subdivision, 2nd Filing. This application proposes to replat 22 single - family residential lots located within Block 3, Crestview Hills Subdivision, 2 "d Filing, into 20 lots. Public Works staff confirmed that the applicant has complied with all items listed in the Subdivision Review Committee memo dated January 18, 2006. FINANCIAL IMPACT None. Reception 1676828 05/23/2006 SUBDIVISION IMPROVEMENTS AGREEMENT THIS AGREEMENT is made on -An l & oo(v between the CITY OF PUEBLO, a Municipal Corporation ( "City "), and T -E -H Development, Inc., a Colorado Corporation as Manager for Crestwood Management, LLC, a Colorado Limited Liability Company ( "Subdivider "). RECITALS WHEREAS, Subdivider has subdivided or is about to subdivide a certain tract of land located in the City and legally described in attached Exhibit "A"; and WHEREAS, the Subdivider, as a condition of approval of the final plat of Crestview Hills, 2nd Filing, 1st Amendment ( "Subdivision "), wishes to enter into this Subdivision Improvements Agreement as authorized by Chapter 4, Title XII of the Pueblo Municipal Code; and WHEREAS, Subdivider is required by Chapter 4, Title XII of the Pueblo Municipal Code to construct and install public improvements described and set forth in Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by City Council ( "Required Public Improvements "); and WHEREAS, the Required Public Improvements are generally described in the attached Exhibit `B" and shown on approved construction plans and documents on file in the office of the City's Director of Public Works ( "Plans and Documents "). WHEREAS, by Chapter 4, Title XII of the Pueblo Municipal Code, Subdivider is obligated to provide security or collateral sufficient in the judgement of the Director of Public Works to make reasonable provisions to construct and complete the Required Public Improvements. NOW, THEREFORE, in consideration of the foregoing and the following mutual covenants and agreements, the City and Subdivider agree as follows: Subdivider agrees within one hundred and eighty (180) days after applying for a building permit to construct any building or structure on any building site within the Subdivision, or upon the issuance of a certificate of occupancy for any such building or structure, whichever occurs first, to construct and install at its sole cost all of the Required Public Improvements. 2. In lieu of installing the Required Public Improvements within the time period prescribed in Paragraph 1, Subdivider or any subsequent owner of the land or any portion thereof shall deposit cash or other collateral with the City Director of Finance, DPW 101 01 /01 /06(Revised 01/11/06) II II II I IIII 1111 IIII 11 � 11 1 II II Page: 2 of It P Chris C. Munoz Pueb1oCtyC1k$Reo SUED PGR 56.00 D 0.00 or with any bank or trust company licensed in the State of Colorado, subject to an escrow agreement approved by the City Attorney. The holder of such cash or collateral shall pay all or any portion thereof to the City upon demand after the time to complete all Required Public Improvements by Subdivider or subsequent owner expires. Such deposit or escrow agreement shall be referred to as the "deposit ". 3. The amount of the deposit shall be computed by the City's Director of Public Works by estimating the total cost of all uncompleted Required Public Improvements within the block at the time application for building permit is made. The amount of the deposit required by this alternative shall not be less than 25% of such estimate plus the cost of extending all required sewer and water lines from nearest existing sewer and water lines to the proposed building site for which a building permit is sought, plus the costs of extending curb, gutter, sidewalk and paving from the edge of the Subdivision or existing improvements of a like nature, whichever is closer to the proposed building site. In any case where the block, as later defined, exceeds one thousand (1000') feet in length between intersecting streets, the estimate of the City Director of Public Works under this paragraph may be reduced to the total costs of all uncompleted Required Public Improvements in at least one half (1/2) of such block, and the required deposit shall be based upon such decreased estimate. The Subdivider, however, shall provide a turnaround of at least sixty (60') feet in diameter at the mid -block point and barricade such street so that no through traffic shall be permitted beyond the point to which the estimate of Director of Public Works is based. 4. Within one hundred eighty (180) days after subsequent application for a building permit to construct any building or structure upon any building site within the block, or upon the issuance of a certificate of occupancy for any such building or structure, whichever occurs first, Subdivider shall also deposit an amount not less than the estimate of the Director of Public Works for all Required Public Improvements from existing improvements to the proposed building site, less any previous deposits made under this agreement upon building sites lying between the most recent proposed site and existing improvements. In the event the Subdivider or any subsequent owner of the land fails to complete the Required Public Improvements or to make such deposit within the required time, no additional building permits shall be issued to the Subdivider or the subsequent owner or to any other person to build or construct any building or structure in the Subdivision until such default is remedied. In addition, the City may treat the amount of such deposit as a debt due the City from the Subdivider or subsequent owner, which debt shall be a lien upon all the land in the Subdivision and notice of lien may be filed for record in the office of the County Clerk and Recorder at any time after such default. Action upon such debt may be instituted by the City within six (6) years from the date of filing such lien for record. All remedies provided for in this agreement are cumulative and the use of one shall not prohibit the use of another. DPW 101 01 /01 /06(Revi sed01 / 11 /06) IIIIII IIII IIIIII I II IIII IIIIII IIII III VIII I VIII 05/23/2006 11 9P Chris C. Munoz Pueb1oCtyC1k &Rec BUBD RGR 56.00 D 0.00 6. Upon paying such deposit, the City Director of Public Works shall release the proposed building site from the terms of the Agreement except the terms of Paragraph 7 below. As a condition of approval of this Subdivision, and to meet the requirements of Chapter 4, Title XII of the Pueblo Municipal Code, Subdivider specifically agrees that no certificate of occupancy shall be issued by the Pueblo Regional Building Department until the Required Public Improvements, or those improvements necessary as determined by the City Director of Public Works, to totally serve specific lot(s) or block(s) for which certificates of occupancy are sought, have been properly designed, engineered, constructed and accepted as meeting the specifications and standards of the City. The restrictions on issuing certificates of occupancy contained in this Paragraph 7 and the restriction on the issuance of building permits contained in Paragraph 5 shall run with the land and shall extend to and be binding upon the heirs, legal representatives, successors, and assigns of the Subdivider and may be specifically enforced by the City. Acceptance of this Subdivision by the City does not constitute an acceptance of the roads, parks and other public improvements for maintenance by the City. Until such roads, parks, and other public improvements have been installed and meet the requirements, standards, and specifications of the City, its Subdivision ordinances and any applicable Parks Department specifications, and such are specifically approved and accepted in writing by the City Director of Public Works, and, if appropriate, the City Director of Parks and Recreation, the maintenance, construction, and all other matters pertaining to or affecting said roads, parks and other public improvements and rights -of -way are the sole responsibility of the Subdivider or any subsequent owner(s) of the land within the Subdivision. 9. The required time to complete all Required Public Improvements by Subdivider within such block shall be one (1) year from the date of application for the first building permit issued within such block. Upon completion and written approval and acceptance of the Required Public Improvements within the required time and the payment of all inspection costs by Subdivider, the Director of Public Works shall cause all obligations of the Subdivider relating to the Required Public Improvements within such block to be released. If such Required Public Improvements are not completed within the required time, the City Director of Public Works may cause the proceeds of all deposits or other collateral or monies in escrow to be used to compete the same. If insufficient monies are available at the end of the required time to complete all Required Public Improvements for the entire length of such block, the Director of Public Works shall cause all collateral or monies in escrow to be reduced to cash and shall deposit the same with the Director of Finance. Such cash shall be used to complete that portion of the Required Public Improvements as the Director of Public Works, in the Director's sole discretion, shall determine. Until all the DPW 101 01/0 1 /06(Revised01 / 11/06) VIII VIII IIII I IIII VIII IIIIII IIII III VIII IIII III 05/23/2006 02?39P Chris C. Munoz Pueb10CtyC1k &Rec SUED PGR 56.00 D 0.00 Required Public Improvements are completed and approved by the Director of Public Works, Subdivider and the subdivided land shall remain liable and responsible for all Required Public Improvements. 10. For purposes of this Agreement, the "block" shall mean both tiers of lots fronting or abutting upon the street which the proposed building or structure shall front, to the rear property line of such lots, or the center line of the alley, if there is an alley, enclosed at either end by a street which intersects both tiers of lots and shall include the full width of all streets upon which such lots abut. 11. If the Required Public Improvements are for a commercial subdivision and include stormwater drainage facilities, stormwater detention facilities, or maintenance and restoration of adjacent drainage channels, and/or associated improvements and revegetation (the "facilities "), located either within or outside of the Subdivision, Subdivider shall install the facilities in accordance with plans and specifications therefore approved by, and on file with the City, and thereafter, the facilities shall be repaired, replaced and maintained in good working order and condition by the owners of the land within the Subdivision. The City is granted the right (but not the obligation) to inspect, control, repair, replace and maintain the facilities and to recover all costs and expenses therefore including an administrative charge of 15% from the owners of the land within the Subdivision. All such City's costs and administrative charges shall become a perpetual lien on all the land within the Subdivision upon recording in the office of the Pueblo County Clerk and Recorder a statement of lien setting forth the City's costs and describing the land signed by the City's Director of Public Works. Failure of the City to inspect, control, repair, maintain, or replace the facilities shall not subject the City to any liability for such failure. 12. Subdivider agrees to provide the City with a current title insurance commitment at the time of final platting evidencing that fee simple title of all lands in the Subdivision is totally vested with the Subdivider free and clear of all liens and encumbrances. If such land is not free and clear, the holder of such indebtedness or encumbrance shall subordinate its interest or encumbrance to this Agreement and all its terms, conditions, and restrictions. 13. The City or the purchaser of any lot(s) within this Subdivision shall have the authority to bring an action in any Court of competent jurisdiction to compel the enforcement of this Agreement or any amendment hereto. Such authority shall include the right to compel rescission of any sale, conveyance, or transfer of any lot(s) or tract(s) contrary to the provisions of the Ordinances of the City or this Agreement. In the event of any litigation arising out of this Agreement, the Court shall award the prevailing party its costs and expenses, including reasonable expert witness and attorney's fees. Venue for any such litigation shall be Pueblo County, Colorado. DPW 101 01 /01/06(Revised0l / 11/06) VIIIII I III I VIII III I III IIII I III 167 of 11 P Chris C. Munoz Pueh1oCtyC1k &Reo SUBD RGR 56.00 D 0.00 14. City and Subdivider have attempted by the attached Exhibit `B" and Plans and Documents to describe all Required Public Improvements to be constructed and installed by Subdivider with respect to the Subdivision. However, if the attached Exhibit `B" and Plans and Documents fail to describe or to include, for any reason, any Required Public Improvement described and set forth in Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by City Council ( "Omitted Public Improvement "), Subdivider shall not be released or discharged from Subdivider's obligation to construct and install the Omitted Public Improvement in the time and manner contained in this Agreement and Chapter 4, Title XII of the Pueblo Municipal Code. In order to determine whether or not there are Omitted Public Improvements, the following shall be applicable: (a) If the Required Public Improvements are constructed and installed within ten (10) years from the date hereof, or within a five year extension if granted in writing by the Director of Public Works, then Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by the City Council and interpreted as of the date hereof shall control, unless adherence to a more recent standard does not require significant engineering modifications or major revisions to the plans and documents. For the purposes of this subsection, a major revision is defined as, but not necessarily limited to the relocation or re- alignment of any curb and gutter, sanitary sewer, storm sewer, manholes or storm inlets, or the change of size or type of sewer mains, inlets, curb and gutter or sidewalk. (b) If the Required Public Improvements are constructed and installed after ten (10) years from the date hereof, or after a five year extension if granted in writing by the Director of Public Works, then Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by the City Coucil and interpreted as of the date the Required Public Improvements are constructed and installed shall control. (c) If Chapter 4 of Title XII and /or the standards and specifications approved by the City Council are modified or amended to conform with the requirements of federal or state law, rules or regulations prior to the construction and installation of the Required Improvements, they shall control as so modified and amended. 15. Except for guarantee and obligation to correct defects required by Section 12-4 - 70)(9) of the Pueblo Municipal Code, nothing in this Agreement shall be construed to extend any obligation of the Subdivider beyond the date of written approval and accepted by the Director of Public Works of the Required Public Improvements described in attached Exhibit `B ", provided, however that the obligation of the DPW 101 01/0 1 /06(RevisedO l /11 /06) IIIIII VIII IIIIII IIII IIIIII IIIIII VIII III VIII IIII IIII 1676 of 11 Page; 6 Chris C, Munoz PuebloCtyClk &Rec SUED PGR 56.00 D 0.00 (SEAL) Developer to construct or install any Omitted Public Improvements will cease following two (2) years from the date of acceptance of the Required Public Improvements described in the attached Exhibit `B" by the Director of Public Works. 16. All Required Public Improvements shall be constructed and installed in compliance with all applicable standards and specifications approved by City Council. 17. The parties agree this Agreement may be periodically amended by mutual consent provided such amendment is in writing and signed by all parties. 18. This Agreement shall extend to and be binding upon the successors and assigns of the City and upon the heirs, successors, assigns and legal representatives of Subdivider, and shall be recorded in the office of the County Clerk and Recorder of Pueblo County, Colorado, and shall constitute an agreement running with the land until released as described above. The parties have caused this Agreement to be executed and attested by its duly authorized and acting officer. T -E -H Development, Inc., a Colorado Corporation as Manager for Crestwood Management, LLC, a Colorado Limited Liability Company Sub ' i r Thomas E. Hausman, President By: The foregoing instrument was acknowledged before me on _ ,,7 00& by Thomas E. Hausman, President of T -E -H oloraao corporation as Ma B0 orado Limited Liability MY NOTARY uj PUBLIC o P� 9� OF GoL� F,,g3LQ A My commission expires l0 28 -2009 A STATE OF COLORADO ) ss. COUNTY OF PUEBLO ) , Inc., Subdivider. anagement, LLC, Notary Public CITY OF P BLO, a Municipal Corporation President of City Council DPW 101 01 /01 /06(RevisedOl /I 1/06) The foregoing instrument was acknowledged before me this q ° day of 2006 by Michael A. Occhiato ,as President of C ty Council, and Gina Dutrhar as City Clerk of the City of Pueblo, Colorado. hand and official seal. ,- My bFritM ion expires: A -21 -2007 :- as ,iG,_oo Notary Public • •.1I City IIIIII VIII IIIIII IIII IIIIII IIIIII VIII III VIII IIII IIII 1676828 /Z / 6 05 02:39P 0 DPW 101 01 /01 /06(RevisedOl /11/06) IIIIII VIII IIIIII IIII IIIIII IIIIII VIII III VIII IIII IIII O Page: 6828 05 39P EXHIBIT "A" LAND DESCRIPTION A parcel of land located in a portion of Block 3 in Crestview Hills, 2 Filing according to the recorded plat thereof as filed for record at Reception No. 1473070 in the County of Pueblo and State of Colorado and being more particularly described as follows: All of Lots 2 through 23 both inclusive in Block 3 of Crestview Hills, 2nd Filing Containing 3.333 acres more or less. Prepared by: NORTHSTAR ENGINEERING AND SURVEYING, INC. 111 E. 51h Street Pueblo, Colorado 81003 November 8, 2005 IN 01 038 03 R1 IIIIII VIII IIIIII IIII IIIIII IIIIII VIII III VIII IIII IIII 05/ : 9 1 1 Chris C. Munoz PUeb1oCtyC1k &Reo SUED RGR 56.00 D 0.00 SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: DEVELOPER: ENGINEER: Streets (MEADOWLARK LN.) Asphalt (3" Asphalt on 18" Base) Modified Ramp Curb and Gutter Water 8" PVC Water Main Fire Hydrant Ass'y. Services (60' ROW) Sanitary Sewer 8" PVC Sewer Main 48" Manholes Services (60' ROW) Street Lights CRESTVIEW HILLS, 2ND FILING, 1ST AMENDMENT PHASE 1 CRESTVIEW MANAGEMENT, LLC NORTHSTAR ENGINEERING AND SURVEYING, INC. 2640 SY @ $24.50 /SY = $64,680 1320 LF @ $10.50 /LF = $13,860 660 LF @ $45.00 /LF = $29,700 1 EA @ $3,000.00 /EA = $3,000 10 EA @ $500.00 /EA = $5,000 604 LF @ $31.00 /LF = $18,724 2 EA @ $2,273.00 /EA = $4,546 10 EA @ $1,033.00 /EA = $10,330 3 EA @ $1,343.00 /EA = $4,029 TOTAL - PHASE 1 $153,869 V ol IIIIII VIII III II IIII IIIIII IIIIII VIII III IIIIII III IIII Page: 10 00o of 1 1 Chris C. Munoz Pueb1oCtyC1k4Reo SUBD PGR 56.00 D 0.00 SUBDIVISION IMPROVEMENTSAGREEMENT EXHIBIT "B" SUBDIVISION NAME: DEVELOPER: ENGINEER: Streets (INSPIRATION LN.) Asphalt (3" Asphalt on 15" Base) Modified Ramp Curb and Gutter Handicap Ramps Water 8" PVC Water Main Fire Hydrant Ass'y. Services (60' ROW) Sanitary Sewer 8" PVC Sewer Main 48" Manholes Services (60' ROW) Storm Sewer 18" RCP Pipe Type "S" Inlet L =4' Type "S" Inlet L =7' Type "S" Inlet L =11' Type I -B Manhole Monuments Street Lights Baracade, L =16' CRESTVIEW HILLS, 2ND FILING, 1ST AMENDMENT PHASE 2 CRESTVIEW MANAGEMENT, LLC NORTHSTAR ENGINEERING AND SURVEYING, INC. 2790 SY @ $21.50 /SY = $59,985 1325 LF @ $10.50 /LF = $13,913 531 SF @ $3.00 /SF = $1,593 740 LF @ $45.00 /LF = $33,300 1 EA @ $3,000.00 /EA = $3,000 10 EA @ $500.00 /EA = $5,000 660 LF @ $31.00 /LF = $20,460 3 EA @ $2,273.00 /EA = $6,819 10 EA @ $1,033.00 /EA = $10,330 332 LF @ $39.00 /LF = $12,948 1 EA @ $2,583.00 /LF = $2,583 1 EA @ $3,204.00 /LF = $3,204 1 EA @ $4,032.00 /LF = $4,032 1 EA @ $2,324.00 /EA = $2,324 1 EA @ $594.00 /EA = $594 1 EA @ $1,343.00 /EA = $1,343 1 EA @ $852.00 /EA = $852 TOTAL - PHASE 1 TOTAL - PHASES 1 & 2 This is an estimate only. Actual construction costs may vary. $182,280 10 III I II I VIII I II III IIIIII III II IIIIII I II 1678268 11 of 11 P Chris C. Munoz Pueb1cCtyC1k &Rec SUBD RGR 55.00 D 0.00 SUBDIVISION IHPROVEAfENTSAGREEHENT EXHIBIT 'B" PREPARED BY: MSW FIRM: NORTHSTAR ENGINEERING AND SURVEYING, INC. The undersigned hereby certifies that (i) the Required Public Improvements shown hereon and the Plans and Specifications therefore constitute all of the public improvements required to be installed and constructed for the Subdivision by Chapter 4, Title XII of the Pueblo Municipal Code and the standards and specifications approved by City Council, (ii) the quantities of construction elements shown hereon accurately depicts the quantities necessary to construct the Required Public Improvements and (iii) the unit prices shown hereon are the most current unit prices provided by REVIEWED BY: Professional of 11 Reception 1676829 05/23/2006 ADDENDUM TO SUBDIVISION IMPROVEMENTS AGREEMENT (PHASED CONSTRUCTION) This Addendum shall be incorporated in and become a part of the ?`�' ( o Zoo , Subdivision Im rovements A eement for Crestview Hills, 2nd F h gr Est Amendment (herein the "Subdivision ") and enforceable as provided in said Subdivision Improvements Agreement. 1. The Subdivider will develop the Subdivision in separate phases in the sequence described in the attached Exhibit "A ". 2. The Subdivider shall construct and install all Required Public Improvements in the manner and as described in the Subdivision Improvements Agreement needed and required to serve all lots within each Phase and in the sequence set forth in the attached Exhibit "A ". 3. For purposes of determining the extent and - timing of the Required Public Improvements, each Phase shall be considered as a separate subdivision. 4. After completion of all Required Public Improvements for any Phase and approval thereof by the Director of Public Works, the City will release the lots in that Phase from the Subdivision Improvements Agreement and this Addendum. 5. Any development of the Subdivision contrary to the phasing sequence set forth in paragraph 1 above without the prior written approval of the Director of Public Works ( "Director ") shall constitute a breach of the Subdivision Improvements Agreement and this Addendum and City may thereafter refuse to approve the issuance of building permits for construction within the Subdivision. 6. No modifications to the phasing sequence set forth in the attached Exhibit "A" shall be approved by the Director until (a) Subdivider's engineer certifies in writing that the requested modifications will not result in any lot in the Subdivision being inadequately served by required public improvements, (b) Subdivider furnishes title information satisfactory to the City showing all persons and entities having a recorded interest in all lots within the Subdivision ( "Interested Parties "), and (c) all Interested Parties execute and acknowledge their consent to and approval of the modification to the phasing sequence in form and content approved by the City Attorney. 7. The Subdivision Improvements Agreement as amended by this Addendum shall remain in full force and effect and the covenants of this Addendum shall run with the land within the Subdivision and shall extend to, be binding upon, and inure to the benefit of the City and Subdivider and their respective heirs, personal representatives, successors, and assigns. Executed at Pueblo, Colorado, as of T -E -H Development, Colorado Corporation as Manager Inc., for Crestwood Mana¢ement LLC a Col orado Subdivider Limited Liability Company DPW 103 1/6/04 STATE OF COLORADO ) ss. COUNTY OF PUEBLO ) B y Thomas E. Hausman, President of B T -E -H Development, Inc., a Colorado Corporati as Manager for Crestwood Management, LLC a Colorado Limited Liability Company n The foregoing instrument was acknowledged before me this & — day of ,&J�, by Thomas E. Hausman, President of , Subdivider. T -E-H zrclaf Dev c1 elpoment, Inc., a Colorado Corporation as Manager for Witness my hand 3L1C1201ttlSCalanagement, LLC a Colorado Limited Liability Company My co ssion expires: 10 -,� 8- A,00 g P(L B0 Gy NOTARY S I * * * Notary P uj PUBLIC 5r P CB op C OL� 44y �.a, cp My commission expires 10-28 -2009 TY OF PUEBLO, � � � � hf unjsjpal Corporation of the Council III IIII I IIII I iIII II II IIII I III II 5 67 2 of 3 P Chris C. Munoz Pueb1OCtyC1kSRec ADD AGAR 16.00 D 0.00 DPW 103 1/6/04 IIIIII VIII IIIIII IIII IIIIII IIIIII VIII III VIII IIII IIII 60 6 D682939P 0 0.00 Chris C. Munoz PuebloCtyCik&Rec ADD AGAR 16.0 ADDENDUM TO SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "A" The Subdivider will develop the Subdivision in separate phases in the following sequence: (a) Phase I shall consist of the following lots within the Subdivision: Lots 1 through 10, Block 1 (b) Phase lI shall consist of the following lots within the Subdivision: Lots 11 through 20, Block 1 DPW 103 1/6/04