HomeMy WebLinkAbout13757RESOLUTION NO. 13757
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN
THE AMOUNT OF $31,065 TO ML STRASIA & SONS
CONSTRUCTION INC., FOR EMERGENCY SANITARY SEWER
POINT REPAIR AT 127 BROADWAY AVENUE AND
AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE
SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code; and
WHEREAS, the point repair work was awarded to ML Strasia & Sons Construction, Inc.
under the 2017-2018 multi-year point repair contract; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
This contract is for repair of the sanitary sewer at 127 Broadway Avenue Contract
Agreement for Sanitary Sewer Repair with ML Strasia & Sons Construction Inc., Project No. 16-
043 (WWAN03) is hereby awarded to said bidder in the amount of $31,065.
SECTION 2.
Funds for Project 16-043 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 4.
The officers and staff of the City are directed and authorized to perform any and all acts
consistent with the intent of this Resolution and the contract to effectuate the transactions
described therein.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED August 28, 2017
BY: Ed Brown
City Clerk’s Office Item # M-3
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: August 28, 2017
TO:
President Stephen G. Nawrocki and Members of City Council
CC:
Sam Azad, City Manager
VIA:
Gina Dutcher, City Clerk
From:
Nancy Keller, Director of Wastewater
SUBJECT:
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT
OF $31,065 TO ML STRASIA & SONS CONSTRUCTION INC., FOR EMERGENCY
SANITARY SEWER POINT REPAIR AT 127 BROADWAY AVENUE AND
AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME
SUMMARY:
This Resolution awards a construction contract to ML Strasia & Sons Construction Inc. for
emergency sanitary sewer point repair at 127 Broadway Avenue.
PREVIOUS COUNCIL ACTION
:
None
BACKGROUND
:
On June 19, 2017, a collection crew member noticed that the outfall to the Arkansas River near
the southbound offramp exit of Abriendo Avenue from I-25 smelled like raw sewage. Bypass
pumping was immediately set up for the outfall while the source was investigated. The collection
crew found that the sanitary main was leaking into a storm sewer crossing below. A failed joint
on the sanitary main near 127 Broadway Ave allowed raw sewage to flow out and an abandoned
tie-in connection on the storm sewer allowed it to enter the storm system. The failed joint and
abandoned tie-in connection were repaired.
The quote for the unit prices for the estimated work performed by ML Strasia & Sons Construction
Inc. and the change order for the project are attached. This work was performed under the
Sanitary Sewer Point Repair multi-year contract under which five (5) contractors were qualified
via competitive bid.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Sanitary Sewer Replacement-related
Remove & Replace 8” PVC Pipe <10’ Deep $1,425.00
Install Extra Lean Concrete (Flow Fill) $2,070.00
Asphalt Patch – 4” on 6” Class 6 ABC $4,389.00
Remove Manhole $1,200.00
Remove & Replace 7” Reinforced Concrete $1,024.00
Reinstate Service $400.00
Traffic Control $574.00
Crushed Asphalt w/ Delivery $150.00
Bypass Pumping Equipment $1,965.00
Bypass Pump Watch $3,822.00
Bypass Pumping Storm Sewer Outlet $13,096.00
Mobilization $950.00
Subtotal: $31,065.00
100%
TOTAL: $31,065.00
FINANCIAL IMPLICATIONS
:
Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer
User Fund. Funding was available and had been budgeted, appropriated and allocated to Project
No. 16-043 (WWAN03).
BOARD/COMMISSION RECOMMENDATION
:
Not applicable
STAKEHOLDER PROCESS
:
None
ALTERNATIVES
:
Alternative No. 1 – No Action
Under this alternative, the City would leave the sewer main unrepaired and allow raw sewage to
continue to seep into the storm main and be in violation of the Colorado Discharge Permit for the
James R. DiIorio Water Reclamation Facility.
Alternative No. 2 – Place the Repair on a Rehabilitation List
Under this alternative, the City would make no immediate repairs to the sanitary main. The
sanitary main would be put on a rehabilitation list and prioritized by the level of importance for future
rehabilitation projects. Like Alternative No. 1 – the Wastewater Department would be in violation
of the discharge permit until the sanitary main was repaired.
RECOMMENDATION
:
Approval of the Resolution.
Attachments
: Bid Summary Sheet
Change Order
Site Location Map
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number: 16-043 Change Order No. ONE 8/2/2017 Page 1 of 1
Project Name : FY2017&2018 Sanitary Sewer Point Repair
127 Broadway Ave
Contractor: M.L. Strasia&Sons Construction, Inc.
You are hereby requested to comply with the following changes from the plans&specifications:
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By
1 REMOVE&REPLACE 8"PVC< 10'DEEP ($75.00)
2 ASPHALT PATCH-6"FULL DEPTH ASPHALT ($1,520.00)
5 FLOWFILL $2,070.00
6 ASPHALT PATCH-4" $4,389.00
7 REMOVE MANHOLE $1,200.00
8 REMOVE&REPLACE 7"CONCRETE $1,024.00
9 TRAFFIC CONTROL $574.00
10 CRUSHED ASPHALT W/DELIVERY $150.00
11 BYPASS PUMPING EQUIPMENT $1,965.00
12 BYPASS PUMP WATCH $3,822.00
13 BYPASS PUMPING STORM SEWER OUTLET(KRS) $13,096.00
TOTAL Decrease /Increase ($1,595.00)1 $28,290.00 I
Net Adjustment This Change Order $ 26,695.00
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 4,370.00
Total Adjusted Contract Amount To Date $ 31,065.00
Reason For Change: Actual Field Quantities.
Extra work needed to complete project
The time provided for completion of the contract is changed by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto.
Prepared by: Date:
Associate Engineer II
Reviewed by: Date:
Wastewater Engineering Manager
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Director of Wastewater
FORM CO100.1299
. ..r...,r•gr• . #•,„ ' ,--'‘'.'"\1/4::4',,,,,'" •.. .....-- '''''' ./ "' It; ,k.,..\ 1,i'
. r L` '.„ - '� a 1. ^ ". MP3/ `t �� tw1 L`
Y
Ar- zaa...•, :'',:,,,,..,-;','.,:s,',..,,,?.,,--I',.,:.',.:-'1.'..4‘-,.*,,,,.., ... .;,,,,,, *.,:31::'.,,,i;,. „.rte
''',,r 1:s.,0.7''''''',':
,Ak
: • \ ', '' 44t '''''''4'r ' . ' ' ''''
. '" ,, . 4* f ; % ate' _ 4 p
Y
/ ,, 4 44, . it'1 I I Pt,/ ...,..''. ilio'.'.::' .<141/ ... ‘t. ,..,-•,:l..:,_-,,
a.
rP
i
-'$
•
^v a,
.�
.
•
Y�r
0° /-' ,-.. .4.1',,:•-: ,,,..„,
Y