RESOLUTION NO. 14501
A RESOLUTION RATIFYING AN EMERGENCY
CONSTRUCTION CONTRACT IN THE AMOUNT OF
$175,073.15 WITH PARKER EXCAVATING, INC. FOR
EMERGENCY SANITARY SEWER POINT REPAIR IN THE
ALLEY BEHIND 1631 ALMA AVENUE, PROJECT NO. 18-
098 (WWAN03) AND APPROVING THE PURCHASING
AGENT’S EXECUTION OF SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo
City Mayor in accordance with Section 1-10-5 of the Pueblo Municipal Code; and
WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under
the 2019-2020 multi-year point repair contract; NOW, THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
City Council ratifies and approves the contract for repair of the sanitary sewer at
1631 Alma Avenue with Parker Excavating Inc., Project No. 18-098 (WWAN03)
awarded to said bidder in the amount of $175,073.15.
SECTION 2.
Funds for Project 18-098 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent is authorized to execute said contract on behalf of Pueblo,
a Municipal Corporation, and the City Clerk shall properly affix the seal of the City
thereto and attest the same.
SECTION 4.
The officers and staff of the City are directed and authorized to perform any and
all acts consistent with the intent of this Resolution and the contract to effectuate the
transactions described therein. Furthermore, all actions previously taken by officers and
staff of the City consistent with the contract including any payments authorized under
the contract are hereby ratified.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED November 9, 2020
BY: Ed Brown
MEMBER OF CITY COUNCIL
APPROVED:
PRESIDENT OF CITY COUNCIL
ATTESTED BY:
CITY CLERK
City Clerk’s Office Item # M-2
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: November 9, 2020
TO: President Dennis E. Flores and Members of City Council
CC: Nicholas A. Gradisar, Mayor
VIA: Brenda Armijo, City Clerk
FROM: Nancy Keller, Director of Wastewater
SUBJECT: A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT
IN THE AMOUNT OF $175,073.15 WITH PARKER EXCAVATING, INC. FOR
EMERGENCY SANITARY SEWER POINT REPAIR IN THE ALLEY BEHIND
1631 ALMA AVENUE, PROJECT NO. 18-098 (WWAN03) AND APPROVING
THE PURCHASING AGENT’S EXECUTION OF SAME
SUMMARY:
This Resolution ratifies and approves award of a construction contract to Parker Excavating,
Inc. for emergency sanitary sewer point repair at 1631 Alma Avenue.
PREVIOUS COUNCIL ACTION:
None
BACKGROUND:
th
On July 28 the collection crew attempted to televise 1631 Alma Ave. for the 2-year warranty
inspection. The TVI truck was setup at the upstream manhole. The cleaning truck was set up at
the downstream manhole to clean the main for the TVI to be performed. The cleaning truck
attempted to send the cleaning head up the main and was stopped at about 268' with some kind
of blockage and could not continue. According to the work order, 288' is the starting footage for
the point repair being inspected. The cleaning truck set up at the upstream manhole to try and
clean the main and the cleaning head was stopped at about 114’ and could not continue
cleaning. An attempt to camera the line was made and at about 114' there seems to be a large
sag or offset joint keeping the camera from continuing. Due to the number of defects and not
being able to clean and televise the main, the decision was made to replace the entire section of
the main.
The repair work was performed under the Sanitary Sewer Point Repair multi-year contract under
which three contractors were qualified via competitive bid An estimate was prepared and K.R.
Swerdfeger was the low bidder but declined the work due to being short staffed. Parker
Excavating was the next low bidder and accepted the work.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-Related
Total: $ 83,589.15 48%
Surface Improvement Related
Total: $ 91,484.00 52%
Grand Total: $175,073.15 100%
FINANCIAL IMPLICATIONS:
Funding for this Project came from the sanitary sewer rehabilitation budget funded by the Sewer
User Fund. Funding was available and had previously been budgeted, appropriated and
allocated to Project No. 18-098 (WWAN03).
BOARD/COMMISSION RECOMMENDATION:
Not applicable
STAKEHOLDER PROCESS:
None
ALTERNATIVES:
Not approve this Resolution, but such action would require a finding that there was not an
emergency condition.
RECOMMENDATION:
Approval of the Resolution.
Attachments: Bid Summary Sheet
Change Order
Site Location Map
66Z100100 INaod
JelemalseM to ioPaJla
:amp :Aq peno.lddy
eseaJoul Lions janoo o;;uaioy;ns a/e suogeudoidde!n;nnel;eq uoge;uasaJdaJ sa;nll;suoo
ioloailp ay;Aq leAwdde peu6ls'aoud loaf uoo leul6uo ay;wa;aseaJoul ue seaneo JapJ0 e6ueLi0 s!141 II
anueluaseJdaa s,dope4;uo3
elep :Aq paldeooy
ia6eueyg 6uueaw6u3 lemma;seM
•alep Aq paMalnaa
6 iaeU 6u3 a;eloossy
:oleo Aq paJedaid
oleJay/Ode;oe/;uoo ay;;o suolsinojd pe pue loeiluoo ay;of luawpuewe ue ewooaq Deus luawnoop siLil
sAep Jepueleo 0 Aq pa6ueyo sl loeJ;uoo ayl;o uogaldwoo io;pepinad awll ayl
pafaid alaldwoo of papaau>IJOM ejlx3
sagguen0 plaid lenloy :a6ueyp Jod uoseaa
9L EL0'SLL $ amp ol;unowy loe4woO pa;snfpy lelol
00'000'99 $ lunowy;o5Jluo3lew6u0
00'0 $ (s)JapJ0 a6uey0 snolna/d;o lunowV
9L 690'60L $ Japi0 a6uey0 slyl luawlsnfpy l8N
SL L9L'Z£L$ 11(00 Z60'£Z$) eseajoul/(eseaJoea) 1V101
ZS EOZS dd0-lfVH LL
6v9ZL'L$ 1VI2,131W J 9 SSV10-SV3aV)JOMA! 9L
00.00t L$ V3aV N3d0 033S-3a S L
ZLLb0'9$ 10?11NO33Id1VW, bL
Z£'L£9'ZZ$ ONIdWldSSVdA9 £L
00 0ZS'9$ ONIdLdfld SSVdA9 dO NMOG-NV31 ONV dfl-13S Z L
00.009'L9$ Ally 3611N3-3SV9 ONV 11VHdSV 30V1d3a ONV 3AOW3a L L
00446'£$ 3dId,AL OL
ONV,.9 2d0d 09V 9 SSV10„4 NO VWH,.4-HO LVd 11VHdSV
001L L b$ 31OHNVIN V10,94 30V1d3H S 3AOLN3a L
00'096'L$ (llld MOld)31380NO3 NV3l Va1X3 llV1SNI 9
(00'369$) a311f1J s Elan°OaVONV1S 30V1d32J'9 3AO0,13H S
009£6'L$ 3132:13N00 0332:10dN136,.4 33V1d32:1 S 3AOIN3H
00.9E L'9$ 3132:13N00 033HOdNI3a„L 33Vld]a'9 3AO J J E
(00 005'33$) L ONV.9 aOd 09V 9 SSV10„4 NO VWH„4-HOLVd 11VHdSV Z
00.039$ d330,OL> did OAd.9 30V1d32i'9 3AO013a
Ag PBJ;uo0 Ag loeJwo0 °N
asea/oul aseajoap sa6ueLi0;o uogduosap wall PIS
:suol;eol;loads 8 sueld ayl woJ;sa6ueyo 6uiMollo;ayl yliM Aldwoo o;paisenba/Agalay ale no),
aul'6ugeneox3 Japed JOPEJ;uoo
any ewiV 1.E91.
nedaa wlod JaMag AiellueS 0303 9 6 LOZAd •aweN loafoid
L;o L abed 0303/12/0L 3NO • ON JadJO a6ueyO 960-9L :JagwnN loafad
S)iHOM 011end 40 1N3 W lb Vd3Q 0163nd 40 A110
213atio 3ONVH0 10111:11NOa
._
W i►\S E .D ST 4u" 1�
CJ
f • r - . -'2.:r It -, .
- 4 .
SPRAGUE AVE
ua ,,
.
it
i
a. PITMAN. PL
,.. ._ .
.- .34321.0 >
i
'-`-, i -.'' :.' :: '' ...-, I jilt 1 o ,.-.„,
/ n i
.�►- _1 z ,
O Q
0
.,,,,'.. 4. 1-, -. 'I
, BAY STATE AVE, ilt ".,.°'
it . ,, .. ,..
I
+4 . r t =y3 +vim, .aw
,;,,,.
•
y,.
e
m
t:
': 04:" r il fill' . .. I .44, ,, ,14 . , ., ... ,
4 . SMI
k_ S a Mt, q'I . A� •
n *- , i l n,.n�
I""
�
JONES"AVEO
424237.3 :tel
' Y 3
`C
Z s - 1,. Z
4.
::(12w . jil .'1 1:7 - '
Q ' , 7.°:L,,,...,jilk, /II.U
0 antra ' i I+t_,,?,„,, 4. ...
„4,,,.. ow . . . . ....1 . .._...,:: . a, -
' "1 424237,6 eAHUALNl1JLIAL
'
k *. ,,, ,_... Disclaimer:This map/information has been produced by the City of Pueblo,Wastewater Department,and is for
-- ; ''k, j l reference only.Data provided herein is derived from sources with varying levels of accuracy.The City of Pueblo
— — disclaims all responsibility for the accuracy or completeness of the information contained herein.