Loading...
HomeMy WebLinkAbout15040 RESOLUTION NO. 15040 A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $23,272.55 WITH PARKER EXCAVATING, INC. FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 2410 EAST EVANS AVENUE, PROJECT NO. 20-059 (WWAN03) AND APPROVING THE PURCHASING AGENT’S EXECUTION OF SAME WHEREAS, an emergency sanitary sewer repair was authorized by the Mayor in accordance with Section 1-10-5 of the Pueblo Municipal Code; and WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under the 2021-2023 multi-year point repair contract; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that SECTION 1. City Council ratifies and approves the contract for repair of the sanitary sewers at 2410 E Evans Ave with Parker Excavating, Inc., Project No. 20-059 (WWAN03) awarded to said bidder in the amount of $23,272.55. SECTION 2. Funds for Project 20-059 (WWAN03) shall be from the Sewer User Fund. SECTION 3. The Purchasing Agent was authorized to execute said contract on behalf of Pueblo, A Municipal Corporation, and the City Clerk properly affixed the seal of the City thereto and attested the same. SECTION 4. The officers and staff of the City are authorized to perform any and all acts consistent with the intent of this Resolution and the contract to implement the transactions described therein. Furthermore, all actions previously taken by officers and staff of the City consistent with the contract including any payments authorized under the contract and the contract change order in the amount of $11,734.55 are hereby ratified. SECTION 5. This Resolution shall become effective immediately upon passage and approval. INTRODUCED: November 14, 2022 BY: Larry Atencio MEMBER OF CITY COUNCIL APPROVED: PRESIDENT OF CITY COUNCIL ATTESTED BY: CITY CLERK City Clerk's Office Item # M1 Background Paper for Proposed Resolution COUNCIL MEETING DATE: November 14, 2022 TO: President Heather Graham and Members of City Council CC: Mayor Nicholas A. Gradisar VIA: Marisa Stoller, City Clerk FROM: Andra Ahrens, Director Wastewater SUBJECT: A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $23,272.55 WITH PARKER EXCAVATING, INC. FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 2410 EAST EVANS AVENUE, PROJECT NO. 20-059 (WWAN03) AND APPROVING THE PURCHASING AGENT’S EXECUTION OF SAME SUMMARY: This Resolution ratifies and approves award of a construction contract to Parker Excavating, Inc. for emergency sanitary sewer point repairs at 2410 E Evans Ave. PREVIOUS COUNCIL ACTION: None. BACKGROUND: During routine inspection of sewer mains, the Wastewater Department collection crew discovered a long pipe segment with sags ranging from 35% to 100% in the main located to the east of 2410 East Evans Ave. The sags will further deteriorate the pipe, block the flow, and increase the chance of an immediate backup in the main. An emergency repair was necessary to repair the sags, so a backup would not occur. The repair work was performed under the Sanitary Sewer Point Repair multi-year contract under which three contractors were qualified via competitive bid. An estimate was prepared, and Parker Excavating was the lowest bidder and accepted the work. The cost breakdown for the project is as follows: Sanitary Sewer Replacement-related Total: $ 13,023.55 56% Surface Improvement Related Total: $ 10,249.00 44 % Grand Total: $ 23,272.55 100% FINANCIAL IMPLICATIONS: Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer User Fund. Funding was available and had been budgeted, appropriated, and allocated to Project No. 20-059 (WWAN03). BOARD/COMMISSION RECOMMENDATION: Not applicable. STAKEHOLDER PROCESS: None. ALTERNATIVES: Not approve the Resolution, but this would require a finding that there was not an emergency condition. RECOMMENDATION: Approval of the Resolution. ATTACHMENTS: 1. 2410 E Evans Ave Emergency Point Repair Attachment IBM CONTRACT CHANGE ORDER CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS Project Number: 20-059 (WWAN03) Change Order No. : ONE 10/25/2022 Page 1 of 1 Project Name: 2021,2022 and 2023 Sanitary Sewer Point Repair 2410 E Evans Ave Contractor: PARKER EXCAVATING INC. 1428 Stockyard Rd.,Pueblo,CO 81001 You are hereby requested to comply with the following changes from the plans&specifications: Bid Item Description of Changes Decrease Increase No. Contract By Contract By 2 ASPHALT PATCH—4"HMA ON 4"CLASS 6 ABC FOR 8"AND 10"PIPE(21-101 ($3,750.00) 5 ASPHALT PATCH—4"HMA ON 4"CLASS 6 ABC FOR 8"AND 10"PIPE(>100LF) $10,249.00 6 REMOVE&REPLACE 8"PVC PIPE<10'DEEP $1,125.00 7 REMOVE CAMERA/CLEANING HEAD/TAP CUTTER $1,992.00 8 ,MOBILIZATION $1,650.00 9 'TRAFFIC CONTROL $468.55 TOTAL (Decrease)/Increase ($3,750.00)0 $15,484.55 Net Adjustment This Change Order $ 11,734.55 Amount of Previous Change Order(s) $ 0.00 Original Contract Amount $ 11,538.00 Total Adjusted Contract Amount To Date $ 23,272.55 Reason For Change: Actual Field Quantities and Removal of Cleaning Head that got stuck at 806 Bragdon Ave. The time provided for completion of the contract is changed by 0 calendar days. This document shall become an amendment to the contract and all provisions of the contract apply hereto. Prepared by: Date: Associate Engineer II Reviewed by: Date: Wastewater Engineering Manager Accepted by: Date: Contractor's Representative If this Change Order causes an increase from the original contract price,signed approval by the Director constitutes representation that lawful appropriations are sufficient to cover such increase. Approved by: Date: Director of Wastewater FORM CO100.1299 N w,AK� . E 20-059 (VVVVAN03) '--s 1i' 2021-2023 Emergency Sanitary Sewer int Repair s 2410 E Evans Ave r 1 1.1f ,. 17.1 l 1 ! .,.• , �r )114H • • .,�. 1i 1 X77 �� ..t m;. ;µ`*' 1 '• }4 sus nall —a ol� 1,',--------.411.H . - � P",14.N�rl . . ' ' s, I i) 117 a -4- 4/ „ : .0 ,,.,... iii ,it _ 0 . 494018.8 1 �,.. ,,.`I 494023.9 Lr, , .. ;. jr ..,..„ .., . I," , REPAIR LOCATION • -:f - . NEVADA•AVE ° ` ° A, y - Between 0+75 and 1+25 from MH494019.0 ., 14 • 494020.9 f 494019 0 c I k !_ r,,,,yE ,,,,,,...„.•,,,, , :. , • .:iii,v, _ ... . _ .. . ... , , I,, ,I +'y, i4A. 301 ,,.,, , ,,,., , 1 r: .. , . , I3 �, 1 , 4°" . ..:_,,i,,li.,,' ,:3".0,,,, ti7"E'7..: 1;'„ • `• � , 3 ..,.SL. I I` 1 1 �}r t WFA ,,k;,;, '. ,r,-.1.a.ilk""1111 i 1 L.:."',... (.1'.' 1 . f lir ui- ' f i�'it1110.1116 , ,. ,; filkii'ir 444 : : ' Ei s IF n IA � __,�y w - 4,i , F F , ..I -_- Y •',.-73,i�! pi: I 1'- ti �•� #` I. 'r pF t • f ,.,,,:p > tt tF �� 1 ...JOLIET AVE '4 p, } �wf' ,F , 493918 4 Z .4. ,A 493914 6" I ...� ./ .7,-7 ItiP �" P; iii�' fA;; / i,,,: tG V+ a . ryr Ili ,r ,. " Pi% ?. ;.{...". " ,,AhmIt'''''"7. ' ......4 t. •+'ii .1,:'' FSI.. ( 1 'i 'F 4C �i I • i ¢ I 1,' q $at11 ti 1 niW I., ® 1*'•.11 r� • ��' z ` ' . ., ,, n ; _ Fp ‘.,,,, ,..i.:.;., .. . Alq `, s�1 :, .( 1, I: .� $F'�r .T Y31"„ ad .1 -At,;::,::::' 4::;:;:i1:11.:1-;!.;.ilil ` a � �,I, _ �' c. � �ion n. rj 2e"1