HomeMy WebLinkAbout14167RESOLUTION NO. 14167
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN
THE AMOUNT OF $277,619.06 TO PARKER EXCAVATING INC.,
FOR EMERGENCY SANITARY SEWER POINT REPAIR AT
NORTHERN AVENUE AND CARTERET AVENUE AND
AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE
SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the former Pueblo
City Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code; and
WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under the 2017-
2018 multi-year point repair contract; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
This contract is for repair of the sanitary sewer at Northern Avenue and Carteret Avenue
with Parker Excavating Inc., Project No. 16-043 (WWAN03) and is hereby awarded to said bidder
in the amount of $277,619.06
SECTION 2.
Funds for Project 16-043 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the Acting City Clerk shall affix the seal of the City thereto and attest
the same.
SECTION 4.
The officers and staff of the City are directed and authorized to perform any and all acts
consistent with the intent of this Resolution and the contract to effectuate the transactions
described therein. Furthermore, all actions previously taken by officers and staff of the City
consistent with the contract including any payments authorized under the contract are hereby
ratified.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED March 11, 2019
BY: Ed Brown
MEMBER OF CITY COUNCIL
APPROVED:
PRESIDENT OF CITY COUNCIL
ATTESTED BY:
ACTING CITY CLERK
City Clerk’s Office Item # M-2
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: March 11, 2019
TO:
President Dennis E. Flores and Members of City Council
CC:
Nicholas A. Gradisar, City Mayor
VIA:
Brenda Armijo, Acting City Clerk
FROM:
Nancy Keller, Director of Wastewater
SUBJECT:
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT
OF $277,619.06 TO PARKER EXCAVATING INC., FOR EMERGENCY SANITARY
SEWER POINT REPAIR AT NORTHERN AVENUE AND CARTERET AVENUE
AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME
SUMMARY:
This Resolution awards a construction contract to Parker Excavating Inc. for emergency sanitary
sewer point repair at Northern Avenue and Carteret Avenue.
PREVIOUS COUNCIL ACTION
:
None
BACKGROUND
:
On September 28, 2018, the Collection Crew was performing a television inspection on the 21-
inch main at Northern Avenue and Carteret Avenue when the Collection Crew found a large hole
at the top of the pipe with a significant void above the pipe and the remaining pipe segment to be
severely deteriorated. The void was located under the outside westbound lane in the heavily
traveled Northern Avenue. An emergency repair was performed to repair the pipe and fill in the
void to protect the traveling public.
While the hole in the pipe and void were repaired immediately, the entire pipe segment needed
to be replaced. The wastewater engineering department requested quotes to replace the 21-inch
diameter main from the five contractors that are on the emergency call list. The 21-inch diameter
pipe was not included in the original bid.. The unit prices for the estimated work performed by
Parker Excavating, Inc. and the change order for the project are attached. This work was
performed under the Sanitary Sewer Point Repair multi-year contract under which five (5)
contractors were qualified via competitive bid.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Total: $ 237,627.06
Surface Improvement Related
Total: $ 39,992.00
Grand Total: $ 277,619.06
FINANCIAL IMPLICATIONS
:
Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer
User Fund. Funding was available and had been budgeted, appropriated and allocated to Project
No. 16-043 (WWAN03).
BOARD/COMMISSION RECOMMENDATION
:
Not applicable
STAKEHOLDER PROCESS
:
None
ALTERNATIVES
:
Alternative No. 1 – No Action
Under this alternative, the City would make no improvements to the existing sanitary
system and the large hole/void would remain in the 21-inch sewer main. This could cause
the ground above to collapse which would create a serious health and safety issue to the
public.
Alternative No. 2 – Place the Repair on a Rehabilitation List
Under this alternative, the City would make no immediate repairs to the sanitary main. The
sanitary main would be put on a rehabilitation list and prioritized by the level of importance for future
rehabilitation projects, risking a potential safety and health hazard for the public.
RECOMMENDATION
:
Approval of the Resolution.
Attachments
: Bid Summary Sheet
Change Order
Site Location Map
---- — - - w . _ . _._ .- __ _ .
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number: 16-043 Change Order No. : ONE 10/10/2018 Page 1 of 1
Project Name: FY2017&2018 Sanitary Sewer Point Repair
Carteret and Northern
Contractor: Parker Excavating, Inc.
You are hereby requested to comply with the following changes from the plans&specifications:
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By I
1 ASPHALT PATCH-6"FULL DEPTH ASPHALT(1-20 LF) ($1,198.00)
2 INSTALL EXTRA LEAN CONCRETE(FLOW FILL) ($428.00)
4 REMOVE&REPLACE 18"PVC $1,136.00
5 18"FERNCO $172.43
6 ASPHALT PATCH-6"FULL DEPTH ASPHALT(21-100 LF) $1,150.00
7 BYPASS PUMPING $5,180.75
8 SET-UP&TEAR DOWN BYPASS PUMPING $2,514.00
9 TRAFFIC CONTROL $654.98
pi.-- TOTAL (Decrease)/Increase 0 ($1,626.00)1 $10,808.16
Net Adjustment This Change Order $ 9,182.16
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 4,958.00
Total Adjusted Contract Amount To Date $ 14,140.16
Reason For Change: Actual Field Quantities.
Extra work needed to complete project
The time provided for completion of the contract is changed by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto.
Prepared by: Date: I
Associate Engineer I
Reviewed by: Date:
Wastewater Engineering Manager
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Director of Wastewater
FORM CO100.1299
t i R ,a '
f q F3
,, ,.1} y
_
�' ^T
ri, ..,.:CLARE ONT'AVE``` IIM
F
lir x- r
li
2 ,..-,, = i..
area ... S'
a I !y1, ) ,,z lit `'i, r4
.. ' �.
.- ' r
it." z .. ! �1t r . s
• -.. i ia IY ,,w n I •--' — r t d° ,.
rr.Gs.
,,, ..1,. it. ,
1 it . ti:'
�R
• I 1-# _ ! t
gyp ' i
4,, [ i-.
rr i as
''' 4::';;L:If' I: . " • M al :2 — ' ^ A *- ", I • -,, •'1, - "Ii. .,!,' al--I
„ '4 4 .1 ".. ...1 ,. _,,,, -,, . :-.-- _
:,,,,. ,
0 lea. �.• i
t
' `: .l '0
. 15,L,. ps ...1 v,:-j
471U7YYYrrr • 4
D �k
t ..
" ,
'
4 . t
1.
41,1i
. ...„
lin el-
14,, , t
eAb 7 x •
k ' '
,..
.
SH
F 1 � rR.-
It it l ,t y { Y 1,1 .• gip'
w 41/
'72-',.%77.:,,'!'t.,,,,,,,,, **-' , '. , ' . . "tit i. ...4,,,...,. . . al ;::
I at,
ylNOSS