Loading...
HomeMy WebLinkAbout05930Reception 1074134 03/17/1995 ORDINANCE NO. 5930 AN ORDINANCE APPROVING THE PLAT OF GATEWAY PLAZA SUBDIVISION BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, COLORADO, that: SECTION 1. The final plat of Gateway Plaza Subdivision, being a subdivision of land legally described as follows: All of Lots 1, 2, 3 and 4 Block 1 in Gateway Subdivision, Fourth Filing, according to the recorded plat thereof, filed for record July 10, 1992 AND All of vacated Valley Drive, as platted in said Gateway Subdivision, Fourth Filing, AND A parcel of land in the SE 1/4 of the NE 1/4 of Section 14, Township 20 South, Range 65 West of the 6th P.M. being more particularly described as follows: Considering the East line of the NE 1/4 of said Section 14, Township 20 South, Range 65 West of the 6th P.M. to bear N.00° 02' 07" E. and all bearings contained herein being relative thereto. Beginning at the Northeast corner of said Gateway Subdivision, Fourth Filing; thence Westerly, along the North boundary line of said Fourth Filing, the following five (5) courses: 1. N.89° 57' 53" W., a distance of 100.00 feet; 2. along the arc of a curve to the right, whose radius is 340 feet, a distance of 178.02 feet; 3. N.59° 57' 53" W., a distance of 204.93 feet; 4. along the arc of a curve to the left, whose radius is 400 feety a distance of 125.07 feet; 5. N.77° 52' 46" W., a distance of 101.57 feet to the Southeast corner of Gateway Subdivision, Third Filing, according to the recorded plat thereof, filed for record November 1, 1988; thence N.12° 06' 00" E., along the East boundary line of said Third Filing and that line extended, a dis- tance of 260.00 feet; thence S.77° 52' 46" E., a dis- tance of 474.81 feet; thence S.89° 57' 53" E., a dis- tance of 144.31 feet to the East line of the said NE 1/4 of Section 14; thence S.00° 02' 07"W., along said East line, a distance of 369.01 feet to the Point of Beginning, containing 11,418 acres, is hereby approved; all dedicated streets, utility and drainage easements, rights-of-way and land set aside for public sites, parks and open spaces shown and dedicated on said plat are hereby accepted for public use. SECTION 2. The acceptance of such dedicated streets, rights- of-way, utility and drainage easements, public sites, parks and open spaces by the City does not obligate the City to maintain or repair same until such streets, rights-of-way, utility and drainage easements, public sites, parks and open spaces have been constructed and installed in compliance and in accordance with the requirements and provisions of Chapter 4, Title XII of the 1971 Code of Ordinances, as amended and any agree- ment entered into pursuant thereto. SECTION 3. This ordinance shall become effective immediately upon final passage and approval. INTRODUCED December 27 1994 FAY B. KASTELIC By Councilperson APPROVED President of the Council Reception 1074136 03/17/1995 SUBDIVISION IHPROVEHENTS AGREEHENT , by and between the CITY OF PUEBLO, a Nunicipal Corporation, hereinafter referred to as "City", and JANES E. O'NEAL, hereinafter referred to as "Subdivider" WITNESSETH: WHEREAS, Subdivider has subdivided or is about to subdivide a certain tract of land located in the City and legally described as set forth in Exhibit "A", which is attached hereto and incorporated herein; and WHEREAS, the Subdivider, as a condition of approval of the final plat of GATEWAY PLAZA, wishes to enter into this Subdivision Improvements A9reement as authorized by Chapter 4, Title XII of the 1971 Code of Ordinances; and WHEREAS, Subdivider is required pursuant to Section 12-4-7(J) of the 1971 Code of Ordinances of the City to construct and install certain public improvements as set forth in Exhibit "B", which is attached hereto and incorporated herein; and WHEREAS, pursuant to Chapter 4, Title XII of the 1971 Code of ordinances Subdivider is obli9ated to provide security or collateral sufficient in the judgment of the City Council to make reasonable provisions for the construction and completion of the required public improvements set forth in Exhibit "B" NOW THEREFORE, in consideration of the following mutual covenants and agreements, the City and Subdivider a9ree as follows: 1. Subdivider agrees within one hundred and eighty (180) days after application for a buildin9 permit to construct any buildin9 or structure on any building site within the subdivision, or upon the issuance of a certificate of occupancy for any such building or structure, whichever is sooner, to construct and install at his sole cost and expense all of those public improvements set forth in Exhibit "B", which is attached hereto and incorporated herein. 2. In lieu of installing the required public improvements set forth in Exhibit "B: within one hundred eighty (180) days, Subdivider or any subsequent owner of the land or any portion thereof shall deposit cash or other collateral with the Director of Finance of the City, or with any bank or trust company licensed in the State of Colorado, sub3ect to an escrow agreement approved by the City Attorney. The holder of such cash or collateral shall pay all or any portion thereof to the City upon demand after the time for completion of all required improvements by Subdivider or subsequent owner shall have expired. Such deposit or escrow agreement shall be hereinafter referred to as the "deposit". 3. The amount of the deposit shall be computed by the City's Director of Public Works by estimating the total costs of all uncompleted improvements required by this section within the block at the time application for buildin9 permit is made. The amount of the deposit required by this alternative shall be not less than 25~ of such estimate plus the costs of extending all required sewer and water lines from the nearest existing sewer and water lines to the proposed building site for which a building permit is sought, plus improvements of a like nature whichever is nearer to the proposed building site. In any case where the block, as hereinafter defined, shall exceed one thousand (1,000) feet in length between intersecting streets, the estimate of the City Director of Public Works under this paragraph may be reduced to the total costs of all uncompleted improvements in at least one-half of such block, and the required deposit shall be based upon such decreased estimate, Book: 2791 Page= 119 Chrls C. Nunoz Page: 2 of 13 Pueblo Co. Clk.&Rec. provided, however, Subdivider shall undertake to provide a turnaround of at least sixty (60') feet in diameter at the mid- block point and barricade said streets so that no through traffic shall be permitted beyond the point to which the estimate of the Director of Public Works is based. 4. Within one hundred eighty (180) days after subsequent application for a building permit to construct any building or structure upon any building site within the block, or upon the issuance of a certificate of occupancy for any such building or structure, whichever is sooner, Subdivider shall likewise deposit an amount not less than the estimate of the Director of Public Works for all required improvements from existing improvements to the proposed building site, less any previous deposits made hereunder upon building sites lying between the most recently proposed site and existing improvement. 5. The City may treat the amount of such deposit as a debt due the City from Subdivider or subsequent owner, which debt shall be a lien upon all the land in the Subdivision and notice of lien may be filed for record in the office of the County Clerk and Recorder at any time after such default. Action upon such debt may be instituted by the City within six (6) years from the date of filin9 such lien for record. All remedies provided for herein are cumulative and the use of one shall not prohibit the use of another. 6. Upon payment of each such deposit, the City Director of Public Works shall release the proposed buildin9 site from the terms of this Agreement. 7. As a condition of approval of this Subdivision, and to meet the requirements of Section 12-4-7(J) of the 1971 Code of Ordinances, Subdivider specifically agrees that no certificate of occupancy shall be issued by the Pueblo Regional Buildin9 Department until a certificate of compliance has been approved and issued by the City Director of Public Works and duly recorded in the Office of the Pueblo County Clerk and Recorder which certifies that those public improvements set forth in Exhibit "B", or that portion of said improvements as shall be necessary to totally serve specific lot(s) or block(s) for which buildin9 permits or certificates of occupancy are sought and which are covered by a particular certificate of compliance, have been properly designed, engineered, constructed, and accepted as meetin9 the specifications and standards of the City. These restrictions and those in Exhibit B on the issuance of certificates of occupancy shall run with the land and shall extend to and be bindin9 upon the heirs, executors, legal representatives, successors and assigns of Subdivider and may be specifically enforced by the City. 8. Acceptance of this Subdivision by the City does not constitute an acceptance of the roads, park, and other public improvements for maintenance by the City. Until such roads and other park and public improvements have been installed and meet the requirements, standards, and specifications of the City, its Subdivision ordinances, and any applicable Parks Department specifications, and such are specifically approved and accepted in writin9 by the City Director of Public Works, and, if appropriate, the City director of Parks and Recreation, the maintenance, construction, and all other matters pertainin9 to or affectin9 said roads, park and other public improvements and rights of way are the sole responsibility of the Subdivider or any subsequent owner(s) of the land within this Subdivision. 9. The required time for completion of all such improvements by Subdivider within such block shall be one (1) year from the date of application for the first buildin9 permit issued within such block. Upon completion and written approval and acceptance of such improvements within the required time and the payment of all inspection costs by Subdivider, the Director of Public Works shall cause all obligations of Subdivider relatin9 to such improvements within such block to be re]eased. If said improvements are not completed within the required time, the City Director of Public Works may cause the proceeds of all deposits or other collateral or 2 Book: 2791 Page: 120 Chrls C. Nunoz Page: 3 of 13 Pueblo Co.Clk.&Rec. monies in escrow to be used to complete the same. If sufficient monies are available at the end of the required time to complete all such improvements herein required for the entire length of such block, the Director of Public Works shall cause all collateral or monies in escrow to be reduced in cash and shall deposit the same with the Director of Finance and such cash shall be used to complete that portion of the improvements the Director of Public Works shall determine. Until all improvements are completed and approved by the Director of Public Works, Subdivider and the subdivided land shall remain liable and responsible therefor. 10. For purposes of this A9reement, the word "block" shall mean both tiers of lots fcontin9 or abuttin9 upon the street which the proposed buildin9 or structure shall front to the rear property line of such lots, or the center line of the alley, if there is an al]ey, enclosed at either end by a street which intersects both tiers of lots, and shall include the full width of all streets upon which such lots abut. 11. Subdivider agrees to provide the City with a current title insurance commitment at the time of final plattin9 evidencin9 tha~ fee simple title of all lands in the Subdivision is totally vested with the Subdivider free and clear of any and all encumbrances. If such land is not free and clear, the holder of such indebtedness shall subordinate its interest or encumbrance to this Agreement and all its terms, conditions, and restrictions. 12o It is mutually agreed that the City or any purchaser of any lot(s) within this Subdivision shall have the authority to brin9 an action in any Court of competent jurisdiction to compel the enforcement of this A9reement or any amendment thereto. Such authority shall include the ri9ht to compel rescission of any sale, conveyance, or transfer of any lot(s) or tract(s) contrary to the provisions of the Ordinances of the City or this Agreement. 13. The parties hereto mutually agree that this Agreement may be amended from time to time by mutual consent provided that such amendment be in writin9 and be signed by all parties hereto. 14. This Agreement shall extend to and be bindin9 upon the successors and assi9ns of the City and upon the heirs, administrators, executors, successors, assigns, and le9al representatives of Subdivider, and shall be placed on record in the office of the County Clerk and Recorder Pueblo County, Colorado, and shall constitute an agreement runnin9 with the land until released as hereinabove set forth. -3- Book: 2791 Page: 121 Chrls C. Munoz Page: 4 of 13 Pueblo Co. Clk.&Rec. WITNESS WHEREOF, the parties hereto have caused this Agreement to be executed and attested by its duly authorized and actin9 officers and the sea] of the Subdivider set hereon. JAMES E. O'NEAL By~ U iVi eP (s E A L) STATE OF COLORADO couNTY OF'~5,.,--\~V) The foregoin9 instrument was acknowledged before me this day of ~C~nrc.~ , 199 ~--~, by James E. O'Neal, Subdivider. My commission e×pires: I~-Z~-~? ..":::~','S:~.L. ~ULDER, COD~DO'%~ ~"~'~' ~, %'.,,,,,', =,~,: .',: ...~' ::~L~ a Municipal Corporation President of o'~ ~T~Ce'~'O"' the Council "j' ',,,;f,l,~t 'c o,% '.~ :' ity C~e ~:1': ::.-.. .-., ) ss. OOUNTY OF PUEBLO ) The regoin9 instrument was ck le,d e,d b. o as PP y Counci I , an~ ~ ' ado. ' - as City,,,e,l,e~;~ of the City of Pueblo, "::~,:~ ........ "' ion expir sA o"-' // · . , APPROVED AS TO FORM: ~ey -4- Book: 2791 Page: 122 Chrls C. Nunoz Paqe: 5 of 13 Pueblo Co. Clk.&Rec. SUBDIVISION IHPROVEHENT AGREEHENT EXHIBIT "A" All of Lots 1, 2, 3 and 4, Block 1 in Gateway Subdivision, Fourth Filing, according to the recorded plat thereof, filed for record July 10, 1992 AND All of vacated Valley Drive, as platted in said Gateway Subdivision, Fourth Filing AND A parcel of land in the SE 1/4 of the NE 1/4 of Section 14, Township 20 South, Range 65 West of the 6th P.M. being more particularly described as follows: Considering the East line of the NE 1/4 of said Section 14, Township 20 South, Range 65 West of the 6th P.M. to bear N.OO°O2'OT"E. and all bearings contained herein being relative thereto. Beginning at the Northeast corner of said Gateway Subdivision, Fourth Filing; thence Westerly, along the North boundary line of said Fourth Filing, the following five (5} courses: 1. N.89°57'53"W., a distance of lO0.O0 feet; 2. along the arc of a curve to the right, whose radius is 340 feet, a distance of 178.02 feet; 3. N.59°57'53"W., a distance of 204.93 feet; 4. along the arc of a curve to the left, whose radius is 400 feet, a distance of 125.07 feet; 5. N.77°52'46"W., a distance of 101.57 feet to the Southeast corner of Gateway Subdivision, Third Filing, according to the recorded plat thereof, filed for record November l, 1988; thence N.12°O6'OO"E., along the East boundary line of said Third Filing and that line extended, a distance of 260.00 feet; thence S.77°52'46"E., a distance of 474.81 feet; thence S.89°57'53"E., a distance of 144.31 feet to the East line of the said NE 1/4 of Section 14; thence S.00°02'07"W., along said East line, a distance of 369.01 feet to the Point of Beginning. Containing 11.418 acres, total. Book: 2791 Page: 124 Chrls C. Munoz Paqe: 7 of 13 Pueblo Co. Clk.&Bec, SUBDIVISION IHPROVEMENT AGREEMENT EXHIBIT "B" SUBDIVISION NAME: GATEWAY PLAZA DEVELOPER: JAMES E. O'NEAL ENGINEER: KLH ENGINEERING CONSULTANTS, INC. FORTINO BLVD WEST (FUTURE WIDENING) DEMOLITION WEST SIDE OF FORTINO BLVD. WEST Remove deciduous trees 8"2 ca]iper to 15"± ca]iper: 5 each @ $150/EA = $750 Evergreen shrub to be removed (small 3'± High): 5 each @ 25/EA = 125 Hugo pine to be removed small (2'± High): 2 each @ 25/EA = 50 Low 9rowing evergreen spreader to be removed: 460 SF @ 0.50/SF = 230 Deciduous bush to be removed small: 1 each @ 25/EA = 25 Remove Yucca plant: 1 each @ 25/EA = 25 Remove existing 1/2" - red landsca}e rock: 975±SF @ O.05/SF = 49 Remove ex sting 1 1/2" lava landsca}e rock: 570±SF @ O.05/SF = 29 Remove existing 2" landscape rock: 460±SF @ O.05/SF = 23 Remove existing concrete curb head: 78±LF @ 2/LF = 156 Remove exist. asphalt curb: 116±LF @ 2/LF = 232 Remove ex~stin9 asphalt driveway: 850±SF @ 0.20/SF = 170 Remove existing private sidewalk: 56±SF @ 0,25/SF = 14 Remove ex sting sod: 640 SF @ O.05/SF = 32 Relocate existing stop s~gn: I each @ 50/EA = 50 Relocate existing no pack~n9 signs: 3 each @ 50/EA = 150 Relocate existing street s~gn: 1 each @ 50/EA = 50 Remove existing parking corner Fort~no &Va]]ey 30±SF @ 0.20/SF = 6 Remove 6' public sidewalk, 4" thick: 1790±SF @ 0.25/SF = 448 Remove 6' public sidewalk, 6"-7" thick (at driveways): 475±SF @ 0.50/SF = 238 Remove pub]~c 6" std. curb and 9utter: 351±LF @ 2/LF = 702 Remove existing curb return/square pan: 1 each @ 100/EA = 100 Remove existin9 concrete cross pan: 256 SF @ 0.50/SF = 128 Remove Type W Inlet: 1 each @ 500/EA = 500 Remove existing asphalt from existing pan to 20' west on Valley: 640 SF @ 0.50/SF = 320 Remove existing sidewalk drain, shorten 2" PVC in drain 6' min., 1 each @ 50/EA = 50 Shorten 2" PVC under sidewalk 6' min. 1 each @ 25/EA = 25 Demolish/terminate sprinkler system @ southwest corner Valley and Fortino: 1 each @ 100/EA = 100 Demolish/relocate/terminate sprinkler system @ Van Schaack Building: 1 each @ 300/EA = 300 Remove exist. asphalt in private parkin9 lot to provide for transition from new sidewalk to park lot grades to north and south of exist. inlet 180 SF @ 1/SF = 180 SUB TOTAL 5,257 15~ Contingencies 789 PREPARED BY: J. WtLKERSON February 23, 1995 DATE FIRM: KLH ENGINEERING CONSULTANTS. INC. REVIEWED BY: City of Pueblo DAlE PAGE 2 OF 8 Book: 2791 Page: 123 Chrls C. Munoz Paqe: 6 of 13 Pueblo Co. Clk.&Rec. SUBDIVISION tHPROVEHENT AGREEHENT EXHIBIT "B" SUBDIVISION NAHE: GATEWAY PLAZA DEVELOPER: JAHES E. O'NEAL ENGINEER: KLH ENGINEERING CONSULTANTS, INC. IHPROVEHENTS TO U.S. HWY. 50 WEST DEHOLITION (Hedian, Asphalt C & G, Edge Asp., Etc.): Lump Sum = $1,500. ASPHALT 6" HBP Grading "C": 1647.7 SY @ $13.50/SY = $22,244. 2" HBP Grading "C" (Hedian Surface): 77.8 SY @ $13.50/SY = $1,050. 2" HBP Grading "C" (Drainage Chute): 139.8 SY @ $13.50/SY = $1,887. 4" Asphalt Curb: 1330 LF @ $3.00/LF = $3,990. 6" Asphalt Curb (Hedian): 340 LF @ $3.50/LF = $1,190. CONCRETE 6' Sidewalk (Future): 796.5 LF @ $12.00 = $9,558. Handicap Ramp (Future): 1 EA @ $350/EA = $350. Reconstruct Nose on Hedian: 2 EA @ $500/EA = $1,000. 6" STD Curb & Gutter (Future): 796.5 LF @ $7.50/LF = $5,974. STORH DRAIN 24" OHP: 25.3 LF @ $25/LF = $633. 24" CHP Elbow: 1EA @ $200/EA = $200. 24" Po]y Pipe: 98 LF @ $35/LF = $3,430. Type 1-B HH: 1EA @ $1,300/EA = $1,300. EHBANKHENT: 2267 CY @ $3.00/CY = $6,801 REHOVE AND RELOCATE SIGNS: 5 EA @ $100/ea = $500 NEW SIGNS: 8 EA @ $200/ea = $1,600 STRIPING: Lump Sum = $1,000 TRAFFIC CONTROL: Lump Sum = $2,500 SEEDING/HULCHING: 57,094 SF @ $0.15/SF = $8,564 STREET LIGHTS: 3 EA @ $1,300/EA = $3,900 U.S. HWY. 50 TOTAL = $79,171 *Approved escrow agreement or letter of credit is required for this obligation prior to issuance of any Certificate of Occupancy within this subdivision. This is an estimate only. Actual Construction costs may vary. This estimate may not include all construction costs. PREPARED BY: J. WILKERSON February 23, 1995 DATE F I RH: KLH ENG I NEER I NG CONSULTANTS, INC. City of Pueblo DATE PAGE 1 OF 8 ,: Book: 2791 Page: 125 Chris C, Munoz Paqe: 8 of 13 Pueblo Co,Clk,&Rec. SUBDIVISION IMPROVEMENT AGREEMENT EXHIBIT "B" SUBDIVISION NAME: GATEWAY PLAZA DEVELOPER: JAMES E. O'NEAL ENGINEER: KLH ENGINEERING CONSULTANTS, INC. DEMOLITION EAST SIDE OF FORTINO BLVD. WEST Remove existing sod: 3550±SF @ O.05/SF = $178 Remove existing 6" STD public curb and gutter: 302±LF @ 2/LF = 604 Remove existing 6" Type 2 curb and 9utter (private driveway): 120±LF @ 2/LF = 240 Remove existing 7" thick concrete cross pans: 450±SF @ 0.50/SF = 225 Remove existing curb return/square pan: 1 each @ IO0/EA = 100 Remove existing 6' sidewalk, 4" thick: 1752±SF @ 0.25/SF = 438 Remove existing 6' sidewalk along private driveway: 41±LF @ 0.25/SF = 10 Remove existing HC Ramps @ private driveway: 292±SF @ 0.25/SF = 73 Remove and relocate existing water meter: 1 each @ 300/EA = 300 Remove and relocate existing no parking sign: 2 each @ 50/EA = 100 Remove and relocate existing business sign, coordinate with sign owner: 1 each @ IO0/EA = 100 Remove existing private asphalt drive: 660 SF @ 0.20/SF = 132 Adjust sprinkler heads to grade (east side of sidewalk): 28 each @ 15/EA = 420 Demo]ish/reroute sprinkler system west side of sidewalk and north side of driveway: 1 each @ 300/EA = 300 Demolish/reroute sprinkler system west side of sidewalk, north of sta 1+14.63, and south of driveway: 1 each @ 300/EA = 300 SUB TOTAL 3,520 15~ Contingencies 528 CONSTRUCTION TO MATCH EXIST. PRIVATE IMPROVEMENTS WEST SIDE OF FORTINO Transition exist. sidewalk @ Van Schaak to public sidewalk 20 SF @ 2/SF = $40 Construct new sidewalk drains (Van Schaak): 2 EA @ 150/EA = 300 Concrete wall @ exist. inlet: 15 LF @ 15/LF = 225 Construct asphalt or conc. slope paving transition (No. & So, of inlet): 180 SF @ 3/SF = 540 Patch @ No. driveway (2" on 6" min.): 450 SF @ 1.0/SF = 450 5'± transition (asphalt) from back of walk to exist. park lot: 650 SF @ 1.0/SF = 650 Patch @ driveways (1' wide x 6" full depth aspha]t): 51LF @ 3/LF = 153 Transition Van Schaak landscaping to back of new walk: 1 EA @ 400 = 400 PREPARED BY: J. WILKERSON February 23, 1995 DATE FIRM: KLH ENGINEERING CONSULTANTS, INC. REVIEWED BY: ~~--~~ ~/6~//~S'' City Of Pueblo DATE PAGE 3 OF 8 · .: Book: 2791 Page: 126 Chrls C. Munoz Page: 9 of 13 Pueblo Co. Clk.&Bec. SUBDIVISION IMPROVEMENT AGREEMENT EXHIBIT "B" SUBDIVISION NAME: GATEWAY PLAZA DEVELOPER: JAMES E. O'NEAL ENGINEER: KLH ENGINEERING CONSULTANTS, INC. EAST SIDE OF FORTINO Construct new 6' sidewalk alon9 private drive: 45 LF @ 12/LF = 540 Pave reconstructed private drive (3" on 6"): 84 SY @ 13.50/SY = 1,134 New Type 2 curb and 9utter @ private drive: 142 LF @ 7.50/LF = 1,065 Reinstall or replace/install sod: 1500 SF @ 0.25/SF = 375 SUB TOTAL 5,872 ASPHALT Patch (Match Exist or 3" on 6" Min.; New Lanes and Pans on Valley) 1097 SY @ $13.50/SY = $14,810. 2" Overlay: 2690.7 SY @ $5.50/SY = $14,799. 3/4" PMS Overlay (Valley Dr. West of Pan): 143.8 SY @ $5.00/SY = $719. CONCRETE 6" STD C&G: 660 LF @ $7.50/LF = $4,950 Square Pans: 2 EA @ $400/EA = $800 Handicap Ramps: 4 EA @ $350/EA = $1,400 4' Conc. Pans: 116 SF @ $3.50/SF = 406 8' Conc. Pan: 564 SF $3.50/SF = $1,974 6' Sidewalk (4"): 570 LF @ $12/LF = $6,840 6' Sidewalk (6"): 70 LF @ $14/LF = $980 WATER Raise Valve Boxes: 3 EA @ $125/EA = $375. Remove & Relocate Fire Hyd: 1EA @ $1,000/EA = $1,000. SEWER Raise Manhole: 1 EA @ 200/EA = $200. STORM SEWER 15" Po]y Pipe: 27 LF @ $24/LF = $648. 24" CL III RCP: 16 LF @ $35/LF = $560 Remove & Rep]ace/Re]coate Exist 24" RCP: Lump Sum = $1,000 Type 1-C M.H. = 1EA $1,500/EA = $1,500 Break Into Exist. M.H.: 1EA @ $500/EA = $500 Type "S" Inlet, L=12': 1 EA @ 3,000/EA = $3,000 Raise Manhole: 2 EA @ $200/EA = $400 This is an estimate only. Actual Construction costs may vary. This estimate may not include a]] construction costs. PREPARED BY: J. WILKERSON February 23, 1995 DATE FIRM: KLH ENGINEERING CONSULTANTS, INC. City of Pueb]o DATE PAGE 4 OF 8 Book: 2791 Page: 127 Chris C. Nunoz Page: 10 of 13 Pueblo Co. Clk.&/ec. SUBDIVISION IMPROVEMENT AGREEMENT EXHIBIT "B" SUBDIVISION NAME: GATEWAY PLAZA DEVELOPER: JAMES E. O'NEAL ENGINEER: KLH ENGINEERING CONSULTANTS, INC. FORTINO BLVD. WEST (FUTURE WIDENING) CONT'D TRAFFIC CONTROL: Lump Sum = $1,500. STRIPING: Lump Sum = $1,500. RELOCATE STREET LIGHTS: 2 EA @ $500/EA = $1,000. TOTAL 78,827. LESS CSECU ESCROW 9,574. NEW TOTAL 67,253. x 0.75 DEVELOPER RESPONSIBILITY (75%) $50,440., *Deposit and Approved escrow agreement or letter of credit is required for this ob]iSation prior to issuance of any Certificate of Occupancy within this subdivision. Fortino Blvd. West will be installed at City's direction upon availability of funds from other developers or Colorado Department of Transportation. This is an estimate only. Actual Construction costs may vary. This estimate may not include all construction costs. PREPARED BY: J. WILKERSON February 23, 1995 DATE FIRM: KLH ENGINEERING CONSULTANTS, INC. Cit of Pueblo DATE Approved and Accepted James E >['' DATE PAGE 5 OF 8 Book: 2791 Page: 128 Chrls C. Munoz Page: 11 of 13 Pueblo Co. Clk.&Bec. SUBDiVISiON IMPROVEMENT AGREEMENT EXHIBIT "B'~ SUBDIVISION NAME: GATEWAY PLAZA DEVELOPER: JAMES E. O'NEAL ENGINEER: KLH ENGINEERING CONSULTANTS, INC. OUTLOOK BLVD (WEST 1/2 OF STREET ONLY) ASPHALT: 1730.2 SY @ $13.50/SY = $23,358. CONCRETE 6" STD C & G: 354.1LF @ $7.50/LF = $2,656. Square Pans: 6 EA @ $800/EA = $4,800. Handicap Ramps: 6 EA @ $700/EA = $4,200. Cross Pans: 832 SF @ $3.50/SF = $2,912. 6' Sidewalk: 354.1LF @ $12/LF = $4,249. SANITARY SEWER 8" PVC: 845.2 LF @ $19/LF = $16,059. 48" DIA. MH: 4 EA @ $1,200/EA = $4,800. Services: 1EA @ $400/EA = $400. Concrete Encasement: 20 LF @ $15/LF = $300. WATER Tie-In to Exist 12" Main: 1EA @ $1500/EA = $1,500 12" PVC: 781LF @ $21/LF = $16,401 12" Gate Value: 2 EA @ $1050/EA = $2,100 Permanent Blow-Off: 1EA @ $650/EA = $650 Services: 2 EA @ $400/EA = $800 Fire Hydrant Assembly: 1EA @ $2300/EA = $2,300 PUBLIC STORM SEWER 18" Po]y Pipe: 15 LF @ $27.50/LF = $413 24" Po]y Pipe: 241.3 LF @ $35/LF = $8,446 48" CL II RCP: 200 LF @ $90/LF = $18,000 48" FES: 1EA @ 1000/EA = $1,000 Type 1-B MH: 2 EA @ $1300/EA = $2,600 Type 1-O MH: 2 EA @$1500/EA = $3,000 Conc. Encasement @ Water Line: 12 LF @ $15/LF = $180 Rip Rap: 20.4 CY @ $50/CY = $1,020 This is an estimate only. Actual Construction costs may vary. This estimate may not include a]] construction costs. PREPARED BY: J. W I LKERSON February 23, 1995 DATE F I RM: KLH ENG I NEER I NG CONSULTANTS, INC. City of Pueblo DATE PAGE 6 OF 8 Book: 2791 Page: 129 Chrls C. Munoz Page: 12 of 13 Pueblo Co. Clk.&Rec. SUBDIVISION IHPROVEHENT AGREEHENT EXHIBIT "B" SUBDIVISION NAHE: GATEWAY PLAZA DEVELOPER: JAHES E. O'NEAL ENGINEER: KLH ENGINEERING CONSULTANTS, INC. OUTLOOK BLVD. CONT'D PRIVATE STORH DRAIN 14" x 23" HE - V RCP: 37.5 LF @ $50/LF = $1,875. STREET LIGHTS: 2 EA @ $1300/EA = $2,600. BARRICADES L = 24'): 1 EA @ $800/EA = $800. OUTLOOK BLVD. TOTAL = $127,419. HISCELLANEOUS PRIVATE SANITARY SEWER (SITE) 8" PVC: 452.9 LF @ $19/LF = $8,605. 6" Cleanout: 1EA @ $300/EA = $300. 48" DIA. HH: 1EA @ $1,200/EA = $1,200. 4" Services: 3 EA @ $600/EA = $1,800. SUB TOTAL = $11,905. PRIVATE WATER HAtN (TO LOTS 1 AND 2) 6" PVC: 305 LF @ $12/LF = $3,660. Permanent Blow-Off: 1EA @ $650/EA : $650 6" Gate Valve: 1EA @ $500/EA = $500 Service (55'): 1EA @ $400/EA = $400 Service (180'): 1EA @ $800/EA = $800 Fire Hydrant Assymbly: 1EA @ $2300/EA = $2,300 Cut & Patch Asphalt: 270 LF @ $30/LF = $8,100 3/4" PHS Overlay (in Fortino West): 55 SY @ $5.00/SY = $275 SUB TOTAL = $16,685. PRIVATE STORH DRAIN (ACROSS SITE) 14" X 23" HE-V RCP: 322.2 LF @ $50/LF = $16,110. 30" Poly: 171.7 LF @ $50/LF = $8,585. 29" x 45" HE-V RCP: 341.5 LF @ $100/LF = $34,150. This is an estimate only. Actual Construction costs may vary. This estimate may not include all construction costs. PREPARED BY: J. WILKERSON February 23, 1995 DATE F I RH: KLH ENG I NEER I NG CONSULTANTS, INC. REviEwED BY: City of Pueblo DATE PAGE 7 OF 8 Book: 2791 Page: 130 Chrls C. Nunoz Page: 13 of 13 Pueblo Co. Clk.&Rec. SUBDIVISION IMPROVEMENT AGREEMENT EXHIBIT "B" SUBDIVISION NAME: GATEWAY PLAZA DEVELOPER: jAMES E. O'NEAL ENGINEER: KLH ENGINEERING CONSULTANTS, INC. MISCELLANEOUS CONT'D. PRIVATE STORM DRAIN CONT'D 42" OLIII ROP: 129.7 LF @ $75/LF = $9,728 Type "S" Inlet, L=t5': 1EA @ $3,400/LF = $3,400 Modified Type "S" inlet, L=10': 1EA @ $2800/LF = $2,800 Modified Type 'iS" inlet, L=15': 3 EA @ $3,600/LF = $10,800 Construct Temp Swale To Det. Basin: Lump Sum = $3,000 Rip Rap in Temp. Swale: 350 CY @ $50/CY = $17,500 Regrade/Restore Exist. Temp Swale East of Outlook B]vd: Lump Sum = $2,000 SUB TOTAL = $108,073. STORM SEWER (EAST LINE GATEWAY 2ND FILING) 15" CL IV RCP: 80 LF @ $25/LF = $2,000. 18" Po]y: 105.7 LF @ $27.50/LF = $2,907. 30" Poly: 219.8 LF @ $50/LF = $10,990. Modified Type "S" Inlet, L = 4': 1EA @ $1,400/EA = $1,400. Type "S" Inlet, L = 4': 1 EA @ $1,200/EA = $1,200. Type 1-B MH: 1EA @ $1,300/EA = $1,300. SUB TOTAL = $19,797. FUTURE PUBLIC STORM DRAIN @ NO. END OUTLOOK BLVDo (Construct When Development Proceeds North) 14" x 23" HE V RCP: 23.1LF @ $50/LF = $1,155. 18" Po]y: 4.3 LF @ $27.50/LF = $119. 24" Poly: 53 LF @ $35/LF = $1,855. Type "S" inlet, L = 12': 1 EA @ $3,000 = $3,000. Conc. Encasement: 4 LF @ $15/LF = $60. Type I-B MH: 1EA @ $1,300/EA = $1,300. Rip Rap: 11CY @ $50/CY = $550. SUB TOTAL = $8,039.~ MISCELLANEOUS TOTAL = $164,499. GRAND TOTAL = $420,886. · Approved escrow agreement or letter of credit is required for this obligation prior to issuance of any Certificate of Occupancy within this subdivision This is an estimate only. Actual Construction costs may vary. This estimate may not include all construction costs. PREPARED B'Y: J. W I LKERSON February 23, 1995 DATE F I RM: KLH ENG t NEER I NG CONSULTANTS, INC. City of Pueblo DATE PAGE 8 OF 8