HomeMy WebLinkAbout15653RESOLUTION NO.15653 A RESOLUTION RATIFYING THE AWARD OF AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $91,389.36 TO RUSS GRADING & EXCAVATING LLC, FOR PROJECT NO. 23-040 (SWAN03) - FOR EMERGENCY STORM SEWER POINT REPAIR AT THE INTERSECTION OF NORTHERN AVENUE AND SPRUCE STREET, APPROVING A CHANGE ORDER IN THE AMOUNT OF $27,001.25 FOR ADDITIONAL WORK AND MATERIALS, AND AUTHORIZING AND APPROVING THE PURCHASING AGENT'S EXECUTION OF THE SAME WHEREAS, an emergency storm sewer repair was authorized by the Mayor in accordance with Section 1-10-5 of the Pueblo Municipal Code; and WHEREAS, the point repair work was awarded to Russ Grading & Excavating LLC, under the 2023-2026 Storm Sewer Point Repair contract: NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that SECTION 1. City Council hereby ratifies and approves Project No. 23-040 (SWAN03) – Emergency Storm Sewer Point Repair at the intersection of Northern Avenue and Spruce Street, and hereby approves the award of the emergency construction contract to Russ Grading & Excavating LLC, in the amount of $91,389.36. SECTION 2. Change Order #1 to Project No. 23-040 (SWAN03) – Emergency Storm Sewer point Repair at the intersection of Northern Avenue and Spruce Street for an extended 16 calendar days and Change Order #2 in the amount of $27,001.25 is hereby ratified and approved. SECTION 3. Funds for Project No. 23-040 (SWAN03) – Emergency Storm Sewer Point Repair at the intersection of Northern Avenue and Spruce Street shall be paid from the Stormwater Utility Fund – Project Account SWAN03, Point Repairs & Pipe Cleaning. SECTION 4. The officers and staff of the City are authorized to perform any and all acts consistent with this Resolution to implement the policies and procedures described herein. Furthermore, all actions previously taken by officers and staff of the City consistent with the Contract, including any payments authorized under the Contract, are hereby ratified. INTRODUCED: June 10, 2024 BY: Regina Maestri MEMBER OF CITY COUNCIL APPROVED: __________________________ PRESIDENT OF CITY COUNCIL ATTESTED BY: ________________________ CITY CLERK City Clerk's Office Item # M4 Background Paper for Proposed Resolution COUNCIL MEETING DATE: June 10, 2024 TO: President Mark Aliff and Members of City Council CC: Mayor Heather Graham VIA: Marisa Stoller, City Clerk FROM: Andrew Hayes, Public Works Director SUBJECT: A RESOLUTION RATIFYING THE AWARD OF AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $91,389.36 TO RUSS GRADING & EXCAVATING LLC, FOR PROJECT NO. 23-040 (SWAN03) - FOR EMERGENCY STORM SEWER POINT REPAIR AT THE INTERSECTION OF NORTHERN AVENUE AND SPRUCE STREET, APPROVING A CHANGE ORDER IN THE AMOUNT OF $27,001.25 FOR ADDITIONAL WORK AND MATERIALS, AND AUTHORIZING AND APPROVING THE PURCHASING AGENT'S EXECUTION OF THE SAME SUMMARY: This Resolution ratifies and approves the award of a construction contract to Russ Grading & Excavating LLC, for emergency storm sewer point repair at the intersection of Northern Avenue and Spruce Street. PREVIOUS COUNCIL ACTION: None. BACKGROUND: The Stormwater Utility was notified that a stormwater pipe was damaged on the southside of the intersection of Northern Avenue and Spruce Street. The pipes were inspected due to a milling project being conducted on Northern Avenue. Closed caption television (CCTV) was conducted of the 3 runs of pipe in the system and revealed that a fiber line was bored through the southeast pipe that connects a manhole and an inlet located south of the intersection of Northern Avenue and Spruce Street. A visual inspection of the system revealed that the inlets needed to be replaced as well. An emergency point repair was required to repair the inlets and pipes. The pipe that was bored through will be replaced, and the company that is responsible for the fiber line has agreed to pay the cost of replacing the pipe and materials associated with that section of pipe. The amount of $29,339.00 will be billed to Segura + Unite Private Networks (UPN) for boring through the southeast stormwater pipe. The bill includes the price of HP stormwater pipe, asphalt, concrete flow fill, the Board of Water Works relocating of its pipe, and a portion of mobilization. The bid summary sheet with the unit prices for the estimated work performed by Russ Grading & Excavating LLC. This work was performed under the 2023-2026 Storm Sewer Point Repair Resolution #15335 which contractors were qualified via competitive bid. The cost breakdown for the project is as follows: BID DESCRIPTION ESTIMATED UNIT OF UNIT AMOUNT ITEM QUANITY MEASUREPRICE 1. Remove Existing Pipe 170LF $182.00$30,940.00 and Replace w/15" High Performance Polypropylene Pipe Less than 8' Deep 2. Remove and Replace 170LF $70.00$11,900.00 Asphalt 5" Asphalt on 6" Class 6 ABC 15" Pipe 3. Remove and Replace 4 LF $50.00$200.00 Standard Curb and Gutter 4. Install Extra Lean 28CY $175.00$4,900.00 Concrete (Flowable Fill) 5. Dissimilar Pipe 1 EA $750.00$750.00 Connection for Pipe 12" to 18" 6. Remove and Replace 4 1 EA $6,000.00 $6,000.00 ft Dia. Standard Manhole 7. Remove and Replace 3 EA $8,500.00 $25,500.00 Single Denver 16 Combination Inlet 8. Mobilization1 LS $4,000.00 $4,000.00 9. Traffic Control +10% 1 LS $7199.36 $7,199.36 TOTAL $91,389.36 CHANGE ORDER (ADD-ONS) 1. Remove & Replace 39LF $50.00$1,950.00 Standard Curb and Gutter 2. Install Extra Lean 18.91 CY $175.00$3,309.25 Concrete (Flow Fill) 3. Remove and Replace 194.00 LF $23.00$4,462.00 4” Concrete 4. Remove & Replace 5” 95LF $80.00$7,600.00 Asphalt 15” Pipe (>100) 5. Board of Water Works 1 LS $19,030.00 $19,030.00 12” Main Relocation Due to Conflict 6. Payment and 1 LS $2,550.00 $2,550.00 Performance Bond TOTAL $38,901.25 CHANGE ORDER (DEDUCTIONS) 1. Remove Existing Pipe 70LF --$11,900.00 and Replace 5” Asphalt $11,900.00 15” Pipe (>100) GRAND TOTAL $118,390.61 FINANCIAL IMPLICATIONS: Funding in the amount of $118,390.61 will be paid from the Stormwater Utility budget. Project Account SWAN03, Point Repairs and Pipe Cleaning. BOARD/COMMISSION RECOMMENDATION: None. STAKEHOLDER PROCESS: None. ALTERNATIVES: Not applicable. RECOMMENDATION: Approval of the Resolution. ATTACHMENTS: 1.Bid Summary 2. Site Location Map 3. Change Order 1 - No Cost Change Order (Time Extentsion) 4. Change Order 2 5. Invoices from Russ Grading & Excavating LLC