HomeMy WebLinkAbout13868RESOLUTION NO. 13868
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN
THE AMOUNT OF $29,898.22 TO PARKER EXCAVATING INC.,
FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 3204
NORTH ELIZABETH AND AUTHORIZING THE PURCHASING
AGENT TO EXECUTE THE SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code; and
WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under the 2017-
2018 multi-year point repair contract; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
This contract is for repair of the sanitary sewer at 3204 North Elizabeth Contract
Agreement for Sanitary Sewer Repair with Parker Excavating Inc., Project No. 16-043 (WWAN03)
is hereby awarded to said bidder in the amount of $29,898.22.
SECTION 2.
Funds for Project 16-043 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 4.
The officers and staff of the City are directed and authorized to perform any and all acts
consistent with the intent of this Resolution and the contract to effectuate the transactions
described therein.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED: January 8, 2018
BY: Ed Brown
MEMBER OF CITY COUNCIL
City Clerk’s Office Item # M-1
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: January 8, 2018
TO:
Members of City Council
CC:
Sam Azad, City Manager
VIA:
Brenda Armijo, Acting City Clerk
From:
Nancy Keller, Wastewater Director
SUBJECT:
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT
OF $29,898.22 TO PARKER EXCAVATING INC., FOR EMERGENCY SANITARY
SEWER POINT REPAIR AT 3204 NORTH ELIZABETH AND AUTHORIZING THE
PURCHASING AGENT TO EXECUTE THE SAME
SUMMARY:
This Resolution awards a construction contract to Parker Excavating Inc. for emergency sanitary
sewer point repair at 3204 North Elizabeth.
PREVIOUS COUNCIL ACTION
:
None
BACKGROUND
:
The Wastewater Collection Crew was called to an incident that occurred on September 22, 2017.
The main located behind 3204 North Elizabeth had a sanitary sewer overflow that was reported
to the state. The collection crew cleaned the main to prevent another overflow. Additional
preventative cleaning was performed on September 26, 2017. While cleaning the line, the crew
encountered a blockage they couldn’t pass. The collection crew tried to perform a television
inspection to determine what the blockage was, but the camera became lodged at approximately
the same location. An emergency repair was required to remove the camera from the already
defective main.
The quote for the unit prices for the estimated work performed by Parker Excavating, Inc. and the
change order for the project are attached. This work was performed under the Sanitary Sewer
Point Repair multi-year contract under which five (5) contractors were qualified via competitive
bid.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Mobilization $550.00
Remove and Replace 8” PVC Pipe $103.00
Remove and Replace 12” PVC Pipe $8,722.00
Remove Camera/Cleaning head $1,200.00
Remove and Replace 48” Manhole $2,950.00
Transition Coupling $499.74
Extra Stabilization Rock $672.98
Haul Off Material $1,050.00
Dirt Haul In $3,600.00
Traffic Control $750.00
Bypass Pumping Set-up $1,500.00
Bypass Pumping $4,765.92
Bypass Tear Down $1,500.00
93%
Subtotal: $27,863.64
Surface Improvement related
Crushed Concrete Material $2,034.58
7%
Subtotal: $2,034.58
FINANCIAL IMPLICATIONS
:
Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer
User Fund. Funding was available and had been budgeted, appropriated and allocated to Project
No. 16-043 (WWAN03).
BOARD/COMMISSION RECOMMENDATION
:
Not applicable
STAKEHOLDER PROCESS
:
None
ALTERNATIVES
:
Alternative No. 1 – No Action
Under this alternative, the City would leave the camera stuck in the main, thus creating a large
obstruction in addition to the existing blockage, potentially causing a backup and/or another
sanitary sewer overflow on to a public surface.
Alternative No. 2 – Place the Repair on a Rehabilitation List
Under this alternative, the City would make no immediate repairs to the sanitary sewer. The main
would be put on a rehabilitation list and prioritized by the level of importance for future rehabilitation
projects. Similar to Alternative No. 1 – the camera would remain in the pipe, increasing the chances
for a backup or spill on to public surfaces.
RECOMMENDATION
:
Approval of the Resolution.
Attachments
: Site Location Map
Bid Summary Sheet
Change Order
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number: 16-043 Change Order No. : ONE 10/17/2017 Page 1 of 1
Project Name : FY2017&2018 Sanitary Sewer Point Repair
3204 N. ELIZABETH
Contractor: Parker Excavating, Inc.
You are hereby requested to comply with the following changes from the plans & specifications:
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By
1 REMOVE&REPLACE 8"PVC PIPE<10'DEEP ($4,017.00)
2 REMOVE CAMERA/CLEANING HEAD/TAP CUTTER $600.00
4 REINSTATE SERVICES ($175.00)
6 REMOVE&REPLACE 12"PVC PIPE $8,722.00
7 TRANSITION COUPLING $499.74
8 EXTRA STABILIZATION ROCK $672.98
9 HAUL OFF MATERIAL $1,050.00
10 CRUSHED CONCRETE MATERIAL $2,034.58
11 DIRT HAUL IN $3,600.00
12 TRAFFIC CONTROL $750.00
13 BYPASS SET-UP $1,500.00
14 BYPASS PUMPING $4,765.92
15 BYPASS TEAR-DOWN $1,500.00
TOTAL (Decrease)/ Increase ($4,192.00) $25,695.22
Net Adjustment This Change Order $ 21,503.22
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 8,395.00
Total Adjusted Contract Amount To Date $ 29,898.22
Reason For Change: Actual Field Quantities.
Extra work needed to complete project
The time provided for completion of the contract is changed by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto.
Prepared by: Date:
Associate Engineer I
Reviewed by: Date:
Wastew ater Engineering Manager
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Director of Wastew ater
4014* ,,.
,
M ,
'-v-'..;••0.-.14--,,n .. •
µms' e .4;;. L. .40f,‘::•.;
.+� - 3 ar'.•,•; .q.... :::�! P- }
—
1 _
t -+
va_
43223°:13 613
1'4.1
f g. . -
01.10 0
? ,._:. - ,�0 o;7•R- -
--- ss
•
`_.
„r. .
....01/0”. g -- _,. ii.:::,_,,,,,, -, .. .u..,......,N-- iii . .
.....,. ,., ,.. , , -,;, ,. .........__,,,t„, _ , ,
' t 3F-.-.:..... •
4 ..,1,.,:r., 'O-
,. t 3 ,cam
Vis' f" r 'y, � `' cir ii ir
a
`c,♦ A s
. �.t► ' _._.1 - •"14 a ark ��
ya ,. iti
• ri::: ji,4., frro - .•- - '-' 11:- _ ,,,, .,„, v .. , v,,,,,,, . ,.: S.--
10111 Via, .:.4 _
w
r
v - f
. 4114
— '..
ta'''i y, ;, �"'