HomeMy WebLinkAbout13816RESOLUTION NO. 13816
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN
THE AMOUNT OF $125,719 TO PARKER EXCAVATING INC.,
FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 2325
WYOMING AVENUE AND AUTHORIZING THE PURCHASING
AGENT TO EXECUTE THE SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code; and
WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under the 2017-
2018 multi-year point repair contract; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
This contract is for repair of the sanitary sewer at 2325 Wyoming Ave. Contract Agreement
for Sanitary Sewer Repair with Parker Excavating Inc., Project No. 16-043 (WWAN03) is hereby
awarded to said bidder in the amount of $125,719.
SECTION 2.
Funds for Project 16-043 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 4.
The officers and staff of the City are directed and authorized to perform any and all acts
consistent with the intent of this Resolution and the contract to effectuate the transactions
described therein.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED November 13, 2017
BY: Ed Brown
City Clerk’s Office Item # M-2
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: November 13, 2017
TO: President Stephen G. Nawrocki and Members of City Council
CC: Sam Azad, City Manager
VIA: Brenda Armijo, Acting City Clerk
FROM: Nancy Keller, Wastewater Director
SUBJECT: A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT
OF $125,719 TO PARKER EXCAVATING INC., FOR EMERGENCY SANITARY
SEWER POINT REPAIR AT 2325 WYOMING AVENUE AND AUTHORIZING THE
PURCHASING AGENT TO EXECUTE THE SAME
SUMMARY:
This Resolution awards a construction contract to Parker Excavating Inc. for emergency sanitary
sewer point repair at 2325 Wyoming Ave.
PREVIOUS COUNCIL ACTION
:
None
BACKGROUND
:
On June 15, 2017, the Collection Crew was performing a routine cleaning on the south side of
town off Nevada Ave. and Wyoming Ave. The main was televised after the cleaning head became
stuck. Several deficiencies were observed including a 90% sag that spanned over 15’ with a
service right in the middle. There were several offset joints and multiple detached taps that had
flow receding back into the service line. An emergency repair was done to prevent backups in the
main and guarantee all citizens have working sewer services.
The quote for the unit prices for the estimated work performed by Parker Excavating, Inc. and the
change order for the project are attached. This work was performed under the Sanitary Sewer
Point Repair multi-year contract under which five (5) contractors were qualified via competitive
bid.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Mobilization $550.00
Remove and Replace 8” PVC Pipe $20,295.00
Remove and Replace 48” DIA Manhole $5,900.00
Reinstate Services $2,975.00
Traffic Control $11,425.00
32%
Subtotal: $41,145.00
Surface Improvement-related
Install Extra Lean Concrete (Flow Fill) $1,337.50
Asphalt patch 4” on 6” Class 6 $55,398.00
Remove and Replace 7” Concrete $19,574.50
Remove and Replace 6” Concrete $6,900.00
Remove and Replace Curb and Gutter $1,364.00
68%
Subtotal: $84,574.00
TOTAL: 125,719.00
FINANCIAL IMPLICATIONS
:
Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer
User Fund. Funding was available and had been budgeted, appropriated and allocated to Project
No. 16-043 (WWAN03).
BOARD/COMMISSION RECOMMENDATION
:
Not applicable
STAKEHOLDER PROCESS
:
None
ALTERNATIVES
:
Alternative No. 1 – No Action
Under this alternative, the City would allow the main to remain in the same condition, thus creating
maintenance issues for the collection crew, as the line will continue to deteriorate and become
more problematic for the city and residents.
Alternative No. 2 – Place the Repair on a Rehabilitation List
Under this alternative, the City would make no immediate repairs to the sanitary sewer. The main
would be put on a rehabilitation list and prioritized by the level of importance for future rehabilitation
projects. Similar to Alternative No. 1 – the collection crew would be frequently cleaning it, all the
while the main would continue to become more deteriorated.
RECOMMENDATION
:
Approval of the Resolution.
Attachments
: Bid Summary Sheet
Change Order
Site Location Map
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number: 16-043 Change Order No. : ONE 10/9/2017 Page 1 of 1
Project Name : FY2017&2018 Sanitary Sewer Point Repair
2325 Wyoming Ave.
Contractor : Parker Excavating, Inc.
You are hereby requested to comply with the following changes from the plans&specifications:
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By
1 REMOVE&REPLACE 8"PVC PIPE<10'DEEP $495.00
2 ASPHALT PATCH-4"ASPHALT ON 6"CLASS 6 ABC $38,598.00
3 REMOVE&REPLACE 7"REINFORCED CONCRETE $6,374.50
5 REINSTATE SERVICES $525.00
7 FLOWABLE FILL $1,337.50
8 REMOVE&REPLACE 6"REINFORCED CONCRETE $6,900.00
9 REMOVE&REPLACE STANDARD CURB&GUTTER $1,364.00
10 TRAFFIC CONTROL $11,425.00
TOTAL (Decrease)/Increase I $0.00 ( $67,019.00
Net Adjustment This Change Order $ 67,019.00
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 58,700.00
Total Adjusted Contract Amount To Date $ 125,719.00
Reason For Change: Actual Field Quantities.
Extra work needed to complete project
The time provided for completion of the contract is changed by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto.
Prepared by: Date:
Associate Engineer II
Reviewed by: Date:
Wastewater Engineering Manager
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Director of Wastewater
FORM CO100.1299
Ate.'It'd�r �'' L. -sir '.."
r� z r 4,., 1 � .,.
.t$ I ‘,.' 1 ; i
-r=
"" c � �' I _ to u• ` ,
'�-
win- ,. i4' 1
_7.....-...4.,,,, .„..,- , . .,.,,,,,•,.. w
}' "---71`;
� j
€
,It ttn
�ti
f
yy .-' L
k
v sl'.r yF Y . '
at
; .„.„,.,,i,, . ,...,‘„,........s. „..,,,......_ ,_ _._ . ..... ........ .. ,..,. • „ ,, ,
_... , , , _ , „ . :. . ___ -... . ,.,: ;._-_ -,,. 1 i i , :, ...,‘,.,,. ,..,
,- , ,.. ...,„,, ,,. ., 4 T ii*-t 1"i. 1, ., .
re
iii,
otlit
. ..-„, A I -„,. . , i
.. 3AV 0NIWOAM 44
t Y• .«-...��- 7.. §Ic
g 10.
�.... �, tr. - r• S
3k �JNIWOAM " '
, ..1•710 A rx #11111"4
I .,
:
w I
r:....� 7j ,a. -
111!ip
-',., •• ..,i il it.4
, .
4t xL „. „lit so 0 . i
�.rw�
.,... , ,
4 r
is av)dod
...
.... ____
r # fq �.
F F,' li p s
11111M11115 1 2 1/11°. . •
s
11
-
t
a - i,,;
tsra ` � 'tiI: .Tc' x, .t" "^'� ifYa." .i y '1� «, .i' c�ID n
M Fl ,
ka„Ys41*- f 1
1