Loading...
HomeMy WebLinkAbout13606 RESOLUTION NO. 13606 A RESOLUTION AUTHORIZING THE ISSUANCE OF A REVOCABLE PERMIT TO APEX COMPANIES LLC FOR THE INSTALLATION OF SOIL AND GROUNDWATER REMEDIATION INFRASTRUCTUREWITHIN THE COURT STREET RIGHT-OF- WAY BETWEEN 14TH STREET AND 15TH STREET BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. The attached Revocable Permit is authorized to be issued to Apex Companies, LLC for the installation of soil and groundwater remediation infrastructure within the Court Street right-of- thth way between 14 Street and 15 Street. SECTION 2. The use of the public right-of-way granted hereby is subject to all limitations, terms and conditions set forth in the attached Revocable Permit. SECTION 3. The officers and staff of the City are directed and authorized to perform any and all acts consistent with the intent of this Resolution to effectuate the policies and procedures described herein. SECTION 4. This Resolution shall become effective immediately upon passage and approval. INTRODUCED February 13, 2017 BY: Ed Brown City Clerk’s Office Item # M-6 Background Paper for Proposed Resolution COUNCIL MEETING DATE: FEBRUARY 13, 2017 TO: President Stephen G. Nawrocki and Members of City Council CC: Sam Azad, City Manager VIA: Gina Dutcher, City Clerk FROM: Earl Wilkinson, Director of Public Works SUBJECT: A RESOLUTION AUTHORIZING THE ISSUANCE OF A REVOCABLE PERMIT TO APEX COMPANIES LLC FOR THE INSTALLATIOIN OF SOIL AND GROUNDWATER REMEDIATION INFRASTRUCTURE WITHIN THE COURT STREET RIGHT-OF-WAY BETWEEN 14TH STREET AND 15TH STREET SUMMARY: Attached is an application for a revocable permit submitted by Apex Companies, LLC to install soil and groundwater remediation infrastructure (wells and subsurface piping) within the Court Street right-of-way between 14th Street and 15th Street. PREVIOUS COUNCIL ACTION: None. BACKGROUND: Apex Companies, LLC and its subcontractor, GDI Drilling, are requesting permission to install 5 remediation wells within the Court Street right-of-way between 14th Street and 15th Street. The purpose of the remediation wells is to clean-up petroleum hydrocarbon-impacted soil and groundwater, associated with a gasoline release being regulated and managed by the Division of Oil and Public Safety (OPS) (Event lD 6531). Well installation is anticipated to take approximately five days. Appropriate traffic control will be utilized per a subcontracted traffic control plan. Concrete and/or asphalt coring, approximately 24-inches in diameter, will be used to access the boring locations. Potholing will be performed to clear boring locations of utilities to 6-feet below grade before drilling. Apex and GDI will then use hallow-stem augur technology to wells to approximately 15 feet below grade, per location. FINANCIAL IMPLICATIONS: None. BOARD/COMMISSION RECOMMENDATION: The Revocable Permit Review Committee recommends approval. STAKEHOLDER PROCESS: None. ALTERNATIVES: Denying the Resolution will prevent remediation of impacted soil and groundwater. Attachments: Revocable Permit, Letter of Intent, Certificate of Liability, Plat MW-16 _ 15TH STREET n' MW-15A M W-21 ' 9 W-A-E lio MW-15B Concrete 1MW-10 S 1437 Court Sign I S Street °MW-14 VP-1B I I l MW-1 A® B Existing Remediation Shed Parking l r — — ® r9MW-13 MW-2 i � � MW- 9 Existing Dewar Enclosure 220 W. 15th I I I Street Former Pump TP-1 Island'''',..7c 0 Senior MW-22 Living J ;i � Complex Parking \�9MW-A Regional 0VP-2B Building < TP-2p e Department — 560 Gallon Lube 0i1�— OX-17 OX-16A/B Tank Closed In Place , 6iMW-3 MW-12 1 —Landscaping S irit OX-15A/6 3 l�/OX-14 P Alley Station MW-9A Alley Junction BoxDN OX-23 M W-118 Maintenance Building 1401 Court Senior Living MW-17 Parking Street Complex e (parking) o VP-3 0 A) 227 W.14th y Street 221 W. 14th Street m 9MW-19 -I 9MW-20 14TH STREET LEGEND e e OX-23 0 New remediation well location (5 locations within VP-4C VP-5C City of Pueblo right-of-way; wells to approx. 15 feet below grade) 0 50' Proposed system trenching and piping (approximatelY 85 linear feet of trench by 1 foot wide by 2 feet deep) Scale: 1"=50' F,F A-A Cross section detail presented in Figure 2 MW-3 $ Monitoring well location FIGURE 1 -Site Plan VP-1B e Vapor monitoring point location 15th Street Standard TP-1 o Monitoring point location 1437 Court Street, Pueblo,CO OX-1 0 Oxygen/ozone injection well location Apex Job No.4693 %,APEX' DATE-11/30/16(WN) FILE-4693 F1-Site Plan 12"maximum Ground Surface •V AA AA AA AA AA AA AA AA \ \\\\\\ \\ \\ \\ \\\N\\ \\ \\ \\ \\ \\ \\ \\ \\ \\ \\ 6"Minimum . \ .. \\ \\ .. .\ \\ \. ..\ Asphalt/Conrete ` \.\\ .. .. .. .. .. .. . \\• \\ \\\. .. .. .. .. .. \\\\`\ \\\\ \\,", \\ \\ \. 5"(Variable Detection tape and thickness) tracer wire,set at Flow Fill atop flow fill 24" Minimum 6" of bedding 13"(Variable ,Thickness) N. 0\ N \ 3/8"Pea N�— Gravel Minimum 2"spacing • � 0` 3"Minimum Bedding- Well Compacted N. N. N. N. . ` i 1"dedicated, 1/8"ID by 1/4 OD continuous run Teflon tubing(provided (unwelded)HDPE by Apex) West F FZ Cross Section Detail East A a-A Cross Section View Looking North A' NOTES: 6„ Approximate 1) Conduit to be dedicated, continuous 1" HDPE and will sit Scale on 3" of bedding. 2) Piping rows to be separated by minimum of 2" of bedding. 3) Conduit to be spaced at least 2 inches apart to allow 6" bedding to fill in between individual pipes. 4)Trench depth to be at 24" (minimum) to 36" (maximum) FIGURE 2-Trench Cross Section Detail and width to be 12" maximum. If more space is needed for conduit, trench should be made deeper rather than 15th Street Standard wider. 1437 Court Street, Pueblo,CO 5) Supply lines to be 1/8-inch ID by 'A-inch OD Teflon tubing. Apex Job No.4693 S ��� , ,DATE-1/3/17(WN) / >( FILE-4693 F2 Trench Detail Wellhead 1"cap with 5/16"hole for tubing(sealed around tubing with silicone) 18"Diameter flush-mount 1/8-inch ID by 1/4-inch OD road box Teflon tubing Concrete Existing grade 0"- •��������I ;6"minimum \, ��������������� ���►����4 \ , asphalt/concrete,. , 8"min. ��� �•�•, , `\\ ` \\`\ . • • • ••����i$ Bentonite — ,�♦�\:�: 8"flowfill • 12"- ► 4. Y 6"minimum _ pea-gravel 1"HDPE 3"minimum pea-gravel . 24"- . . . . . . . . — 12"-3/8"diameter pea gravel fill and bedding(well-compacted) NOTES Bentonite grout ...*''''''A 1. All conduit to be continuous-run,dedicated 1"HDPE.Maximum one weld per run. 2. Conduit to be laid at 21'below ground Borehole and surface and on top of 3"of bedding. system well 3. Conduit to be capped to prevent infiltration of water and debris once trench is backfilled. 1"stainless steel Cap to have 5/16"diameter hole for tubing casing(existing) and to be sealed with silicone. 4. Conduit to house 1/4"OD Teflon tubing. FIGURE 3-Remediation Well Detail O.. 15th Street Standard 1437 Court Street, Pueblo,CO To well screen Apex Job No.4693 `/ D C/1'\ f DATE-1/5/17(WN) FILE-4693 F4 Ozone Wellhead.dc .1hk APEX January 18, 2017 Mr. Michael Barela City of Pueblo, Department of Transportation 350 Alan Hamel Avenue Pueblo, Colorado 81003 Subject: Revocable Permit Application Former 15th Street Amoco 1437 Court Street, Pueblo, Colorado 81003 Apex Project No. 4693 Dear Mr. Barela: On behalf of the Division of Oil and Public Safety(OPS)of the Colorado Department of Labor and Employment, Apex Companies, LLC(Apex)is requesting a revocable permit for remediation well installation and subsurface trenching within the City of Pueblo public right-of-way(ROW), at the above referenced site (Figure 1). Permit application fees will be submitted to the City of Pueblo upon submittal of this application. Apex and its subcontractor, GDI Drilling, will install 5 remediation wells within the public ROW between February 27 and March 3, 2017. The monitoring wells will be located within the Court Street right-of-way between 14th Street and 15th Street, as shown in Figure 1.The purpose of the remediation wells is to clean-up petroleum hydrocarbon-impacted soil and groundwater, associated with a gasoline release being regulated and managed by the OPS (Event ID 6531). Well installation is anticipated to take approximately five days. Appropriate traffic control will be utilized per a subcontracted traffic control plan (included with this submittal).Concrete and/or asphalt coring, approximately 24-inches in diameter, will be used to access the boring locations. Potholing will be performed to clear boring locations of utilities to 6-feet below grade before drilling. Apex and GDI will then use hallow-stem augur technology to wells to approximately 15 feet below grade, per location. Thereafter,Apex and its subcontractor will perform subsurface trenching from an existing remediation shed to the newly installed wells. Subsurface trenches will be approximately 12-inches in width by 24-inches deep (Figure 2)and concrete and/or asphalt cutting will be used to access trenching locations. Remediation system conduit (1-inch HDPE) will be laid within trenches, and trenches will be backfilled as presented in Figure 2. Figure 3 presents the final well design and system connection.All surfaces will be completed to match existing. Please call me at 303.242.8753 if you have any questions or comments regarding this submittal. Thank you for your time and I hope to hear from you soon. Sincerely, Apex Companies, LLC Will Nabours, P.E. Project Engineer Attachments: Figure 1 —Site Map Figure 2—Trench Cross Section Figure 3—Remediation Well Detail Traffic Control Plan Certificate of Insurance Apex Companies,LLC•4150 Darley Avenue,Suite 1 Boulder,CO 80305•T 800.637.7494• F 303.423.3535•apexcos.corn