HomeMy WebLinkAbout13770
RESOLUTION NO. 13770
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN
THE AMOUNT OF $276,775.25 TO PARKER EXCAVATING, INC.,
FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 633
ELM STREET – PHASE III AND AUTHORIZING THE
PURCHASING AGENT TO EXECUTE THE SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code; and
WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under the 2017-
2018 multi-year point repair contract; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
This contract is for repair of the sanitary sewer at 633 Elm Street – Phase III. Contract
Agreement for Sanitary Sewer Repair with Parker Excavating, Inc., Project No. 16-043
(WWAN03) is hereby awarded to said bidder in the amount of $276,775.25.
SECTION 2.
Funds for Project 16-043 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 4.
The officers and staff of the City are directed and authorized to perform any and all acts
consistent with the intent of this Resolution and the contract to effectuate the transactions
described therein.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED September 11, 2017
BY: Ed Brown
City Clerk’s Office Item # M-3
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: September 11, 2017
TO:
President Stephen G. Nawrocki and Members of City Council
CC:
Sam Azad, City Manager
VIA:
Gina Dutcher, City Clerk
From:
Nancy Keller, Wastewater Director
SUBJECT:
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT
OF $276,775.25 TO PARKER EXCAVATING, INC., FOR EMERGENCY
SANITARY SEWER POINT REPAIR AT 633 ELM STREET – PHASE III AND
AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME
SUMMARY:
This Resolution awards a construction contract to Parker Excavating, Inc. for emergency sanitary
sewer point repair at 633 Elm Street – Phase III.
PREVIOUS COUNCIL ACTION
:
None
BACKGROUND
:
On May 1, 2017, a sinkhole in the dirt approximately 75 feet southeast of 633 Elm Street was
discovered and the Wastewater Department quickly started an emergency repair project, 633 Elm
St - Phase I, on the main. While work was being performed to repair the 33-inch sanitary main,
another sinkhole formed downstream from the first. This second sinkhole was, again below dirt
and caused by a 33-inch reinforced concrete main collapsing. The collapse was a result of a
combination of the weight of the soil due to prior precipitation and a deteriorated concrete pipe
from hydrogen sulfide gases. The collapse of the pipe along with the heavy flow in the pipe
created a sinkhole that was approximately 30-feet in diameter at the surface. The reinforced
concrete pipe was in such poor condition there was not a section of pipe that would be suitable
to connect the new pipe. The last portion of the sanitary main segment and manhole had to be
replaced.
The quote for the unit prices for the estimated work performed by Parker Excavating, Inc. and the
change order for the project are attached. This work was performed under the Sanitary Sewer
Point Repair multi-year contract under which five (5) contractors were qualified via competitive
bid. A line item to Remove and Replace 36-inch PVC pipe was not on the original bid estimate.
A request to all 5 contractors was made to provide a price for the new line item. ML Strasia &
Sons, Co. and Pate Construction, Co. were unresponsive and therefore disqualified for this repair.
During the project the costs were modified by actual field quantities as noted on the attached
change order.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Remove and Replace 36” PVC Pipe $45,654.00
Remove and Replace 72” DIA manhole $8,200.00
Flow Fill $6,955.00
Layne Bypass - Labor $18,266.00
Layne Bypass - Equipment $2,766.50
Bypass Pumping – Materials, Subs, Misc. $154,182.35
MH Lining $40,751.40
100%
Total Sewer Cost and Percentage $276,775.25
100%
Subtotal: $276,775.25
FINANCIAL IMPLICATIONS
:
Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer
User Fund. Funding has been budgeted, appropriated and allocated to Project No. 16-043
(WWAN03).
BOARD/COMMISSION RECOMMENDATION
:
Not applicable
STAKEHOLDER PROCESS
:
None
ALTERNATIVES
:
No other alternatives were available.
RECOMMENDATION
:
Approval of the Resolution.
Attachments
: Bid Summary Sheet
Change Order
Site Location Map
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number: 16-043 Change Order No. ONE 8/4/2017 Page 1 of 1
Project Name : FY2017&2018 Sanitary Sewer Point Repair
633 Elm St. -Phase III
Contractor: Parker Excavating, Inc.
You are hereby requested to comply with the following changes from the plans&specifications:
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By
1 REMOVE&REPLACE 60"MANHOLE ($3,450.00)
2 MOBILIZATION ($550.00)
4 BYPASS-LABOR $476.00
5 LANE BYPASS-LABOR $17,790.00
6 LANE BYPASS-EQUIPMENT $2,766.50
7 BYPASS PUMPING-MATERIALS,SUBS,OTHER $194,933.75
8 REMOVE&REPLACE 72"MANHOLE $8,200.00
9 LEAN CONCRETE/FLOVVABLE FILL $6,955.00
TOTAL (Decrease)/Increase ($4,000.00) $231,121.25
Net Adjustment This Change Order $ 227,121.25
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 49,654.00
Total Adjusted Contract Amount To Date $ 276,775.25
Reason For Change: Actual Field Quantities.
Extra work needed to complete project
The time provided for completion of the contract is changed by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto
Prepared by: Date:
Associate Engineer II
Reviewed by: Date:
Wastewater Engineering Manager
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Director of Wastewater
FORM CO100.1299
I ' ' :. . ' 4.. ‘,,‹ 1, ..r.i ..,' 4p., ,,,, ''i '
; %
jy �.
•
I. .. .,r'., i 'r A^ }t qM♦ *'mea q.,..,.....w`t ,,.r } 4 `_ r
M��Ig. `+ 4'', ......00040,-.404:74-- Pm. b
`a
�'< a '�*- �, it s
w
ae
liiiE A@RIEP/1A V :.«e.,c>—., 4E E y
tic t
�'r .
1h ^
.14 1111
q
r
s
4 �, r
k