HomeMy WebLinkAbout14751RESOLUTION NO. 14751
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN
THE AMOUNT OF $19,173.84 TO K.R. SWERDFEGER
CONSTRUCTION, INC., FOR EMERGENCY STORM SEWER
POINT REPAIR AT THE INTERSECTION OF JACKSON STREET
AND EVANS AVENUE AND AUTHORIZING THE PURCHASING
AGENT TO EXECUTE SAME
WHEREAS, an emergency storm sewer repair was authorized by the Mayor of The City
of Pueblo in accordance with Section 1-10-5 of the Pueblo Municipal Code; and
WHEREAS, the point repair work was awarded to K.R. Swerdfeger Construction, Inc.,
under the 2020-2022 Storm Sewer Point Repair contract; NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
This contract is for repair of stormwater pipes and a manhole at the intersection of Jackson
Street and Evans Avenue by K.R. Swerdfeger Construction, Inc., Project No. 20-019 (SW1501)
and is hereby awarded to said bidder in the amount of $19,173.84.
SECTION 2.
Funds for Project 20-019 (SW1501) shall be from the Stormwater Utility Fund.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 4.
The officers and staff of the City are authorized to perform any and all acts consistent with
the intent of this Resolution and the contract to implement the transactions described therein.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED November 22, 2021
BY: Ed Brown
MEMBER OF CITY COUNCIL
APPROVED:
PRESIDENT OF CITY COUNCIL
ATTESTED BY:
CITY CLERK
City Clerkâs Office Item # M-1
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: November 22, 2021
TO: President Lawrence W. Atencio and Members of City Council
CC: Nicholas A. Gradisar, Mayor
VIA: Marisa Stoller, City Clerk
FROM: Jeff Hawkins, Director of Stormwater
SUBJECT: A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT
OF $19,173.84 TO K.R. SWERDFEGER CONSTRUCTION, INC., FOR
EMERGENCY STORM SEWER POINT REPAIR AT THE INTERSECTION OF
JACKSON STREET AND EVANS AVENUE AND AUTHORIZING THE
PURCHASING AGENT TO EXECUTE SAME
SUMMARY:
This Resolution awards a construction contract to K.R. Swerdfeger Construction, Inc. for
emergency storm sewer point repair at the intersection of Jackson Street and Evans Avenue.
PREVIOUS COUNCIL ACTION:
None
BACKGROUND:
The Stormwater Utility was notified that there was a sinkhole developing at the intersection of
Jackson Street and Evans Avenue near a stormwater inlet. Televised inspection of the stormwater
infrastructure revealed a collapsed lateral. An emergency repair was required to repair the
defective stormwater pipe, as well as appurtenant surface repairs.
The bid summary sheet with the unit prices for the estimated work performed by K.R. Swerdfeger
Construction, Inc. and the change order for the project are attached. This work was performed
under the 2020-2022 Storm Sewer Point Repair Ordinance #9755 which contractors were
qualified via competitive bid.
The cost breakdown for the project is as follows:
Total
Description
Remove Existing Pipe and Replace w/12" HP Polypropylene
$ 9,976.00
Corrugated Double Wall Pipe Less than 8' Deep
Remove and Replace Asphalt 4" Asphalt on 4" Class 6 ABC
$ 4,176.00
(based on 12" pipe replacement)
Install Extra Lean Concrete (Flowable Fill) $ 1,092.00
Mobilization $ 3,515.00
Traffic Control $ 414.84
$19,173.84
FINANCIAL IMPLICATIONS:
Funding for this project came from the Stormwater Utility budget. Funding was available and had
been budgeted, appropriated, and allocated to Project No. 20-019 (SW1501).
BOARD/COMMISSION RECOMMENDATION:
Not applicable
STAKEHOLDER PROCESS:
None
ALTERNATIVES:
Not applicable
RECOMMENDATION:
Approval of the Resolution.