Loading...
HomeMy WebLinkAbout13488 RESOLUTION NO. 13488 A RESOLUTION AUTHORIZING THE CITY OF PUEBLO TO SUBMIT FOUR GRANT APPLICATIONS TO THE COLORADO DEPARTMENT OF TRANSPORTATION FOR FUNDING FROM THE TRANSPORTATION ALTERNATIVES PROGRAM FOR THE NORTHERN AVENUE TRAIL, PHASE 3 PROJECT IN 2018, ARKANSAS RIVER FLOOD LEVEE TRAIL AND MULTIMODAL CONNECTIONS PLANNING IN 2018, ARKANSAS RIVER FLOOD LEVEE TRAIL AND MULTIMODAL CONNECTIONS, PHASE 1 CONSTRUCTION PROJECT IN 2019, AND THE TH WEST 4 STREET SH96 PEDESTRIAN WALKABILITY IMPROVEMENTS PROJECT IN 2020 AND AUTHORIZING THE PRESIDENT OF CITY COUNCIL TO EXECUTE THE SAME WHEREAS, the City supports the construction of the Northern Avenue Trail Project, Phase 3 continuing a trail along the north side of Northern Avenue between Cambridge Avenue and Prairie Avenue, and connecting to the main entrance of the Colorado State Fair Grounds along Prairie Avenue; and, WHEREAS, the City supports the planning and design of the 2.75 mile bike/pedestrian corridor for the development of a non-motorized transportation facility along the top of the reconstructed Arkansas River Flood Levee including bike/pedestrian bridges that connecting with the existing Arkansas River Trail and adjacent neighborhoods and historic commercial areas; and, WHEREAS, the City supports the construction of the Phase 1 improvements including a concrete trail, a bike/pedestrian bridge over the Arkansas River, and other amenities along the top of the Pueblo Conservancy District reconstructed flood levee; and, WHEREAS, The City supports the widening and replacement of sidewalks, curb and gutters, new driveway construction, storm inlet modification and street lighting on a th quarter mile section of West 4 street/SH96 in Downtown Pueblo located between North Santa Fe Avenue and Midtown Circle; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that: SECTION 1. A grant application requesting $500,000 in 2018 from the Colorado Department of Transportation for funding from the Transportation Alternatives Program for the Northern Avenue Trail Project, Phase 3, a copy of which is attached hereto, is hereby approved. SECTION 2. A grant application requesting $200,000 in 2018 from the Colorado Department of Transportation for funding from the Transportation Alternatives Program for the Arkansas River Flood Levee Trail and Multimodal Connections Planning Project, a copy of which is attached hereto, is hereby approved. SECTION 3. A grant application requesting $600,000 in 2019 from the Colorado Department of Transportation for funding from the Transportation Alternatives Program for the Arkansas River Flood Levee Trail and Multimodal Connections, Phase 1 Construction Project, a copy of which is attached hereto, is hereby approved. SECTION 4. A grant application requesting $1,040,000 in 2020 from the Colorado Department of th Transportation for funding from the Transportation Alternatives Program for the West 4 Street SH96 Pedestrian Walkability Improvements Project, a copy of which is attached hereto, is hereby approved. SECTION 5. The President of the City Council is hereby authorized to execute the Grant Applications on behalf of the City of Pueblo, a Municipal Corporation, and copies of the Grant Applications are attached hereto and a full copy of the applications are on file in the Department of Planning and Community Development. SECTION 6. The officers and staff of the City are directed and authorized to perform any and all acts consistent with the intent of this Resolution. SECTION 7. This Resolution shall become effective immediately upon passage and approval. INTRODUCED August 8, 2016 BY: Ed Brown City Clerk’s Office Item # M-3 BACKGROUND PAPER FOR PROPOSED RESOLUTION COUNCIL MEETING DATE: August 8, 2016 TO: President Stephen G. Nawrocki and Members of City Council CC: Sam Azad, City Manager VIA: Gina Dutcher, City Clerk FROM: Steven Meier, Planning and Community Development Department SUBJECT: A RESOLUTION AUTHORIZING THE CITY OF PUEBLO TO SUBMIT FOUR GRANT APPLICATIONS TO THE COLORADO DEPARTMENT OF TRANSPORTATION FOR FUNDING FROM THE TRANSPORTATION ALTERNATIVES PROGRAM FOR THE NORTHERN AVENUE TRAIL, PHASE 3 PROJECT IN 2018, ARKANSAS RIVER FLOOD LEVEE TRAIL AND MULTIMODAL CONNECTIONS PLANNING IN 2018, ARKANSAS RIVER FLOOD LEVEE TRAIL AND MULTIMODAL CONNECTIONS, TH PHASE 1 CONSTRUCTION PROJECT IN 2019, AND THE WEST 4 STREET SH96 PEDESTRIAN WALKABILITY IMPROVEMENTS PROJECT IN 2020 AND AUTHORIZING THE PRESIDENT OF CITY COUNCIL TO EXECUTE THE SAME SUMMARY: This Resolution approves the submittal of four Transportation Alternative grant applications to the Colorado Department of Transportation for funding related to the Northern Avenue Trail, Phase 3 Project (2018), Arkansas River Flood Levee Trail and Multimodal Connections Planning Project (2018), Arkansas River Flood Levee Trail and th Multimodal Connections, Phase 1 Construction (2019), and the West 4 Street SH96 Pedestrian Walkability Improvements (2020). PREVIOUS COUNCIL ACTION: None. BACKGROUND: The Colorado Department of Transportation (CDOT) is requesting final grant applications for three years of Transportation Alternatives funding projects related to non-motorized transportation projects for fiscal years 2018-2020. The program, funded through the 2015 Federal FAST ACT transportation legislation, provides competitive grant funds for non- motorized and historic transportation projects that must qualify under specific funding categories. Each project requires a minimum 20% in local matching funds for the project. The City Planning, Transportation, and Parks and Recreation departments have developed project applications to submit for funding for 2018, 2019, and 2020. Since the applications include requests for funding beyond the current City budget year, the local matching funds will need to be secured from future City funds and other matching grant opportunities over the next 2-3 year period. The four applications are all projects that were included within the City’s 2017 five-year capital improvement program. If funding is awarded by CDOT, the projects contracts will not be approved until the local matching funding is budgeted and appropriated for a project. The following projects were submitted to CDOT for preliminary review in April of this year: 1. Northern Avenue Trail, Phase 3 Project (2018) Scope: The project will continue the trail along the north side of Northern Avenue between Cambridge Avenue and Prairie Avenue, and connecting to the main entrance of the Colorado State Fair Grounds along Prairie Avenue. This project will complete the City’s trail system to the Colorado State Fair Grounds providing the area residents and visitors to the State Fair with a direct bike / pedestrian connection. Funding: CDOT Trans Alternative Funds – Federal $500,000 City 2016 HUTF Local Matching Funds $125,000 Total Project Cost $625,000 2. Arkansas River Flood Levee Trail and Multimodal Connections Planning (2018) Scope: The planning and design of a 2.75 mile bike/pedestrian corridor for the development of a non-motorized transportation facility along the top of the reconstructed Arkansas River Flood Levee. The planning project will identify locations for bike/pedestrian bridges that connect the flood levee trail with the existing Arkansas River Trail and adjacent neighborhoods and historic commercial areas. Funding: CDOT Trans Alternative Funds – Federal $200,000 Pueblo Conservancy District $ 15,000 City Local Matching Funds – Subject to budget and appropriation prior to contract $ 10,000 Colorado Department of Local Affairs – Energy Impact Assistance fund Grant (unsecured) $ 25,000 Total Project Cost $250,000 3. Arkansas River Flood Levee Trail and Multimodal Connections, Phase 1 Construction Project (2019) Scope: The construction of the improvements including 1,200' of concrete trail, a 260' x 12' bike pedestrian bridge over the Arkansas River, bump outs, railing, lighting and seating areas. This project is a unique opportunity to partner with the Pueblo Conservancy District as part of the reconstruction of the 90 year old Arkansas River Flood Levee that extends for three miles through the center of the City of Pueblo. Funding: CDOT Trans Alternative Funds – Federal $600,000 Colorado Department of Local Affairs – Energy Impact Assistance Fund Grant (unsecured) $400,000 Great Outdoors Colorado Local Government Grant 2017 $350,000 City of Pueblo Matching Funds – Subject to budget and appropriation prior to contract $125,000 Pueblo Conservancy District $125,000 Total Project Cost $1,600,000 th 4. West 4 Street SH96 Pedestrian Walkability Improvements Project (2020) Scope: Sidewalk widening and replacement, curb and gutter replacement, new driveway construction, storm inlet modification and street lighting on a th quarter mile section of West 4 street/SH96 in Downtown Pueblo. The project is located between N. Santa Fe Avenue/US50C and Midtown th Circle just east of the new 4 Street Bridge. Funding: CDOT Trans Alternative Funds – Federal $1,040,000 City of Pueblo Matching Funds – Subject to budget and appropriation prior to approval of construction contract $ 260,000 Total Project Cost $1,300,000 FINANCIAL IMPACT: The four applications include requests for funding beyond the current City budget year and local matching funds will need to be secured from future City funds, and other matching grant opportunities over the next 2-3 year period. If a project is awarded by CDOT, the grant contract will not be approved until the full project costs including local matching funds are available, budgeted and appropriated for a project to be authorized to be initiated. The Director of Finance will be required to certify that all funds are available to complete the project prior to City Council’s approval of a grant contract for a project. The matching funds for the Northern Avenue Trail, Phase 3 project will be provided from the City’s 2016 Highway User Trust Funds. The Arkansas River Flood Levee Trail and Multimodal Connections Planning will require funding to be secured from a DOLA Energy Impact Assistance Grant, and other local funding from the Pueblo Conservancy District and the City in 2018. The Arkansas River Flood Levee Trail and Multimodal Connections, Phase 1 construction will be dependent upon receiving additional grant funding from the Trust for the Great Outdoors Colorado (GOCO), additional funding from a DOLA Energy Impact Assistance Grant in 2018, along with $250,000 in additional local matching funds split between the City and the Pueblo th Conservancy District. The West 4 Street SH96 Pedestrian Walkability Improvements Project with funding requested for 2020 will require local matching funds in the amount of $260,000 to be provided as the 20% match for the project. BOARD/COMMISSION RECOMMENDATION: All four of the projects are identified in the PACOG 2040 Long Range Transportation Plan listing of priority projects. The plan was approved by the PACOG Board on June 23, 2016. The priority trail projects were reviewed and endorsed by the PACOG Transportation and Citizen Advisory Committee. STAKEHOLDER PROCESS: The PACOG 2040 Transportation Plan was released for public comments and review between December 2015 and May 2016. Representatives from the City of Pueblo, Pueblo County, Pueblo West Metropolitan District, and the Pueblo Active Community Environments citizen group all participated in the development of the priority trail projects for the 2040 Long Range Transportation Plan. ALTERNATIVES: If the grant applications are not submitted and awarded, the City will either significantly delay or not implement the projects. RECOMMENDATION: Approval of the Resolution. Attachments: 2016 EIAF Grant application summary