HomeMy WebLinkAbout06177SUBSTITUTED COPY
Reception 1175638
07/02/1997
ORDINANCE NO. 6177
AN ORDINANCE APPROVING THE PLAT OF REGENCY CREST SUBDIVISION
BE IT ORDAINED BY THE CI T Y COUNCIL OF PUEBLO, COLr)RADO, THAT:
SECTION 1 .
The final plat of Regency Crest Subdivision, being a subdivision of lard legally described
as follows:
A parcel of land ! ocated in the City of Pueblo, County of Pueblo, State of Colorado, to -wit:
A parcel of land located in the S1 /2 of the NE1 /4 and t �e N1/2 of the SE114' of Section 4,
T- 21 South, Range 65 West of the 6th Principal Meridian, more particularly described
as follows;
BEGINNING at the northwest corner of W estwood Villa accord to the recordevd .plat
the filed for r ecord June E, 1961;
TI °pence - 8" (SO'2='52'39 "W plat; (ail bearings used herein are based on the
assumption that the south line of Red Creek Springs Road, mon± mented as shown hereon,
bears N88 0 37'21 "W) along the west line of said Westwood Village, a distance of 1618.26
(1620.38 .plat) feet to a point on the north line of that parcel of land described in that doc ument
recorded id � Book 39 at Page 398 in the records of the Pueblo County Clerk and Recorder;
Tr�ence N88 °37'21 "W along said north ine, a distance of 1075.83 feet;
Thence NO3 °1 8'38 "E a distance of 1641.38 feet to a point in the south line of St. Clair A venu e
(Pi,ane Vie Street plat
Thence S87 °23'29 "E, along said south line, a distance of 107 5.30 feet to the POINT OF
BEGINNING.
Said parcel contains 40.23 ac es.
is hereby approved; all dedicated street, utility and drainage easements, rights - oaf -way z. lard
set aside for public sites, parks and open spaces shown and dedicated cn said plat are hereby
accepted for public use.
SECTION 2.
The acceptance of such dedicated streets, rights -of -way, utility and drainage easements,
public sites, parks and open spaces by the City does not obligate the City to maintain or repair
same until such streets, rights -of -way, utility and drainage easements, public sites, parks and
open spaces have been constructed and installed in compliance and accordance with the
requirements and provisions of Chapter 4, Title XII of the 1971 Code of Ordinances, as
amended and any agreement entered into pursuant thereto.
"E CTION 3.
This ordinance shall become effective immediately upon final passage and approval.
INTRODUCED Februarx 10 , 1997
,L r. Q.
,. u
.,"
ATttS
BY Samuel Corsentino
Councilperson
APPROVED `
President f Cit Council
City Cle
SUBDIVISION IMPROVEMENTS AGREEMENT
Reception 1175640
07/02/1997
THIS AGREEMENT made and entered Into this - day of 199? ,
by and between the CITY OF PUEBLO, a Municipal Corporation, hereinafter referred to as "City ", and
DOti1= 1 61 LLC
hereinafler referred to as "Subdivider".
WITNESSETH:
WHEREAS, Subdivider has subdivided or is about to subdivide a certain tract of land located in the
City and legally described as set forth In Exhibit "A ", which Is attached hereto and incorporated herein; and
WHEREAS, the Subdivider, as a condition of approval of the final plat of Regency Crest
Subdivision, wishes to enter into this Subdivision Improvements Agreement as
authorized by Chapter 4, Title XII of the 1971 Code of Ordinances; and
WIIEREAS, Subdivider is required pursuant to Section 12- 4 -7(J) of the 1971 Code of Ordinances of the
City to construct and Install certain public improvements as set forth In Exhibit "B ", which is attached hereto
and incorporated herein; and
WHEREAS, pursuant to Chapter 4, Title XII of the 1971 Code of ordinances Subdivider is obligated to
provide security or collateral sufficient In the judgment of the City Council to make reasonable provisions for
the construction and completion of the required public improvements set forth in Exhibit "B"
NOW, THEREFORE, in consideration of the following mutual covenants and ag�eemenls, the City and
Subdivider agree as follows:
1. Subdivider agrees within one hundred and eighty (180) days alter application for a building permit
to construct any building or structure on any building site within the subdivision, or upon the issuance of a
certificate of occupancy for any such building or structure, whichever is sooner, to construct and install at his
sole cost and expense all of those public improvements set forth in Exhibit "B ", which is attached Hereto and
incorporated herein.
2. In lieu of installing the required public improvements set forth in Exhibit "B" within one hundred
eighty (180) days, Subdivider or any subsequent owner of the land or any portion thereof shall deposit cash
or other collateral with the Director of Finance of the City, or with any bank or trust company licensed in the
Slate of Colorado, subject to an escrow agreement approved by the City Attorney. The holder of such cash or
collateral shall pay all or any portion thereof to the City upon demand after the time for completion of all
required improvements by Subdivider or subsequent owner shall have expired. Such deposit or escrow
agreement shall be hereinafter referred to as the "deposit."
3. The amount of the deposit shall be computed by the City's Director of Public Works by eslirnaling
the total costs of all uncompleted improvements required by this section within the block at the time
application for building permit Is made. The amount of the deposit required by this alternative shall be not
less than 25% of such estimate plus the costs of extending all required sewer and water lines from the
nearest existing sewer and water lines to the proposed building site for which a building permit is sought, plus
the costs of extending curb, gutter, sidewalk and paving from the edge of the subdivision or existing
Improvements of a like nature whichever is nearer to the proposed building site. In any case where the block,
as hereinafter defined, shall exceed one thousand (1,000') feet in length between Intersecting streets, the
estimate of the City Director of Public Works under this paragraph may be reduced to the total costs of all
uncompleted improvements in at least one -half of such block, and the required deposit shall be based upon
such decreased estimate, provided, however, Subdivider shall undertake to provide a turnaround of at least
sixty (60') feet in diameter at the mid -block point and barricade said streets so that no through traffic shall be
permitted beyond the point to which the estimate of the Director of Public Works Is based.
4. Within one hundred eighty (180) days after subsequent application for a building permit to construct
any building or structure upon any building site within the block, or upon the issuance of a certificate of
occupancy for any such building or structure, whichever is sooner, Subdivider shall likewise deposit an
amount not less than the estimate of the Director of Public Works for all required improvements from existing
Improvements to the proposed building site. less any previous deposits made hereunder upon building sites
lying between the most recently proposed site and existing improvement.
-1-
. ' 5. The City may treat the amount of such deposit as a debt due the City from Subdivider or
subsequent owner, which debt shall be a lien upon all the land in the Subdivision and notice of lien may be
filed for record in the office of the County Clerk and Recorder at any time after such default. Action upon
such debt may be instituted by the City within six (6) years from the date of filing such lien for record. All
remedies provided for herein are cumulative and the use of one shall not prohibit the use of another.
6. Upon payment of each such deposit, the City Director of Public Works shall release the proposed
building site from the terms of this Agreement.
w o
7. As a condition of approval of this Subdivision, and to meet the requirements of Section 12- 4 -7(J) of
`.° ff
the 1971 Code of Ordinances, Subdivider specifically agrees that no certificate of occupancy shall be issued
c
by the Pueblo Regional Building Department until a certificate of compliance has been approved and issued
`" N
by the City Director of Public Works and duly recorded in the Office of the Pueblo County Clerk and Recorder
which certifies that those public improvements set forth in Exhibit "B ", or that portion of said improvements as
shall be necessary to totally serve specific lot(s) or block(s) for which building permits or certificates of
N ••
occupancy are sought and which are covered by a particular certificate of compliance, have been properly
designed, engineered, constructed, and accepted as meeting the specifications and standards of the City.
v
These restrictions on the issuance of certificates of occupancy shall run with the land and shall extend
°
to and be binding upon the heirs, executors, legal representatives, successors and assigns of Subdivider and
o
may be specifically enforced by the City.
-
8. Acceptance of this Subdivision by the City does not constitute an acceptance of the roads, park,
and other public improvements for maintenance by the City. Until such roads and other park and public
Improvements have been Installed and meet the requirements, standards, and specifications of the City, its
n
Subdivision ordinances, and any applicable Parks Department specifications, and such are specifically
approved and accepted in writing by the City Director of Public Works, and, if appropriate, the City Director of
Parks and Recreation, the maintenance, construction, and all other matters pertaining to or affecting said
roads, park and other public improvements and rights of way are the sole responsibility of the Subdivider or
any subsequent owner(s) of the land within this Subdivision.
9. Tile required time for completion of all such improvements by Subdivider within such block shall be
one (1) year from the date of application for the first building permit issued within such block. Upon
completion and written approval and acceptance of such improvements within the required time and the
payment of all inspection costs by Subdivider, the Director of Public Works shall cause all obligations of
Subdivider relating to such improvements within such block to be released. If said improvements are not
completed within the required time, the City Director of Public Works may cause the proceeds of all deposits
or other collateral or monies in escrow to be used to complete the same. If sufficient monies are available at
the end of the required time to complete all such improvements herein required for the entire length of such
block, the Director of Public Works shall cause all collateral or monies in escrow to be reduced in cash and
shall deposit the same with the Director of Finance and such cash shall be used to complete that portion of
the improvements the Director of Public Works shall determine. Until all improvements are completed and
approved by the Director of Public Works, Subdivider and the subdivided land shall remain liable and
responsible therefor.
10. For purposes of this Agreement, the word "block" shall mean both tiers of lots fronting or abutting
upon the street which the proposed building or structure shall front to the rear property line of such lots, or
the center line of the alley, if there is an alley, enclosed at either end by a street which intersects both tiers
of lots, and shall include the full width of all streets upon which such lots abut.
11. Subdivider agrees to provide the City with a current title insurance commitment at the time of final
platting evidencing that lee simple title of all lands in the Subdivision is totally vested with the Subdivider free
and clear of any and all encumbrances. If such land is not free and clear, the holder of such indebtedness
shall subordinate its interest or encumbrance to this Agreement and all its terms, conditions, and restrictions.
12. It is mutually agreed that the City or any purchaser of any lot(s) within this Subdivision shall have
the authority to bring an action in any Court of competent jurisdiction to compel the enforcement of this
Agreement or any amendment thereto. Such authority shall include the right to compel rescission of any sale,
conveyance, or transfer of any lot(s) or tract(s) contrary to the provisions of the Ordinances of the City or this
Agreement.
13. The parties hereto mutually agree that this Agreement may be amended from time to time by
mutual consent provided that such amendment be in writing and be signed by all parties hereto.
14. This Agreement shall extend to and be binding upon the successors and assigns of the City and
upon the heirs, administrators, executors, successors, assigns, and legal representatives of Subdivider, and
shall be placed on record in the office of the County Clerk and Recorder of Pueblo County, Colorado, and
shall constitute an agreement running with the land until released as hereinabove set forth.
-2-
IN WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and attested by its
duty authorized and acting officers and the seal of the Subdivider set hereon.
(SEAL)
STATE OF COLORADO)
Ss.
COUNTY OF PUEBLO )
D011EGA HOMES, LLC
Subdivider
By 7
C.T. Proctor
Managing Member
The foregoing Instrument was acknowledged before me this day
of d LA n cz�. 199x, by - � (� rc a - tD r , Subdivider.
My commission expires: i ( - y 9 G
(SEAL)
C
A a (A d � ct
Notary Public
Address: I Z I - } LK) .� 5 W
?uF b1C, 00 ',Ico n
CITY OF PUEBLO, a Municipal Corporation
By
P siden( of the Council
City Clerk
STATE OF COLORADO)
) ss.
COUNTY OF PUEBLO )
Book: 3012 Page: 917 Chris C. Munoz
Page: 3 of 12 Pueblo Co.C1k.&Rec.
The foregoing instrument was acknowledged before me this 2 day
of cc 199, by "���l�z %�� <<_, , as President of City
Council, and t At-lel)e as City Clerk of the City of Pueblo, Colorado.
Mx xornOssion expires:
VC
. `
P U,5 -
r r� �c
APPROVED AS TO FORM:
NoI#t Public
Ada
r ss:
City Attorn '
-3-
EXHIBIT
A parcel of land located in the City of Pueblo, County of Pueblo, State of Colorado, to-
wit,
A parcel of land located in the S1/2 of the NE1 /4 and the N1 /2 of the SE1 /4 of Section
4, Township 21 South, Range 65 West of the 6th Principal Meridian, more particularly
described as follows,
BEGINNING at the northwest corner of Westwood Village, according to the recorded
plat thereof, filed for record June 6, 1961;
thence S03'1 6'38"W (S02 0 52'39 "W plat) (all bearings used herein are based on the
assumption that the south line of Red Creek Springs Road, monumented as shown
hereon, bears N88 °37'21 "W) along the west line of said Westwood Village, a distance
of 1618.26 (1620.38 plat) feet to a point on the north line of that parcel of land
described in that document recorded in Book 39 at Page 398 in the records of the
Pueblo County Clerk and Recorder;
Thence N88 °37'21 "W, along said north line, a distance of 1075.83 feet;
Thence NO3`l8'38 "E a distance of 1641.38 feet to a point in the south line of St. Clair
Avenue (Plane View Street plat),
Thence S87 "23'29 "E, along said south line, a distance of 1075.30 feet to the POINT OF
BEGINNING.
Said parcel contains 40.23 acres
Book: 3012 Page: 918 Chris C. Munoz
Page: 4 of 12 Pueblo Co.Clk. &Rec.
(4)
SUBDIVISION IMPROVEMENT AGREEMENT
SUBDIVISION NAME: REGENCY CREST SUBDIVISION,
A SPECIAL AREA PLAN, PHASE 1
DEVELOPER: DOMEGA HOMES, LLC
EXHIBIT "B"
ENGINEER: RICKY A. KIDD, P.E.
STREETS
ASPHALT
PATCH SERVICES RED CREEK
SPRINGS ROAD
OVERLAY 1" RED CREEK
SPRINGS ROAD
CURB & GUTTER
CROSSPANS
SQR PAN RAD W/HC RAMP
RAD CURB W/HC RAMP
TEMPORARY TURN AROUND
4308 SY @ $11.10 /SY
$47,819
1500 SF @ $2.00 /SF
70 TON @ $60.00/TON
2105 LF @ $7.80/LF
784 SF @ $3.80 /SF
5 EA @ $723 /EA
1 EA @ $606/EA
1 EA @ $2,000/EA
SANITARY SEWER
1,220 LF @ $29.221LF
8" PVC PIPE, 0-12'
1634 LF @ $22.00/LF
48" MANHOLES
5 EA @ $1,400/EA
SERVICES - 60' R.O.W.
26 EA @ $575/EA
SERVICES - 80' R.O.W.
3 EA @ $765/EA
REMOVE & REPLACE
$3,600
SANITARY SEWER MANHOLE
1 EA @ $2,200/EA
ADJUST EXISTING MR RING AND
MONUMENTS
COVER TO FINISHED GRADE
1 EA @ $250/EA
STORM SEWER
EXCAVATION
COMPACTED FILL
STOCKPILE
2" TO 8" RIPRAP
6" STD. CURB AND GUTTER
MONITORING WELLS
SILT FENCE
MISC. GRADING
3950 CY @ $1.25 /CY
650 CY @ $3.00 /CY
1,200 CY @ $1.00 /CY
5 CY @ $50 /CY
658 LF @ $7.80/LF
3 EA @ $700/EA
220 LF @ $4.00/LF
1 LS @ $8000/LS
WATER
$3,000
$4,200
$16,419
$2,979
$3,615
$606
$2,000
$35,948
$7,000
$14,950
$2,295
$2,200
$250
$4,938
$1,950
$1,200
$250
$5,132
$2,100
$880
$8,000
8" PVC PIPE
1,220 LF @ $29.221LF
$35,648
SERVICES - 60' R.O.W.
26 EA @ $480/EA
$12,480
SERVICES - 80' R.O.W.
3 EA @ $640/EA
$1,920
FIRE HYDRANT ASSEMBLY
2 EA @ $1,800/EA
$3,600
STREET LIGHTS
4 EA @ $1,300/EA
$5,200
MONUMENTS
4 EA @ $450/EA
$1,800
BARRICADES - L =16'
1 EA @ $800/EA
$800
TOTAL: $229,179
This is an estimate only. Actual construction costs may vary. This estimate may not
include all construction costs.
PREPARED BY: RICKY A. KIDD, P. E. DATE: 2/25/97
FIRM: KIDD E &CMS, INC.
REVIEWED BY: CkfiM (iy'A DATE: /6
City of Pueblo
5 Book: 3012 Page: 919 Chris C. Munoz
Page: 5 of 12 Pueblo Co.C1k.&Rec.
SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME:
REGENCY CREST SUBDIVISION,
$68,328
36" POLY PIPE
A SPECIAL AREA PLAN, PHASE 2
$41,820
DEVELOPER:
DOMEGA HOMES, LLC
$2,052
ENGINEER:
RICKY A. KIDD, P.E.
$10,000
STREETS
3 EA @ $1,600/EA
$4,800
PUEBLO BLVD.
3 EA @ $2,200/EA
$6,600
ROTOMILL
6500 SF @ 0.55 /SF
$3,575
EXCAVATION
344 CY @ $15.00 /SY
$5,160
FLOWABLE FILL
320 CY @ $45.00 /SY
$14,400
ASPHALT PATCH
75 TON @ $60.00/TON
$4,500
ASPHALT INLAY
40 TON @ $60.00/TON
$2,400
ST. CLAIR
5" ASPHALT PATCH
76 TON @ $60.00/TON
$4,560
1" FW OVERLAY
270 TON @ $60.00/TON
$16,200
5.5" FD ASPHALT
980 SY @ $11.95 /SY
$11,711
R &R CROSSPAN
160 SF @ $7.75/SF
$1,240
EXC. AND WASTE
300 CY @ $8.00 /CY
$2,400
ASPHALT
3655 SY @ $11.10 /SY
$40,570
CURB & GUTTER
2090 LF @ $7.80/LF
$16,302
CROSSPANS
256 SF @ $3.80 /SF
$973
SQR PAN RAD W/HC RAMP 2 EA @ $723/EA
$1,446
RAD CURB W/HC RAMP
4 EA @ $606/EA
$2,424
SANITARY SEWER
8" PVC PIPE, 0 -12'
269 LF @ $22.00/LF
$5,918
48" MANHOLES
1 EA @ $1,400/EA
$1,400
SERVICES
24 EA @ $575/EA
$13,800
M0 a 1F
42" POLY PIPE
949 LF @ $72.00/LF
$68,328
36" POLY PIPE
697 LF @ $60.00/LF
$41,820
15" POLY PIPE
76 LF @ $27.00/LF
$2,052
TYPE S INLET L = 20'
2 EA @ $5,000/EA
$10,000
TYPE 1 -B MANHOLES
3 EA @ $1,600/EA
$4,800
TYPE 1 -C MANHOLES
3 EA @ $2,200/EA
$6,600
6" STD. CURB AND GUTTER
441 LF @ $7.80/LF
$3,440
SIDEWALK DRAIN
2 EA @ $500/EA
$1,000
WATER
8" PVC PIPE
910 LF @ $29.22/LF
$26,590
SERVICES
24 EA @ $480/EA
$11,520
FIRE HYDRANT ASSEMBLY
2 EA @ $1,800/EA
$3,600
STREET LIGHTS
3 EA @ $1,300/EA
$3,900
MONUMENTS
2 EA @ $450/EA
$900
BARRICADES
2 EA @ $800/EA
$1,600
TRAFFIC CONTROL
1 EA @ $11,000/EA
$11,000
TOTAL:
$346,129
This is an estimate only. Actual construction costs may vary. This estimate may not
include all construction costs.
PREPARED BY: RICKY A. KIDD, P.E
FIRM: KIDD E &CMS, INC.
REVIEWED BY:
City of Pueblo
6
DATE: 2/25/97
DATE • l6
Book: 3012 Page: 920 Chris C. Munoz
Page: 6 of 12 Pueblo Co.Clk.&Rec.
SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME: REGENCY CREST SUBDIVISION,
A SPECIAL AREA PLAN, PHASE 3
DEVELOPER: DOMEGA HOMES, LLC
ENGINEER: RICKY A. KIDD, P.E.
STREETS
PATCH SERVICES -
RED CREEK SPRINGS RD.
1" OVERLAY -
RED CREEK SPRINGS RD.
ASPHALT
CURB & GUTTER
RAD CURB W/HC RAMP
TEMPORARY TURN AROUND
1500 SF @ $2.00 /SF
70 TON @ $60/TON
3248 SY @ $11.10 /SY
1655 LF @ $7.80/LF
2 EA @ $606/EA
I EA @ $2,000/EA
$3,000
$4,200
$36,053
$12,909
$1,212
$2,000
SANITARY SEWER
8" PVC PIPE, 0 -12'
1340 LF @ $22.00/LF
$29,480
48" MANHOLES
5 EA @ $1,400/EA
$7,000
SERVICES - 60' R.O.W.
26 EA @ $575/EA
$14,950
SERVICES - 80' R.O.W.
3 EA @ $765/EA
$2,295
ADJUST EXISTING MH RING AND
COVER TO FINISHED GRADE
2 EA @ $250
$500
STORM SEWER
36" POLY PIPE
145 LF @ $60.00/LF
$8,700
15" POLY PIPE
70 LF @ $27.00/LF
$1,890
TYPE S INLET L =8'
3 EA @ $2,600/EA
$7,800
TYPE 1 -B MANHOLE
1 EA @ $1,600/EA
$1,600
I"
8" PVC PIPE 880 LF @ $29.22/LF $25,714
SERVICES - 60' R.O.W. 26 EA @ $480/EA $12,480
SERVICES - 80' R.O.W. 3 EA @ $640/EA $1,920
FIRE HYDRANT ASSEMBLY 1 EA @ $1,800/EA $1,800
STREET LIGHTS 5 EA @ $1,300/EA $6,500
MONUMENTS 2 EA @ $450/EA $900
BARRICADES RELOCATE 1 EA @ $800/EA $800
TOTAL: $183,703
This is an estimate only. Actual construction costs may vary. This estimate may not
include all construction costs.
PREPARED BY: RICKY A. KIDD, P. E. DATE: 2/25/97
FIRM: KIDD E &CMS, INC.
REVIEWED BY: d�T—v d e%— DATE:
City of Pueblo
Book: 3012 Page: 921 Chris C. Munoz
Page: 7 of 12 Pueblo Co.Clk. &Rec.
7
SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME: REGENCY CREST SUBDIVISION,
A SPECIAL AREA PLAN, PHASE 4
DEVELOPER: DOMEGA HOMES, LLC
ENGINEER: RICKY A. KIDD, P.E.
STREETS
ST. CLAIR ASPHALT 1467 SY @ $11.95 /SY
EXC. AND WASTE 620 CY @ $8.00 /CY
ASPHALT 3230 SY @ $11.10 /SY
CURB & GUTTER 1650 LF @ $7.80/LF
RAD CURB W/HC RAMP 2 EA @ $606/EA
6" STD. CURB AND GUTTER 540 LF @ $7.80/LF
SANITARY SEWER
8" PVC PIPE, 0 -12' 269 LF @ $22.00/LF
48" MANHOLES 1 EA @ $1,400/EA
SERVICES 24 EA @ $575/EA
STORM SEWER
36" POLY PIPE
175 LF @ $60.00/LF
24" POLY PIPE
50 LF @ $36.00/LF
18" POLY PIPE
432 LF @ $30.00/LF
TYPE S INLET L =17'
2 EA @ $4,400/EA
TYPE 1 -B MANHOLES
1 EA @ $1,600/EA
WATER
8" PVC PIPE 880 LF @ $29.22/LF
SERVICES 24 EA @ $480/EA
FIRE HYDRANT ASSEMBLY 2 EA @ $1,800/EA
STREET LIGHTS
MONUMENTS
BARRICADES
3 EA @ $1,300/EA
1 EA @ $450/EA
1 EA @ $800/EA
TOTAL:
$17,531
$4,960
$35,853
$12,870
$1,212
$4,212
$5,918
$1,400
$13,800
$10,500
$1,800
$12,960
$8,800
$1,600
$25,714
$11,520
$3,600
$3,900
$450
$800
$179,400
This is an estimate only. Actual construction costs may vary. This estimate may not
include all construction costs.
PREPARED BY: RICKY A. KIDD, P. E. DATE: 2/25/97
FIRM: KIDD E &CMS, INC.
REVIEWED BY: (Zw &'- " DATE:
City of Pueblo
Book: 3012 Page: 922 Chris C. Munoz
Page: 8 of 12 Pueblo Co.Clk.&Rec.
8
SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME: REGENCY CREST SUBDIVISION,
A SPECIAL AREA PLAN, PHASE 5
DEVELOPER: DOMEGA HOMES, LLC
ENGINEER: RICKY A. KIDD, P.E.
STREETS
1" OVERLAY -
RED CREEK SPRINGS RD.
13 TON @ $60.00 /TON
$780
ASPHALT -
RED CREEK SPRINGS RD.
1347 SY @ $11.95 /SY
$16,097
EXC. AND WASTE
305 CY @ $8.00 /CY
$2,440
ASPHALT
4344 SY @ $11.10 /SY
$48,218
CURB & GUTTER
1715 LF @ $7.80/LF
$13,377
CROSSPANS
784 SF @ $3.80 /SF
$2,979
SQR PAN RAD W/HC RAMP
5 EA @ $7231EA
$3,615
RAD CURB W/HC RAMP
1 EA @ $606/EA
$ 606
TEMPORARY TURN AROUND
1 EA @ $2,000/EA
$2,000
6" STD. CURB AND GUTTER
1010 LF @ $7.80/LF
$7,878
SANITARY SEWER
8" PVC PIPE, 0 -12' 1489 LF @ $22.00/LF $32,758
48" MANHOLES 4 EA @ $1,400/EA $5,600
SERVICES - 60' R.O.W. 27 EA @ $575/EA $15,525
SERVICES - 80' R.O.W. 3 EA @ $765/EA $2,295
STORM SEWER
30" POLY PIPE 85 LF @ $50.00/LF $4,250
18" POLY PIPE 66 LF @ $29.001LF $1,914
TYPE S INLET L=8' 2 EA @ $2,600/EA $5,200
TYPE 1 -B MANHOLE 1 EA @ $1,800/EA $1,800
WATER
8" PVC PIPE 300 LF @ $29.22/LF
SERVICES - 60 ' R.O.W. 27 EA @ $480/EA
SERVICES - 80' RO.W. 3 EA @ $640/EA
FIRE HYDRANT ASSEMBLY 3 EA @ $1,800/EA
STREET LIGHTS
MONUMENTS
BARRICADES RELOCATE
5 EA @ $1,300/EA
3 EA @ $450/EA
2 EA @ $800/EA
TOTAL:
$ 8,766
$12,960
$1,920
$5,400
$6,500
$1,350
$800
$205,028
This is an estimate only. Actual construction costs may vary. This estimate may not
include all construction costs.
PREPARED BY: RICKY A. KIDD, P. E.
FIRM: KIDD E &CMS, INC.
REVIEWED BY: Avyl«
City of Pueblo
DATE: 2/25/97
DATE:
4//6 rj-
9 Book: 3012 Page: 923 Chris C. Munoz
Page: 9 of 12 Pueblo Co.Clk. &Rec.
SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME: REGENCY CREST SUBDIVISION,
A SPECIAL AREA PLAN, PHASE 6
DEVELOPER: DOMEGA HOMES, LLC
ENGINEER: RICK A. KIDD, P.E.
STREETS
ST. CLAIR ASPHALT 733 SY @ $11.95 /SY
EXC. AND WASTE 200 CY @ $8.00 /CY
ASPHALT 2947 SY @ $11.10 /SY
CURB &GUTTER 1470 LF @ $7.80/LF
RAD CURB W/HC RAMP 4 EA @ $606/EA
6" STD. CURB AND GUTTER 276 LF @ $7.80/LF
SANITARY SEWER
8" PVC PIPE, 0 -12' 100 LF @ $22.00/LF
SERVICES - 60' R.O.W. 20 EA @ $575/EA
SERVICES - 80' R.O.W. 2 EA @ $765/EA
STORM SEWER
27" POLY PIPE 125 LF @ $42.00/LF
WATER
8" PVC PIPE 815 LF @ $29.22/LF
SERVICES - 60' R.O.W. 20 EA @ $480/EA
SERVICES - 80' R.O.W. 2 EA @ $640/EA
FIRE HYDRANT ASSEMBLY 1 EA @ $1,800/EA
STREET LIGHTS
MONUMENTS
BARRICADES
3 EA @ $1,300/EA
1 EA @ $450/EA
1 EA @ $800/EA
TOTAL:
$8,759
$1,600
$32,712
$11,466
$2,424
$2,153
$2,200
$11,500
$1,530
$5,250
$23,814
$9,600
$1,280
$1,800
$3,900
$450
$800
$121,238
This is an estimate only. Actual construction costs may vary. This estimate may not
include all construction costs.
PREPARED BY: RICKY A. KIDD, P. E.
FIRM: KIDD E &CMS, INC.
REVIEWED BY: (1 / A — . aGSO
City of Pueblo
10
DATE: 2/25/97
DATE: /6
Book: 3012 Page: 924 Chris C. Munoz
Page: 10 of 12 Pueblo Co.Clk. &Rec.
SUBDIVISION IMPROVEMENT AGREEMENT
SUBDIVISION NAME: REGENCY CREST SUBDIVISION,
A SPECIAL AREA PLAN, PHASE 7
DEVELOPER: DOMEGA HOMES, LLC
EXHIBIT "B"
ENGINEER: RICKY A. KIDD, P.E.
STREETS
ASPHALT-
RED CREEK SPRINGS RD.
ESC. AND WASTE
ASPHALT
CURB & GUTTER
CROSSPANS
SQR PAN RAD W/HC RAMP
RAD CURB W/HC RAMP
TEMPORARY TURN AROUND
1562 SY @ $11.95 /SY
250 CY @ $8.00 /CY
3211 SY @ $11.10 /SY
1640 LF @ $7.80/LF
272 SF @ $3.80 /SF
1 EA @ $723/EA
1 EA @ $606/EA
1 EA @ $2,000/EA
$18,666
$2,000
$35,321
$12,792
$1,034
$723
$606
$2,000
SANITARY SEWER
8" PVC PIPE, 0 -12' 1397 LF @ $22.00/LF
48" MANHOLES 4 EA @ $1,400/EA
SERVICES - 60' R.O.W. 26 EA @ $575/EA
SERVICES - 80' R.O.W. 3 EA @ $765.EA
ADJUST EXHISTING MH RING AND
COVER TO FINISHED GRADE 1 EA @ $250/EA
$30,734
$5,600
$14,960
$2,295
$250
STORM SEWER
30" POLY PIPE
15" POLY PIPE
TYPE S INLET L=14'
TYPE 1 -B MANHOLE
140 LF @ $50.00/LF
65 LF @ $27.00/LF
2 EA @ $3,800/EA
1 EA @ $1,600/EA
$7,000
$1,755
$7,600
$1,600
WATER
8 "PVC PIPE 875 LF @ $29.22/LF
SERVICES - 60' R.O.W. 26 EA @ $480/EA
SERVICES - 80' R.O.W. 3 EA @ $640/EA
FIRE HYDRANT ASSEMBLY 2 EA @ $1,800/EA
STREET LIGHTS
MONUMENTS
BARRICADES
4 EA @ $1,300/EA
2 EA @ $450/EA
2 EA @ $800/EA
TOTAL:
$25,568
$12,480
$1,920
$3,600
$5,200
$900
$800
$195,404
This is an estimate only. Actual construction costs may vary. This estimate may not
include all construction costs.
PREPARED BY: RICKY A. KIDD, P. E.
FIRM: KIDD E &CMS, INC.
REVIEWED BY:
City of Pueblo
11
DATE: 2/25/97
DATE: /�o
Book: 3012 Page: 925 Chris C. Munoz
Page: 11 of 12 Pueblo Co.C1k.&Rec.
SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME: REGENCY CREST SUBDIVISION,
A SPECIAL AREA PLAN, PHASE 8
DEVELOPER: DOMEGA HOMES, LLC
ENGINEER: RICKY A. KIDD, P.E.
STREETS
ASPHALT-
ST. CLAIR STREET 1511 SY @ $11.95 /SY
EXC. AND WASTE 350 CY @ $8.00 /CY
ASPHALT 3683 SY @ $11.10 /SY
CURB & GUTTER 1600 LF @ $7.80/LF
CROSS PANS 528 SF @ $3.80 /SF
SQR PAN RAD W/HC RAMP 4 EA @ $723/EA
RAD CURB W/HC RAMP 2 EA @ $606/EA
6" STD. CURB AND GUTTER 593 LF @ $7.80/LF
$18,056
$2,800
$40,881
$12,480
$2,006
$2,892
$1,212
$4,625
SANITARY SEWER
8" PVC PIPE, 0 -12' 140 LF @ $22.00/LF $3,080
SERVICES - 60' R.O.W. 20 EA @ $575/EA $11,500
SERVICES - 80' R.O.W. 3 EA @ $765/EA $2,295
STORM SEWER
24" POLY PIPE 163 LF @ $36.00/LF $5,868
WATER
8" PVC PIPE 905 LF @ 29.22/LF
SERVICES - 60' R.O.W. 20 EA @ $480/EA
SERVICES - 80' R.O.W. 3 EA @ $640/EA
FIRE HYDRANT ASSEMBLY 1 EA @ $1,800/EA
STREET LIGHTS
MONUMENTS
BARRICADES
5 EA @ $1,300/EA
3 EA @ $450/EA
1 EA @ $800/EA
TOTAL:
$26,444
$9,600
$1,920
$1,800
$6,500
$1,350
$800
$156,109
GRAND TOTAL PHASE 1 THRU PHASE 8• $1,616,190
This is an estimate only. Actual construction costs may vary. This estimate may not
include all construction costs.
PREPARED BY: RICKY A. KIDD, P. E. DATE: 2/25/97
FIRM: KIDD E &CMS, INC. /
REVIEWED BY: DATE:
City of Pueblo
12
Book: 3012 Page: 926 Chris C. Munoz
Page: 12 of 12 Pueblo Co.C1k.&Rec.
Reception 1175641
07/02/1997
ADDENDUM TO SUBDIVISION IMPROVEMENTS AGREEMENTS
This Addendum shall be incorporated in and become a part of the J 5 — ti) - 13 , 19917
Subdivision Improvements Agreement for the Regency Crest Subdivision (herein the
"Subdivision) and enforceable as provided in said Subdivision Improvements Agreement.
1. Subdivider shall install a Temporary Retention Pond in accordance with approved
plans therefor on rile in the office of the Director of Public Works and maintain it in
compliance with all applicable law and regulation and in accordance with the
Temporary Retention Pond Supplementary Report Addendum No. 1 on rile in the
office of the Director of Public Works.
2. Subdivider shall provide the city with an irrevocable letter of credit, in a form approved
by the City Attorney, and in an amount equal to the estimated cost of the construction
of the St. Clair Storm Sewer Outfall and storm sewer improvements for Phase 2 of
the Subdivision, plus 15 %, in accordance with the approved plans therefor on file with
the Director of Public Works. This letter of credit shall be provided to the City prior to
approval of the Subdivision plat.
3. Subdivider shall construct the St. Clair Storm Sewer Outfall and storm drainage
improvements for Phase 2 of the Subdivision in accordance with the approved plans
therefor within 18 months of approval by City Council of the Subdivision.
4. If Subdivider shall fail to abide by the terms of paragraphs 1 and 3 above, the City's
Director of Public Works shall have the right to demand payment of the amount
1
provided in the letter of credit from the issuing institution and cause the St. Clair
Storm Sewer Outfall and storm sewer improvements for Phase 2 of the Subdivision
to be constructed. If there are insufficient funds to complete the work, the City
shall have the right to place a lien upon the land within the Subdivision until such
time as the entire cost of the construction, plus an additional 15% for administrative
expenses, has been paid to the City.
5. Subdivider shall defend, indemnify and hold City and its officers, agents and
employees harmless from and against any and all demands, claims, damages,
injuries, causes of action, penalties, and expenses, including reasonable attorney
fees, caused by or in any manner arising, directly or indirectly, out of or from the
construction, installation, use or maintenance or failure to maintain the
Temporary Retention Pond, including without limitation, groundwater infiltration
or recharging.
6. The covenants of this Addendum shall run with the land within the Subdivision
and shall be binding upon and may be specifically enforced against the Subdivider
and its successors and assigns, and subsequent owners of lots within the Subdivision.
If Subdivider or any subsequent owners of lots within the subdivision fail to construct
the Temporary Retention Pond, or construct the outfall and storm drainage
improvements, or furnish the irrevocable letter of credit, or make any payment or
indemnity as required by this Addendum, no additional building permits shall be
issued to build or construct any building or structure in the Subdivision until such
failure is remedied.
2
Book: 3012 Page: 929 Chris C.
Page: 3 of 4 P Munos
Pueblo Co.C1k.&Rec.
Executed at Pueblo, Colorado as of the date and year stated above.
SUBDIVIDER
D011MA HOMES, LLC
C.T. Proctor, Managing Member
PUEBLO, A MUNICIPAL CORPORATION
B y_
3
SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME:
DEVELOPER:
ENGINEER:
REGENCY CREST SUBDIVISION,
A SPECIAL AREA PLAN, PHASE 2
DOMEGA HOMES, LLC
RICKY A. KIDD, P.E.
STREETS
PUEBLO BLVD.
ROTOMILL
EXCAVATION
FLOWABLE FILL
ASPHALT PATCH
ASPHALT INLAY
ST. CLAIR
5" ASPHALT PATCH
1" FW OVERLAY
5.5" FD ASPHALT
R &R CROSSPAN
EXC. AND WASTE
ASPHALT
CURB & GUTTER
CROSSPANS
SQR PAN RAD W /HC RAMP
RAD CURB W /HC RAMP
SANITARY SEWER
8" PVC PIPE, 0 -12'
48" MANHOLES
SERVICES
STORM SEWER
42" POLY PIPE
36" POLY PIPE
15" POLY PIPE
TYPE S INLET L = 20'
TYPE 1 -B MANHOLES
TYPE 1 -C MANHOLES
6" STD. CURB AND GUTTER
SIDEWALK DRAIN
6500 SF @ 0.55 /SF
344 CY @ $15.00 /SY
320 CY @ $45.00 /SY
75 TON @ $60.00/TON
40 TON @ $60.00/TON
76 TON @ $60.00/TON
270 TON @ $60.00/TON
980 SY @ $11.95 /SY
160 SF @ $7.75/SF
300 CY @ $8.00 /CY
3655 SY @ $11.10 /SY
2090 LF @ $7.80 /LF
256 SF @ $3.80 /SF
2 EA @ $723/EA
4 EA @ $606 /EA
269 LF @ $22.00 /LF
1 EA @ $1,400 /EA
24 EA @ $575/EA
949 LF @ $72.00 /LF
697 LF @ $60.001LF
76 LF @ $27.00/LF
2 EA @ $5,0001EA
3 EA @ $1,600 /EA
3 EA @ $2,200/EA
441 LF @ $7.80 /LF
2 EA @ $500 /EA
WATER
8" PVC PIPE 910 LF @ $29.22/LF
SERVICES 24 EA @ $480/EA
FIRE HYDRANT ASSEMBLY 2 EA @ $1,800 /EA
$3,575
$5,160
$14,400
$4,500
$2,400
$4,560
$16,200
$11,711
$1,240
$2,400
$40,570
$16,302
$973
$1,446
$2,424
$5,918
$1,400
$13,800
$68,328
$41,820
$2,052
$10,000
$4,800
$6,600
$3,440
$1,000
$26,590
$11,520
$3,600
STREET LIGHTS
3 EA @ $1,300/EA
$3,900
MONUMENTS
2 EA @ $450/EA
$900
BARRICADES
2 EA @ $8001EA
$1,600
TRAFFIC CONTROL
1 EA @ $11,000/EA
$11,000
TOTAL:
$346,129
This is an estimate only. Actual construction costs may vary. This
estimate may
costs.
PREPARED BY: RICKY A. KIDD, P.E DATE: 2/25/97
FIRM: KIDD E &CMS, INC.
- t REVIEWED BY: - DATE: A.
City of Pueblo
6
ST. CLAIR OUTFALL
AND PHASE 2
STORM SEWER
IMPROVEMENTS
$ 3,575
$ 5,160
$ 14,400
$ 4,500
$ 2,400
$ 4,560
$ 16,200
$ 1,240
$ 68,328
$ 41,820
$ 2,052
$ 10,000
$ 4,800
$ 6,600
$ 3,440
$ 1,000
$1 1,000
$201,075
. 30,161 15% Cont.
$231,236
include all construction
Book: 3012 Page: 930 Chris C. Munoz
Page: 4 of 4 Pueblo Co.C1k.&Rec.
Reception 1175642
07/02/1997
NOTICE OF SHALLOW SANITARY SEWER SERVICE LINES
Notice is hereby given to the owner(s) of Lots 23 -42, Block 4 Lots 1 -42, Block 6; Lots
1 -8, Block T, Lots 1 -42, Block 8, Lots 1 -21, Block 10, and Lots 1 -4, Block 11; all being in
REGENCY CREST SUBDIVISION, A SPECIAL AREA PLAN, Pueblo County, Colorado, and
their heirs, personal representatives, successors and assigns, that sanitary sewer service to
basements of these lots may require a pumping system due to the elevation of the sanitary sewer
lines in the street of public right -of -way.
This notice is dated June 17, 1997.
SUBDIVIDER
DOMEGA HOMES, LLC
C. T. Proctor, Managing Member
Address: DRAWER 3430
PUEBLO CO 81005
STATE OF COLORADO
)SS
COUNTY OF PUEBLO )
The foregoing instrument was acknowledged before me on June 17, 1997, by DOMEGA
HOMES, LLC, C. T. Proctor, Managing Member
Witness my hand and seal.
U
Notary Public - `'J? �Q • i s''
CO
9407301.206 ( -%7- /�/ •�.s