Loading...
HomeMy WebLinkAbout06816Reception 1469349 11/13/2002 ORDINANCE NO. 6816 AN ORDINANCE APPROVING THE PLAT OF EL CAMINO 15 FILING SUBDIVISION BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. A resubdivision of all of Lot 1, Block 12 in El Camino Subdivision, Fourth Filing, according to the recorded plat thereof, filed for record July 18, 1977 and a subdivision of a portion of the SW1 /4 of the SWIA of Section 16 and the NWl /4 of the NWI /4 of Section 21, Township 21 South, Range 65 West of the 6"' P.M. in the County of Pueblo and State of Colorado and being more particularly described as follows: Considering the West line of the NW '/4 of Section 21, Township 21 South, Range 65 West of the 6 ffi P.M. to bear N. 00 °26'27" E. and all bearings contained herein being relative thereto. Beginning at the Northwest corner of said Section 21; thence N. 00 °25'00" E., along the West line of said SWIA of Section 16, a distance of 40.00 feet to the South subdivision boundary line of said El Camino Subdivision, Fourth Filing; thence Easterly, along said South boundary line the following three (3) courses: 1. S. 89 0 12'30" E., a distance of 371.12 feet, (371.10 feet, plat); 2. along the arc of a curve to the left whose radius is 860 feet, a distance of 251.79 feet; 3. S. 15 0 58'59" E., a distance of 80.00 feet; to the Southwest corner of said Lot 1, Block 12; thence Easterly, along the boundary of said Lot 1, Block 12 the following four (4) courses: 1. along the arc of a curve to the left whose center bears N. 15 °58'59" W. and whose radius is 940 feet, a distance of 59.14 feet (59.15 feet, plat); 2. N. 70 0 24'43" E., a distance of 164.62 feet; 3. along the arc of a curve to the right whose radius is 860 feet, a distance of 21.89 feet (22.01 feet, plat); 4. along the arc of a curve to the right whose center bears S. 81 °42'01" W. and whose radius is 700 feet, a distance of 83.99 feet (84.03 feet, plat) to the South line of said thence S. 89 °12'30" E., along South line, a distance of 464.78 feet to the West subdivision boundary line of El Camino Subdivision, 9' Filing, according to the recorded plat thereof, filed for record April 2, 1999; thence S. 00 °30'53" W., along said West line, a distance of 692.18 feet; thence N. 89 °29'07" W., a distance of 120.00 feet; thence S. 00 °30'53" W., a distance of 50.00 feet; thence N. 89 0 29'07" W., a distance of 247.16 feet; thence N. 73 °55'06" W., a distance of 261.39 feet; thence N. 16 °04'54" E., a distance of 88.22 feet; thence N. 73 °55'06" W., a distance of 73.39 feet; thence N. 49 °25'39" W., a distance of 144.96 feet; thence N. 06 0 01'25" E., a distance of 129.52 feet; thence N. 89 °12'30" W., a distance of 281.18 feet; thence S. 00 °47'30" W., a distance of 116.90 feet; thence S. 31 °33'52" W., a distance of 92.15 feet; thence N. 89 °33'37" W., a distance of 251.68 feet to the said West line of the NW ' / 4 of Section 21; thence N. 00 °26'27" E., along said West line, a distance of 546.47 feet to the Point of Beginning. Containing 18.893 acres. The acceptance of such dedicated streets, rights -of -way, utility and drainage easements, public sites, parks and open spaces by the City does not obligate the City to maintain or repair same until such streets, rights -of -way, utility and drainage easements, public sites, parks and and open spaces have been constructed and installed in compliance and in accordance with the requirements and provisions of Chapter 4, Title XII of the 1971 Code of Ordinances, as amended and any agreement entered into pursuant thereto. RR(:TTON 3. Neither the adoption of this ordinance and the requirements imposed hereby shall create any duty or obligation of any person, firm, corporation or other entity with regard to the enforce- ment or nonenforcement of this ordinance or the City's Subdivision Ordinances and regulations. No person, firm, corporation or other entity shall have any private right of action, claim or demand against the City or its officers, employees or agents, for any injury, damage or liability arising out of or in any way connected with the adoption, enforcement, or nonenforcement of this ordinance or the Subdivision Ordinance and Regulations of the City, or the engineering, surveying, drainage improvement or other work or improvements required thereby. Nothing in this ordinance or in the City's subdivision ordinances and regulations shall create or be construed to create any claim, demand or liability against the City or its officers, employees or agents, or to waive any of the immunities, limitations on liability, or other provisions of the Colorado Governmental Immunity Act, Section 24 -10 -101, et seq. Colorado Revised Statutes, or to waive any immunities or limitations on liability otherwise available to the City or its officers, employees or agents. SECTION 4. This ordinance shall be approved upon final passage but shall not become effective until (a) all information, documents, drawings, profiles, improvement agreements, if any, and plat required by Chapter 4 of Title XII of the 1971 Code of Ordinances meeting and complying with the subdivision requirements of the City and any applicable Annexation Agreement have been filed with and approved by the Director of Public Works, and (b) the final subdivision plat is recorded in the office of the Pueblo County Clerk and Recorder. If any such filings and approvals have been deferred pursuant to Section 12 -4 -5 (b) (2) of the 1971 Code of Ordinances, and are not for any reason filed and approved within one (1) year after passage of this Ordinance, or within any extended period granted by Resolution of the City Council, this Ordinance shall automatically be rescinded and repealed thirty (30) days after written notice of such rescission and repeal is given to the Subdivider. No vested rights shall accrue to the subdivision or be acquired until this Ordinance or the final subdivision plat becomes effective. SF.CTTnN 5. The approval of this Ordinance shall not release or discharge or be construed to release or discharge the owner of the herein described real property or the real property from any condition or obligation imposed upon the owner or the real property pursuant to any applicable Annexation Agreement or condition imposed by the Planning and Zoning Commission, except the requirement to provide a landscaped median on Bandera Boulevard. INTRODUCED: April 8, 2002 a 13 L c rye' 11111 If 11111111111111111 page: 4 of 4 1469349 Chr1sC. Munoz Pueb loCtyClk &Rec ORD / 02.18F R 21.00 D 0.00 ATTESTED i �' �1.Tb ITY CLERK BY: Al Gurule CO ILPERSON APPROVED: PRESIDENT OF CITY COUNCIL PASSED AND APPROVED: April 22, 2002 Background Paper for Proposed ORDINANCE AGENDA ITEM # P15 DATE: APRIL 8, 2002 DEPARTMENT: PLANNING & COMMUNITY DEVELOPMENT /JIM MUNCH TITLE AN ORDINANCE APPROVING THE PLAT OF EL CAMINO 15 FILING SUBDIVISION TSSUF: Shall City Council approve a request to subdivide this property of approximately 19 acres into single - family homes in an R -1 zone district? RECOMMENDATION The Planning and Zoning Commission voted 5 -1 to recommend approval of the plat with the condition that there be a landscaped median constructed on Bandera Boulevard. BACKGROUND The applicant is proposing to subdivide land for single - family homes in the 15` filing of El Camino. The Planning and Zoning Commission conditioned the approval upon the applicant providing a landscaped median on Bandera Boulevard. The Planning and Zoning Commission voted 5 -1 to recommended approval of the plat. FINANCIAL IMPACT None Reception 1469351 11/13/2002 SUBDIVISION IMPROVEMENT AGREEMENT THIS AGREEMENT is made on 6a1T s o%%c2 )1 , 4oerj. , between the CITY OF PUEBLO, a Municipal Corporation ( "City "), and HORIZON COMMUNITIES, INC., a Colorado Corporation ( "Subdivider "). RECITALS WHEREAS, Subdivider has subdivided or is about to subdivide a certain tract of land located in the City and legally described in attached Exhibit "A "; and WHEREAS, the Subdivider, as a condition of approval of the final plat of EL CAMINO SUBDIVISION, 15th FILING ( "Subdivision "), wishes to enter into this Subdivision Improvements Agreement as authorized by Chapter 4, Title XII of the 1971 Code of Ordinances; and WHEREAS, Subdivider is required by Section 12 -4 -7 (J) of the 1971 Code of Ordinances of the City to construct and install certain public improvements generally described in attached Exhibit "B" and shown on approved construction plans and documents on file at the office of the City's Director of Public Works ( "Required Public Improvements "); and WHEREAS, by Chapter 4, Title XII of the 1971 Code of Ordinances, Subdivider is obligated to provide security or collateral sufficient in the judgement of the City Council to make reasonable provisions to construct and complete the Required Public Improvements. NOW, THEREFORE, in consideration of the following mutual covenants and agreements, the City and Subdivider agree as follows: 1. Subdivider agrees within one hundred and eighty (180) days after applying for a building permit to construct any building or structure on any building site within the Subdivision, or upon the issuance of a certificate of occupancy for any such building or structure, whichever occurs first, to construct and install at its sole cost all of the Required Public Improvements. In lieu of installing the Required Public Improvements within the time period prescribed in Paragraph 1, Subdivider or any subsequent owner of the land or any portion thereof shall deposit cash or other collateral with the City Director of Finance, or with any bank or trust company licensed in the State of Colorado, subject to an escrow agreement approved by the City Attorney. The holder of such cash or collateral shall pay all or any portion thereof to the City upon demand after the time to complete all Required Public Improvements by Subdivider or subsequent owner expires. Such deposit or escrow agreement shall be referred to as the "deposit ". DPW 101 10/21/98 IN 1469351 IIII1 .00 18130 0000 2.18E Chr PuebloCtyC1k &Ree SUBD AG R 8 Chr isC.Munoz 3. The amount of the deposit shall be computed by the City's Director of Public Works by estimating the total cost of all uncompleted Required Public Improvements within the block at the time application for building permit is made. The amount of the deposit required by this alternative shall not be less than 25% of such estimate plus the costs of extending all required sewer and water lines from nearest existing sewer and water lines to the proposed building site for which a building permit is sought, plus the costs of extending curb, gutter, sidewalk and paving from the edge of the Subdivision or existing improvements of a like nature, whichever is closer to the proposed building site. In any case where the block, as later defined, exceeds one thousand (1000') feet in length between intersecting streets, the estimate of the City Director of Public Works under this paragraph may be reduced to the total costs of all uncompleted Required Public Improvements in at least one half (1/2) of such block, and the required deposit shall be based upon such decreased estimate. The Subdivider, however, shall provide a turnaround of at least sixty (60') feet in diameter at the mid -block point and barricade such street so that no through traffic shall be permitted beyond the point to which the estimate of Director of Public Works is based. 4. Within one hundred eighty (180) days after subsequent application for a building permit to construct any building or structure upon any building site within the block, or upon the issuance of a certificate of occupancy for any such building or structure, whichever occurs first, Subdivider shall also deposit an amount not less than the estimate of the Director of Public Works for all Required Public Improvements from existing improvements to the proposed building site, less any previous deposits made under this agreement upon building sites lying between the most recent proposed site and existing improvements. 5. In the event the Subdivider or any subsequent owner of the land fails to complete the Required Public Improvements or to make such deposit within the required time, no additional building permits shall be issued to the Subdivider or the subsequent owner or to any other person to build or construct any building or structure in the Subdivision until such default is remedied. In addition, the City may treat the amount of such deposit as a debt due the City from the Subdivider or subsequent owner, which debt shall be a lien upon all the land in the Subdivision and notice of lien may be filed for record in the office of the County Clerk and Recorder at any time after such default. Action upon such debt may be instituted by the City within six (6) years from the date of filing such lien for record. All remedies provided for in this agreement are cumulative and the use of one shall not prohibit the use of another. 6. Upon paying such deposit, the City Director of Public Works shall release the proposed building site from the terms of the Agreement except the terms of Paragraph 7 below. DPW 101 2 10/21/98 7. As a condition of approval of this Subdivision, and to meet the requirements of Section 12- 4 -7(J) of the 1971 Code of Ordinances, Subdivider specifically agrees that no certificate of occupancy shall be issued by the Pueblo Regional Building Department until the Required Public Improvements, or those improvements necessary as determined by the City Director of Public Works, to totally serve specific lot(s) or block(s) for which certificates of occupancy are sought have been properly designed, engineered, constructed and accepted as meeting the specifications and standards of the City. The restrictions on issuing certificates of occupancy contained in this Paragraph 7 and the restriction on the issuance of building permits contained in Paragraph 5 shall run with the land and shall extend to and be binding upon the heirs, legal representatives, successors, and assigns of the Subdivider and may be specifically enforced by the City. 8. Acceptance of this Subdivision by the City does not constitute an acceptance of the roads, parks and other public improvements for maintenance by the City. Until such roads, parks, and other public improvements have been installed and meet the requirements, standards, and specifications of the City, its Subdivision ordinances and any applicable Parks Department specifications, and such are specifically approved and accepted in writing by the City Director of Public Works, and, if appropriate, the City Director of Parks and Recreation, the maintenance, construction, and all other matters pertaining to or affecting said roads, parks and other public improvements and rights -of -way are the sole responsibility of the Subdivider or any subsequent owner(s) of the land within the Subdivision. 9. The required time to complete all Required Public Improvements by Subdivider within such block shall be one (1) year from the date of application for the first building permit issued within such block. Upon completion and written approval and acceptance of the Required Public Improvements within the required time and the payment of all inspection costs by Subdivider, the Director of Public Works shall cause all obligations of the Subdivider relating to the Required Public Improvements within such block to be released. If such Required Public Improvements are not completed within the required time, the City Director of Public Works may cause the proceeds of all deposits or other collateral or monies in escrow to be used to compete the same. If insufficient monies are available at the end of the required time to complete all Required Public Improvements for the entire length of such block, the Director of Public Works shall cause all collateral or monies in escrow to be reduced to cash and shall deposit the same with the Director of Finance. Such cash shall be used to complete that portion of the Required Public Improvements as the Director of Public Works, in the Director's sole discretion, shall determine. Until all the Required Public Improvements are completed and approved by the Director of Public Works, Subdivider and the subdivided land shall remain liable and responsible for all Required Public Improvements. DPW 101 3 10/21/98 10. For purposes of this Agreement, the "block" shall mean both tiers of lots fronting or abutting upon the street which the proposed building or structure shall front, to the rear property line of such lots, or the center line of the alley, if there is an alley, enclosed at either end by a street which intersects both tiers of lots and shall include the full width of all streets upon which such lots abut. 11. If the Required Public Improvements are for a commercial subdivision and include stormwater drainage facilities, stormwater detention facilities, or maintenance and restoration of adjacent drainage channels, and/or associated improvements and revegetation (the "facilities "), located either within or outside of the Subdivision, Subdivider shall install the facilities in accordance with plans and specifications therefore approved by, and on file with the City, and thereafter, the facilities shall be repaired, replaced and maintained in good working order and condition by the owners of the land within the Subdivision. The City is granted the right (but not the obligation) to inspect, control, repair, replace and maintain the facilities and to recover all costs and expenses therefore including an administrative charge of 15% from the owners of the land within the Subdivision. All such City's costs and administrative charges shall become a perpetual lien on all the land within the Subdivision upon recording in the office of the Pueblo County Clerk and Recorder a statement of lien setting forth the City's costs and describing the land signed by the City's Director of Public Works. Failure of the City to inspect, control, repair, maintain, or replace the facilities shall not subject the City to any liability for such failure. 12. Subdivider agrees to provide the City with a current title insurance commitment at the time of final platting evidencing that fee simple title of all lands in the Subdivision is totally vested with the Subdivider free and clear of all liens and encumbrances. If such land is not free and clear, the holder of such indebtedness shall subordinate its interest or encumbrance to this Agreement and all its terms, conditions, and restrictions. 13. The City or the purchaser of any lot(s) within this Subdivision shall have the authority to bring an action in any Court of competent jurisdiction to compel the enforcement of this Agreement or any amendment hereto. Such authority shall include the right to compel rescission of any sale, conveyance, or transfer of any lot(s) or tract(s) contrary to the provisions of the Ordinances of the City or this Agreement. In the event of any litigation concerning this Agreement, the Court shall award the prevailing party its costs and expenses, including reasonable expert witness and attorney's fees. 14. The parties agree this Agreement may be periodically amended by mutual consent provided such amendment is in writing and signed by all parties. DPW 101 4 10/21/98 The parties have caused this Agreement to be executed and attested by its duly authorized and acting officer. HORIZON COMMUNITIES, INC., _a Colorado Corporation Subdivider (SEAL) By: By: Robert W. Leach, President The foregoing instrument was acknowledged before me on 6e4re tn ►► , 'bcpo% , by Robert W. Leach President of Horizon Communit----2 Inc Subdivider. OVUM a Colorado Corporation Dn expires: 1 I %alo oo�, ti.►awvaae.w �A�g ►a'�w, Go�.vf2.poo �u y g"Q7-*M STATE OF COLORADO COUNTY OF PUEBLO ) ss. Notary Public a Municipal Corporation President of City Council The foregoing instrument was acknowledged before me this 7th day of November , 2002 by Michael A nrrhiato as Pre ' of City Council, and Gina Dutcher as City Clerk of the City of $� do. Tq 0 ' �� �s y hand and official seal. J i i Z My c0 ssion expires: 8-21-2003 N gj ` g V B j O C Notary Public My APPROVED AS TO FORM: City Attorney DPW 101 5 10/21/98 SUBDIVISION IMPROVEMENT AGREEMENT EXHIBIT A A resubdivision of all of Lot 1, Block 12 in El Camino Subdivision, Fourth Filing, according to the recorded plat thereof, filed for record July 18, 1977 and a subdivision of a portion of the SW 1 /4 of the SW 1 /4 of Section 16 and the NWi /4 of the NW1 /4 of Section 21, Township 21 South, Range 65 West of the 6"' P.M. in the County of Pueblo and State of Colorado and being more particularly described as follows: Considering the West line of the NW 1 /4 of Section 21, Township 21 South, Range 65 West of the 6"' P.M. to bear N. 00 0 26'27" E. and all bearings contained herein being relative thereto. Beginning at the Northwest corner of said Section 21; thence N. 00 0 25'00" E., along the West line of the said SW 1 /a of Section 16, a distance of 40.00 feet to the South subdivision boundary line of said El Camino Subdivision, Fourth Filing; thence Easterly, along said South boundary line the following three (3) courses: 1. S. 89 0 12'30" E., a distance of 371.12 feet (371.10 feet, plat); 2. along the arc of a curve to the left whose radius is 860 feet, a distance of 251.79 feet; 3. S. 15 0 58'59" E., a distance of 80.00 feet to the Southwest corner of said Lot 1, Block 12; thence Easterly, along the boundary of said Lot 1, Block 12 the following four (4) courses: 1. along the arc of a curve to the left whose center bears N. 15 0 58'59" W. and whose radius is 940 feet, a distance of 59.14 feet (59.15 feet, plat); 2. N. 70 0 2443" E., a distance of 164.62 feet; 3. along the arc of a curve to the right whose radius is 860 feet, a distance of 21.89 feet (22.01 feet, plat); 4. along the arc of a curve to the right whose center bears S. 81 0 42'01" W. and whose radius is 700 feet, a distance of 83.99 feet (84.03 feet, plat) to the South line of said Fourth Filing; IIII III I II 1469351 IIIIIIIIIIIIIIIIIIIIIIIIIIII VII IIIII 00 1913p 0 00 2.18E ChrisC.Munoz Pugb1OCtYCIk &Rec SLED AG R 81 thence S. 89 0 12'30" E., along said South line, a distance of 464.78 feet to the West subdivision boundary line of El Camino Subdivision, 9 th Filing, according to the recorded plat thereof, filed for record April 2, 1999; thence S. 00 0 30'53" W., along said West line, a distance of 692.18 feet; thence N. 89 0 29'07" W., a distance of 120.00 feet; thence S. 00 0 30'53" W., a distance of 50.00 feet; thence N. 89 0 29'07" W., a distance of 247.16 feet; thence N. 73 0 55'06" W., a distance of 261.39 feet; thence N. 16 0 04'54" E., a distance of 88.22 feet; thence N. 73 0 55'06" W., a distance of 73.39 feet; thence N. 49 0 25'39" W., a distance of 144.96 feet; thence N. 06 0 01'25" E., a distance of 129.52 feet; thence N. 89 0 12'30" W., a distance of 281.18 feet; thence S. 00 0 47'30" W., a distance of 116.90 feet; thence S. 31 0 3352" W., a distance of 92.15 feet; thence N. 89 0 33'37" W., a distance of 251.68 feet to the said West line of the NW 1 /a of Section 21; thence N. 00 0 2627" E., along said West line, a distance of 586.47 feet to the Point of Beginning. Containing 18.893 acres, total. 7 SUBDMSION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDIVISION, 15TH FILING DEVELOPER: HORIZON COMMUNITIES ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. PHASE 1 STREETS ( BANDERA BLVD) Asphalt (4" Asphalt on 10" Base) 3,800 SY @ $23.50 /SY = $89,300 Curb and Gutter 1,630 LF @ $10.00 /LF = $16,300 Handicap Ramps 400 SF @ $3.50 /SF = $1,400 Sidewalk 5,515 SF @ $2.50 /SF = $13,788 WATER 12" PVC Water Main 572 LF @ $40.00 /LF = $22,880 Fire Hydrant Assembly EA @ $2,700.00 /EA = $0 SANITARY SEWER: 8" PVC Sewer Main 540 LF @ $35.00 /LF = $18,900 48" Manholes 2 EA @ $2,240.00 /EA = $4,480 STORM SEWER 30" HDPE Pipe 262 LF @ $60.00 /LF = $15,720 36" HDPE Pipe 332 LF @ $72.00 /LF = $23,904 Type 1 -B Manhole 2 EA @ $2,000.00 /EA = $4,000 STREET LIGHTS 4 EA @ $1,300.00 /EA = $5,200 MONUMENT BOX 3 EA @ $575.00 /EA = $1,725 BARRICADE 1 EA @ $1,125.00 /EA = $1,125 STREET SIGNS 100' R.O.W. (T- Intersection) 1 EA @ $400.00 /EA = $400 BANDERA BLVD X219,122 SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDIVISION, 15TH FILING DEVELOPER: HORIZON COMMUNITIES ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. PHASE 1 STREETS (SAN JACINTO COURT) Asphalt (3" Asphalt on 6" Base) 720 SY @ Curb and Gutter 300 LF @ WATER 6" PVC Water Main Services Fire Hydrant Assembly SANITARY SEWER: 8" PVC Sewer Main Services 48" Manholes STORM SEWER 15" HDPE Pipe Type "S" Inlet, L =7' :11 MONUMENT BOX STREET SIGNS 60' R.O.W. (T- Intersection) $17.50 /SY = $12,600 $10.00 /LF = $3,000 $40.00 /LF = $6,440 $500.00 /EA = $2,500 $2,700.00 /EA = $0 161 LF @ 5 EA @ EA @ 131 LF @ 5 EA @ 1 EA @ 31 LF @ 1 EA @ 1 EA @ 1 EA @ $35.00 /LF = $800.00 /EA = $2,240.00 /EA = $30.00 /LF = $3,100.00 /EA = $1,300.00 /EA = $575.00 /EA = $4,585 $4,000 $2,240 $930 $3,100 $1,300 $575 1 EA @ $200.00 /EA = $200 SAN JACINTO COURT $41,470 SUBDMSION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDMSION, 15TH FILING DEVELOPER: HORIZON COMMUNITIES ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. PHASE 1 STREETS (MOJAVE DRIVE) Asphalt (3" Asphalt on 6" Base) 2,345 SY @ $17.50 /SY = $41,038 Curb and Gutter 1,135 LF @ $10.00 /LF = $11,350 Handicap Ramps 240 SF @ $3.50 /SF = $840 Sidewalk 965 SF @ $2.50 /SF = $2,413 WATER 8" PVC Water Main LF @ $40.00 /LF = $0 Services 10 EA @ $500.00 /EA = $5,000 Fire Hydrant Assembly EA @ $2,700.00 /EA = $0 SANITARY SEWER: 8" PVC Sewer Main 568 LF @ $35.00 /LF = $19,880 Services 10 EA @ $800.00 /EA = $8,000 48" Manholes 2 EA @ $2,240.00 /EA = $4,480 STORM SEWER 15" HDPE Pipe 44 LF @ $30.00 /LF = $1,320 18" HDPE Pipe 4 LF @ $36.00 /LF = $144 24" HDPE Pipe 260 LF @ $48.00 /LF = $12,480 30" HDPE Pipe 192 LF @ $60.00 /LF = $11,520 36" HDPE Pipe 126 LF @ $72.00 /LF = $9,072 Type 1 -B Manhole 3 EA @ $2,000.00 /EA = $6,000 Type "S" Inlet, L =4' 1 EA @ $2,200.00 /EA = $2,200 Type "S" Inlet, L =7' 1 EA @ $3,100.00 /EA = $3,100 Sidewalk Drain 2 EA @ $1,500.00 /EA = $3,000 STREET LIGHTS 2 EA @ $1,300.00 /EA = $2,600 MONUMENT BOX 2 EA @ $575.00 /EA = $1,150 STREET SIGNS 60' R.O.W. (4 -Way- Intersection) 1 EA @ $300.00 /EA = $300 MOJAVE DRIVE $145 SUBDMSION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDIVISION, 15TH FILING DEVELOPER: HORIZON COMMUNITIES ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. PHASE 1 STREETS(ALTURAS DRIV Asphalt (3" Asphalt on 6" Base) 2,065 SY @ $17.50 /SY = $36,138 Curb and Gutter 1,110 LF @ $10.00 /LF = $11,100 Handicap Ramps 240 SF @ $3.50 /SF = $840 Sidewalk 1,545 SF @ $2.50 /SF = $3,863 WATER 1 EA @ $2,200.00 /EA = $2,200 8" PVC Water Main 600 LF @ $40.00 /LF = $24,000 Services 7 EA @ $500.00 /EA = $3,500 Fire Hydrant Assembly 1 EA @ $2,700.00 /EA = $2,700 SANITARY SEWER: 4 EA @ $575.00 /EA = $2,300 8" PVC Sewer Main 570 LF @ $35.00 /LF = $19,950 Services 7 EA @ $800.00 /EA = $5,600 48" Manholes 3 EA @ $2,240.00 /EA = $6,720 STORM SEWER 15" HDPE Pipe 35 LF @ $30.00 /LF = $1,050 30" RCP Pipe 107 LF @ $60.00 /LF = $6,420 30" HDPE Pipe 160 LF @ $60.00 /LF = $9,600 Type 1 -B Manhole 1 EA @ $2,000.00 /EA = $2,000 Type "S" Inlet, L =4' 1 EA @ $2,200.00 /EA = $2,200 Type "W" Inlet, L =4' 1 EA @ $2,200.00 /EA = $2,200 Sidewalk Drain 2 EA @ $1,500.00 /EA = $3,000 STREET LIGHTS 2 EA @ $1,300.00 /EA = $2,600 MONUMENT BOX 4 EA @ $575.00 /EA = $2,300 BARRICADE 1 EA @ $825.00 /EA = $825 STREET SIGNS 60' R.O.W. (4 -Way- Intersection) 1 EA @ $300.00 /EA = $300 ALTURAS DRIVE ;146,905 SUBDMSION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDIVISION, 15TH FILING DEVELOPER: HORIZON COMMUNITIES ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. PHASE 1 23 LF @ $48.00 /LF = $1,104 STREETS (CABAZON COURT) 1 EA @ $3,400.00 /EA = $3,400 Asphalt (3" Asphalt on 6" Base) 855 SY @ $17.50 /SY = $14,963 Curb and Gutter 380 LF @ $10.00 /LF = $3,800 Sidewalk 345 SF @ $2.50 /SF = $863 WATER 1 EA @ $200.00 /EA = $200 6" PVC Water Main 150 LF @ $40.00 /LF = $6,000 Services 4 EA @ $500.00 /EA = $2,000 Fire Hydrant Assembly EA @ $2,700.00 /EA = $0 SANITARY SEWER: 8" PVC Sewer Main 159 LF @ $35.00 /LF = $5,565 Services 4 EA @ $800.00 /EA = $3,200 48" Manholes 1 EA @ $2,240.00 /EA = $2,240 STORM SEWER 18" HDPE Pipe 23 LF @ $48.00 /LF = $1,104 Type "S" Inlet, L =8' 1 EA @ $3,400.00 /EA = $3,400 STREET LIGHTS i EA @ $1,300.00 /EA = $1,300 MONUMENT BOX 1 EA @ $575.00 /EA = $575 STREET SIGNS 60' R.O.W. (T- Intersection) 1 EA @ $200.00 /EA = $200 CABAZON COURT $45,209 SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDIVISION, 15TH FILING DEVELOPER: HORIZON COMMUNITIES ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. PHASE 1 Earthwork 11,820 CY @ $2.00 /CY = $23,640 6' Low Flow Pan 1,760 SF @ $3.20 /SF = $5,632 Inlet Structure at N.W. Comer 1 EA @ $4,000.00 /EA = $4,000 Type "M" Riprap 15 CY @ $50.00 /CY = $750 Outlet Structure 1 EA @ $5,000.00 /EA = $5,000 Planting and Revegetation 2.05 AC @ $12,000.00 /AC = $24,600 MM. IMPROVEMENTS $63,622 TOTAL PHASE 1 $662,214 SUBDMSION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDIVISION, 15TH FILING DEVELOPER: HORIZON COMMUNITIES ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. PHASE II STREETS (BRIDLE TRAIL) Asphalt (3" Asphalt on 12" Base) Curb and Gutter Handicap Ramps 7" Concrete Waterline cover WATER Fire Hydrant Assembly SANITARY SEWER: 8" PVC Sewer Main 48" Manholes STORM SEWER 18" RCP Pipe Type 1 -B Manholes STREET LIGHTS MONUMENT BOX C7_L'l"11 9 0 3,280 SY @ $23.50 /SY = $77,080 1,250 LF @ $10.00 /LF = $12,500 750 SF @ $3.50 /SF = $2,625 585 SF @ $3.80 /SF = $2,223 EA @ $2,700.00 /EA = $0 676 LF @ $35.00 /LF = $23,660 3 EA @ $2,240.00 /EA = $6,720 660 LF @ $36.00 /LF = $23,760 3 EA @ $2,000.00 /EA = $6,000 2 EA @ $1,300.00 /EA = $2,600 3 EA @ $575.00 /EA = $1,725 1 EA @ $825.00 /EA = $825 BRIDLE TRAIL X159,718 SUBDIVISION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDIVISION, 15TH FILING DEVELOPER: HORIZON COMMUNITIES ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. PHASE II STREETS (LODI COURT) Asphalt (3" Asphalt on 6" Base) 995 SY @ $17.50 /SY = $17,413 Curb and Gutter 460 LF @ $10.00 /LF = $4,600 WATE 8" PVC Water Main 240 LF @ $40.00 /LF = $9,600 Services 7 EA @ $500.00 /EA = $3,500 Fire Hydrant Assembly EA @ $2,700.00 /EA = $0 SANITARY SEWER: 8" PVC Sewer Main 211 LF @ $35.00 /LF = $7,385 48" Manholes 1 EA @ $2,240.00 /EA = $2,240 Services 7 EA @ $800.00 /EA = $5,600 STORM SEWER 18" HOPE Pipe 60 LF @ $36.00 /LF = $2,160 Type "S" Inlet, L =6' 2 EA @ $2,800.00 /EA = $5,600 STREET LIGHTS 1 EA @ $1,300.00 /EA = $1,300 MONUMENT BOX 2 EA @ $575.00 /EA = $1,150 STREET SIGNS 60' R.O.W. (T- Intersection) 1 EA @ $200.00 /EA = $200 LODI COURT $60,748 SUBDMSION IMPROVEMENTS AGREEMENT EXHIBIT "B" SUBDIVISION NAME: EL CAMINO SUBDIVISION, 15TH FILING DEVELOPER: HORIZON COMMUNITIES ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC. PHASE II STREETS ( PETALINA COURT) Asphalt (3" Asphalt on 6" Base) 1,700 SY @ $17.50 /SY = $29,750 Curb and Gutter 855 LF @ $10.00 /LF = $8,550 WATER 8" PVC Water Main 440 LF @ $40.00 /LF = $17,600 Services 12 EA @ $500.00 /EA = $6,000 Fire Hydrant Assembly EA @ $2,700.00 /EA = $0 SANITARY SEWER: 8" PVC Sewer Main 307 LF @ $35.00 /LF = $10,745 48" Manholes 2 EA @ $2,240.00 /EA = $4,480 Services 12 EA @ $800.00 /EA = $9,600 STORM SEWER 18" HDPE Pipe 40 LF @ $36.00 /LF = $1,440 Type "S" Inlet, L =6' 1 EA @ $2,800.00 /EA = $2,800 STREET LIGHTS 1 EA @ $1,300.00 /EA = $1,300 MONUMENT BOX 1 EA @ $575.00 /EA = $575 STREET SIGNS 60' R.O.W. (T- Intersection) 1 EA @ $200.00 /EA = $200 PETALINA COURT $93,040 TOTAL PHASE 2 $313,506 TOTAL ALL PHASES $975,719 This is an estimate only. Actual construction costs may vary. This estimate may not include all construction costs. The undersigned hereby certifies that (I) the quantities of construction elements shown hereon accurately depicts the quantities necessary to construct the Required IOU Publi and (ii) the unit prices shown hereon are the most current unit p ' ity of Pueblo. FIRM: 11.40l�01491; F Professional Engineer Date PWT NORTHSTA AND SURVEYING, INC. /O 1S1uZ CITY OF PUEBLO 16 a co l"i L N Lf) CD M ° m� Comm LO ^M 41W m ro� m �o � o m - N � U m O: tl U T � V a m EMS= a N O � V N U Reception 1469352 11/13/2002 ADDENDUM TO SUBDIVISION IMPROVEMENTS AGREEMENT (PHASED CONSTRUCTION) This Addendum shall be incorporated in and become a part of the y�z�n aan, 11 , 1&.o nz Subdivision Improvements Agreement for EL CAMINO SUBDIVISION, 15th FILING (herein the "Subdivision ") and enforceable as provided in said Subdivision Improvements Agreement. The Subdivider will develop EL CAMINO SUBDIVISION, 15th FILING in separate phases to be identified herein as Phase I, Phase II, (etc.) 2. Phase I shall consist of the following lots within the Subdivision: Block 39 Lots 15 through 18 Block 40 Lots 52 through 57 Block 50 Lots 14 through 17 and Parcel A Block 51 Lots 20 through 30 3. Phase II shall consist of the following lots within the Subdivision: Block 51 Lots 1 through 19 4. The Subdivider shall construct and install all of Required Public Improvements in the manner and as described in the Subdivision Improvements Agreement needed and required to serve the lots within each Phase. 5. For purposes of determining the extent and timing of the Required Public Improvements, each Phase shall be considered as a separate subdivision and an event requiring completion of the improvements in one Phase will not require completion of improvements in the other Phase. 6. After completion of the Required Public Improvements for any Phase and approval thereof by the Director of Public Works, the City will release the lots in that Phase from the agreement and this addendum. DPW 103 12/03/98 i IIIIII VIII 1111111 VIII IIII 1111 146 of 2 P ChrisC.Munoz Pueb10CtyC1k&R ADD AG R 11.00 D 0.00 7. The Subdivision Improvements Agreement as amended by this Addendum shall remain in full force and effect and the covenants of this Addendum shall run with the land within the Subdivision and shall extend to, be binding upon, and inure to the benefit of the City and Subdivider and their respective heirs, personal representatives, successors, and assigns. Executed at Pueblo, Colorado as of A )Z7TI g"q 1k n, 11 1,0 HORIZON COMMUNITIES, INC., a Colorado Corporation ,(f Subdivider By: e_ b Robert W. Leach, President By: (Seal) STATE OF COLORADO ) )ss. COUNTY OF PUEBLO ) The foregoing instrument was acknowledged before me this 11 ~ day of 6LSPtcrnAS1 , 20o-1 by Robert W. Leah President of Horiz Communities, Inc,a Colorado Corporation, Subdivider. My commission expires: 7'tm� q,oa1. �..1 1d1i.7NpA0.1L LA� 7M'Cty►.0,, LOL.&U►oo %lo6D1 Notary Public ` toF c��� j4 CNM h*fl EgMQ7.10= CITY OF PUEBLO A Municipal Corporation By: _ President of the Council DPW 103 12/03/98