HomeMy WebLinkAbout06175Reception 1167693
05/06/1997
ORDINANCE NO. 6175
AN ORDINANCE APPROVING THE PLAT OF EL CAMINO
SUBDIVISION, 6TH FILING
BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, COLORADO, that:
SECTION 1.
The final plat of El Camino Subdivision, 6th Filing, being a subdivision of land legally
described as follows:
A portion of Parcel A, as platted in El Camino Subdivision, 7th Filing, accord-
ing to the recorded plat thereof, filed for record July 19, 1988, and
A portion of the NE 1/4 of the NW 1/4, the NW 1/4 of the NE 1/4 and the
NE 1/4 of the NE 1/4 of Section 21, Township 21 South, Range 65 West
of the 6th P.M. and being more particularly described as follows:
Considering the West line of the NE 1/4 of Section 21, Township 21 South,
Range 65 West of the 6th P.M. to bear N.00'36'1 6"E. And all bearings
contained herein being relative thereto.
Beginning at the Southwest corner of Lot 1, Block 37 in said El Camino
Subdivision, 7th Filing; thence Southeasterly, along the South boundary
line of said Block 37, the following nine (9) courses:
1. S.89 0 12'30 "E., a distance of 258.64 feet;
2. S.83 0 40'48 "E., a distance of 79.87 feet;
3. S.70 0 05'57 "E., a distance of 86.25 feet;
4. S.70 0 02'21 "E., a distance of 225.65 feet;
5. S.89 0 16'29" E., a distance of 219.81 feet;
6. S.79 °31' 07 "E., a distance of 147.86 feet;
7. S.33 0 41'12" E., a distance of 146.71 feet;
8. S.18 °34' 02 "E., a distance of 196.37 feet;
9. S.53 0 34'02" E., a distance of 200.21 feet
to the Southernmost corner of Lot 18 in
said Block 37;
thence continuing S.53 °34'02" E., a distance of 60.00 feet to the East right -
of -way line of Alhambra Drive, as platted in said 7th Filing; thence N. 36°
25'58" E., along said East right -of -way line, a distance of 72.16 feet to the
Westernmost corner of Lot 20, Block 38 in said 7th Filing; thence Easterly,
along the boundary of said Block 38 the following two (2) courses:
1. S.53 0 34'02" E., a distance of 100.00 feet;
Book: 2994 Page: 470 Chris C. Munoz
Page: 2 of 3 Pueblo CO.Clk.&Rec.
2. N.36 0 25'58 "E., a distance of 334.84 feet to the Westerly
right -of -way line of the Arkansas Valley Conduit;
thence 5.18 °34'02 "E., along said Westerly right -of -way line, a distance
of 798.14 feet to the South line of the said NE 1/4 of the NE 1/4 of Section
21; thence N.88 °59'53 "W., along said South line and along the South
line of the said NW 1/4 of the NE 1/4, a distance of 1720.26 feet; thence
N.01 °00'07 "E., a distance of 177.61 feet; thence Northwesterly, along
the arc of a curve to the left, whose radius is 560.00 feet, a distance
of 259.05 feet; thence N.25 °30'09" W., a distance of 400.00 feet; thence
Northwesterly, along the arc of a curve to the right, whose radius is
640.00 feet, a distance of 250.56 feet to the Southeast corner of Lot
1, Block 40 in El Camino Subdivision, Filing 7A, according to the recorded
plat thereof, filed for record April 23, 1992; thence Easterly and
Northerly, along the boundary of said Filing 7A the following three
(3) courses:
1. N.86 0 55'42 "E., a distance of 80.00 feet to the East
right -of -way line of Encino Drive;
2. Northerly, along said East right -of -way line and along the
arc of a curve to the right whose center bears N. 86 °55'
42 "E., and whose radius is 560.00 feet, a distance of
30.15 feet;
3. N.00 0 00'48" E., continuing along said East right -of -way
line, a distance of 4.46 feet to the point of beginning,
containing 32.646 acres,
is hereby approved; all dedicated streets, utility and drainage easements, rights -of -way and land
set aside for public sites, parks and open spaces shown and dedicated on said plat are hereby
accepted on said plat are hereby accepted for public use.
SECTION 2.
The accepted of such dedicated streets, rights -of -way, utility and drainage easements,
public sites, parks and open spaces by the City does not obligate the City of maintain or repair
same until such streets , rights -of -way, utility and drainage easements, public sites, parks and
open spaces have been constructed and installed in compliance and in accordance with the
requirements and provisions of Chapter 4, Title XII of the 1991 Code of Ordinances, as amended
into pursuant thereto.
SECTION 3.
Book: 2994 Page: 47P Chris
uebloCo.Clku
Page. &R Page. ,
This ordinance shall become effective immediately upon final passage and approval.
INTRODUCED February 10, 1997
By Samuel Corsentino
: Councilperson
f APPROVED CSI•
President of Yhe C ncil
AT'IE :
J2.)
City Clerk
1/27/97
Reception 1167695
05/06/1997
SUBDIVISION IMPROVEMENTS AGREEMENT
THIS AGREEMENT made and entered into this �— day of A R;<
, of 1997, by and between the CITY OF PUEBLO, a Municipal
Corporation, hereinafter referred to as "City ", and ED ROBINSON &
ASSOCIATES, INC., a Colorado Corporation, hereinafter referred to
as "Subdivider ".
W I T N E S E T H:
WHEREAS, Subdivider has subdivided or is about to subdivide a
certain tract of land located in the City and legally described as
set forth in Exhibit "A ", which is attached hereto and incorporated
herein; and
WHEREAS, the Subdivider, as a condition of approval of the
final plat of EL CAMINO SUBDIVISION, 6TH FILING, wishes to enter
into this Subdivision Improvements Agreement as authorized by
Chapter 4, Title XII of the 1971 Code of Ordinances; and
WHEREAS, Subdivider is required pursuant to Section 12- 4 - 7(J)
of the 1971 Code of Ordinances of the City to construct and install
certain public improvements as set forth in Exhibit "B ", which is
attached hereto and incorporated herein; and
WHEREAS, pursuant to Chapter 4, Title XII of the 1971 Code of
ordinances Subdivider is obligated to provide security or
collateral sufficient in the judgment of the City Council to make
reasonable provisions for the construction and completion of the
required public improvements set forth in Exhibit "B ".
NOW THEREFORE, in consideration of the following mutual
covenants and agreements, the City and Subdivider agree as follows:
1. Subdivider agrees within one hundred and eighty (180) days
after application for a building permit to construct any building
or structure on any building site within the subdivision, or upon
the issuance of a certificate of occupancy for any such building or
structure, whichever is sooner, to construct and install at his
sole cost and expense all of those public improvements set forth in
Exhibit "B ", which is attached hereto and incorporated herein.
2. In lieu of installing the required public improvements set
forth in Exhibit "B: within one hundred eighty (180) days,
Subdivider or any subsequent owner of the land or any portion
thereof shall deposit cash or other collateral with the Director of
Finance of the City, or with any bank or trust company licensed in
the State of Colorado, subject to an escrow agreement approved by
the City Attorney. The holder of such cash or collateral shall pay
all or any portion thereof to the City upon demand after the time
for completion of all required improvements by Subdivider or
subsequent owner shall have expired. Such deposit or escrow
agreement shall be hereinafter referred to as the "deposit ".
3. The amount of the deposit shall be computed by the City's
Director of Public Works by estimating the total costs of all
uncompleted improvements required by this section within the block
at the time application for building permit is made. The amount of
the deposit required by this alternative shall be not less than 25%
of such estimate plus the costs of extending all required sewer and
water lines from the nearest existing sewer and water lines to the
proposed building site for which a building permit is sought, plus
improvements of a like nature whichever is nearer to the proposed
building site. In any case where the block, as hereinafter
defined, shall exceed one thousand (1,000) feet in length between
intersecting streets, the estimate of the City Director of Public
Works under this paragraph may be reduced to the total costs of all
uncompleted improvements in at least one -half of such block, and
the required deposit shall be based upon such decreased estimate,
-1-
Book: 2994 Page: 474 Chris C. Munoz
Page: 2 of 11 Pueblo Co.Clk. &Rec.
provided, however, Subdivider shall undertake to provide a
turnaround of at least sixty (60' ) feet in diameter at the mid -
block point and barricade said streets so that no through traffic
shall be permitted beyond the point to which the estimate of the
Director of Public Works is based.
4. Within one hundred eighty (180) days after subsequent
application for a building permit to construct any building or
structure upon any building site within the block, or upon the
issuance of a certificate of occupancy for any such building or
structure, whichever is sooner, Subdivider shall likewise deposit
an amount not less than the estimate of the Director of Public
Works for all required improvements from existing improvements to
the proposed building site, less any previous deposits made
hereunder upon building sites lying between the most recently
proposed site and existing improvement.
5. The City may treat the amount of such deposit as a debt
due the City from Subdivider or subsequent owner, which debt shall
be a lien upon all the land in the Subdivision and notice of lien
may be filed for record in the office of the County Clerk and
Recorder at any time after such default. Action upon such debt may
be instituted by the City within six (6) years from the date of
filing such lien for record. All remedies provided for herein are
cumulative and the use of one shall not prohibit the use of
another.
6. Upon payment of each such deposit, the City Director of
Public Works shall release the proposed building site from the
terms of this Agreement.
7. As a condition of approval of this Subdivision, and to
meet the requirements of Section 12- 4 -7(J) of the 1971 Code of
Ordinances, Subdivider specifically agrees that no certificate of
occupancy shall be issued by the Pueblo Regional Building
Department until a certificate of compliance has been approved and
issued by the City Director of Public Works and duly recorded in
the Office of the Pueblo County Clerk and Recorder which certifies
that those public improvements set forth in Exhibit "B ", or that
portion of said improvements as shall be necessary to totally serve
specific lot(s) or block(s) for which building permits or
certificates of occupancy are sought and which are covered by a
particular certificate of compliance, have been properly designed,
engineered, constructed, and accepted as meeting the specifications
and standards of the City.
These restrictions on the issuance of certificates of
occupancy shall run with the land and shall extend to and be
binding upon the heirs, executors, legal representatives,
successors and assigns of Subdivider and may be specifically
enforced by the City.
8. Acceptance of this Subdivision by the City does not
constitute an acceptance of the roads, park, and other public
improvements for maintenance by the City. Until such roads and
other park and public improvements have been installed and meet the
requirements, standards, and specifications of the City, its
Subdivision ordinances, and any applicable Parks Department
specifications, and such are specifically approved and accepted in
writing by the City Director of Public Works, and, if appropriate,
the City director of Parks and Recreation, the maintenance,
construction, and all other matters pertaining to or affecting said
roads, park and other public improvements and rights of way are the
sole responsibility of the Subdivider or any subsequent owners) of
the land within this Subdivision.
9. The required time for completion of all such improvements
by Subdivider within such block shall be one (1) year from the date
of application for the first building permit issued within such
block. Upon completion and written approval and acceptance of such
improvements within the required time and the payment of all
inspection costs by Subdivider, the Director of Public Works shall
cause all obligations of Subdivider relating to such improvements
within such block to be released. If said improvements are not
completed within the required time, the City Director of Public
Works may cause the proceeds of all deposits or other collateral or
-2-
Book: 2994 Page: 475 Chris C. Munoz
Page: 3 of 11 Pueblo Co.Clk. &Rec.
monies in escrow to be used to complete the same. If sufficient
monies are available at the end of the required time to complete
all such improvements herein required for the entire length of such
block, the Director of Public Works shall cause all collateral or
monies in escrow to be reduced in cash and shall deposit the same
with the Director of Finance and such cash shall be used to
complete that portion of the improvements the Director of Public
Works shall determine. Until all improvements are completed and
approved by the Director of Public Works, Subdivider and the
subdivided land shall remain liable and responsible therefor.
10. For purposes of this Agreement, the word "block" shall
mean both tiers of lots fronting or abutting upon the street which
the proposed building or structure shall front to the rear property
line of such lots, or the center line of the alley, if there is an
alley, enclosed at either end by a street which intersects both
tiers of lots, and shall include the full width of all streets upon
which such lots abut.
11. Subdivider agrees to provide the City with a current title
insurance commitment at the time of final platting evidencing that
fee simple title of all lands in the Subdivision is totally vested
with the Subdivider free and clear of any and all encumbrances. If
such land is not free and clear, the holder of such indebtedness
shall subordinate its interest or encumbrance to this Agreement and
all its terms, conditions, and restrictions.
12. It is mutually agreed that the City or any purchaser of
any lot(s) within this Subdivision shall have the authority to
bring an action in any Court of competent jurisdiction to compel
the enforcement of this Agreement or any amendment thereto. Such
authority shall include the right to compel rescission of any sale,
conveyance, or transfer of any lot(s) or tract(s) contrary to the
provisions of the Ordinances of the City or this Agreement.
13. The parties hereto mutually agree that this Agreement may
be amended from time to time by mutual consent provided that such
amendment be in writing and be signed by all parties hereto.
14. This Agreement shall extend to and be binding upon the
successors and assigns of the City and upon the heirs,
administrators, executors, successors, assigns, and legal
representatives of Subdivider, and shall be placed on record in the
office of the County Clerk and Recorder Pueblo County, Colorado,
and shall constitute an agreement running with the land until
released as hereinabove set forth.
-3-
Book: 2994 Page: 476 Chris C. Munoz
Page: 4 of 11 Pueblo Co.Clk. &Rec.
IN WITNESS WHEREOF, the parties hereto have caused this Agreement
to be executed and attested by its duly authorized and acting
officers and the seal of the Subdivider set hereon.
ED ROBINSON & ASSOCIATES, INC.
a Colorado Corporation
Subdivider
B
Edward L. Robinson, President
(S E A L)
STATE OF COLORADO)
) ss. By
COUNTY OF PUEBLO ) Helen K Robinson, Secretary
The foregoing instrument was acknowledged before me this
day of Cc n., / _� , 1997, by Edward 1. Robinson, President
and Helen G. Robinson, Secretary of ED ROBINSON & ASSOCIATES, INC.,
a Colorado Corporation, Subdivider.
My commission expires:
rD
� f
4M� ac., ia49
Notary Public
Address:
CITY OF PUEBLO, a Municipal Corporation
f by
-C I ._1, Pre dent f the Council
. iT"T'EST:, ,
Clerk
STATE OF COLORADO)
) ss.
COUNTY OF PUEBLO )
The foregoing instrument was acknowledged before me this a"
day of � 1997, b rcia , as
President of City Council, and as City
Clerk of the City of Pueblo, Colorado.
My commission expires:
o
Pipf 61VE ,- AS TO FORM:
Notary tx�blic
Address: Pb &CK 19 3
(? )E1k1A -, C 8 jD 2 3
�ht
City orney
-4-
Book: 2994 Page: 477 Chris C. Munoz
Page: 5 of 11 Pueblo Co.Clk. &Rec.
SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT "A"
A portion of Parcel A, as platted in E1 Camino Subdivision, 7th
Filing, according to the recorded plat thereof, filed for record
July 19, 1988
AND
A portion of the NE 1/4 of the NW 1/4, the NW 1/4 of the NE 1/4 and
the NE 1/4 of the NE 1/4 of Section 21, Township 21 South, Range 65
West of the 6th P.M. and being more particularly described as
follows:
Considering the West line of the NE 1/4 of Section 21, Township 21
South, Range 65 West of the 6th P.M. to bear N. 00 0 36 1 16 11 E. and all
bearings contained herein being relative thereto.
Beginning at the Southwest corner of Lot 1, Block 37 in said E1
Camino Subdivision, 7th Filing; thence Southeasterly, along the
South boundary line of said Block 37, the following nine (9)
courses:
1. S.89 °12 E., a distance of 258.64 feet;
2. S.83 °40 E., a distance of 79.87 feet;
3. S.70 °05 E., a distance of 86.25 feet;
4. 5.70 0 02 1 21" E., a distance of 225.65 feet;
5. 5.89 °16 E., a distance of 219.81 feet;
6. S.79 °31 E., a distance of 147.86 feet;
7. 5.33 0 41 1 12" E., a distance of 146.71 feet;
8. S.18 °34 E., a distance of 196.37 feet;
9. S.53 °34 "E., a distance of 200.21 feet to the
Southernmost corner of Lot 18 in said Block 37;
thence continuing S.53 0 34 1 02" E., a distance of 60.00 feet to the
East right -of -way line of Alhambra Drive, as platted in said 7th
Filing; thence N.36 0 25 1 58" E., along said East right -of -way line,
a distance of 72.16 feet to the Westernmost corner of Lot 10, Block
38 in said 7th Filing; thence Easterly, along the boundary of said
Block 38 the following two (2) courses:
1. S.53 0 34 1 02" E., a distance of 100.00 feet;
2. N.36 °25'58" E., a distance of 334.84 feet to the Westerly
right -of -way line to the Arkansas Valley Conduit;
thence S.18 0 34 1 02" E., along said Westerly right -of -way line, a
distance of 798.14 feet to the South line of the said NE 1/4 of the
NE 1/4 of Section 21; thence N.88 0 59 1 53" W., along said South line
and along the South line of the said NW 1/4 of the NE 1/4, a
distance of 1720.26 feet; thence N.01 0 00 1 07" E., a distance of
177.61 feet; thence Northwesterly, along the arc of a curve to the
left, whose radius is 560.00 feet, a distance of 259.05 feet;
thence N.25 0 30 1 09" W., a distance of 400.00 feet; thence
Northwesterly, along the arc of a curve to the right, whose radius
is 640.00 feet, a distance of 250.56 feet to the Southeast corner
of Lot 1, Block 40 in E1 Camino Subdivision, Filing 7A, according
to the recorded plat thereof, filed for record April 23, 1992;
thence Easterly and Northerly, along the boundary of said Filing
7A the following three (3) courses:
-5-
Book: 2994 Page: 478 Chris C. Munoz
Page: 6 of 11 Pueblo Co.Clk. &Rec.
1. N.86 °55 1 42 "E., a distance of 80.00 feet to the East
right -of -way line of Encino Drive;
2. Northerly, along said East right -of -way line and along
the arc of a curve to the right whose center bears
N.86 °55'42"E.,and whose radius is 560.00 feet, a distance
of 30.15 feet;
3. N.00 0 00 1 48 "E., continuing along said East right -of -way
line, a distance of 4.46 feet to the Point of Beginning.
Containing 32.646 acres.
9-
Book: 2994 Page: 479 Chris C. Munoz
Page: 7 of 11 Pueblo Co.Clk. &Rec.
SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME: EL CAMINO SUBDIVISION, 6TH FILING
DEVELOPER: ED ROBINSON & ASSOCIATES, INC.
ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC.
Phase I
Pasadena Drive
Sanitary Sewer
8 PVC Sewer main 904 LF @ $22 /LF $19,888.
48" Manholes 4 EA @ $1400 /EA $5,600.
Services (60 19 EA @ $1400 /EA $10,925.
Water
12" PVC Water Main
6 PVC Water Main
Services (60' R.O.W.)
450 LF @ $29 /LF
459 LF @ $29 /LF
19 EA @ $480 /EA
$13,050.
$13,311.
$9,120.
Streets
Asphalt (3 on 6 11 )
Curb & Gutter
Storm Sewer
18" Poly Pipe
Type S Inlet L =15'
Rip -Rap
Type S Inlet L =4'
Concrete Channel
Type 1 -B Manhole
Street Lights
Monuments
Phase I Pasadena Drive Sub -Total
3757 SY @ $11 /SY
1930 LF @ $7.80 /LF
306 LF @ $29 /LF
1 Ea @ $4000 /EA
12.5 CY @ $50 /CY
1 EA @ $1800 /EA
213 LF @ $35 /LF
1 EA @ $1600 /EA
3 EA @ $1300 /EA
3 EA @ $500 /EA
$41,327.
$15,054.
$8,626.
$4,000.
$625.
$1,800.
$7,455.
$1,600.
$3,900.
$1,500.
$157,781.
Pomona Court
Water
6 PVC Water main
Services (60' R.O.W.)
376 LF @ $29 /LF
7 EA @ $480 /EA
$10,904.
$3,360.
Sanitary Sewer
8 PVC Sewer main
48" Manholes
Services (60' R.O.W.)
349 LF @ $22 /LF
1 EA @ $1400 /LF
7 EA @ $575/EA
$7,678.
$1,400.
$4,025.
Storm Drain
Sidewalk Culvert -9'
Concrete Channel
Type M Rip Rap
Monuments
Streets
Asphalt (3 on 6 11 )
Curb and Gutter
Street Lights
1 Ea @ $1000 /EA
32 LF @ $35 /LF
5.6 CY @ $50 /CY
4 EA @ $500 /EA
1745 SY @ $11 /SY
797 LF @ $7.80 /LF
1 EA @ $1300 /EA
Phase I Pomona Court Sub Total
$1,000.
$1,120.
$280.
$2,000.
$19,195.
$6,217.
$1,300.
$58,479.
-7-
Book: 2994 Page: 480 Chris C. Munoz
Page: 8 of 11 Pueblo Co.Clk. &Rec.
SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME: EL CAMINO SUBDIVISION, 6TH FILING
DEVELOPER: ED ROBINSON & ASSOCIATES INC.
ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING INC
Alhambra Drive
Water
12" PVC Water main
363
Lf
@
$29 /LF
Services (60' R.O.W.)
5
EA
@
$480 /EA
Sanitary Sewer
47
LF
@
$140 /LF
10" PVC Sewer main
8
LF
@
$22 /LF
8 PVC Sewer main
332
LF
@
$22 /LF
48" Manholes
1
EA
@
$1400 /EA
Services
5
EA
@
$575/EA
Storm Drain
38 "x 60" HERCP
29
LF
@
$120 /LF
48" CL II RCP
56
LF
@
$100 /LF
54" CL II RCP
47
LF
@
$140 /LF
66 11 x54" RCP Reducer
1
EA
@
$2000 /EA
Intake Structure L =10'
1
EA
@
$3500 /EA
Detention Basin Spillway
1
EA
@
$10,000 /EA
Detention Basin Orifice
Plate
1
EA
@
$300 /EA
Concrete V -Pans in Park
1892
LF
@
$11 /LF
Type III MH
1
EA
@
$4000 /LF
Type H Rip Rap
37
CY
@
$50 /CY
Streets
Asphalt (3" on 6 11 )
1298
SY
@ $11 /SY
Curb and Gutter
649
LF
@ $7.80 /LF
Street Lights
1
EA
@ $1300 /EA
Monuments
2
EA
@ $500 /EA
Alhambra Drive
Sub
Total
Phase I Total
$10,527.
$2,400.
$176.
$7,304.
$1,400.
$2,875.
$3,480.
$5,600.
$6,580.
$2,000.
$3,500.
$10,000.
$300.
$20,812.
$4,000.
$1,850.
$14,278.
$5,062.
$1,300.
$1,000.
$104,444.
$320,704.
-8-
Book: 2994 Page: 481 Chris C. Munoz
Page: 9 of 11 Pueblo Co.C1k.&Rec.
SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME: EL CAMINO SUBDIVISION, 6TH FILING
DEVELOPER: ED ROBINSON & ASSOCIATES, INC.
ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC._
Phase II
Encino Drive
Sanitary Sewer
47
LF
@
$27 /LF
$1,269.
8 PVC Sewer main
815
LF
@
$22 /LF
$17,930.
48" Manholes
4
EA
@
$1400 /EA
$5,600.
Services (80' R.O.W.)
5
EA
@
$765/EA
$3,825.
6 PVC Sewer Main
50
LF
@
$16 /LF
$800.
Water
1
EA
@
$1600 /EA
$1,600.
12" PVC Water main
1125
LF
@
$29 /LF
$32,625.
Services (80' R.O.W)
5
EA
@
$640 /EA
$3,200.
Storm Drai
15" Polypipe
47
LF
@
$27 /LF
$1,269.
18" Polypipe
250
LF
@
$29 /LF
$7,250.
54" CLII RCP
130
LF
@
$115/LF
$14,950.
24" Polypipe
58
LF
@
$36 /LF
$2,088.
Type III Manhole
1
EA
@
$4000 /EA
$4,000.
Type 1 -B Manhole
1
EA
@
$1600 /EA
$1,600.
Type S Inlet L =4'
2
EA
@
$1800 /EA
$3,600.
Type S Inlet L -6'
1
EA
@
$2200 /EA
$2,200.
Rip Rap (Type M)
132
CY
@
$50 /CY
$6,600.
Streets
Asphalt (3' on 10 11 )
5800
SY
@
$14.60/SY
$84,680.
Curb and Gutter
2274
LF
@
$7.80 /LF
$17,737.
WE
Book: 2994 Page: 482 Chris C. Munoz
Page: 10 of 11 Pueblo Co.Clk. &Rec.
SUBDIVISION IMPROVEMENT AGREEMENT
SUBDIVISION NAME: EL CAMINO SUBDIVISION, 6TH FILING
DEVELOPER: ED ROBINSON & ASSOCIATES. INC.
EXHIBIT "B"
ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC.
Monuments 5 EA @ $500 /EA $2,500.
Street Lights
6 EA @ $1,300 /EA
$7,800.
Phase II Encino Drive Sub -Total
$220,254.
Redondo Lane
Water
8 PVC Water main
Services (60' R.O.W.)
1061 LF @ $29 /LF
20 EA @$480 /EA
$30,769.
$9,600.
Sanitary Sewer
8 PVC Sewer main
48" Manholes
Services
Storm Drain
18" Polypipe
30" Polypipe
24" Polypipe
Concrete Channel
Type S Inlet L =4"
Type S Inlet L =10'
Type 1 -B Manholes
Type M Rip Rap
Streets
Asphalt (3 on 6 11 )
Curb and Gutter
Monuments
Street Lights
945 LF @ $22 /LF
3 EA @ $1400 /EA
20 EA @ $575/EA
28 LF @ $29 /LF
339 LF @ $50 /LF
151 LF @ $36 /LF
151 LF @ $35 /LF
1 EA @ $1800 /EA
1 EA @ $3000 /EA
2 EA @ $1600 /EA
20 CY @ $50 /CY
3943 SY @ $11 /SY
1972 LF @ $7.80 /LF
4 EA @ $500 /EA
3 Ea @ $1300 /EA
Phase II Redondo Lane Sub Total
Pasadena Drive
Water
12" PVC Watermain 568 LF @ $29 /LF
Services (60' R.O.W.) 10 EA @ $480 /EA
Sanitary Sewer
8 PVC Sewermain
48" Manholes
Services (60' R.O.W.)
556 LF @ $22 /LF
2 EA @ $1400 /EA
10 EA @ $575/EA
$20,790.
$4,200.
$11,500.
$812.
$16,950.
$5,436.
$5,285.
$1,800.
$3,000.
$1,600.
$1,000.
$43,373.
$15,382.
$2,000.
$3,900.
$177,397.
$16,472.
$4,800.
$12,232.
$2,800.
$5,750.
Streets
Asphalt (3 on 6 2520 SY @ $11 /SY $27,720.
Curb and Gutter 1106 LF @ $7.80 /LF $8,626.
-10-
Book: 2994 Page: 483 Chris C. Munoz
Page: 11 of 11 Pueblo Co.Clk. &Rec.
SUBDIVISION IMPROVEMENT AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME: EL CAMINO SUBDIVISION, 6TH FILING
DEVELOPER: ED ROBINSON & ASSOCIATES, INC.
ENGINEER: NORTHSTAR ENGINEERING AND SURVEYING, INC.
Street Lights 2 EA @ $1300 /EA $2,600.
Storm Drain
18" Poly Pipe
24" Poly pipe
Type S Inlet L =4'
Drop Inlet
Rip Rap
159 LF @ $29 /LF
450 LF @ $36 /LF
1 EA @ $1800 /EA
1 EA @$2,000 /EA
17 CY @ $50 /CY
$4,611.
$16,200.
$1,800.
$2,000.
$850.
Monuments
2 EA @ $500 /EA
Phase II Pasadena Drive Sub Total
Total Phase II
$1,000.
$107,461.
$505,112.
Earthwork 51,000 CY @ $1.50 /CY $76,500.
Horizon Communities, Inc. (Successor to Ed Robinson & Associates,
Inc.) will be responsible for removal of silt and repair of eroded
areas in Parcel A until sod is placed. If sod is not placed within
2 years Horizon Communities will revegetate disturbed areas with
native grasses and a temporary irrigation system.
This is an estimate only. Actual Construction costs may vary.
This estimate may not include all construction costs.
PREPARED BY: A. RICKEY NOVEMBER 27, 1996
DATE
FIRM: NORTHSTAR ENGINEERING AND SURVEYING, INC.
REVIEWED BY: �il•/>H
City of Pueblo
off &M
7
DATE
8503221.101
-11-
Reception 1167696
05/06/1997
RATIFICATION OF PLAT
FOR VALUE RECEIVED, Horizon Communities, Inc., a Colorado
Corporation, does hereby ratify and consent to the subdivision of
land platted as EL CAMINO SUBDIVISION, 6TH FILING shown on the
Subdivision Plat recorded in Plat Book ,,244V at Page C�7� of the
records of Pueblo County, Colorado, and confirms and joins in the
dedication of all streets, easements, rights of way and access
restrictions shown thereon and subordinates its interest in the
property described in this Subdivision Plat to any Subdivision
Improvements Agreement between the Subdivider and the City of
Pueblo executed in conjunction therewith.
/1
Signed this � Ttti' day of App, t I- , 1997.
Horizon Communities, Inc.
a Colorado Corporation
By: "t ct"�
Robert W. Leach
Title: Vice - President
STATE OF COLORADO)
) ss.
COUNTY OF PUEBLO )
The foregoing instrument was acknowledged before me by
Robert W. Leach, Vice - President 7th day of April ,
1997.
My Commission expires 8 -31 -98
:c' o ary Public
Reception 1167697
05/06/1997
RATIFICATION OF PLAT
FOR VALUE RECEIVED, Pueblo Bank & Trust Company, a
Colorado Corporation, being the owner of indebtedness secured by a
deed of trust recorded April 24, 1997 in Book 2990 at Page _
419 does hereby ratify and consent to the subdivision of land
platted as EL CAMINO SUBDIVISION, 6TH FILING shown on the
Subdivision Plat recorded in Plat Book ,,994 at Page 4 of the
records of Pueblo County, Colorado, and confirms and joins in the
dedication of all streets, easements, rights of way and access
restrictions shown thereon and subordinates its interest in the
property described in this Subdivision Plat to any Subdivision
Improvements Agreement between the Subdivider and the City of
Pueblo executed in conjunction therewith.
Signed this 1-114- day of APRIL- , 1997.
Pueblo Bank & Trust Company,
a Colorado Corporation
Title: - S V1 - pl- �
STATE OF COLORADO)
) ss.
COUNTY OF PUEBLO )
The foregoing instrument was acknowledged before me by
John Thompson of Pueblo Bank &
Trust Company, Colorado Corporation this 7th day of
April , 1997.
My Commission expires
;±
Notary Public
C OV
8503221.106
Reception 1167698
NOTICE OF SHALLOW SANITARY SEWER SERVICE LINES
Notice is hereby given to the owner(s) of the lots listed in
Exhibit "A" attached hereto, all being in EL CAMINO SUBDIVISION,
6TH FILING, Pueblo County, Colorado, and their heirs, personal
representatives, successors and assigns, that sanitary sewer
service to basements of these lot(s) may require a. pumping system
due to the elevation of the sanitary sewer line(s) in the street or
public right of way.
T h i s notice is dated 3, 1997.
SUBDIVIDER:
ED ROBINSON & ASSOCIATES, INC.
a Colorado Corporation
B - By
Edward L. Ro inson, President Helen r Robinson, Secretary
STATE OF COLORADO )
) ss.
'OUhI OF PUEBLO )
the foregoing instrument. was acKnowledaed before me on
1997, by Edward L. Robinson, Presiden7 and Helen G.
Robinson, Secretary of ED ROBINSON & ASSOCIATES, INC., a Colorado
Corporation.
Witness my hand and seal.
el. ssion expires: �. � QCa, Igy9
Notary Public
Book: 2994 Page: 487 Chris C. Munoz
Page: 2 of 2 Pueblo Co.Clk. &Rec.
EXHIBIT "A"
in Block 44:
Lots 1 through 12
Lots 14 through 16
-) Block 45 :
Lots 1 through 20
in Block 46:
Lots 1 through 4
Lots 6 through 8
Lots 10 through 12
Lots 15 through 23
all being in E1 Camino Subdivision, 6th Filing, according to the
recorded plat thereof.
8503221.200