HomeMy WebLinkAbout06409Reception 1328315
04/10/2000
ORDINANCE NO. 6409
AN ORDINANCE APPROVING THE PLAT OF EL CAMINO
SUBDIVISION, 13TH FILING
BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
The final plat of El Camino Subdivision, 13th Filing, being a subdivision of land
legally described as:
A portion of Parcel A, as platted in El Camino Subdivision, 7th Filing,
according to the recorded plat thereof, filed for record July 19, 198 8
and
A portion of the NE 1/4 of the NW 1/4 of Section 21, Township 21 South,
Range 65 West of the 6th P.M. in the County of Pueblo, State of Colorado
and all being more particularly described as follows:
Considering the East line of the NW 1/4 of Section 21, Township 21 South,
Range 65 West of the 6th P.M. to bear N.00 °36'16 "E. and all bearings con-
tained herein being relative thereto.
Beginning at the Southwest corner of Lot 1, Block 40 in El Camino Subdivi-
sion, Filing No. 7A, according to the recorded plat thereof, filed for record
April 23, 1992; thence N.86 °55'42" E., along the South boundary line of said
Filing No. 7A, a distance of 105.51 feet to the West right -of -way line of
Encino Drive, as platted in El Camino Subdivision, 6th Filing, according to
the recorded plat thereof, filed for record May 6,1997; thence Southeasterly,
along said West right -of -way line and along the arc of a curve to the left
whose center bears N.86 °5542 "E. and whose radius is 640 feet, a distance
of 250.55 feet to the Northernmost corner of a tract of land conveyed to
School District No. 60 by deed recorded in Book 2523 at Page 221 of the
Pueblo County records; thence Southwesterly, along the boundary of said
tract of land the following four (4) courses:
1. S.64 0 29'51" W., a distance of 300.00 feet;
2. along the arc of a curve to the right whose center bears S.73 0 44'36" W.
and whose radius is 370 feet, a distance of 227.69 feet;
3. S.19 0 00'07 "W., a distance of 239.20 feet;
4. S.01 "W., a distance of 200.00 feet to the South line of the said
NE 1/4 of the NW 1/4;
thence N.88 0 59'53 "W., along said South line, a distance of 288.44 feet; thence
N.00 °30'53 "E., a distance of 304.17 feet; thence S.89 °29'07 "E., a distance of
55.00 feet; thence N.00 0 30'53 "E., a distance of 180.00 feet; thence S.89 °29'07"
11111111111111111111111 11111111111111111111111111111111111111 IN
1328313 04/10/2000 11:39A ORD Chris C. Munoz
2 of 3 R 13.00 D 0.00 Pueblo C!y Clk & Rec.
E., a distance of 17.46 feet; thence N.00 °47'30 "E., a distance of 120.00 feet to
the Southeast corner of Lot 12, Block 40 in El Camino Subdivision, 9th Filing,
according to the recorded plat thereof; thence along the boundary of said 9th
Filing, according to the recorded plat thereof; thence along the boundary of
said 9th Filing the following three (3) courses:
1. N.00 0 47'30 "E., a distance of 438.99 feet;
2. S.89 0 12'30 "E., a distance of 395.00 feet;
3. 5.00 0 47'30 "W., a distance of 27.08 feet to the point of beginning,
containing 8.861 acres,
is hereby approved, and all dedicated streets, utility and drainage easements, rights -of -way
and land set aside for public sites, parks and open spaces shown and dedicated on said
plat are hereby accepted for public use.
SECTION 2.
The acceptance of such dedicated streets, rights -of -way, utility and drainage easements,
public sites, parks and open spaces by the City does not obligate the City to maintain or repair
same until such streets, rights -of -way, utility and drainage easements, public sites, parks and
and open spaces have been constructed and installed in compliance and in accordance with the
requirements and provisions of Chapter 4, Title XII of the 1971 Code of Ordinances, as amended
and any agreement entered into pursuant thereto.
SECTION 3.
Neither the adoption of this ordinance and the requirements imposed hereby shall create
any duty or obligation of any person, firm, corporation or other entity with regard to the enforce-
ment or nonenforcement of this ordinance or the City's Subdivision Ordinances and regulations.
No person, firm, corporation or other entity shall have any private right of action, claim or
demand against the City or its officers, employees or agents, for any injury, damage or liability
arising out of or in any way connected with the adoption, enforcement, or nonenforcement of
this ordinance or the Subdivision Ordinance and Regulations of the City, or the engineering,
surveying, drainage improvement or other work or improvements required thereby. Nothing
in this ordinance or in the City's subdivision ordinances and regulations shall create or be
construed to create any claim, demand or liability against the City or its officers, employees
or agents, or to waive any of the immunities, limitations on liability, or other provisions of the
Colorado Governmental Immunity Act, Section 24 -10 -101, et seq. Colorado Revised Statutes,
or to waive any immunities or limitations on liability otherwise available to the City or its
officers, employees or agents.
SECTION 4.
This ordinance shall be approved upon final passage but shall not become effective
until (a) all information, documents, drawings, profiles, and plat required by Chapter 4 of
Title XII of the 1971 Code of Ordinances meeting and complying with the subdivision require-
111111111111111111111111111111111111111111111111111111111 IN
1328315 04/10/2000 11:59A ORD Chris C. Munoz
3 of 3 R 15.00 D 0.00 Pueblo Cty Clk 8 Ree.
ments of the City have been filed with and approved by the Director of Public Works, and (b)
the final subdivision plat is recorded in the office of the Pueblo County Clerk and Recorder.
If any such filings and approvals have been deferred pursuant to Section 12 -4 -5 (B) (2) of the
1971 Code of Ordinances, and are not for any reason filed and approved within one (1) year
after final passage of this Ordinance, or within any extended period granted by Resolution
of the City Council, this Ordinance shall automatically be rescinded and repealed thirty
(30) days after written notice of such rescission and repeal is given to the Subdivider. No
vested rights shall accrue to the subdivision or be acquired until this Ordinance or the final
subdivision plat becomes effective.
INTRODUCED February 8, 1999
By Rich Golenda
C ncilmember
APPROVED
President of the Council
1/29/99
'k
Ae
City Clerk
By Rich Golenda
C ncilmember
APPROVED
President of the Council
1/29/99
Reception 1328317
04/10/2000
SUBDIVISION IMPROVEMENTS AGREEMENT
THIS AGREEMENT is made on February 25, r 2000 , between the CITY OF
PUEBLO, a Municipal Corporation ( "City "), and
HORIZON COMMUNITIES, INC., a Colorado Corporation
( "Subdivider ")
RECITALS:
WHEREAS, Subdivider has subdivided or is about to subdivide a certain tract of land located
in the City and legally described in attached Exhibit "A "; and
WHEREAS, the Subdivider, as a condition of approval of the final plat of
EL CAMINO SUBDIVISION, 13TH FILING
( "Subdivision "), wishes to enter into this Subdivision Improvements Agreement as authorized by
Chapter 4, Title XII of the 1971 Code of Ordinances; and
WHEREAS, Subdivider is required by Section 12 -4 -7 () of the 1971 Code of Ordinances of
the City to construct and install certain public improvements generally described in attached Exhibit
"B" and shown on approved construction plans and documents on file at the office of the City's
Director of Public Works (`Required Public Improvements "); and
WHEREAS, by Chapter 4, Title XII of the 1971 Code of Ordinances, Subdivider is obligated
to provide security or collateral sufficient in the judgement of the City Council to make reasonable
provisions to construct and complete the Required Public Improvements.
NOW, THEREFORE, in consideration of the following mutual covenants and agreements,
the City and subdivider agree as follows:
1. Subdivider agrees within one hundred and eighty (180) days after applying for a
building permit to construct any building or structure on any building site within the
Subdivision, or upon the issuance of a certificate of occupancy for any such building
or structure, whichever occurs first, to construct and install at its sole cost all of the
Required Public Improvements.
2. In lieu of installing the Required Public Improvements within the time period
prescribed in Paragraph 1, Subdivider or any subsequent owner of the land or any
portion thereof shall deposit cash or other collateral with the City Director of Finance,
or with any bank or trust company licensed in the State of Colorado, subject to an
escrow agreement approved by the City Attorney. The holder of such cash or
collateral shall pay all or any portion thereof to the City upon demand after the time
DPW 2/18/98
1
111111 1111111111111111 IN 111111111111111111111111 II
1328317 04/10/2000 11:59A SUB AG Chris C. Munoz
2 of 12 R 60.00 D 0.00 Pueblo Cty Clk & Roe.
to complete ail Required Public Improvements by Subdivider or subsequent owner
expires. Such deposit or escrow agreement shall be referred to as the "deposit ".
The amount of the deposit shall be computed by the City's Director of Public Works
by estimating the total cost of all uncompleted Required Public Improvements within
the block at the time application for building permit is made. The amount of the
deposit required by this alternative shall not be less than 25% of such estimate plus
the costs of extending all required sewer and water lines from nearest existing sewer
and water lines to the proposed building site for which a building permit is sought, plus
the costs of extending curb, gutter, sidewalk and paving from the edge of the
Subdivision or existing improvements of a like nature, whichever is closer, to the
proposed building site. In any case where the block, as later defined, exceeds one
thousand (1000') feet in length between intersecting streets, the estimate of the City
Director of Public Works under this paragraph may be reduced to the total costs of
all uncompleted Required Public Improvements in at least one half ('/2) of such block,
and the required deposit shall be based upon such decreased estimate. The Subdivider,
however, shall provide a turnaround of at least sixty (60') feet in diameter at the mid -
block point and barricade such street so that no through traffic shall be permitted
beyond the point to which the estimate of the Director of Public Works is based.
Within one hundred eighty (180) days after subsequent application for a building
permit to construct any building or structure upon any building site within the block,
or upon the issuance of a certificate of occupancy for any such building or structure,
whichever occurs first, Subdivider shall also deposit an amount not less than the
estimate of the Director of Public Works for all Required Public Improvements from
existing improvements to the proposed building site, less any previous deposits made
under this agreement upon building sites lying between the most recently proposed
site and existing improvements.
5. In the event the Subdivider or any subsequent owner of the land fails to complete the
Required Public Improvements or to make such deposit within the required time, no
additional building permits shall be issued to the Subdivider or the subsequent owner
or to any other person to build or construct any building or structure in the
Subdivision until such default is remedied. In addition, the City may treat the amount
of such deposit as a debt due the City from the Subdivider or subsequent owner, which
debt shall be a lien upon all the land in the Subdivision and notice of lien may be filed
for record in the office of the County Clerk and Recorder at any time after such
default. Action upon such debt may be instituted by the City within six (6) years from
the date of filing such lien for record. All remedies provided for in this agreement are
cumulative and the use of one shall not prohibit the use of another.
6. Upon paying such deposit, the City Director of Public Works shall release the
proposed building site from the terms of the Agreement except the terms of Paragraph
7 below.
DPW 2/18/98
• 1 111111 11111 IIIII 111111 IIII lllltll Illit III IIIII Iill
1328317 04/10/2000 11:39A SUB AS Chrls C. Muno:
3 of 12 R 60.00 D 0.00 Pueblo Cty Clk 8 Roe.
7. As a condition of approval of this Subdivision, and to meet the requirements of
Section 124-7 (.i) of the 1971 Code of Ordinances, Subdivider specifically agrees that
no certificate of occupancy shall be issued by the Pueblo Regional Building
Department until the Required Public Improvements, or those improvements necessary
as determined by the City Director of Public Works, to totally serve specific lot(s) or
block(s) for which certificates of occupancy are sought have been properly designed.,
engineered, constructed and accepted as meeting the specifications and standards of
the City.
The restrictions on issuing certificates of occupancy contained in this paragraph 7 and
the restriction on the issuance of building permits contained in paragraph 5 shall run
with the land and shall extend to and be binding upon the heirs, legal representatives,
successors and assigns of Subdivider and may be specifically enforced by the City.
8. Acceptance of this Subdivision by the City does not constitute an acceptance of the
roads, parks and other public improvements for maintenance by the City. Until such
roads, parks and other public improvements have been installed and meet the
requirements, standards, and specifications of the City, its Subdivision ordinances, and
any applicable Parks Department specifications, and such are specifically approved and
accepted in writing by the City Director of Public Works, and, if appropriate, the City
Director of Parks and Recreation, the maintenance, construction, and all other matters
pertaining to or affecting said roads, parks and other public improvements and rights -
of -way are the sole responsibility of the Subdivider or any subsequent owner(s) of the
land within the Subdivision.
9. The required time to complete all Required Public Improvements by Subdivider within
such block shall be one (1) year from the date of application for the first building
permit issued within such block. Upon completion and written approval and
acceptance of Required Public Improvements within the required time and the payment
of all inspection costs by Subdivider, the Director of Public Works shall cause all
obligations of the Subdivider relating to the Required Public Improvements within
such block to be released. If such Required Public Improvements are not completed
within the required time, the City Director of Public Works may cause the proceeds
of all deposits or other collateral or monies in escrow to be used to complete
the same. If insufficient monies are available at the end of the required time to
complete all Required Public Improvements for the entire length of such block, the
Director of Public Works shall cause all collateral or monies in escrow to be reduced
to cash and shall deposit the same with the Director of Finance. Such cash shall be
used to complete that portion of the Required Public Improvements as the Director
of Public Works, in the Director's sole discretion, shall determine. Until all the
Required Public Improvements are completed and approved by the Director of Public
Works, Subdivider and the subdivided land shall remain liable and responsible for all
the Required Public Improvements.
DPW 2/18/98
111111111111 IN
1328317 04/10/2000 11:39A SUB AG Chris C. Muno:
4 of 12 R 60.00 D 0.00 Pueblo Cty Clk & Rec.
10. For purposes of this Agreement, the "block" shall mean both tiers of lots fronting or
abutting upon the street which the proposed building or structure shall front, to the
rear property line of such lots, or the center line of the alley, if there is an alley,
enclosed at either end by a street which intersects both tiers of lots, and shall include
the full width of all streets upon which such lots abut.
11. If the Required Public Improvements are for a commercial subdivision and include
stormwater drainage, stormwater detention facility, or maintenance and restoration
of restoration of adjacent drainage channels, and/or associated improvements and
revegetation (the "facilities "), located either within or outside of the Subdivision,
Subdivider shall install the facilities in accordance with plans and specifications
therefor approved by, and on file with the City, and thereafter, the facilities shall be
repaired, replaced and maintained in good working order and condition by the owners
of the land within the Subdivision. The City is granted the right (but not the
obligation) to inspect, control, repair, replace and maintain the facilities and to
recover all costs and expenses therefor including an administrative charge of 15% from
the owners of the land within the Subdivision. All such City's costs and
administrative charge shall become a perpetual lien on all the land within the
Subdivision upon recording in the office of the Pueblo County Clerk and Recorder a
statement of lien setting forth the City's costs and describing the land signed by the
City's Director of Public Works. Failure of the City to inspect, control, repair,
maintain or replace the facilities shall not subject the City to any liability for such
failure.
12. Subdivider agrees to provide the City with a current title insurance commitment at the
time of final platting evidencing that fee simple title of all lands in the Subdivision is
totally vested with the Subdivider free and clear of all liens and encumbrances. If such
land is not free and clear, the holder of such indebtedness shall subordinate its interest
or encumbrance to this Agreement and all its terms, conditions and restrictions.
13. The City or the purchaser of any lot(s) within this Subdivision shall have the authority
to bring an action in any Court of competent jurisdiction to compel the enforcement
of this Agreement or any amendment hereto. Such authority shall include the right
to compel rescission of any sale, conveyance or transfer of any lot(s) or tract(s)
contrary to the provisions of the Ordinances of the City or this Agreement. In the
event of any litigation conceming this Agreement, the Court shall award the prevailing
party its costs and expenses, including reasonable expert witness and attorneys' fees.
14. The parties agree this Agreement may be periodically amended by mutual consent
provided such amendment is in writing and be signed by all parties.
15. This Agreement shall extend to and be binding upon the successors and assigns of the
City and upon the heirs, successors, assigns and legal representatives of Subdivider,
DPW 2/18/98 4
11111111111111111111111111111111111111111111111111 IN
1328317 04/10/2000 11:59A SUB AG Chris C. Munoz
5 of 12 R 60.00 D 0.00 Pueblo Ct.y Clk 8 Ree.
and shall be recorded in the office of the County Clerk and Recorder of Pueblo
County, Colorado, and shall constitute an agreement running with the land until
released as described above,
The parties have caused this Agreement to be executed and attested by its duly authorized and
acting officer.
(SEAL)
� 0 iaKit�i '
ss.
COUNTY OF PUEBLO
HORIZON COMMUNITIES, INC.,
a Colorado Corporation
Subdivider
By: w,
Robert W. Leach. President
2
The foregoing instrument was acknowledged before me on February 25 T 2000
by Robert W. Leach, President of HORIZON COMMUNITIES, INC.,
a Colorado Corporation.
Subdivider.
� . ��`9 -•' '..y commission expires: 8 -31 -2002
1 1T �;.o�Rr
ota Public
0
C r 4 l
STATE OF COLORADO )
ss.
COUNTY OF COLORADO )
OF
L
of the Council
icipal Corporation
DPW 2/18/98
111111 IN 111111111111111111111111 IN
1328317 04/10/2000 11:59A SUB AG Chris C. Munoz
6 of 12 R 60.00 D 0.00 Pueblo Cty Clk 8 Ree.
The foregoing instrument was acknowledged before me on Apri 1 6 2000
by Corinne Koehler , as President of City Council, and
�,.Gi na Dutcher as City Clerk of the City of Pueblo, Colorado.
5AN i
TA,9 commission expires: 8 -21 -2003
A4 1v
ve,
O• :y
Notary Public
O� COO
My Commission EA PWNMD AS TO FORM:
City Attorney
DPW 2/18/98
111111111111111111111111111111111111111111111111111111111 IN 111111
1328317 04/10/2000 11:59A SUB AG Chris C. Munoz
7 of 12 R 60.00 D 0.00 Pueblo Cty Clk & Ree.
SUBDIVISION IMPROVEMENTS AGREEMENT
EXHIBIT A
A portion of Parcel A, as platted in El Camino Subdivision, 7 Filing, according to the
recorded plat thereof, filed for record July 19, 1988
AND
A portion of the NE1 /4 of the NW1 /4 of Section 21, Township 21 South, Range 65 West
of the 6 P.M. in the County of Pueblo, State of Colorado and all being more particularly
described as follows:
Considering the East line of the NW1 /4 of Section 21, Township 21 South, Range 65
West of the 6"' P.M. to bear N.00 0 36'16 "E. and all bearings contained herein being
relative thereto.
Beginning at the Southwest corner of Lot 1, Block 40 in El Camino Subdivision, Filing
No. 7a, according to the recorded plat thereof, filed for record April 23, 1992; thence
N.86 0 55'42 "E., along the South boundary line of said Filing No. 7a, a distance of 105.51
feet to the West right -of -way line of Encino Drive, as platted in El Camino Subdivision,
6 Filing, according to the recorded plat thereof, filed for record May 6, 1997; thence
Southeasterly, along said West right -of -way line and along the arc of a curve to the left
whose center bears N.86 0 5542 "E. and whose radius is 640 feet, a distance of 250.55
feet to the Northernmost corner of a tract of land conveyed to School District No. 60 by
deed recorded in Book 2523 at Page 221 of the Pueblo County records; thence
Southwesterly, along the boundary of said tract of land the following four (4) courses:
1. S.64 0 29'51 "W., a distance of 300.00 feet;
2. along the arc of a curve to the right whose center bears S.73
and whose radius is 370 feet, a distance of 227.69 feet;
3. S.19 a distance of 239.20 feet;
4. S.01 a distance of 200.00 feet to the South line of the said NE1 /4
of the N W 1/4;
thence N.88 along said South line, a distance of 288.44 feet; thence
N.00 0 30'53 "E., a distance of 304.17 feet; thence S.89 0 29'07 "E., a distance of 55.00
feet; thence N.00 0 30'53 "E., a distance of 180.00 feet; thence S.89 0 29'07 "E., a distance
7
a
1111111111111 HE 111111114111111111111111111111111111111
1328317 04/10/2000 11:39A SUB AG Chris C. Munoz
8 of 12 R 60.00 D 0.00 Pueblo Cty Clk 8 Rec.
of 17.46 feet; thence N.00 0 47'30 "E., a distance of 120.00 feet to the Southeast corner
of Lot 12, Block 40 in El Camino Subdivision, 9 th Filing, according to the recorded plat
thereof; thence along the boundary of said 9 th Filing the following three (3) courses:
1. N.00 0 47'30 "E., a distance of 438.99 feet;
2. S.89 °12'30 "E., a distance of 395.00 feet;
3. S.00 a distance of 27.08 feet to the Point of Beginning.
Containing 8.861 acres.
1328317 04/10/2000 11:59A SUB
AG Chris C. MI
9
of 12 R 60.00
D 0.00 Pueblo
Cty Clk 8 Roe.
SUBDIVISION IMPROVEMENTS AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME:
EL CAMINO SUBDIVISION
13TH FILING
DEVELOPER:
HORIZON COMMUNITIES, INC.
ENGINEER:
NORTHSTAR ENGINEERING AND SURVEYING, INC.
STREETS ( MODESTO DRIVE)
Asphalt (3" Asphalt on 10" Base)
4414 SY @
$18.60 /SY
$82,100
Asphalt (2" Asphalt on 6" Base)
298 SY @
$13.10 /SY
$3,904
Curb and Gutter
2249 LF @
$10.00 /LF
$22,490
WATER
PVC Water Main
1132 LF @
$33.28 /LF
$37,673
Services
20 EA @
$480.00 /EA
$9,600
SANITARY SEWER:
8" PVC Sewer Main
1082 LF @
$28.00 /LF
$30,296
48" Manholes
5 EA @
$2,100.00 /EA
$10,500
Services
20 EA @
$750.00 /EA
$15,000
STORM SEWER
18" HDPE Pipe
589 LF @
$36.00 /LF
$21,204
15" HDPE Pipe
36 LF @
$30.00 /LF
$1,080
Type "S" Inlet L =8'
3 EA @
$3,400.00 /EA
$10,200
Type I- B Manhole
2 EA @
$2,000.00 /EA
$4,000
STREET LIGHTS
3 EA @
$1,300.00 /EA
$3,900
MONUMENT BOX
7 EA @
$575.00 /EA
$4,025
STREET SIGNS
1 EA @
$200.00 /EA
$200
PARCEL A - CONCRETE WALK
1200 SF @
$2.50 /SF
$3,000
MODESTO DRIVE
$259,172
9
u 111111111111111111111 IN
V2000 11:59A SUB AG Chris C. Mi
10 of
12 R 60.00 D 0.00 Pueblo
C!y Clk & Ree.
SUBDIVISION IMPROVEMENTS
AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME:
EL CAMINO SUBDIVISION
13TH FILING
DEVELOPER:
HORIZON COMMUNITIES, INC.
ENGINEER:
NORTHSTAR ENGINEERING AND SURVEYING, INC.
STREETS (MODESTO PLACE)
Asphalt (3" Asphalt on 6" Base)
696 SY @ $15.00 /SY
$10,440
Curb and Gutter
299 LF @ $10.00 /LF
$2,990
WATER
PVC Water Main
135 LF @ $33.28 /LF
$4,493
Services
5 EA @ $480.00 /EA
$2,400
Fire Hydrant Ass'y.
1 EA @ $1,800.00 /EA
$1,800
SANITARY SEWER:
8" PVC Sewer Main
111 LF @ $28.00 /LF
$3,108
48" Manholes
1 EA @ $2,100.00 /EA
$2,100
Services
5 EA @ $750.00 /EA
$3,750
STREET SIGNS
1 EA @ $200.00 /EA
$200
MODESTO PLACE
$31,281
10
• ' I IIIIII IIIII IIIII IIIIII illl iilllll IIIII III IIIIII III IIII
1328317 04/10/2000 11:39A SUB AG Chris C. Mur
11 of 12 R 60.00 D 0.00 Pueblo Cty Clk & Ree.
SUBDIVISION IMPROVEMENTS AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME: EL CAMINO SUBDIVISION
13TH FILING
DEVELOPER: HORIZON COMMUNITIES, INC.
ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC.
STREETS (SONOMA DRIVE)
Asphalt (3" Asphalt on 10" Base) 466 SY @ $18.60 /SY $8,668
Curb and Gutter 249 LF @ $10.00 /LF $2,490
PVC Water Main
166 LF
@
$33.28 /LF
$5,524
Services
2 EA
@
$480.00 /EA
$960
Fire Hydrant Ass'y.
1 EA
@
$1,800.00 /EA
$1,800
SANITARY SEWER:
8" PVC Sewer Main
160 LF
@
$28.00 /LF
$4,480
Clean Out
1 EA
@
$500.00 /EA
$500
Services
2 EA
@
$750.00 /EA
$1,500
STORM SEWER:
18" HDPE Pipe
156 LF
@
$36.00 /LF
$5,616
15" HDPE Pipe
61 LF
@
$30.00 /LF
$1,830
Type "S" Inlet L =4'
1 EA
@
$2,200.00 /EA
$2,200
Type "S" Inlet L =8'
1 EA
@
$3,400.00 /EA
$3,400
BARRICADE (TYPE III)
1 EA
@
$825.00 /EA
$825
I
TRASH RACK 1 EA @ $750.00 /EA $750
MONUMENT BOX 2 EA @ $575.00 /EA $1,150
STREET SIGNS 1 EA @ $200.00 /EA $200
SONOMA DRIVE 41893
11
r �
ON -SITE EARTHWORK
EARTHWORK 15,347 CY @ $2.00 /CY $30,694
SUBDIVISION NAME: EL CAMINO SUBDIVISION
13TH FILING
DEVELOPER: HORIZON COMMUNITIES, INC.
ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC.
1 111111 I'I'I VIII 11111111111111111 VIII III 111"1 III IN
1328317 04/10/2000 11:59A SUB AG Chris C. Munoz
12 of 12 R 60.00 D 0.00 Pueblo Cty Clk 8 Ree.
SUBDIVISION IMPROVEMENTS AGREEMENT
EXHIBIT "B"
ON -SITE SUBTOTAL $363,040
GRAND TOTAL $363,040
This is an estimate only. Actual construction costs may vary.
This estimate may not include all construction costs.
PREPARED BY: P. T.
FIRM: NORTHSTAR ENGINEERING AND SURVEYING, INC.
REVIEWED BY: �� A�
CITY OF PUEBLO
77 t-A
12