HomeMy WebLinkAbout09481Reception 2148935
08/15/2019 03:43:38 PM
ORDINANCE NO. 9481
AN ORDINANCE APPROVING THE JESIK SUBDIVISION PLAT
BE IT ORDAINED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
The final plat of the Jesik Subdivision, being a subdivision of land legally described
as:
A certain parcel of land situated in the SE '/4 of the SW % of Section 25,
T20S, R65W, 6th P.M.
Commencing at the intersection of the East line of Right-of-way of the AT
& SF Railroad and the South line of 8th Street if extended westerly; thence
East along the South line of 8th Street, if extended westerly 140.10 feet to
the Point of Beginning: Thence South 43.3 feet; thence West and parallel
with the South line of 8th Street a distance of 9.3 feet; thence South 79.1
feet; thence East 129.40 feet to the South line of 8th Street; thence West
along said South line a distance of 119.9 feet to the True Point of Beginning.
County Addition, County of Pueblo, State of Colorado.
attached hereto, is hereby approved. All dedicated streets, utility and drainage
easements, rights-of-way and land set aside for public sites, parks and open spaces
shown and dedicated on said plat are hereby accepted for public use.
SECTION 2.
The acceptance of such dedicated streets, rights-of-way, utility and drainage
easements, public sites, parks and open spaces by the City does not obligate the City to
maintain or repair same until such streets, rights-of-way, utility and drainage easements,
public sites, parks and open spaces have been constructed and installed in compliance
and in accordance with the requirements and provisions of Chapter 4, Title XII of the
Pueblo Municipal Code, as amended and any agreement entered into pursuant thereto.
SECTION 3.
Neither the adoption of this Ordinance nor the requirements imposed hereby shall
create any duty or obligation of any person, firm, corporation or other entity with regard
to the enforcement or nonenforcement of this Ordinance or the City's Subdivision
Ordinances and regulations. No person, firm, corporation or other entity shall have any
private right of action, claim or demand against the City or its officers, employees or
21489354g 08/15/2019 03:43:38 P11
Gilbert20rot f z3C1 a k?RecorDd r0 P eblo2 o 00ty Co
1111 KM"! 91 1��IA)PAC F4'1w 11MMINCC 111 II 1
agents, for any injury, damage or liability arising out of or in any way connected with the
adoption, enforcement, or nonenforcement of this Ordinance or the Subdivision
Ordinance and Regulations of the City, or the engineering, surveying, drainage
improvement or other work or improvements required thereby. Nothing in this Ordinance
or in the City's subdivision Ordinances and regulations shall create or be construed to
create any claim, demand or liability against the City or its officers, employees or agents,
or to waive any of the immunities, limitations on liability, or other provisions of the
Colorado Governmental Immunity Act, Section 24-10-101, et seq. Colorado Revised
Statutes, or to waive any immunities or limitations on liability otherwise available to the
City or its officers, employees or agents.
SECTION 4.
The officers and staff of the City are authorized and directed to perform any and
all acts consistent with the intent of the Ordinance to implement the policies and
procedures described herein.
SECTION 5.
This Ordinance shall be approved upon final action by the Mayor and City Council
but shall not become effective until: (a) all information, documents, drawings, profiles, and
plat required by Chapter 4 of Title XII of the Pueblo Municipal Code meeting and
complying with the subdivision requirements of the City with such modifications, if any,
approved by City Council, have been filed with and approved by the Director of Public
Works, and (b) the final subdivision plat is recorded in the office of the Pueblo County
Clerk and Recorder. If any such filings and approvals have been deferred pursuant to
Section 12-4-5(b)(2) of the Pueblo Municipal Code, and are not for any reason filed and
approved within one (1) year after final passage of this Ordinance, or within any extended
period granted by Resolution of the City Council, this Ordinance shall automatically be
rescinded and repealed thirty (30) days after written notice of such rescission and repeal
is given to the Subdivider. No vested rights shall accrue to the subdivision or be acquired
until this Ordinance becomes effective.
Action by City Council:
Introduced and initial adoption of Ordinance by City Council on May 28, 2019 .
Final adoption of Ordinance by City Council on June Al . 9
Pre'. d 31t of City Council
2148935 08/15/20190013e1 08/15/2019 0033
230 030 71123.00 23.00
Pbe:rt3Ofiz3C1erk/Recorder, Pueblo
County, Co
Action by the Mayor: 11111 Ml fifirlitiOriNaif ill INIKIN CAM MMM
Approved on 6--/ 7 at)f .
❑ Disapproved on based on the following objections:
2Kheeke ere-eittlee'Ort'
Mayor
Action by City Council After Disapproval by the Mayor:
❑ Council did not act to override the Mayor's veto.
❑ Ordinance re-adopted on a vote of , on
O Council action on failed to override the Mayor's veto.
President of City Council
ATTEST
oma` ,4
..)4,62)1 ,
Acting City Clerk 4 t 6 \,�(/�
g .
City Clerk’s Office Item # R-8
BACKGROUND PAPER FOR PROPOSED
ORDINANCE
COUNCIL MEETING DATE:
May 28, 2019
TO: President Dennis E. Flores and Members of City Council
CC: Nicholas A. Gradisar, Mayor
VIA: Brenda Armijo, Acting City Clerk
FROM: Steven Meier, Director of Planning and Community Development
SUBJECT: AN ORDINANCE APPROVING THE JESIK SUBDIVISION PLAT
SUMMARY:
This Ordinance creates a subdivision of approximately 0.35 acres into one (1) building lot
thth
generally located south of West 8 Street, just west of the intersection of West 8 Street
and Craig Street.
PREVIOUS COUNCIL ACTION:
None.
BACKGROUND:
th
The subject property is located along West 8 Street, just west of Craig Street. The
applicant is requesting to plat the property into one (1) lot in order to construct an office
building. This subdivision is required for future development of the property as a
contractor’s office and yard. The property was previously in ownership with the parcel to
the west when they were both purchased by the Star Journal Publishing Corporation in
2006. In 2018 Joseph Jesik purchased the subject property to develop a commercial
business. In order to secure a building permit, a legal subdivision must be approved.
FINANCIAL IMPLICATIONS:
The approval of this subdivision plat will not have any immediate financial impact to the
City. However, build out of this lot will require a higher level of City services (police, fire,
etc.) than currently is provided to the vacant land parcel.
BOARD/COMMISSION RECOMMENDATION:
The Planning and Zoning Commission, at their February 13, 2019 Regular Meeting, voted
5-0 (Avalos and San Filippo-Rosser absent) to recommend approval with the following
conditions:
Conditions of Approval:
1. Comply with P&Z Condition #1 contained in the memorandum from Melanie
Turner, Stormwater Department, dated January 29, 2019 .
2. Comply with all plat and supplemental plan deficiencies noted above.
3. Revise the layout of the utility plan (3rd sheet) to comply with all requirements of
a subdivision utility plan. The plan provided appears to be a utility or site plan,
but it is not to scale, not on a title sheet, not labeled, does not provide a north
arrow, etc.
Conditions of approval 1 through 3 have been completed by the applicant.
STAKEHOLDER PROCESS:
The Planning Department sent out Notice of the Planning and Zoning Commission Public
Hearing to all property owners located within 300 feet of the subject property.
ALTERNATIVES:
If City Council does not approve this Ordinance, the current lot would remain and would
impede the applicant’s ability to develop the property.
Upon request of City Council, the Ordinance could be returned to the Planning and Zoning
Commission for consideration of proposed modifications.
RECOMMENDATION:
Approval of the Ordinance.
Attachments:
Proposed Ordinance
Minutes of the Planning and Zoning Commission February 13, 2019
Public Hearing
Memorandum from the Department of Public Works Dated May 15,
2019
Planning and Zoning Commission Staff Report with Exhibits
Reception 2148937
08/15/2019 03:43:38 PM
SUBDIVISION IMPROVEMENTS AGREEMENT
THIS AGREEMENT is made on July 18 , 2019 , between the
CITY OF PUEBLO, a Municipal Corporation("City"), and
Joseph A. Jesik
("Subdivider").
RECITALS
WHEREAS, Subdivider has subdivided or is about to subdivide a certain tract of land
located in the City and legally described in attached Exhibit"A"; and
WHEREAS,the Subdivider, as a condition of approval of the final plat of
Jesik Subdivision
("Subdivision"), wishes to enter into this Subdivision Improvements Agreement as authorized by
Chapter 4, Title XII of the Pueblo Municipal Code; and
WHEREAS, Subdivider is required by Chapter 4, Title XII of the Pueblo Municipal Code
to construct and install public improvements described and set forth in Chapter 4, Title XII of the
Pueblo Municipal Code and the standards and specifications approved by City Council
("Required Public Improvements"); and
WHEREAS, the Required Public Improvements are generally described in the attached
Exhibit"B" and shown on approved construction plans and documents on file in the office of the
City's Director of Public Works ("Plans and Documents").
WHEREAS, by Chapter 4, Title XII of the Pueblo Municipal Code, Subdivider is
obligated to provide security or collateral sufficient in the judgement of the Director of Public
Works to make reasonable provisions to construct and complete the Required Public
Improvements.
NOW, THEREFORE, in consideration of the foregoing and the following mutual
covenants and agreements, the City and Subdivider agree as follows:
1. Subdivider agrees within one hundred and eighty (180) days after applying for a
building permit to construct any building or structure on any building site within the
Subdivision, or upon the issuance of a certificate of occupancy for any such building
or structure, whichever occurs first, tp construct and install at its sole cost all of the
Required Public Improvements.
2. In lieu of installing the Required Public Improvements within the time period
prescribed in Paragraph 1, Subdivider or any subsequent owner of the land or any
portion thereof shall deposit cash or other collateral with the City Director of Finance,
or with any bank or trust company licepsed in the State of Colorado, subject to an
DPW 101
Dec.2007
21489374g08/15/2019 03:43:38 PM
Galbert2Ort 2101ePk/RecodeDr.0Pueblo o$n0tyy, Co
$11hVO4N, � 11111
escrow agreement approved by the City Attorney. The holder of such cash or
collateral shall pay all or any portion thereof to the City upon demand after the time
to complete all Required Public Improvements by Subdivider or subsequent owner
expires. Such deposit or escrow agreement shall be referred to as the "deposit".
3. The amount of the deposit shall be computed by the City's Director of Public Works
by estimating the total cost of all uncompleted Required Public Improvements within
the block at the time application for building permit is made. The amount of the
deposit required by this alternative shall not be less than 25% of such estimate plus
the cost of extending all required sewer and water lines from nearest existing sewer
and water lines to the proposed building site for which a building permit is sought,
plus the costs of extending curb, gutter, sidewalk and paving from the edge of the
Subdivision or existing improvements of a like nature, whichever is closer to the
proposed building site. In any case where the block, as later defined, exceeds one
thousand (1000') feet in length between intersecting streets,the estimate of the City
Director of Public Works under this paragraph may be reduced to the total costs of all
uncompleted Required Public Improvements in at least one half(1/2) of such block,
and the required deposit shall be based upon such decreased estimate. The
Subdivider, however, shall provide a turnaround of at least sixty (60') feet in
diameter at the mid-block point and barricade such street so that no through traffic
shall be permitted beyond the point to which the estimate of Director of Public Works
is based.
4. Within one hundred eighty (180) days after subsequent application for a building
permit to construct any building or structure upon any building site within the block,
or upon the issuance of a certificate of occupancy for any such building or structure,
whichever occurs first, Subdivider shall also deposit an amount not less than the
estimate of the Director of Public Works for all Required Public Improvements from
existing improvements to the proposed building site, less any previous deposits made
under this agreement upon building sites lying between the most recent proposed site
and existing improvements.
5. In the event the Subdivider or any subsequent owner of the land fails to complete the
Required Public Improvements or to make such deposit within the required time, no
additional building permits shall be issued to the Subdivider or the subsequent owner
or to any other person to build or construct any building or structure in the
Subdivision until such default is remedied. In addition, the City may treat the amount
of such deposit as a debt due the City from the Subdivider or subsequent owner,
which debt shall be a lien upon all the land in the Subdivision and notice of lien may
be filed for record in the office of the County Clerk and Recorder at any time after
such default. Action upon such debt may be instituted by the City within six (6)
years from the date of filing such lien for record. All remedies provided for in this
agreement are cumulative and the use of one shall not prohibit the use of another.
DPW 101 2
May 2009
2148937 08/15/2019 03:43:38 PM
Page: 30
of 10 R 58.00 D 0.00 T 58.00
Gilbert Ortiz Clerk/Recorder, Pueblo County; Co
liii ridlina�likINII IMF MIMIA5h 11111
6. Upon paying such deposit, the City Director of Public Works shall release the
proposed building site from the terms of the Agreement except the terms of Paragraph
7 below.
7. As a condition of approval of this Subdivision, and to meet the requirements of
Chapter 4, Title XII of the Pueblo Municipal Code, Subdivider specifically agrees
that no certificate of occupancy shall be issued by the Pueblo Regional Building
Department until the Required Public Improvements, or those improvements
necessary as determined by the City Director of Public Works, to totally serve
specific lot(s) or block(s) for which certificates of occupancy are sought, have been
properly designed, engineered, constructed and accepted as meeting the specifications
and standards of the City.
The restrictions on issuing certificates of occupancy contained in this Paragraph 7 and
the restriction on the issuance of building permits contained in Paragraph 5 shall run
with the land and shall extend to and be binding upon the heirs, legal representatives,
successors, and assigns of the Subdivider and may be specifically enforced by the
City.
8. Acceptance of this Subdivision by the City does not constitute an acceptance of the
roads, parks and other public improvements for maintenance by the City. Until such
roads, parks, and other public improvements have been installed and meet the
requirements, standards, and specifications of the City, its Subdivision ordinances
and any applicable Parks Department specifications, and such are specifically
approved and accepted in writing by the City Director of Public Works, and, if
appropriate, the City Director of Parks and Recreation, the maintenance, construction,
and all other matters pertaining to or affecting said roads,parks and other public
improvements and rights-of-way are the sole responsibility of the Subdivider or any
subsequent owner(s) of the land within the Subdivision.
9. The required time to complete all Required Public Improvements by Subdivider
within such block shall be one (1) year from the date of application for the first
building permit issued within such block. Upon completion and written approval and
acceptance of the Required Public Improvements within the required time and the
payment of all inspection costs by Subdivider, the Director of Public Works shall
cause all obligations of the Subdivider relating to the Required Public Improvements
within such block to be released. If such Required Public Improvements are not
completed within the required time, the City Director of Public Works may cause the
proceeds of all deposits or other collateral or monies in escrow to be used to compete
the same. If insufficient monies are available at the end of the required time to
complete all Required Public Improvements for the entire length of such block,the
Director of Public Works shall cause all collateral or monies in escrow to be reduced
to cash and shall deposit the same with the Director of Finance. Such cash shall be
used to complete that portion of the Required Public Improvements as the Director of
Public Works, in the Director's sole discretion, shall determine. Until all the
Required Public Improvements are completed and approved by the Director of Public
DPW 101 3
May 2009
2148937 08/15/2019 03:43:38 PM
Page: 4 of 10 R 58.00 D 0.00 T 58.00
Gilbert Ortiz Clerk/Recorder, Pueblo County, Co
''I'; II III
Works, Subdivider and the subdivided land shall remain liable and responsible for all
Required Public Improvements.
10. For purposes of this Agreement,the "block" shall mean both tiers of lots fronting or
abutting upon the street which the proposed building or structure shall front, to the
rear property line of such lots, or the center line of the alley, if there is an alley,
enclosed at either end by a street which intersects both tiers of lots and shall include
the full width of all streets upon which such lots abut.
11. If the Required Public Improvements are for a commercial subdivision and include
stormwater drainage facilities, stormwater detention facilities, or maintenance and
restoration of adjacent drainage channels, and/or associated improvements and
revegetation(the "facilities"), located either within or outside of the Subdivision,
Subdivider shall install the facilities in accordance with plans and specifications
therefore approved by, and on file with the City, and thereafter, the facilities shall be
repaired, replaced and maintained in good working order and condition by the owners
of the land within the Subdivision. The City is granted the right(but not the
obligation)to inspect, control, repair, replace and maintain the facilities and to
recover all costs and expenses therefore including an administrative charge of 15%
from the owners of the land within the Subdivision. All such City's costs and
administrative charges shall become a perpetual lien on all the land within the
Subdivision upon recording in the office of the Pueblo County Clerk and Recorder a
statement of lien setting forth the City's costs and describing the land signed by the
City's Director of Public Works. Failure of the City to inspect, control, repair,
maintain, or replace the facilities shall not subject the City to any liability for such
failure.
12. Subdivider agrees to provide the City with a current title insurance commitment at the
time of final platting evidencing that fee simple title of all lands in the Subdivision is
totally vested with the Subdivider free and clear of all liens and encumbrances. If
such land is not free and clear, the holder of such indebtedness or encumbrance shall
subordinate its interest or encumbrance to this Agreement and all its terms,
conditions, and restrictions.
13. The City or the purchaser of any lot(s) within this Subdivision shall have the
authority to bring an action in any Court of competent jurisdiction to compel the
enforcement of this Agreement or any amendment hereto. Such authority shall
include the right to compel rescission of any sale, conveyance, or transfer of any
lot(s) or tract(s)contrary to the provisions of the Ordinances of the City or this
Agreement. In the event of any litigation arising out of this Agreement,the Court
shall award the prevailing party its costs and expenses, including reasonable expert
witness and attorney's fees. Venue for any such litigation shall be Pueblo County,
Colorado.
14. City and Subdivider have attempted by the attached Exhibit"B" and Plans and
Documents to describe all Required Public Improvements to be constructed and
DPW 101 4
May 2009
2148937 08/15/2019 03:43:38 PM
Pag ert5Ort 2101e R/Reco deDr, Pueblo 5oun0tyy, Co
11111 PA'N1151 I. iliMAIMIailliiiiii h 11111
installed by Subdivider with respect to the Subdivision. However, if the attached
Exhibit"B"and Plans and Documents fail to describe or to include, for any reason,
any Required Public Improvement described and set forth in Chapter 4, Title XII of
the Pueblo Municipal Code and the standards and specifications approved by City
Council ("Omitted Public Improvement"), Subdivider shall not be released or
discharged from Subdivider's obligation to construct and install the Omitted Public
Improvement in the time and manner contained in this Agreement and Chapter 4,
Title XII of the Pueblo Municipal Code,
In order to determine whether or not there are Omitted Public Improvements, the
following shall be applicable:
(a) If the Required Public Improvements are constructed and installed within ten
(10) years from the date hereof, or within a five year extension if granted in
writing by the Director of Public Works,then Chapter 4, Title XII of the
Pueblo Municipal Code and the standards and specifications approved by the
City Council and interpreted as of the date hereof shall control, unless
adherence to a more recent standard does not require significant engineering
modifications or major revisions to the plans and documents.
For the purposes of this subsection, a major revision is defined as, but not
necessarily limited to the relocation or re-alignment of any curb and gutter,
sanitary sewer, storm sewer, manholes or storm inlets, or the change of size or
type of sewer mains, inlets, curb and gutter or sidewalk.
(b) If the Required Public Improvements are constructed and installed after ten
(10) years from the date hereof, or after a five year extension if granted in
writing by the Director of Public Works, then Chapter 4, Title XII of the
Pueblo Municipal Code and the standards and specifications approved by the
City Coucil and interpreted as of the date the Required Public Improvements
are constructed and installed shall control.
(c) If Chapter 4 of Title XII and/or the standards and specifications approved by
the City Council are modified or amended to conform with the requirements
of federal or state law, rules or regulations prior to the construction and
installation of the Required Improvements, they shall control as so modified
and amended.
15. Except for guarantee and obligation to correct defects required by Section 12-4-
7(j)(9) of the Pueblo Municipal Code, nothing in this Agreement shall be construed to
extend any obligation of the Subdivider beyond the date of written approval and
accepted by the Director of Public Works of the Required Public Improvements
described in attached Exhibit"B", provided, however that the obligation of the
Developer to construct or install any Omitted Public Improvements will cease
following two (2)years from the date of acceptance of the Required Public
Improvements described in the attached Exhibit"B" by the Director of Public Works.
DPW 101 5
May 2009
2148937 08/15/2019 03:43:38 P11
Page: 6 of 10 R 58.00 D 0.00 T 58.00
Gilbert Ortiz Clerk/Recorder; Pueblo County, Co
11111 �1I' MWYA«oii l VINIO K%VA i 11 11 1
16. All Required Public Improvements shall be constructed and installed in compliance
with all applicable standards and specifications approved by City Council.
17. The parties agree this Agreement may be periodically amended by mutual consent
provided such amendment is in writing and signed by all parties.
18. This Agreement shall extend to and be binding upon the successors and assigns of the
City and upon the heirs, successors, assigns and legal representatives of Subdivider,
and shall be recorded in the office of the County Clerk and Recorder of Pueblo
County, Colorado, and shall constitute an agreement running with the land until
released as described above.
The parties have caused this Agreement to be executed and attested by its duly authorized
and acting officer.
Joseph A.Jesik
Subdivider
(SEAL) By:
By:
The foregoing instrument was acknowledged before me on July 18,2019
by Joseph A.Jesik , Subdivider.
My commission expires:
KIMBERLY jjt
.'�`IK N blic
NUTAk, I,,
s TAR OF Cut
, .:,,j .o' 'UEBLO a Municipal Co oration
NOTARY Iv - U 35G �� ► ' p
MY COMMISSION C rl(i_c, ::,NuARY 12.2020 / o4 ' Q /e pS /i r
A TEST: _ AYorrZ of PV EBS
411 , Al . • f' Mier- •• I'
City Clerk '?L ..•. I�. de /
STATE OF COLORADO ) Q� Q �
) ss.
COUNTY OF PUEBLO )
//1� The foregoing instrument was acknowledged before me this 7h day of
A/A.6 Lt. S T , 0 019 by A , as
Ma y OA_ 'l, and Lir,_r',P( A- v as City Clerk of the City of
U Pueblo, Colorado. Ivry'
Witness my hand and official seal.
DPW 101 6
May 2009
TAMMY A MARTINEZ
NOTARY PUBLIC
STATE OF COLORADO
NOTARY ID 20164028200
MY COMMISSION EXPIRES 07/28/2020
My commission expires. y/ 0)6,c 62 O
hk_/1 A ))(lak 2..)v
[ SEAL ] Notary Public
APPROVED AS TO FORM:
. ✓,a.12.
City Attorney
2148937 08/15/2019 03:43:38 PM
Page: 7 of 10 R 58.00 D 0.00 T 58.00
Gilbert Ortiz ClerkfReoorder, Pueblo County, Co
liii mirduvwl�r ��N�Ramtioc ol �ikim4 , 11111
DPW 101 7
May 2009
SUBDIVISION IMPROVEMENTS AGREEMENT
EXHIBIT "A"
JESIK SUBDIVISION
LAND DESCRIPTION
A Certain Parcel of Land situated in the SE 1/4 of the SW 1/4 of Section 25,Township 20 South,
Range 65 West of the 6th P.M., more particularly described as follows:
Commencing at the intersection of the East line of Right-of-way of the AT&SF Railroad and the
South line of 8th Street if extended westerly; thence East, along the South line of 8th Street, if
extended westerly 140.10 feet the True Point of Beginning: Thence South 43.3 ft.;thence West
and parallel with the South line of 8th Street a distance of 9.3 ft.; thence South 79.1 ft; thence
East 129.20 ft.;thence North 122.40 feet to the South line of 8th Street; thence West along the
said South line a distance of 119.9 ft. to the True Point of Beginning. County Addition, County of
Pueblo, State of Colorado.
Said Parcel containing ±0.35 Acres.
2148937 08/15/2019 03:43:38 PM
Page: 80
of 10 R 58.00 D 0.00 T 58.00
Gilbert. Ortiz Clerk/Recorder; Pueblo County, Co
11111 PedliaYl hrilli irAti Il � 11111
SUBDIVISION IMPROVEMENTS AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME: JESIK SUBDIVISION
DEVELOPER: JOSEPH A. JESIK
ENGINEER: JESIK CONSULTING
Sanitary Sewer
Service 1 EA @ $1,400/ EA= $1,400
Water
Service 1 EA @ $800/ EA= $800
Drainage
Straw Waddle 120 LF @ $3.50 /LF = $420
Vehicle Tracking Control 1 EA @ $800/ EA= $800
TOTAL $3,420
2148937 08/15/2019 03:43:38 PM
Page: 9 of 10 R 58.00 D 0.00 T 58.00
Gilbert Ortiz Clerk/Recorder, Pueblo County, co
1111 klP1 'FiI�iii lfi :1711'����11� r��Ju l0111JIi 11 11 1
2148937 08/15/2019 03:43:38 PM
Page: 10 of 10 R 58.00 D 0.00 T 58.00
Gilbert Ortiz Clerk/Recorder, Pueblo County. Co
11i11 IIMMI �AMIl:I I 'LN�Ak" IAF rh 111 II
SUBDIVISION IMPROVEMENTS AGREEMENT
EXHIBIT "B"
SUBDIVISION NAME:
DEVELOPER: �S�`'t 1 LJ 4..-
.r
ENGINEER: -�c,
Itemization of Required Public Improvements
(Use Unit Prices Approved by Public Works in Preparation of Exhibit"B")
This is an estimate only. Actual construction costs may vary.
PREPARED BY:
FIRM:
The undersigned hereby certifies that (i)the Required Public Improvements shown hereon and
the Plans and Specifications therefore constitute all of the public improvements required to be
installed and constructed for the Subdivision by Chapter 4, Title XII of the Pueblo Municipal
Code and the standards and specifications approved by City Council, (ii) the quantities of
construction elements shown hereon accurately depicts the quantities necessary to construct the
Required Public Improvements and(ii)the unit prices shown hereon are the most current unit
prices provided by the City of Pueblo.
[P.E.
i Cr,-. �t �O l�
Professional Engineer Date
/ 39781
get 'C7 lis--l?//4 I
119_'7 'r,
Alt
REVIEWED BY: 09/0zIZo,9
Director of Public Works Date
DPW 101 8
May 2009