Loading...
HomeMy WebLinkAbout06817Reception 1520715 08/19/2003 "As Amended" ORDINANCE NO. 6817 AN ORDINANCE APPROVING THE PLAT OF EL CAMINO 16 FILING SUBDIVISION BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. A portion of the NWl /4 of the NW 1/4 of Section 21, Township 21 South, Range 65 West of the 6' P.M. in the County of Pueblo and State of Colorado and being more particularly described as follows: Considering the West line of the NW 1 /4 of Section 21, Township 21 South, Range 65 West of the 6" P.M. to bear N. 00 °26'27" E. and all bearings contained herein being relative thereto. Beginning at the Southwest corner of El Camino Subdivision, 14' Filing, according to the recorded plat thereof, filed for record September 5, 2000; thence N. 88 W., a distance of 430.02 feet; thence N 00'03'53" E., a distance of 295.46 feet; thence N. 89 °29'07" W., a distance of 167.82 feet; thence Southerly, along the arc of a curve to the left whose center bears S. 85 °36'23" E. and whose radius is 950 feet, a distance of 18.01 feet; thence N. 86 °41'33 W., a distance of 100.00 feet; thence N. 85'03'19" W., a distance of 2.63 feet; thence Westerly, along the arc of a curve to the right whose radius is 430 feet, a distance of 120.85 feet; thence N. 21 0 02'52" E., 180.00 feet; thence N. 61 0 22'53" W., a distance of 67.21 feet; thence N. 51 °20'40" W., a distance of 238.31 feet; thence N. 32 °11'51" W., a distance of 168.80 feet to the South subdivision boundary line of El Camino Subdivision, 15' Filing, according to the recorded plat thereof; thence Easterly, along said South line the following eleven (11) courses: 1. N. 31 0 33'52" E., a distance of 92.15 feet; 2. N. 00 0 47'30" E., a distance of 116.90 feet; 3. S. 89 0 12'30" E., a distance of 281.18 feet; 4. S. 06 0 01'25" W., a distance of 129.52 feet; 5. S. 49 0 25'39" E., a distance of 144.96 feet; 6. S. 73 0 55'06" E., a distance of 73.39 feet; 7. S. 16 0 04'54" W., a distance of 88.22 feet; 8. S. 73 0 55'06" E., a distance of 261.39 feet; 9. S. 89 0 29'07" E., a distance of 247.16 feet; 10. N.00 0 30'53" E., a distance of 50.00 feet; 11. S. 89 0 29'07" E., a distance of 120.00 feet to the West subdivision boundary Line of said El Camino Subdivision, 14' Filing; thence S. 00 °30'53" W., along said West line, a distance of 649.20 feet to the Point of Beginning. Containing 12.098 acres. SECTION 2. The acceptance of such dedicated streets, rights -of -way, utility and drainage easements, public sites, parks and open spaces by the City does not obligate the City to maintain or repair same until such streets, rights -of -way, utility and drainage easements, public sites, parks and and open spaces have been constructed and installed in compliance and in accordance with the requirements and provisions of Chapter 4, Title XII of the 1971 Code of Ordinances, as amended and any agreement entered into pursuant thereto. SECTION 3. Neither the adoption of this ordinance and the requirements imposed hereby shall create any duty or obligation of any person, firm, corporation or other entity with regard to the enforce- ment or nonenforcement of this ordinance or the City's Subdivision Ordinances and regulations. No person, firm, corporation or other entity shall have any private right of action, claim or demand against the City or its officers, employees or agents, for any injury, damage or liability arising out of or in any way connected with the adoption, enforcement, or nonenforcement of this ordinance or the Subdivision Ordinance and Regulations of the City, or the engineering, surveying, drainage improvement or other work or improvements required thereby. Nothing in this ordinance or in the City's subdivision ordinances and regulations shall create or be construed to create any claim, demand or liability against the City or its officers, employees or agents, or to waive any of the immunities, limitations on liability, or other provisions of the Colorado Governmental Immunity Act, Section 24 -10 -101, et seq. Colorado Revised Statutes, or to waive any immunities or limitations on liability otherwise available to the City or its officers, employees or agents. SECTION 4. This ordinance shall be approved upon final passage but shall not become effective until (a) all information, documents, drawings, profiles, improvement agreements, if any, and plat required by Chapter 4 of Title XII of the 1971 Code of Ordinances meeting and complying with the subdivision requirements of the City and any applicable Annexation Agreement have been filed with and approved by the Director of Public Works, and (b) the final subdivision plat is recorded in the office of the Pueblo County Clerk and Recorder. If any such filings and approvals have been deferred pursuant to Section 12 -4 -5 (b) (2) of the 1971 Code of Ordinances, and are not for any reason filed and approved within one (1) year after passage of this Ordinance, or within any extended period granted by Resolution of the City Council, this Ordinance shall automatically be rescinded and repealed thirty (30) days after written notice of such rescission and repeal is given to the Subdivider. No vested rights shall accrue to the subdivision or be acquired until this Ordinance or the final subdivision plat becomes effective. SECTION 5. The approval of this Ordinance shall not release or discharge or be construed to release or discharge the owner of the herein described real property or the real property from any condition or obligation imposed upon the owner or the real property pursuant to any applicable Annexation Agreement or condition imposed by the Planning and Zoning Commission, except the requirement to provide a landscaped median on Bandera Boulevard. INTRODUCED: April 8. 2002 V 1 y ATTESTli? i — — ^ (—� �" V CITY CLERK BY: Al G ur u1 COUNCIL PERSON APPROVED: PRESIDENT OF CITY COUNCIL PASSED AND APPROVED: April 22 2002 �► cur � � -- Background Paper for Proposed ORDINANCE DATE: APRIL 8, 2002 ►0 r % AGENDA ITEM # D,6 �I s q DEPARTMENT: PLANNING & COMMUNITY DEVELOPMENT /JIM MUNCH TITLE AN ORDINANCE APPROVING THE PLAT OF EL CAMINO 16 FILING SUBDIVISION ISSUE Shall City Council approve a request to subdivide this property of approximately 12 acres into single - family homes in an R -1 zone district? RECOMMENDATION The Planning and Zoning Commission voted 5 -1 to recommend approval of the plat with the condition that a landscaped median be constructed on Bandera Boulevard. BACKGROUND The applicant is proposing to subdivide land for single - family homes in the 16 ' filing of El Camino. The Planning and Zoning Commission conditioned the approval upon the applicant providing a landscaped median on Bandera Boulevard. The Planning and Zoning Commission voted 5 -1 to recommended approval of the plat. FINANCIAL IMPACT None Reception 1520717 08/19/2003 SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT is made on n o n \ a I 2O19?? between the CITY OF PUEBLO, a Municipal Corporation ( "Ci " ), and HORIZON COMMUNITIES, INC.. a Colorado Corporation ( "Subdivider") RECITALS WHEREAS, Subdivider has subdivided or is about to subdivide a certain tract of land located in the City and legally described in attached Exhibit "A'; and WHEREAS, the Subdivider, as a condition of approval of the final plat of ELCAMINO SUBDIVISION, 16th FILING ( "Subdivision "), wishes to enter into this Subdivision Improvements Agreement as authorized by Chapter 4, Title XII of the 1971 Code of Ordinances; and WHEREAS, Subdivider is required by Section 12-4 -7 (J) of the 1971 Code of Ordinances of the City to construct and install certain public improvements generally described in attached Exhibit `B" and shown on approved construction plans and documents on file at the office of the City's Director of Public Works ( "Required Public Improvements "); and WHEREAS, by Chapter 4, Title XII of the 1971 Code of Ordinances, Subdivider is obligated to provide security or collateral sufficient in the judgement of the City Council to make reasonable provisions to construct and complete the Required Public Improvements. NOW, THEREFORE, in consideration of the following mutual covenants and agreements, the City and Subdivider agree as follows: Subdivider agrees within one hundred and eighty (180) days after applying for a building permit to construct any building or structure on any building site within the Subdivision, or upon the issuance of a certificate of occupancy for any such building or structure, whichever occurs first, to construct and install at its sole cost all of the Required Public Improvements. 2. In lieu of installing the Required Public Improvements within the time period prescribed in Paragraph 1, Subdivider or any subsequent owner of the land or any portion thereof shall deposit cash or other collateral with the City Director of Finance, or with any bank or trust company licensed in the State of Colorado, subject to an escrow agreement approved by the City Attorney. The holder of such cash or collateral shall pay all or any portion thereof to the City upon demand after the time to complete all Required Public Improvements by Subdivider or subsequent owner expires. Such deposit or escrow agreement shall be referred to as the "deposit ". DPW 101 10/21/98 The amount of the deposit shall be computed by the City's Director of Public Works by estimating the total cost of all uncompleted Required Public Improvements within the block at the time application for building pemut is made. The amount of the deposit required by this alternative shall not be less than 25% of such estimate plus the costs of extending all required sewer and water lines from nearest existing sewer and water lines to the proposed building site for which a building permit is sought, plus the costs of extending curb, gutter, sidewalk and paving from the edge of the Subdivision or existing improvements of a like nature, whichever is closer to the proposed building site. In any case where the block, as later defined, exceeds one thousand (1000') feet in length between intersecting streets, the estimate of the City Director of Public Works under this paragraph may be reduced to the total costs of all uncompleted Required Public Improvements in at least one half (1/2) of such block, and the required deposit shall be based upon such decreased estimate. The Subdivider, however, shall provide a turnaround of at least sixty (60') feet in diameter at the mid -block point and barricade such street so that no through traffic shall be permitted beyond the point to which the estimate of Director of Public Works is based. 4. Within one hundred eighty (180) days after subsequent application for a building permit to construct any building or structure upon any building site within the block, or upon the issuance of a certificate of occupancy for any such building or structure, whichever occurs first, Subdivider shall also deposit an amount not less than the estimate of the Director of Public Works for all Required Public Improvements from existing improvements to the proposed building site, less any previous deposits made under this agreement upon building sites lying between the most recent proposed site and existing improvements. 5. In the event the Subdivider or any subsequent owner of the land fails to complete the Required Public Improvements or to make such deposit within the required time, no additional building permits shall be issued to the Subdivider or the subsequent owner or to any other person to build or construct any building or structure in the Subdivision until such default is remedied. In addition, the City may treat the amount of such deposit as a debt due the City from the Subdivider or subsequent owner, which debt shall be a lien upon all the land in the Subdivision and notice of lien may be filed for record in the office of the County Clerk and Recorder at any time after such default. Action upon such debt may be instituted by the City within six (6) years from the date of filing such lien for record. All remedies provided for in this agreement are cumulative and the use of one shall not prohibit the use of another. 6. Upon paying such deposit, the City Director of Public Works shall release the proposed building site from the terms of the Agreement except the terms of Paragraph 7 below. As a condition of approval of this Subdivision, and to meet the requirements of Section 12- 4 -7(J) of the 1971 Code of Ordinances, Subdivider specifically agrees that no certificate of occupancy shall be issued by the Pueblo Regional Building DPW 101 10/21/98 Department until the Required Public Improvements, or those improvements necessary as determined by the City Director of Public Works, to totally specific lot(s) or block(s) for which certificates of occupancy are sought have been properly designed, engineered, constnlcted and accepted as meeting the specifications and standards of the City. The restrictions on issuing certificates of occupancy contained in this Paragraph 7 and the restriction on the issuance of building permits contained in Paragraph 5 shall run with the land and shall extend to and be binding upon the heirs, legal representatives, successors, and assigns of the Subdivider and may be specifically enforced by the City. 8. Acceptance of this Subdivision by the City does not constitute an acceptance of the roads, parks and other public improvements for maintenance by the City. Until such roads, parks, and other public improvements have been installed and meet the requirements, standards, and specifications of the City, its Subdivision ordinances and any applicable Parks Department specifications, and such are specifically approved and accepted in writing by the City Director of Public Works, and, if appropriate, the City Director of Parks and Recreation, the maintenance, construction, and all other matters pertaining to or affecting said roads, parks and other public improvements and rights -of -way are the sole responsibility of the Subdivider or any subsequent owner(s) of the land within the Subdivision. The required time to complete all Required Public Improvements by Subdivider within such block shall be one (1) year from the date of application for the first building permit issued within such block. Upon completion and written approval and acceptance of the Required Public Improvements within the required time and the payment of all inspection costs by Subdivider, the Director of Public Works shall cause all obligations of the Subdivider relating to the Required Public Improvements within such block to be released. If such Required Public Improvements are not completed within the required time, the City Director of Public Works may cause the proceeds of all deposits or other collateral or monies in escrow to be used to compete the same. If insufficient monies are available at the end of the required time to complete all Required Public Improvements for the entire length of such block, the Director of Public Works shall cause all collateral or monies in escrow to be reduced to cash and shall deposit the same with the Director of Finance. Such cash shall be used to complete that portion of the Required Public Improvements as the Director of Public Works, in the Director's sole discretion, shall determine. Until all the Required Public Improvements are completed and approved by the Director of Public Works, Subdivider and the subdivided land shall remain liable and responsible for all Required Public Improvements. 10. For purposes of this Agreement, the "block" shall mean both tiers of lots fronting or abutting upon the street which the proposed building or structure shall front, to the rear property line of such lots, or the center line of the alley, if there is an DPW 101 10/21/98 alley, enclosed at either end by a street which intersects both tiers of lots and shall include the full width of all streets upon which such lots abut. 11. If the Required Public Improvements are for a commercial subdivision and include stormwater drainage facilities, stormwater detention facilities, or maintenance and restoration of adjacent drainage channels, and/or associated improvements and revegetation (the "facilities "), located either within or outside of the Subdivision, Subdivider shall install the facilities in accordance with plans and specifications therefore approved by, and on file with the City, and thereafter, the facilities shall be repaired, replaced and maintained in good working order and condition by the owners of the land within the Subdivision. The City is granted the right (but not the obligation) to inspect, control, repair, replace and maintain the facilities and to recover all costs and expenses therefore including an administrative charge of 15% from the owners of the land within the Subdivision. All such City's costs and administrative charges shall become a perpetual lien on all the land within the Subdivision upon recording in the office of the Pueblo County Clerk and Recorder a statement of lien setting forth the City's costs and describing the land signed by the City's Director of Public Works. Failure of the City to inspect, control, repair, maintain, or replace the facilities shall not subject the City to any liability for such failure. 12. Subdivider agrees to provide the City with a current title insurance commitment at the time of final platting evidencing that fee simple title of all lands in the Subdivision is totally vested with the Subdivider free and clear of all liens and encumbrances. If such land is not free and clear, the holder of such indebtedness shall subordinate its interest or encumbrance to this Agreement and all its terms, conditions, and restrictions. 13. The City or the purchaser of any lot(s) within this Subdivision shall have the authority to bring an action in any Court of competent jurisdiction to compel the enforcement of this Agreement or any amendment hereto. Such authority shall include the right to compel rescission of any sale, conveyance, or transfer of any lot(s) or tract(s) contrary to the provisions of the Ordinances of the City or this Agreement. In the event of any litigation concerning this Agreement, the Court shall award the prevailing party its costs and expenses, including reasonable expert witness and attorney's fees. 14. The parties agree this Agreement may be periodically amended by mutual consent provided such amendment is in writing and signed by all parties. 15. This Agreement shall extend to and be binding upon the successors and assigns of the City and upon the heirs, successors, assigns and legal representatives of Subdivider, and shall be recorded in the office of the County Clerk and Recorder of Pueblo County, Colorado, and shall constitute an agreement running with the land until released as described above. DPW 101 10/21/98 The parties have caused this Agreement to be executed and attested by its duly authorized and acting officer. HORIZON COMMUNITIES, INC. a Colorado Corporation Subd ivider //( di (SEAL) By: C� / n _ � Robert W. Leach, President The foregoing instrument was acknowledged before me on MA-1 J3 017 by Robert W. Leach. President of Subdivider. HORIZON COMMUNITIES, INC., a Colorado Corporation %,, <4 ,,, ;, S j� -,-AMy commission expires: — 7 110 120 ©t• 4: T„ Notary Public ...A &� LXC ; n CITY OF P unicipal Co ation . .....•. O " CvL _ ATTEST: City President of City Council STATE OF COLORADO ) ss. COUNTY OF PUEBLO ) The foregoing instrument was acknowledged before me this day of ICc , 2003 by [31 I I �0 , as nt of City Counci and YIGI nlAT, cr as City Clerk of the City of M lorado. Q om. �0 9'�. F 0 t ss my hand and official seal. J; .Z JA o y mmission expires: -21 - 200 3 "!,u'x% ; A V BLDG. , OF Lat., OP L) Notary Public My Commission AS TO FORM: �� , tomey City Attorney DPW 101 10/21/98 sMunoz Page: 5207 03:30P SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT A A portion of the NWl /4 of the NW1 /4 of Section 21, Township 21 South, Range 65 West of the 6m P.M. in the County of Pueblo and State of Colorado and being more particularly described as follows: Considering the West line of the NW 1 /4 of Section 21, Township 21 South, Range 65 West of the 6` P.M. to bear N. 00 0 26'27" E. and all bearings contained herein being relative thereto. Beginning at the Southwest corner of El Camino Subdivision, 14 Filing, according to the recorded plat thereof, filed for record September 5, 2000; thence N. 88 0 59'14" W., a distance of 430.02 feet; thence N. 00 0 03'53" E., a distance of 295.46 feet; thence N. 89 0 29'07" W., a distance of 167.82 feet; thence Southerly, along the arc of a curve to the left whose center bears S. 85 0 36'23" E. and whose radius is 950 feet, a distance of 18.01 feet; thence N. 86 0 41'33" W., a distance of 100.00 feet; thence N. 85 0 03'19" W., a distance of 2.63 feet; thence Westerly, along the arc of a curve to the right whose radius is 430 feet, a distance of 120.85 feet; thence N. 21 0 02'52" E., a distance of 180.00 feet; thence N. 61 0 2253" W., a distance of 67.21 feet; thence N. 51 0 20'40" W., a distance of 238.31 feet; thence N. 32 0 1151" W., a distance of 168.80 feet to the South subdivision boundary line of El Camino Subdivision, 15 Filing, according to the recorded plat thereof; thence Easterly, along said South line the following eleven (11) courses: 1. N. 31 0 33'52" E., a distance of 92.15 feet; 2. N. 00 0 47'30" E., a distance of 116.90 feet; 3. S. 89 0 12'30" E., a distance of 281.18 feet; 4. S. 06 0 01'25" W., a distance of 129.52 feet; 5. S. 49 0 2539" E., a distance of 144.96 feet; 6. S. 73 0 55'06" E., a distance of 73.39 feet; 7. S. 16 0 04'54" W., a distance of 88.22 feet; 8. S. 73 0 55'06" E., a distance of 261.39 feet; 9. S. 89 0 29'07" E., a distance of 247.16 feet; 10. N. 00 0 30'53" E., a distance of 50.00 feet; 11. S. 89 0 29'07" E., a distance of 120.00 feet to the West subdivision boundary line of said El Camino Subdivision, 14 Filing; thence S. 00 0 30'53" W., along said West line, a distance of 649.20 feet to the Point of Beginning. Containing 12.098 acres. SUBDIVISION NAME: DEVELOPER: ENGINEER: BANDERA PARKWAY SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" EL CAMINO SUBDIVISION 16TH FILING HORIZON COMMUNITIES, INC. NORTHSTAR ENGINEERING AND SURVEYING, INC. STREETS 4" Asphalt over 10" Base Course Curb and Gutter (6" standard) Handicap Ramp (7) Sidewalk (4' detached) WATER 12" PVC Water Main SANITARY SEWER: 8" PVC Sewer Main 48" Manholes STORM SEWER 36" HOPE Pipe Type 1B Manhole STREET LIGHT MONUMENT BOX SIGNAGE T- Intersection (60' R -O -W) BARRICADES L =24' 1660 SY @ $23.50 /SY = $39,010 950 LF @ $10.00 /LF = $9,500 252 SF @ $3.50 /SF $882 680 SF @ $2.50 /SF $1,700 380 LF @ $40.00 /LF = $15,200 346 LF @ $33.00 /LF = $11,418 2 EA @ $2,240.00 /EA = $4,480 332 L.F. @ $72.00 /LF = $23,904 2 EA @ $2,000.00 /EA = $4,000 2 EA @ $1,300.00 /EA = $2,600 3 EA @ $575.00 /EA = $1,725 2 EA @ $300.00 /EA = $600 1 EA @ $1,125.00 /EA = $1,125 BANDERA PARKWAY - SUBTOTAL 1116,144 of IIIIII VIII IIIIII VIII IIII IIIIII IIIIII III IIII III III 0 / + 1520717 0 03:30 0 7 SUBDMSION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDIVISION 16TH FILING DEVELOPER: HORIZON COMMUNITIES, INC. ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. SAN SIMEON COURT STREETS 3" Asphalt over 6" Base Course 1440 SY @ $17.50 /SY = $25,200 Curb and Gutter (Mod. Ramp) 810 LF @ $10.00 /LF = $8,100 WATER 6" PVC Water Main 460 LF @ $40.00 /LF = $18,400 Service 12 EA @ $500.00 /EA = $6,000 Fire Hydrant Ass'y 1 EA @ $2,700.00 /EA = $2,700 SANITARY SEWER: 8" PVC Sewer Main 430 LF @ $33.00 /LF = $14,190 48" Manholes 2 EA @ $2,240.00 /EA = $4,480 Services 12 EA @ $800.00 /EA = $9,600 STORM SEWER 24" HDPE Pipe 29 L.F. @ $48.00 /LF = $1,392 Type "S" Inlet L =14' 1 EA @ $5,200.00 /EA = $5,200 Flowable Backfill 8 CY @ $65.00 /EA = $520 STREET LIGHT 1 EA @ $1,300.00 /EA = $1,300 MONUMENT BOX 4 EA @ $575.00 /EA = $2,300 SAN SIMEON COURT - SUBTOTAL ;99,382 IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII 85200 03:30P ChrisC.Munoz PuebloCtYM&Rec SUED AG R 00.00 D 0.00 E SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: DEVELOPER: ENGINEER: 6 � k STREETS 3" Asphalt over 6" Base Course Curb and Gutter (Mod. Ramp) Handicap Ramp (4) WATER 6 -8" PVC Water Main Fire Hydrant Ass'y Service SANITARY SEWER: 8" PVC Sewer Main 48" Manholes Services STORM SEWER 24" HDPE Pipe 18" HDPE Pipe 15" HDPE Pipe Type 16 Manhole Type "S" Inlet L =14' Flowable Backfill Type "S" Inlet L =9' STREET LIGHT MONUMENT BOX SIGNAGE 4 way- Intersection (60' R -O -W) EL CAMINO SUBDIVISION 16TH FILING HORIZON COMMUNITIES, INC. NORTHSTAR ENGINEERING AND SURVEYING, INC. 1760 SY @ $17.50 /SY = $30,800 880 LF @ $10.00 /LF = $8,800 720 SF @ $3.50 /SF $2,520 410 LF @ $40.00 /LF = $16,400 1 EA @ $2,700.00 /EA = $2,700 9 EA @ $500.00 /EA = $4,500 400 LF @ $33.00 /LF = $13,200 3 EA @ $2,240.00 /EA = $6,720 9 EA @ $800.00 /EA = $7,200 21 L.F. @ $48.00 /LF = $1,008 149 L.F. @ $36.00 /LF = $5,364 28 L.F. @ $30.00 /LF = $840 1 EA @ $2,000.00 /EA = $2,000 1 EA @ $5,200.00 /EA = $5,200 8 CY @ $65.00 /EA = $520 1 EA @ $3,700.00 /EA = $3,700 1 EA @ $1,300.00 /EA = $1,300 2 EA @ $575.00 /EA = $1,150 1 EA @ $300.00 /EA = $300 SONOMA DRIVE - SUBTOTAL $114,222 11111 IN 11111111111111111111111111111111 0 08/19/2003 9 of 03:30P W: SUBDMSION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDIVISION 16TH FILING DEVELOPER: HORIZON COMMUNITIES, INC. ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. ALTURAS DRIVE 3" Asphalt over 6" Base Course 2130 SY @ $17.50 /SY = $37,275 Curb and Gutter (Mod. Ramp) 1200 LF @ $10.00 /LF = $12,000 Handicap Ramp (2) 360 SF @ $3.50 /SF $1,260 WATER 8" PVC Water Main 600 LF @ $40.00 /LF = $24,000 Service 5 EA @ $500.00 /EA = $2,500 SANITARY SEWER: 8" PVC Sewer Main 452 LF @ $33.00 /LF = $14,916 48" Manholes 2 EA @ $2,240.00 /EA = $4,480 Services 5 EA @ $800.00 /EA = $4,000 STORM SEWER 30" HDPE Pipe 140 L.F. @ $60.00 /LF = $8,400 24" HDPE Pipe 430 L.F. @ $48.00 /LF = $20,640 Type 1B Manhole 2 EA @ $2,000.00 /EA = $4,000 STREET LIGHT 2 EA @ $1,300.00 /EA = $2,600 MONUMENT BOX 2 EA @ $575.00 /EA = $1,150 SIGNAGE T- Intersection (60' R -O-W) 1 EA @ $200.00 /EA = $200 ALTURAS DRIVE - SUBTOTAL $137,421 ��l IN 1852003 of 03:30P ChrisC.Munoz Pueb1oCtyC1k &Reo SUED AG R 66.00 D 0.00 10 SUBDMSION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDIVISION 16TH FILING DEVELOPER: HORIZON COMMUNITIES, INC. ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. PASCADERO DRIVE STREET 3" Asphalt over 6" Base Course 950 SY @ $17.50 /SY = $16,625 Curb and Gutter (Mod. Ramp) 530 LF @ $10.00 /LF = $5,300 WATER 8" PVC Water Main 300 LF @ $40.00 /LF = $12,000 Service 6 EA @ $500.00 /EA = $3,000 Fire Hydrant Ass'y 1 EA @ $2,700.00 /EA = $2,700 SANITARY SEWER: 8" PVC Sewer Main 280 LF @ $33.00 /LF = $9,240 Services 6 EA @ $800.00 /EA = $4,800 STORM SEWER 18" HDPE Pipe 20 L.F. @ $36.00 /LF = $720 Type "S" Inlet L =7' 1 EA @ $3,100.00 /EA = $3,100 Flowable Backfill 8 CY @ $65.00 /EA = $520 STREET LIGHT 1 EA @ $1,300.00 /EA = $1,300 BARRICADES L =16' 1 EA @ $825.00 /EA = $825 PASCADERO DRIVE - SUBTOTAL ;60,130 iIIIIIIVIII IIIIII VIII IIII IIIIII IIIIII III IIIIII III IIII 0 08/19/2003 1520717 0:30P of risunoz 03 11 SUBDMSION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDMSION 16TH FILING DEVELOPER: HORIZON COMMUNITIES, INC. ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. COSTA MESA DRIVE STREETS 3" Asphalt over 6" Base Course 480 SY @ $17.50 /SY = $8,400 Curb and Gutter (Mod. Ramp) 170 LF @ $10.00 /LF = $1,700 WATER 8" PVC Water Main 190 LF @ $40.00 /LF = $7,600 Service 1 EA @ $500.00 /EA = $500 SANITARY SEWER: 8" PVC Sewer Main 165 LF @ $33.00 /LF = $5,445 Services 1 EA @ $800.00 /EA = $800 STORM SEWER 36" HOPE Pipe 28 L.F. @ $72.00 /LF = $2,016 30" HDPE Pipe 122 L.F. @ $60.00 /LF = $7,320 24" HDPE Pipe 7 L.F. @ $48.00 /LF = $336 Type 1B Manhole 1 EA @ $2,000.00 /EA = $2,000 Type "S" Inlet L =15' 1 EA @ $5,500.00 /EA = $5,500 MONUMENT BOX BARRICADES L =16' 1 EA @ $575.00 /EA = $575 1 EA @ $825.00 /EA = $825 COSTA MESA DRIVE - SUBTOTAL $43,017 11111111111111111111111 IN 1111111111111111111111111111 0 13 0 5? 0 03 03:30P 00 12 IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDIVISION 16TH FILING DEVELOPER: HORIZON COMMUNITIES, INC. ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. TOTAL PROJECT: $570,316 This is an estimate only. Actual construction costs may vary. PREPARED BY: M. CUPPY FIRM: NORTHSTAR ENGINEERING AND SURVEYING, INC. The undersigned hereby certifies that (i) the quantities of construction elements shown hereon to quantities necessary to construct the Required Public Improvements and town hereon are the most current unit price provided by the City of Pueblo. Pro'fesstonal Engineer Date City of Pueblo IIIIIIIIIIIIIII IN 1111111111111111111111111111 859/ 03:30P ChrizC.Munoz Pueb1oCtyC1k&Rec SUED AG R 66.00 0 0.00 13 REVIEWED BY: