HomeMy WebLinkAbout13244RESOLUTION NO. 13244
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT
IN THE AMOUNT OF $4,247 TO PARKER EXCAVATING, INC.,
FOR EMERGENCY SANITARY SEWER POINT REPAIR AT 3124
SKYVIEW AVENUE AND AUTHORIZING THE PURCHASING
AGENT TO EXECUTE THE SAME
WHEREAS, an emergency sanitary sewer repair was authorized by the Pueblo City
Manager in accordance with Section 1-10-5 of the Pueblo Municipal Code ; and
WHEREAS, the point repair work was awarded to Parker Excavating, Inc., under the
2015-2016 multi-year point repair contract; NOW THEREFORE,
BE IT RESOLVED BY THE CITY COUNCIL OF PUEBLO, that:
SECTION 1.
This contract is for repair of the sanitary sewer at 3124 Skyview Avenue. Contract
Agreement for Sanitary Sewer Repair with Parker Excavating, Inc., Project No. 14-067
(WWAN03) is hereby awarded to said bidder in the amount of $4,247.
SECTION 2.
Funds for Project 14-067 (WWAN03) shall be from the Sewer User Fund.
SECTION 3.
The Purchasing Agent is hereby authorized to execute said contract on behalf of Pueblo,
A Municipal Corporation, and the City Clerk shall affix the seal of the City thereto and attest the
same.
SECTION 4.
The officers and staff of the City are directed and authorized to perform any and all acts
consistent with the intent of this Resolution and the contract to effectuate the transactions
described therein.
SECTION 5.
This Resolution shall become effective immediately upon passage and approval.
INTRODUCED: June 8, 2015
BY: Ed Brown
City Clerk’s Office Item # M-2
Background Paper for Proposed
Resolution
COUNCIL MEETING DATE: June 8, 2015
TO: President Stephen G. Nawrocki and Members of City Council
CC: Sam Azad, City Manager
VIA: Gina Dutcher, City Clerk
From: Gene Michael, Wastewater Director
SUBJECT:
A RESOLUTION AWARDING A CONSTRUCTION CONTRACT IN THE AMOUNT
OF $4,247 TO PARKER EXCAVATING, INC., FOR EMERGENCY SANITARY
SEWER POINT REPAIR AT 3124 SKYVIEW AVENUE AND AUTHORIZING THE
PURCHASING AGENT TO EXECUTE THE SAME
SUMMARY:
Attached is a resolution awarding a construction contract to Parker Excavating, Inc. for
emergency sanitary sewer point repair at 3124 Skyview Avenue.
PREVIOUS COUNCIL ACTION
:
None
BACKGROUND
:
The Pueblo Board of Water Works (BOWW) informed the City of Pueblo Wastewater
Department of a water main rehabilitation project on the 3100 block of Skyview Avenue
scheduled for June 2015. The water main and sanitary sewer main cross each other at several
locations on the curvilinear street. The sanitary main was televised to determine the structural
integrity of the pipe before the BOWW disturbed the subsurface. A void with soil visible was
encountered on the main and needed to be repaired immediately.
The quote for the unit prices for the work by Parker Excavating, Inc. and the change order for
the project are attached. This work was performed under the Sanitary Sewer Point Repair
multi-year contract under which four (4) contractors were qualified via competitive bid. During
the project the costs were modified by actual field quantities as noted on the attached change
order.
The cost breakdown for the project is as follows:
Sanitary Sewer Replacement-related
Remove & Replace 8" PVC < 8’ $1,190.00
Flowable Fill $588.00
Reinstate Service $250.00
Traffic Control $700.00
Mobilization $700.00
81%
Subtotal: $3,428.00
Surface Improvement-related
Asphalt Patch $819.00
19%
Subtotal: $819.00
TOTAL: $4,247.00
FINANCIAL IMPLICATIONS
:
Funding for this project came from the sanitary sewer rehabilitation budget funded by the Sewer
User Fund. Funding was available and had been budgeted, appropriated and allocated to
Project No. 14-067 (WWAN03).
BOARD/COMMISSION RECOMMENDATION
:
Not applicable
STAKEHOLDER PROCESS
:
None
ALTERNATIVES
:
Alternative No. 1 – No Action
Under this alternative, the City would make no improvements to the existing sanitary system and
the void would remain and possibly grow. This could lead to untreated wastewater leaching into
the ground. The likelihood of a pipe failure will increase with the BOWW disturbing the soil.
Failure of the sanitary sewer main could cause a failure of the water main as well, leading to
much more difficult and costly repairs for both mains, as well as the potential that the drinking
water system could become contaminated with sewage.
Alternative No. 2 – Place the Main on the Rehabilitation List
Under this alternative, the City would make no immediate repairs to the sanitary sewer. The
main would be put on a rehabilitation list and prioritized by the level of importance for future
rehabilitation projects. In addition, similar to Alternative No. 1 – No Action, the void in the main
would remain and possibly grow which could lead to untreated wastewater leaching into the
ground. The likelihood of a pipe failure will increase with the BOWW disturbing the soil. Failure of
the sanitary sewer main could cause a failure of the water main as well, leading to much more
difficult and costly repairs for both mains, as well as the potential that the drinking water system
could become contaminated with sewage.
RECOMMENDATION
:
Approval of the Resolution.
Attachments
: Bid Summary Sheet
Change Order
Site Location Map
CONTRACT CHANGE ORDER
CITY OF PUEBLO DEPARTMENT OF WASTEWATER
Project Number: 14-067 Change Order No. : ONE 5/19/2015 Page 1 of 1
Project Name : 3124 Skyview
Contractor: Parker Excavating Inc.
You are hereby requested to comply with the following changes from the plans&specifications:
Bid Item Description of Changes Decrease Increase
No. Contract By Contract By
3 Remove and Replace Stand. C&G ($420.00)
EW-1 Traffic Control $700.00
TOTAL (Decrease)/Increase fi ($420.00)1 $700.00
Net Adjustment This Change Order $ 280.00
Amount of Previous Change Order(s) $ 0.00
Original Contract Amount $ 3,967.00
Total Adjusted Contract Amount To Date $ 4,247.00
Reason For Change: Actual Field Quantities.
The time provided for completion of the contract is unchanged t by 0 calendar days.
This document shall become an amendment to the contract and all provisions of the contract apply hereto.
Prepared by: Date:
Wastewater Inspector
Reviewed by: Date:
Wastewater Engineering Supervisor
Accepted by: Date:
Contractor's Representative
If this Change Order causes an increase from the original contract price, signed approval by the Director
constitutes representation that lawful appropriations are sufficient to cover such increase.
Approved by: Date:
Director of Wastewater
FORM CO100.1299
3124 Skyview Emergency Repair Project
yi fror q b E 1...b { VR
'2. d # r Wit, Y.A; y7 w3� c '4^� �x =
�, wcifsi,----....:;,):4;-; ,,4 1 ° > .. CENTENNIA. r-,� :fit> ..9 C� YY�' az, y, ,� z, F r yrt'r. „4F 1 ;,-;i s 'iir rt '.-4$',-,'-';' ,--,',%'-'-
d .0 +4,4,1,.4,:.,,i,'.
414 4: z . 1 tap +L'r d t -
L, •n s F + r• � r�^, T
• �� v'f ., HIGH SCHOOL°' .
Ttit!
r
-Alt.;,,,,
� " «,rw"jq,a „�c• .'` .� ,471%..,..,..,745,..,:,.. ., 1* Itk
' ipr �+'i!'i % ,.W.4,1,:-..,.kt.04-t-.:,,feh:P.-14We'' ''',....,4',,,!4-."`7.4., . -'ii"."=.4.."AT.'*'4"i'..--..'....-` ,,c,t,- % ''',':',. '4:7i.'-ii,w,If4iM,:k , *-.4- - 7411'' ,:,,,
-410
r t f& +�.� • T 4 r a:" r t
f44"t4--,,Z ••-,
v cyg< ,"`�,h`'.:' '. *'. .• '--•14—'•
p' .,-,--y...,--",,.r„ ..11 ,.../..r:. :.,4-4,„,,„_-, . * ry}�'�4"'-'7 ,0$4.4.>`(•-'z'. r, , F . ,F ,,,,-4r,,qc5�,
til-
an���- z�: n� REPAIR LOCATION
� � > �.�+ �� � �► ,..-.4„.•;;,..4-...,1%;*r
h �0 r : •a w.d ,t ...a `>F�" ^,eF�;' ,1. :.F• 4 � t� •,0:-:---.4
• �+'y�,^1 74 --.P e •-4.
+1 + r Ar rr r "4 HIP'tet w ' ,
wr y 1 k tom " ▪ , z a
of , '''''‘..-'g.,1'
i np . F `* } 3 • ±y•s�i ii.,-,'-`,14$ 7,t-f-'"
` 5'r',�.e_ `. ` F �" - -**4•
A,'
i yyk. 'At.Cfyt ;:c4„® G XF [ 4 a to -'"' *r2 - �2* ,''.4-'''-,'11''
R''
,'..
','-1,", r« '4'4.',
''' ..d,t'W; {° _ , m ,. ia,441 ,^ y,z� < ..'� t .. 4 c �I " .'f k}jr� p�l ( ,• 'b�`:. ..
frit
ar` '� �. .,y .:4' _ . .'6 •'^ uta,
F y u� ° vita _ -a,.i ;�,�a ` 1te , Q,,,.,41a�1 , s'p s "
F r 1 S'.,4 .3-� ' + At tt .� . ;F.',F rY 04.,14., '• '',1:''...;:-_,S.
✓ .-;-,.t_, a c[x
4, 1 f a "' t..'''.,' ; ,
'.;;.14\�+ ;,� " .s.�' afi. na,l t, �„�, :,-, .,,,. 2 f ,. rS ' i fi y i. R.'• i^ •'.r iii'�; j x ,,r
� wi s. `ti. ^� rR31►. vP 'L�•j' l,�-
•'. 4•';:'
t '%'" �.':R. ./ a' .a�_"' s. i
t- . .'. r ,_* fr ,N w31St St.. iii h r ��;4i,rn r 1 ;r ,, �,l..4' 'e '1,-
lY� ''?at'4 ,, Q
a+ 4 Sym rt oro','
, . '� Qi m s
� E t� 1 � 7 • ��i'..1‘.$'
T 3 S'•#�' ��� 1 � �}4 ,n �1' .,,,,..„4t.' �"r,— z' s�'
fl,t,
�� �a a q m w f• J
y �4i kr, F yt., 4 , { C r 47
tic.
�y Z4,' ,i-„_
�,x",,r 1 •
it 4'i ;p 1 F d-,-,':,:„.
.ii— 1. t' • y1, ".� 5 i`" . *°,x`1 y ,
tt �� �; , •� s�: {° ^�� Y�: '� "�. l fia�" ?,'� z r tea' { 8r f '1 s'9'�L� fg n ;,.* • i S, ,
,, f }x„c,�ly. p '&�Aj R. 7 �IN.� � '"h �.#�,�(a9 t 1 ti, � '�x.. j A • ,-1 t• Y t
k-,,-.0,4);F:W r "4` i 1Nt � 'ia�a t Y ",f ? q
,+ tj ` w 29th st
�"''`. {In .----1,-----.,1.-t ".,_‘.4'.7,11..'4•4".!..'"___,.: �"' • r , ...t, err � • y",� �,�it' ,�
}}}} ,;5� .1121. "to . 7 .ay5: p �y�.+J1 b "id�j,6i ''`Y�r e '-..--f., - * • tF sN..'�
4 >(J , > A ,,,$,_;.^, �. ! Y. F { 4`Y T t ,F t -. 1 .e5
,t
9$ .' fi r ..-,:t'1..t• t o " �1a 1 • 7 ww ▪ Z 1
r ��Aasi 1.4.
� '4`a �,.y 5 p '->a x=-+.a•jo; at1 44 m F Q i-7,1,r� '""Y '.,• r Y a h171
a'.'4�.ri'+{ 'r�Nd { ,6 r,c;;'$:„.,(4.....1.
-krry j �r '^r{fr4s >' rUt}�•tshy :.t t r,
1.0 �,,o yi,„ t C z 'h jr w+ ...T n' Q wr j. heo,. a . , 1' �0 �.�
wsb l
4 i' , ,,
�'' kt''4,to ",.' '' � �typrJ�1 Cir 1t k , iG� i' w w28th st '� yt ,
,... Yr ZZmi St ,i- *--1�y<. - '', ;' •L'� 16;:L, ` 4,�' 91.. U kp�e. !I1,i.)' • .1' 4' t. • ��e � 7
���"�•}111 � " rr (• �� t :•" s '�� — P its , .,0- ; �.' L"�' ' ▪,. .'v. `'' F ,
,. r,r,r-`.t.:f r „ 2 t„ "kh k firs- :aP .r+i°a"•, .. 4:0",...,4:,- �S« is .:..f.'�;`Rzr~3 t, r:, '�..s;3:n:G w^ ,