A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN
THE AMOUNT OF $70,849.80 TO CORTEZ CONSTRUCTION
CO., FOR EMERGENCY SANITARY SEWER POINT REPAIR AT
TH
THE 400 BLOCK OF WEST 7 STREET AND AUTHORIZING
THE PURCHASING AGENT TO EXECUTE THE SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code ; and
WHEREAS, the point repair work was awarded to Cortez Construction CO., under the
2015-2016 multi-year point repair contract; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
th
This contract is for repair of the sanitary sewer at the 400 Block of West 7 Street. Contract
Agreement for Sanitary Sewer Repair with Cortez Construction Co., Project No. 14-067
(WWAN03) is hereby awarded to said bidder in the amount of $70,849.80.
SECTION 2.
Funds for Project 14-067 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 4.
The officers and staff of the City are directed and authorized to perform any and all acts
consistent with the intent of this Resolution and the contract to effectuate the transactions
described therein.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED: September 26, 2016
BY: Ed Brown
City Clerk’s Office Item # M-3
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: September 26, 2016
TO: President Stephen G. Nawrocki and Members of City Council
CC: Sam Azad, City Manager
VIA: Gina Dutcher, City Clerk
From: Nancy Keller, Wastewater Director
SUBJECT:
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT
OF $70,849.80 TO CORTEZ CONSTRUCTION COMPANY, FOR EMERGENCY
TH
SANITARY SEWER POINT REPAIR AT THE 400 BLOCK OF WEST 7 STREET
AND AUTHORIZING THE PURCHASING AGENT TO EXECUTE THE SAME
SUMMARY:
This Resolution awards a construction contract to Cortez Construction Company for emergency
th
sanitary sewer point repair at the 400 Block of West 7 Street.
PREVIOUS COUNCIL ACTION
:
None
BACKGROUND
:
On June 23, 2016 the Collection crew televised a sewer line segment by the 400 Block of West
th
7 Street. Upon cleaning and televising, they noticed a collapse in the line which resulted with
services breaking the main and allowing debris to come into the system. After reviewing the video,
the pipe segment between the manholes (including the manholes) was in need of replacement
and was therefore included in this point repair.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Mobilization $833.75
Remove and Replace 8” PVC Pipe $12,880.00
Reinstate Services $3,622.50
Asphalt Patch- 4” asphalt 6” Class 6 $40,531.75
Remove and Replace 48” Dia. manhole $9,200.00
11 Loads of Dirt, (15 tons per load) $3,781.80
100%
Subtotal: $70,849.80
FINANCIAL IMPLICATIONS
:
Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer
User Fund. Funding was available and had been budgeted, appropriated and allocated to Project
No. 14-067 (WWAN03).
BOARD/COMMISSION RECOMMENDATION
:
Not applicable
STAKEHOLDER PROCESS
:
None
ALTERNATIVES
:
Alternative No. 1 – No Action
Under this alternative, the City would make no improvements to the existing sanitary system and
the hole would remain and continue to let soil into the sewer main and eventually cause a large sink
hole that would be dangerous to the public. With the existing condition of the main, likelihood of a
pipe failure will increase. Failure of the sanitary sewer main could cause a failure of the ground
surface, leading to much more difficult and costly repairs for both the main and ground surface.
Alternative No. 2 – Place the Repair on a Rehabilitation List
Under this alternative, the City would make no immediate repairs to the sanitary sewer. The main
would be put on a rehabilitation list and prioritized by the level of importance for future rehabilitation
projects. In addition, similar to Alternative No. 1, “No Action”, the hole would cause a sink hole.
With the existing condition of the main likelihood of a pipe failure will increase. Failure of the sanitary
sewer main could cause failure of the ground surface, leading to much more difficult and costly
repairs for both the sewer main and surface alley.
RECOMMENDATION
:
Approval of the Resolution.
Attachments
: Bid Summary Sheet
Change Order
Site Location Map
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF PUBLIC WORKS
Project Number: 14-067 Change Order No. : ONE 8/26/2016 Page 1 of 1
Project Name : FY2015/2016 Sanitary Sewer Point Repair
400 Block of W. 7th Street
Contractor: Cortez Construction Co., Inc.
You are hereby requested to comply with the following changes from the plans&specifications:
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By
1 REMOVE& REPLACE 8"PVC LESS THAN 8' DEEP $9,200.00
3 ASPHALT PATCH-4" on 6"Class 6 ABC $26,846.75
13 REINSTATE SERVICES $517.50
2 REMOVE&REPLACE 8" PVC LESS THAN 12' DEEP $12,880.00
15 MATERIALS - 11 LOADS OF 15 TON DIRT $3,781.80
TOTAL (Decrease)! Increase j $9,717.50 $43,508.55
Net Adjustment This Change Order $ 33,791.05
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 37,058.75
Total Adjusted Contract Amount To Date $ 70,849.80
Reason For Change: Actual Field Quantities.
Extra work needed to complete project
The time provided for completion of the contract is unchange) by 0 calendar days.
This document shall become a amendment to the contract and all provisions of the contract apply hereto.
Prepared by: /�( • w---- Date: 6°.'3/-k
Reviewed by: I���,,,�r��i�i� � Date:
, ih eering S,,•��°•ervisor
Accepted by: , _/,_ Dat-•• i
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations re sufficient to cover such increase.
Approved by: 4--11 11 r" Date: 1 to
Director of Wastewater
FORM CO100.1299
El
i
IAV GN\1N,:j N
.
fi,
... .,..
Nifttli i . . .. .
•1 '*
1 6
P.
', .:4' ,....14';;');''.."'_:-.1'!1111111:'t..:'''''''' ' " :''':','''':;,,,i**4':, 3 ,, .r..
Ft* T
r
,, y
u
.• . . ,Iiiir.„... ......:
a, .: „..
O !
....... ' E..
. , u
...
at'.. . „...... it
111 k
•
n..
44 . ti
� ;fir 1117'`
4''. t ''''
.:.,.w. N;.GREENWOOD ST
4ilirilitwwrwr� k i, 4