Loading...
HomeMy WebLinkAbout15582RESOLUTION NO. 15582 A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $54,364.25 WITH RUSS GRADING & EXCAVATING LLC, FOR EMERGENCY STORM SEWER POINT REPAIR AT THE INTERSECTION OF 20TH STREET AND GREENWOOD AVENUE, PROJECT NO. 23-040 (SWAN03) AND APPROVING THE PURCHASING AGENT'S EXECUTION OF THE SAME WHEREAS, an emergency storm sewer repair was authorized by the Mayor in accordance with Section 1-10-5 of the Pueblo Municipal Code; and WHEREAS, the point repair work was awarded to Russ Grading & Excavating LLC, under the 2023-2026 Storm Sewer Point Repair contract; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that SECTION 1. City Council ratifies and approves the contract for repair of the stormwater pipes at the intersection of 20th Street and Greenwood Avenue with Russ Grading & Excavating LLC, Project No. 23-040 (SWAN03) awarded to said bidder in the amount of $54,364.25. SECTION 2. Funds for Project No. 23-040 (SWAN03) shall be from the Stormwater Utility Fund. SECTION 3. The Purchasing Agent was authorized to execute said contract on behalf of Pueblo, a Colorado Municipal Corporation, and the City Clerk properly affixed the seal of the City thereto and attested the same. SECTION 4. The officers and staff of the City are authorized to perform any and all acts consistent with this Resolution and the contract to implement the policies and procedures described herein. SECTION 5. This Resolution shall become effective immediately upon passage and approval. INTRODUCED: April 8, 2024 BY: Dennis Flores MEMBER OF CITY COUNCIL APPROVED: __________________________ PRESIDENT OF CITY COUNCIL ATTESTED BY: ________________________ CITY CLERK City Clerk's Office Item # M5 Background Paper for Proposed Resolution COUNCIL MEETING DATE: April 8, 2024 TO: President Mark Aliff and Members of City Council CC: Mayor Heather Graham VIA: Marisa Stoller, City Clerk FROM: Andrew Hayes, Public Works Director SUBJECT: A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $54,364.25 WITH RUSS GRADING & EXCAVATING LLC, FOR EMERGENCY STORM SEWER POINT REPAIR AT THE INTERSECTION OF 20TH STREET AND GREENWOOD AVENUE, PROJECT NO. 23-040 (SWAN03) AND APPROVING THE PURCHASING AGENT'S EXECUTION OF THE SAME SUMMARY: This Resolution ratifies and approves the award of a construction contract to Russ Grading & Excavating LLC, for emergency storm sewer point repair at the intersection of 20th Street and Greenwood Avenue. PREVIOUS COUNCIL ACTION: None. BACKGROUND: The Stormwater Utility was notified that flooding was occurring at the intersection of 20th Street and Greenwood Avenue. A visual inspection of the inlets and a CCTV inspection were conducted inside the stormwater pipes at the intersection. The visual inspection of the inlets on the northwest and southwest side revealed structural damage due to aging and normal wear and tear. The CCTV inspection of the pipes showed pipe fractures, root intrusion, pipes disconnected at the joints, and holes in the pipes. An emergency point repair was required to repair the inlet and pipes at the intersection. The bid summary sheet with the unit prices for the estimated work performed by Russ Grading & Excavating LLC. This work was performed under the 2023-2026 Storm Sewer Point Repair Resolution #15335 through which contractors were qualified via competitive bid. The cost breakdown for the project is as follows: BID DESCRIPTION ESTIMATED UNIT AMOUNT ITEM QUANTITY PRICE 1. Remove Existing Pipe and 103 $182.00 $18,746.00 Replace w/15" High Performance Polypropylene Pipe Less than 8' Deep 2. Remove Existing Pipe and 5 $250.00 $1,250.00 Replace w/18" High Performance Polypropylene Pipe Less than 8' Deep 3. Remove and Replace 93 $80.00 $7,400.00 Asphalt 5" Asphalt on 6" Class 6 ABC 15" Pipe 4. Remove and Replace 4 $50.00 $200.00 Standard Curb and Gutter 5. Install Extra Lean Concrete 14 $185.00 $2,590.00 (Flowable Fill) 6. Dissimilar Pipe Connection 3 $750.00 $2,250.00 for Pipe 12" to 18" 7. Remove and Replace 4 ft 1 $6,000.00 $6,000.00 Dia. Standard Manhole 8. Remove and Replace Single 2 $8,500.00 $17,000.00 Denver 16 Combination Inlet 9. Mobilization 1 $4,000.00 $4,000.00 10. Traffic Control +10% 1 $3,073.55 $3,073.55 CHANGE ORDER (ADD-ONS) 1. Remove Existing Pipe and 10 $245.00 $2450.00 Replace w/12" High Performance Polypropylene Pipe Less than 8' Deep 2. Remove Existing Pipe and 45 $232.00 10,440.00 Replace w/15" High Performance Polypropylene Pipe Less than 8' Deep 3. Remove and Replace 20 $50.00 $1,000.00 Standard Curb and Gutter` 4. Potholing 4 $250.00 $1,000.00 CHANGE ORDER (DEDUCTIONS) 1. Remove Existing Pipe and 103 $182.00 -$18,746.00 Replace w/15" High Performance Polyproylene Pipe Less than 8' Deep 2. Remove Existing Pipe and 5 $250.00 -$1,250.00 Replace w/18" High Performance Polypropylene Pipe Less than 8' Deep 3. Remove and Replace 38 $80.00 -$3,040.00 Asphalt 5" Asphalt on 6" Class ABC 15" Pipe 4. Install Extra Lean Concrete 5 $185.00 -$925.00 (Flowable Fill) 5. Dissimilar Pipe Connection 1 $750.00 -$750.00 for Pipe 12" to 18" GRAND TOTAL $54,364.25 FINANCIAL IMPLICATIONS: Funding for this project came from the Stormwater Utility budget. Funding was available and had been budgeted, appropriated, and allocated to Project No. 23-040 (SWAN03). BOARD/COMMISSION RECOMMENDATION: None. STAKEHOLDER PROCESS: None. ALTERNATIVES: Not applicable RECOMMENDATION: Approval of the Resolution. ATTACHMENTS: 1. Bid Summary 20th Street and Greenwood Avenue 2. Site location Map 20th Street and Greenwood Avenue