HomeMy WebLinkAbout13651RESOLUTION NO. 13651
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN
THE AMOUNT OF $22,155.14 TO PARKER EXCAVATING INC.,
FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 2030
PINE STREET AND AUTHORIZING THE PURCHASING AGENT
TO EXECUTE THE SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code; and
WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under the 2017-
2018 multi-year point repair contract; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
This contract is for repair of the sanitary sewer at 2030 Pine Street Contract Agreement
for Sanitary Sewer Repair with Parker Excavating Inc., Project No. 16-043 (WWAN03) is hereby
awarded to said bidder in the amount of $22,155.14.
SECTION 2.
Funds for Project 16-043 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 4.
The officers and staff of the City are directed and authorized to perform any and all acts
consistent with the intent of this Resolution and the contract to effectuate the transactions
described therein.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED April 10, 2017
BY: Ed Brown
City Clerk’s Office Item # M-4
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: April 10, 2017
TO:
President Stephen G. Nawrocki and Members of City Council
CC:
Sam Azad, City Manager
VIA:
Gina Dutcher, City Clerk
From:
Nancy Keller, Director of Wastewater
SUBJECT:
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT
OF $22,155.14 TO PARKER EXCAVATING INC., FOR EMERGENCY SANITARY
SEWER POINT REPAIR AT 2030 PINE STREET AND AUTHORIZING THE
PURCHASING AGENT TO EXECUTE THE SAME
SUMMARY:
This Resolution awards a construction contract to Parker Excavating Inc. for emergency sanitary
sewer point repair at 2030 Pine Street.
PREVIOUS COUNCIL ACTION
:
None
BACKGROUND
:
On February 1, 2017, the Wastewater Collection crew responded to a call for a back-up at 2023
Pine Street. Attempts to clean the line were not effective and a decision was made to televise
the line. In televising the line, it became apparent that the top of the main broke off and settled on
the bottom, thus creating the problem. The piece was too large to remove, so it was determined
that a point repair was necessary to remove and replace the broken sections of pipe in the main.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Mobilization $550.00
Remove and Replace 8” PVC Pipe $7,029.00
Reinstate Services $1,050.00
Traffic Control $2,550.00
Asphalt patch 4” on 6” Class 6 $6,573.00
Water Service $825.00
Compaction Testing $862.50
Saw Cutting & Move MH $1,050.00
8” Coupling $473.00
Over Excavation of 3’ of Rock $490.00
Bypass Pumping $702.64
100%
Subtotal: $22,155.14
FINANCIAL IMPLICATIONS
:
Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer
User Fund. Funding was available and had been budgeted, appropriated and allocated to Project
No. 16-043 (WWAN03).
BOARD/COMMISSION RECOMMENDATION
:
Not applicable
STAKEHOLDER PROCESS
:
None
ALTERNATIVES
:
Alternative No. 1 – No Action
Under this alternative, the City would allow the sections of main to continue to be lodged in the
pipe, thus creating more back-ups and potentially further damage to the main.
Alternative No. 2 – Place the Repair on a Rehabilitation List
Under this alternative, the City would make no immediate repairs to the sanitary sewer. The main
would be put on a rehabilitation list and prioritized by the level of importance for future rehabilitation
projects. Similar to Alternative No. 1 – the broken top section of the main would still be in the pipe,
thus creating more back-ups and potentially further damage to more pipe.
RECOMMENDATION
:
Approval of the Resolution.
Attachments
: Bid Summary Sheet
Change Order
Site Location Map
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number: 16-043 Change Order No. : ONE 2/17/2017 Page 1 of 1
Project Name: FY2017&2018 Sanitary Sewer Point Repair
2030 PINE ST.
Contractor: Parker Excavating, Inc.
You are hereby requested to comply with the following changes from the plans&specifications:
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By
1 REMOVE&REPLACE 8"PVC PIPE LESS THAN 10' DEEP $594.00
(>100 LF PRICING)
2 ASPHALT PATCH-6"FULL DEPTH PATCH $1,113.00
3 REMOVE&REPLACE 48"DIA MANHOLE ($2,950.00)
6 TRAFFIC CONTROL $2,550.00
7 WATER SERVICE $825.00
8 COMPACTION TESTING $862.50
9 SAW CUTTING&MOVE MH $1,050.00
10 8"COUPLING $473.00
11 OVER EXCAVATION-3'ROCK $490.00
12 BYPASS PUMPING $702.64
TOTAL (Decrease)/Increase ( ($2,950.00) $8,660.14
Net Adjustment This Change Order $ 5,710.14
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 16,445.00
Total Adjusted Contract Amount To Date $ 22,155.14
Reason For Change: Actual Field Quantities.
Extra work needed to complete project
The time provided for completion of the contract is changed by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto.
Prepared by: Date:
Associate Engineer II
Reviewed by: Date:
Wastewater Engineering Supervisor
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Director of Wastewater
FORM CO100.1299
o, M1! r<
.'. —7 ,•' ' i tr.' . ,
k'. 411114 '
ilit
s. . ,-01,:i..,,,,
_,;'i: . ,„ r
- ..,.*,....:., 4* ' ,,.,'
7,;
!•14 ,# ,„,:., .4441
t - - ,Ftp `#at1i(.,,, 4ee'j tAi
,i f3}�. .t..yfi
s ,-'
. ,,.. ••. , # t ***"*m-•-•—;t -- '
01
a . ,,....:_., , ,. , _.,...., k.: 40 •,* ,',,,4,'1"_, ; ,,.., , ' itt''''” I:" '
•L.JI
i ,..4.:',„, D,
MUM .� - ',
C '
a' x'3 " L to. # K` H -..,.0.1,,,..-:.;;-1. ,',-;,,,,'
r
�� � MIUTANA AVE
:, , , 1- .?end ,'-. ,