HomeMy WebLinkAbout14396RESOLUTION NO. 14396 A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $37,328.17 WITH PARKER EXCAVATING, INC. FOR PROJECT NO. 18-098 (WWAN03) AND APPROVING THE PURCHASING AGENT’S EXECUTION OF THE SAME WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City Mayor in accordance with Section 1-10-5 of the Pueblo Municipal Code; and WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under the 2019- 2020 multi-year point repair contract; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. City Council ratifies and approves the contract for repair of the sanitary sewer in the prairie near 38 William White Blvd with Parker Excavating, Inc., Project No. 18-098 (WWAN03) awarded to said bidder in the amount of $37,328.17. SECTION 2. Funds for Project 18-098 (WWAN03) shall be from the Sewer User Fund. SECTION 3. The Purchasing Agent was authorized to execute said contract on behalf of Pueblo, A Municipal Corporation, and the City Clerk properly affixed the seal of the City thereto and attested the same. SECTION 4. The officers and staff of the City are directed and authorized to perform any and all acts consistent with the intent of this Resolution and the contract to effectuate the transactions described therein. Furthermore, all actions previously taken by officers and staff of the City consistent with the contract including any payments authorized under the contract are hereby ratified. SECTION 5. This Resolution shall become effective immediately upon passage and approval. INTRODUCED: April 27, 2020 BY: Ed Brown MEMBER OF CITY COUNCIL APPROVED: PRESIDENT OF CITY COUNCIL ATTESTED BY: CITY CLERK City Clerk’s Office Item # M-2_ Background Paper for Proposed Resolution COUNCIL MEETING DATE: April 27, 2020 TO: President Dennis E. Flores and Members of City Council CC: Nicholas A. Gradisar, Mayor VIA: Brenda Armijo, City Clerk FROM: Nancy Keller, Director of Wastewater SUBJECT: A RESOLUTION RATIFYING AN EMERGENCY CONSTRUCTION CONTRACT IN THE AMOUNT OF $37,328.17 WITH PARKER EXCAVATING, INC. FOR PROJECT NO. 18-098 (WWAN03) AND APPROVING THE PURCHASING AGENT’S EXECUTION OF THE SAME SUMMARY: This Resolution ratifies and approves award of a construction contract to Parker Excavating, Inc. for emergency sanitary sewer point repair in the prairie near 38 William White Blvd. PREVIOUS COUNCIL ACTION: None BACKGROUND: On March 9, 2020, while performing routine checks on the forced sewer main, a leak was discovered in the prairie near 38 William White Blvd, 80 feet west of Lift Station 2, southwest of the UTC Aerospace Company. The leak was in the 14-inch C900 pipe, an uncommon pipe material used only for forced mains. The repair work was performed under the sanitary sewer point repair multi-year contract under which three contractors were qualified via competitive bid. Due to the minimal lineal footage of C900 in the collection system, 14-inch C900 pipe is not a bid item on the emergency repair contract. An email was sent out to the qualified contractors on the emergency repair list for prices to perform the repair on the 14-inch C900 pipe. Parker Excavating, Inc. was the only contractor to reply with a price for the repair. The cost breakdown for the project is as follows: Sanitary Sewer Replacement-related Total: $ 37,328.17 100% Surface Improvement Related Total: $ 0.00 0% Grand Total: $ 37,328.17 100% FINANCIAL IMPLICATIONS: Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer User Fund. Funding was available and had been budgeted, appropriated and allocated to Project No. 18-098 (WWAN03). BOARD/COMMISSION RECOMMENDATION: Not applicable STAKEHOLDER PROCESS: None ALTERNATIVES: Not approve the Resolution, but this would require a finding that there was not an emergency condition. RECOMMENDATION: Approval of the Resolution. Attachments: Contractor Quote Change Order Site Location Map CONTRACT CHANGE ORDER CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS Project Number: 18-098 Change Order No. : ONE 3/19/2020 Page 1 of 1 Project Name : FY2019&2020 Sanitary Sewer Point Repair 38 William White Blvd Contractor : Parker Excavating, Inc. You are hereby requested to comply with the following changes from the plans&specifications: Bid Item Description of Changes Decrease Increase No. Contract By Contract By 2 PIPE C900 $13,083.00 3 SLAG MATERIAL $292.50 4 TRUCKING $380.00 5 CLEANUP/GRADING INSIDE LIFT STATION $475.00 6 14"MATERIALS $7,647.67 TOTAL (Decrease)/Increase $0.00 $21,878.17 Net Adjustment This Change Order $ 21,878.17 Amount of Previous Change Order(s) $ 0.00 Original Contract Amount $ 15,450.00 Total Adjusted Contract Amount To Date $ 37,328.17 Reason For Change: Actual Field Quantities. Extra work needed to complete project The time provided for completion of the contract is changed by 0 calendar days. This document shall become an amendment to the contract and all provisions of the contract apply hereto. Prepared by: Date: Associate Engineer I Reviewed by: Date: Wastewater Engineering Manager Accepted by: Date: Contractor's Representative If this Change Order causes an increase from the original contract price, signed approval by the Director constitutes representation that lawful appropriations are sufficient to cover such increase. Approved by: Date: Director of Wastewater FORM CO100.1299 .... ”., .'I,i.,,,'''',• N ...,., . -,...,„ S ...", .. ..... .... - . .A ..., : II .„.- ... ... all 440111 AA 1,1•,1 C• M ,, 1 -I - , > ..< , •. ., . . ..,-, WILLIAM WHITE BLVD -< 4t. > ...; g ji a rag' 111.1.111 1 IS .1 I --1 , ,„. ... '. ' I i ' • E STATE HWY 96 MASSEY RD X HWY 96 E FRONTAGE RD > -,--, • z ''' . Z ' . 4 111 • - 7 ,11, _ .--.. . t., z ... . • „ BARNETT RD ._i i • • z . i _I . .• .. . ., I C•1 ,_ , (V • : ' .• ol # • . I . , E CLAIR RD . . . . . DRIVE RD ' ,-- 4,,,. • , 1 , ,.....444- ,..,, Disclaimer:This map/information has been produced by the City of Pueblo,Wastewater Department,and is for reference only.Data provided herein is derived from sources with varying levels of accuracy.The City of Pueblo disclaims all responsibility for the accuracy or completeness of the information contained herein. F ,, tr ,,,„