HomeMy WebLinkAbout13596RESOLUTION NO. 13596
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN
THE AMOUNT OF $39,069.62 TO K.R. SWERDFEGER
CONSTRUCTION, INC. FOR EMERGENCY SANITARY SEWER
POINT REPAIR AT CENTRAL HIGH SCHOOL AND
AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE
SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code; and
WHEREAS, the point repair work was awarded to K.R. Swerdfeger Construction, Inc.
under the 2015-2016 multi-year point repair contract; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
This contract is for repair of the sanitary sewer at Central High School Contract Agreement
for Sanitary Sewer Repair with K.R. Swerdfeger Construction, Inc. Project No. 14-067 (WWAN03)
is hereby awarded to said bidder in the amount of $39,069.62.
SECTION 2.
Funds for Project 14-067 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 4.
The officers and staff of the City are directed and authorized to perform any and all acts
consistent with the intent of this Resolution and the contract to effectuate the transactions
described therein.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED January 23, 2017
BY: Ed Brown
City Clerk’s Office Item # M-2
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: January 23, 2017
TO:
President Stephen G. Nawrocki and Members of City Council
CC:
Sam Azad, City Manager
VIA:
Gina Dutcher, City Clerk
From:
Nancy Keller, Wastewater Director
SUBJECT:
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT
OF $39,069.62 TO K.R. SWERDFEGER CONSTRUCTION, INC. FOR
EMERGENCY SANITARY SEWER POINT REPAIR AT CENTRAL HIGH SCHOOL
AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME
SUMMARY:
This Resolution awards a construction contract to K.R. Swerdfeger Construction for emergency
sanitary sewer point repair at Central High School.
PREVIOUS COUNCIL ACTION
:
None
BACKGROUND
:
During routine maintenance, the Collection Crew was unable to get through the sewer main that
is located under Central High School. After several attempts, a crew was sent out to try and
televise the main. The main was constructed of ductile iron and was badly corroded. The decision
was made to replace 8 feet of the main and a manhole. The main has since been cleaned and is
on a list to be lined to ensure the problem doesn’t arise in the future.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Remove and Replace 8” PVC Pipe $960.00
Remove and Replace 48 Inch Dia. Manhole $3,000.00
Mobilization $800.00
82%
Subtotal: $4,760.00
Surface Improvement-related
Remove and Replace 4” $1,050.00
18%
Subtotal: $1,050.00
TOTAL: $23,635.41
FINANCIAL IMPLICATIONS
:
Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer
User Fund. Funding was available and had been budgeted, appropriated and allocated to Project
No. 16-043 (WWAN03).
BOARD/COMMISSION RECOMMENDATION
:
Not applicable
STAKEHOLDER PROCESS
:
None
ALTERNATIVES
:
Alternative No. 1 – No Action
Under this alternative, the City would make no improvements to the existing sanitary system and
the main would further corrode and would eventually cause a blockage. This could lead to sewage
backing up into Central High School. With the existing condition of the main likelihood of a pipe
failure will increase. Failure of the sanitary sewer main could cause damage to Central High
School, leading to much more difficult and costly repairs for both the main and to Central High
School.
Alternative No. 2 – Place the Repair on a Rehabilitation List
Under this alternative, the City would make no immediate repairs to the sanitary sewer. The main
would be put on a rehabilitation list and prioritized by the level of importance for future rehabilitation
projects. In addition, as in Alternative No. 1, the main would continue to corrode and cause a
blockage. This could lead to sewage backing up into Central High School. With the existing
condition of the main likelihood of a pipe failure will increase. Failure of the sanitary sewer main
could cause damage to Central High School, leading tomuch more difficult and costly repairs for
both the sewer main and Central High School.
RECOMMENDATION
:
Approval of the Resolution.
Attachments
: Bid Summary Sheet
Change Order
Site Location Map
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number: 14-067 Change Order No. : ONE 12/22/2016 Page 1 of 1
Project Name: FY2015/2016 Sanitary Sewer Point Repair
Central HS&Keating
Contractor: K.R.Swerdfeger Construction,Inc.
You are hereby requested to comply with the following changes from the plans&specifications:
Bid Item Description of Changes Decrease I Increase
No. Contract By Contract By
1 REMOVE&REPLACE 8"PVC PIPE LESS THAN 8'DEEP ($960.00)
2 REMOVE&REPLACE 4"CONCRETE ($1,050.00)
3 REMOVE&REPLACE 48"DIA MANHOLE ($3,000.00)
4 MOBILIZATION ($800.00)
5 LABOR-CENTRAL HIGH POINT REPAIR $11,660.10
9 EQUIPMENT- CENTRAL HIGH $6,852.10
10 MATERIALS,SUBS&OTHER- CENTRAL HIGH $5,123.21
11 LABOR-KEATING POINT REPAIR $11,568.74
12 EQUIPMENT-KEATING $1,771.88
13 MATERIALS,SUBS&OTHER -KEATING $2,093.59
TOTAL (Decrease)/Increase ($5,810.00) $39,069.62
Net Adjustment This Change Order $ 33,259.62
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 5,810.00
Total Adjusted Contract Amount To Date $ 39,069.62
Reason For Change: Actual Field Quantities.
Extra work needed to completeproject
The time provided for completion of the contract is changed by by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto.
Prepared and
Reviewed by: Date:
Wastewater Engineering Supervisor
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price,signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Director of Wastewater
FORM CO100.1299
�J [ ,,�,' ' . y'¢, gyp. .* .7
;•►.._.! .t6.��,� � .. ,,,,...3 .y ,..fir )4,. I.
4
ay y�
BRAGDON3
a
r -. 4b — 4
1 Ai'
'‘," 'V pr 41I,� i 1 mac,.' }; 97
#v��,
�,,( "r 1 L . a , . :., /44 ;
7.4
i �...... •dna a
.. _
PALM•ER AVE ors .
,..-ii 5 a4.. y �
1. .1;#4.,, / „}r„ og., lAY #µ ./: 7'7' �^ 4 it -v1
1 •r t -, , �1 rr - /r,
.,,,,,i-
2 ;] ' ,,,,,,,,j,4
.• ,4 (-)f ,... "Nio a. 0. , '1,. V . it '• ,„ '‘,..1
01
BERKLEY AVE a^ 4�7yr'
it
! Q -...4,* - t
mit = t. - "e, ii• F, 4
e /`
+
�c
.7' .^-/I• t` • -9L i` ''124, `fU'
•
° • z
,XIS," `+ ti/�
Ni, s .4,,,,,,..4,4>,, , , • ,..: ., ,r„, ,.« - , . ,s....„:„/4, 't 7..7 4, .' '. .'
1`
te �f iyq� 4 (�yA
,4% ,.)11,t' I. - .,.. '.' .. ,,., 7
lw w d -.at ,- .., •,/
. ...., ;NI*. ,,:p. .,-)-e ' 0, . 4.' , , .
• 4 '''.',-• " , 1,- ..,,,.,,, „.4„.. :44,,,,,,,..*,,,,
li,,,,,,, , . ,
--.., ., / • ,: if.,
, lik. ,, 44
... . ,it,
. ., ,,,...„,.. „, ../... ,
t .+► • yea ��c J
,,fiN r14% • .*„
.":11 frrofc „,., '., -1 ""' ‘,‘, ''
•
siy
i- ♦ Jrm ti "$ ' a , ' 'J f rt $ O , � j4i,, r
4.
,. ,. .
�
is+ ilit;.,,, ,-,. _ r„ tiV� � • r �►� �