Loading...
HomeMy WebLinkAbout15583RESOLUTION NO. 15583 A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $28,001.54 WITH RUSS GRADING & EXCAVATING LLC, FOR EMERGENCY STORM SEWER POINT REPAIR AT THE INTERSECTION OF NORTHERN AVENUE AND BEULAH AVENUE, PROJECT NO. 23-040 (SWAN03) AND APPROVING THE PURCHASING AGENT'S EXECUTION OF THE SAME WHEREAS, an emergency storm sewer repair was authorized by the Mayor in accordance with Section 1-10-5 of the Pueblo Municipal Code; and WHEREAS, the point repair work was awarded to Russ Grading & Excavating LLC, under the 2023-2026 Storm Sewer Point Repair contract; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that SECTION 1. City Council ratifies and approves the contract for repair of the stormwater pipes at the intersection of Northern Avenue and Beulah Avenue with Russ Grading & Excavating LLC, Project No. 23-040 (SWAN03) awarded to said bidder in the amount of $28,001.54. SECTION 2. Funds for Project No. 23-040 (SWAN03) shall be from the Stormwater Utility Fund. SECTION 3. The Purchasing Agent was authorized to execute said contract on behalf of Pueblo, a Municipal Corporation, and the City Clerk properly affixed the seal of the City thereto and attested the same. SECTION 4. The officers and staff of the City are authorized to perform all acts consistent with the intent of this Resolution and the contract to effectuate the transactions described therein. SECTION 5. This Resolution shall become effective immediately upon passage and approval. INTRODUCED: April 8, 2024 BY: Dennis Flores MEMBER OF CITY COUNCIL APPROVED: __________________________ PRESIDENT OF CITY COUNCIL ATTESTED BY: ________________________ CITY CLERK City Clerk's Office Item # M6 Background Paper for Proposed Resolution COUNCIL MEETING DATE: April 8, 2024 TO: President Mark Aliff and Members of City Council CC: Mayor Heather Graham VIA: Marisa Stoller, City Clerk FROM: Andrew Hayes, Public Works Director SUBJECT: A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $28,001.54 WITH RUSS GRADING & EXCAVATING LLC, FOR EMERGENCY STORM SEWER POINT REPAIR AT THE INTERSECTION OF NORTHERN AVENUE AND BEULAH AVENUE, PROJECT NO. 23-040 (SWAN03) AND APPROVING THE PURCHASING AGENT'S EXECUTION OF THE SAME SUMMARY: This Resolution ratifies and approves the award of a construction contract to Russ Grading & Excavating LLC, for emergency storm sewer point repair at the intersection of Northern Avenue and Beulah Avenue. PREVIOUS COUNCIL ACTION: None. BACKGROUND: The Stormwater Utility was notified that a stormwater pipe was damaged at the southeast corner of the intersection of Northern Avenue and Beulah Avenue. The pipes were noticed due to the Watermain Rehabilitation Project being conducted on Northern Avenue. CCTV of the pipe revealed that the pipe had collapsed due to aging and normal wear and tear. A visual inspection of the system revealed that the inlet connected to the pipe was aged and needed to be replaced as well. An emergency point repair was required to repair the inlet and pipe. The bid summary sheet with the unit prices for the estimated work performed by Russ Grading & Excavating LLC. This work was performed under the 2023-2026 Storm Sewer Point Repair Resolution #15335 through which contractors were qualified via competitive bid. The cost breakdown for the project is as follows: BID DESCRIPTION ESTIMATED UNIT AMOUNT ITEM QUANTITY PRICE 1. Remove Existing Pipe and 21 $232.00 $4,872.00 Replace w/15" High Performance Polypropylene Pipe Less than 8' Deep 2. Remove and Replace Asphalt 5" 35 $80.00 $2,800.00 Asphalt on 6" Class 6 ABC 15" Pipe 3. Install Extra Lean Concrete 6 $175.00 $1,050.00 (Flowable Fill) 4. Dissimilar Pipe Connection for 3 $750.00 $2,250.00 Pipe 12" to 18" 5. Remove and Replace 5 ft Dia. 1 $6,500.00 $6,500.00 Standard Manhole 7. Mobilization 1 $4,000.00 $4,000.00 8. Traffic Control +10% 1 $2,284.54 $2,284.54 CHANGE ORDER (ADD-ONS) 1. Remove Existing Pipe and 10 $250.00 $2,500.00 Replace w/18" High Performance Polypropylene Pipe > 8' Deep 2. Remove Existing Pipe and 5 $232.00 $1,160.00 Replace w/15" High Performance Polypropylene Pipe > 8' Deep 3. Remove and Replace Asphalt 5" 2 $80.00 $160.00 Asphalt on 6" Class 6 ABC 15" Pipe` 4. Install Extra Lean Concrete 21 $175.00 $3,675.00 (Flowable Fill) CHANGE ORDER (DEDUCTIONS) 1. Remove Existing Pipe and 10 $250.00 -$2,500.00 Replace w/18" High Performance Polypropylene Pipe > 8' Deep 2. Dissimilar Pipe Connection for 1 $750.00 -$750.00 Pipe 12" to 18" GRAND TOTAL $28,001.54 FINANCIAL IMPLICATIONS: Funding for this project came from the Stormwater Utility budget. Funding was available and had been budgeted, appropriated, and allocated to Project No. 23-040 (SWAN03). BOARD/COMMISSION RECOMMENDATION: None. STAKEHOLDER PROCESS: None. ALTERNATIVES: Not applicable RECOMMENDATION: Approval of the Resolution. ATTACHMENTS: 1. Bid Summary Northern & Beulah 2. Site Location Map Northern & Beulah