Loading...
HomeMy WebLinkAbout13905RESOLUTION NO. 13905 A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $2,006,131 TO MAIN ELECTRIC LTD AND SETTING FORTH $200,613 FOR CONTINGENCIES, FOR PROJECT NO. 17-079A (WW1203) JAMES R. DIIORIO WATER RECLAMATION FACILITY PHASE III SWITCHGEAR REPLACEMENT PROJECT AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME WHEREAS, competitive bids for the Project No. 17-079A (WW1203) James R. DiIorio Water Reclamation Facility Phase III Switchgear Replacement Project have been received and examined; and WHEREAS, the proposal of Main Electric Ltd. of Pueblo, Colorado was the lowest of those bids determined to be responsive; NOW THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. This contract is for phase III of the electrical rehab at the James R. DiIorio Water Reclamation Facility in the City of Pueblo. Contract Agreement for James R. DiIorio Water Reclamation Facility Phase III Switchgear Replacement with Main Electric Ltd., Project No. 17-079A (WW1203) is hereby awarded to said bidder in the amount of $2,006,131. SECTION 2. Funds for Project 17-079A (WW1203) shall be from the Sewer User Funds. SECTION 3. The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo, A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the same. SECTION 4. In addition to the amount of the bid set forth, as aforementioned, an additional amount as stipulated in this section is hereby established for contingencies and additional work. Contingencies and Additional Work………$200,613 SECTION 5. The officers and staff of the City are directed and authorized to perform any and all acts consistent with the intent of this Resolution and the contract to effectuate the transactions described therein. SECTION 6. This Resolution shall become effective immediately upon passage and approval. INTRODUCED February 26, 2018 BY: Robert Schilling MEMBER OF CITY COUNCIL APPROVED: PRESIDENT OF CITY COUNCIL ATTESTED BY: ACTING CITY CLERK City Clerk’s Office Item # Q-1 Background Paper for Proposed Resolution COUNCIL MEETING DATE: February 26, 2018 TO: President Christopher A. Nicoll andMembers of City Council CC: Sam Azad, City Manager VIA: Brenda Armijo, Acting City Clerk From: Nancy Keller, Wastewater Director SUBJECT: A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT OF $2,006,131 TO MAIN ELECTRIC LTD AND SETTING FORTH $200,613 FOR CONTINGENCIES, FOR PROJECT NO. 17-079A (WW1203) JAMES R. DIIORIO WATER RECLAMATION FACILITY PHASE III SWITCHGEAR REPLACEMENT PROJECT AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME SUMMARY: Attached is a Resolution awarding a construction contract to Main Electric Ltd. for project No. 17-079A (WW1203) James R. DiIorio Water Reclamation Facility Phase III Switchgear Replacement Project to proceed with phase III of the electrical rehab for the James R. DiIorio Water Reclamation Facility. PREVIOUS COUNCIL ACTION : Resolution No.13180, passed on February 23, 2015 for James R. DiIorio Water Reclamation Facility Phase II Electrical Rehab. BACKGROUND : The electrical equipment at the James R. DiIorio Water Reclamation Facility has passed its normal design life and requires constant maintenance. The Water Reclamation Facility depends on electricity to operate the various wastewater treatment processes. Electrical supply components at the facility have at times failed to operate. This is unacceptable and could lead to the inability to treat wastewater and to noncompliance of state requirements. It is the intent of this on-going project to rehabilitate key electrical supply equipment in stages to avoid any service disruptions or permit violations. This third phase of the electrical rehab in general will consist of a complete renovation of the existing Switchgear 78A/78B and 78C/78D utilizing new cables and existing conduit to reconnect the existing loads to the new switchgear. The two existing Switchgear will be consolidated into a single new Switchgear. The project also consists of replacing transformers feeding Low Voltage Switchgear near the RAS Pump Station, and replacing the Medium Voltage Switchgear located near the Primary Clarifiers. A new 36” Mixed Liquor pipe between the Activated Sludge Basins and the RAS Pump Station will be installed, along with associated site work. This project is vital to the smooth operation of treatment processes at the James R. DiIorio Water Reclamation Facility. FINANCIAL IMPLICATIONS : The cost of the construction project was bid at $2,006,131 with contingencies of $200,613. Funds are available from the Sewer User Funds and have been budgeted and appropriated to Project No. 17-079A (WW1203). BOARD/COMMISSION RECOMMENDATION : Not applicable STAKEHOLDER PROCESS : None ALTERNATIVES : Alternative No. 1 – No Action In the event of no action being taken, electrical components could potentially fail and lead to the inability to treat wastewater causing the City to be in noncompliance of state requirements and cause serious health and safety issues to the public. RECOMMENDATION : Approval of the Resolution. Attachments : Bid Summary Sheet Site Location Map