RESOLUTION NO. 15064
A RESOLUTION RATIFYING AN EMERGENCY
CONSTRUCTION CONTRACT IN THE AMOUNT OF
$68,766.35 WITH PARKER EXCAVATING, INC. FOR
EMERGENCY SANITARY SEWER POINT REPAIR AT 508
MINNEQUA AVE, PROJECT NO. 20-059 (WWAN03) AND
APPROVING THE PURCHASING AGENT’S EXECUTION
OF SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Mayor in
accordance with Section 1-10-5 of the Pueblo Municipal Code; and
WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under
the 2021-2023 multi-year point repair contract; NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that
SECTION 1.
City Council ratifies and approves the contract for repair of the sanitary sewers at
508 Minnequa Ave with Parker Excavating, Inc., Project No. 20-059 (WWAN03)
awarded to said bidder in the amount of $68,766.35.
SECTION 2.
Funds for Project 20-059 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent was authorized to execute said contract on behalf of
Pueblo, a Municipal Corporation, and the City Clerk properly affixed the seal of the City
thereto and attested the same.
SECTION 4.
The officers and staff of the City are authorized to perform any and all acts
consistent with the intent of this Resolution and the contract to implement the
transactions described therein. Furthermore, all actions previously taken by officers and
staff of the City consistent with the contract including any payments authorized under
the contract and the contract change order in the amount of $36,542.35 are hereby
ratified.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED: November 28, 2022
BY: Larry Atencio
MEMBER OF CITY COUNCIL
APPROVED:
PRESIDENT OF CITY COUNCIL
ATTESTED BY:
CITY CLERK
City Clerk's Office Item # M1
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: November 28, 2022
TO: President Heather Graham and Members of City Council
CC: Mayor Nicholas A. Gradisar
VIA: Marisa Stoller, City Clerk
FROM:
Andra Ahrens, Director Wastewater
SUBJECT: A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION
CONTRACT IN THE AMOUNT OF $68,766.35 WITH PARKER
EXCAVATING, INC. FOR EMERGENCY SANITARY SEWER POINT
REPAIR AT 508 MINNEQUA AVE, PROJECT NO. 20-059 (WWAN03)
AND APPROVING THE PURCHASING AGENT’S EXECUTION OF
SAME
SUMMARY:
This Resolution ratifies and approves award of a construction contract to Parker
Excavating, Inc. for emergency sanitary sewer point repairs at 508 Minnequa Ave.
PREVIOUS COUNCIL ACTION:
None
BACKGROUND:
During routine inspection of sewer mains, the Wastewater Department collection crew
discovered broken pipes and a collapsed pipe segment with 100% blockage in the main
near 508 Minnequa Ave. In addition, the whole main was in bad shape and it was
determined that the 6-inch main connected to the manhole needed to be replaced and
upsized to 8-inch. These defects will further deteriorate the pipe, block the flow, and
increase the chance of an immediate backup in the main. An emergency repair was
necessary to repair the broken pipe and collapsed pipe segment, so a backup would
not occur.
The repair work was performed under the Sanitary Sewer Point Repair multi-year
contract under which three contractors were qualified via competitive bid. An estimate
was prepared, and Parker Excavating was the lowest bidder and accepted the work.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Total: $ 23,311.85 34%
Surface Improvement Related
Total: $ 45,454.50 66 %
Grand Total: $ 68,766.35 100%
FINANCIAL IMPLICATIONS:
Funding for this project came from the sanitary sewer rehabilitation budget funded by
the Sewer User Fund. Funding was available and had been budgeted, appropriated,
and allocated to Project No. 20-059 (WWAN03).
BOARD/COMMISSION RECOMMENDATION:
Not applicable.
STAKEHOLDER PROCESS:
None.
ALTERNATIVES:
Not approve the Resolution, but this would require a finding that there was not an
emergency condition.
RECOMMENDATION:
Approval of the Resolution.
ATTACHMENTS:
1. 11-28-22 508 Minnequa Ave Emergency Point Repair
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number: 20-059 (WWAN03) Change Order No. : ONE 11/11/2022 Page 1 of 1
Project Name: 2021,2022 and 2023 Sanitary Sewer Point Repair
508 Minnequa Ave
Contractor: PARKER EXCAVATING INC.
1428 Stockyard Rd., Pueblo,CO 81001
You are hereby requested to comply with the following changes from the plans&specifications:
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By
1 REMOVE&REPLACE 8"PVC PIPE<10'DEEP(>100LF) ($13,230.00)
ASPHALT PATCH—4"HMA ON 4"CLASS 6 ABC FOR 8"AND 10"PIPE
2 (>100LF) $33,614.50
4 REINSTATE SERVICES ($776.00)
6 REMOVE&REPLACE 8"PVC PIPE<10'DEEP(<100LF) $10,580.00
T&M-RELAY PIPE TO TIE IN DUE TO GRADE NOT BEING CORRECT-
7 LABOR AND EQUIPMENT $5,279.76
8 TRAFFIC CONTROL $1,074.09
TOTAL (Decrease)/Increase ($14,006.00) $50,548.35
Net Adjustment This Change Order $ 36,542.35
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 32,224.00
Total Adjusted Contract Amount To Date $ 68,766.35
Reason For Change: Actual Field Quantities.
The time provided for completion of the contract is changed by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto.
Prepared by: Date:
Associate Engineer II
Reviewed by: Date:
Wastewater Engineering Manager
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Director of Wastewater
FORM CO100.1299
N
w. �►�. E 20-059 (WWANO3)
�'J'' 2021 -2023 Emergency Sanitary Sewer Point Repair
s 508 Minnequa Ave
l I jot , b° 1
11
„
ilt.
r"�—,. ��11"
"er= 11:.x.. Ad*!■ ••• 'RM :: h-' -ill
,,A. i . .10.Imi ,i ,of
'i' iMItr:m•141-11.11
` �� ",�� �.M♦ i4 �6 gn -` '• .... 3. � 4,
,
� ' ,,,,,„6 0 &MO, 0 _
:,,I,..'
sosi484296.1 484295.8 A !! 48429.3 8 484295.1 s +: ' {*'r •
:.484294.5 a :
.;,4'.°'°01Ph ' 4 1
,,, ' 1 > �
I _I ?''''tj: r eel: - , .I
_ ,1• flip i,.1.' t r, l ��' 84296.3 7�M N LI` I _
r wry �.. �
iins:
1 ',� _ ���.�MINNEQUA,AVE ' ►•,�. n _.'- ;1 _ e ,......tit:-,108.
i
REPAIR LOCATION ;
1 Whole Line from IP#484102.1 to MH#484100,7
Y 1 x
,s u t.
'jlef iltiledr—":1*-
rt: ., 4
s.
484102.8 • ,
T 484104.2 484103.2 '� •84100.7 ;84102.1 �4 ". 4.; i . N
z ‘,„..., • _,, ,
7. `" -i., -r ,
� , '{,.... ' �' .n "Y.+'• ... w ,i` it �� .d;"s3"� + G�:
.
w .) y� 1 £ ? its, -
P
°�, �' 494100.0 is �1 - tig4�i.
'1
-
' ' it,
, - , , , ,
e-
..
.4 .
. .
. . -- 4 .
4,
�,7h C " S. * -i wu"-
�, „�. 1 i
s ° is,
is '*"�: '"' I, + .� 4 „ Yap iv , '
M_
� �
is. iiiiimuil
ow
t •
.� 4 ' „ t' Wry , 141 4
B'
AK S � p, r r-- _ )
�V y "' , _ 494103.9 1
' 1484108.7 ` r t
. _ � l� 48410 C� �;r•� ..,
62 •.
.. INDIANA AVE
._
_.__ q N. lir!'°" or r,t "